NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0262 - Request to Use a Provision of a Later Edition of the ASME B&PV Code,Section XI - IWA-4540(b) (L-2020-LLR-0125)
ML20297A309
Person / Time
Site: Oconee, Mcguire, Catawba, Harris, Brunswick, Robinson, McGuire  Duke energy icon.png
Issue date: 10/06/2020
From: Michael Mahoney
NRC/NRR/DORL/LPL2-2
To: Sigmon C
Duke Energy Progress
References
L-2020-LLR-0125
Download: ML20297A309 (3)


Text

From: Mahoney, Michael Sent: Tuesday, October 6, 2020 3:25 PM To: Sigmon, Chet Austin Cc: Art Zaremba

Subject:

Acceptance Review - Duke Fleet - RA-20-0262 - Request to Use a Provision of a Later Edition of the ASME B&PV Code,Section XI - IWA-4540(b) (L-2020-LLR-0125)

Hi Chet, By letter RA-20-0262, dated September 16, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20260H325), Duke Energy Carolinas, LLC and Duke Energy Progress, LLC (Duke Energy, the licensee) submitted a relief request for Brunswick Steam Electric Plant, Units 1 and 2, Catawba Nuclear Station, Units 1 and 2, McGuire Nuclear Station, Units 1 and 2, Oconee Nuclear Station, Units 1, 2, and 3, H.B.

Robinson Steam Electric Plant, Unit 3, and Shearon Harris Nuclear Power Plant, Unit 1. Duke Energy requested NRC approval to use a specific provision of a later edition of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) Code,Section XI, for the units identified above. Specifically, Duke Energy requests approval to use IWA-4540(b) of the 2017 Edition of the ASME B&PV Code.

The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Pursuant to Section 50.55a, Codes and standards, paragraph (g)(4)(iv), Applicable [Inservice Inspection] ISI Code: Use of subsequent Code editions and addenda, of Title 10 of the Code of Federal Regulations (10 CFR) states: Inservice examination of components and system pressure tests may meet the requirements set forth in subsequent editions and addenda that are incorporated by reference in paragraph (a) of this section, subject to the conditions listed in paragraph (b) of this section, and subject to Commission approval. Portions of editions or addenda may be used, provided that all related requirements of the respective editions or addenda are met.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> to complete. The NRC staff expects to complete this review in approximately 2 months, which is November 2020. If there are emergent

complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities.

If you have any questions, please contact me.

Thanks Mike Mahoney Project Manager, LPL2-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Desk: (301)-415-3867 Email: Michael.Mahoney@NRC.GOV

Hearing Identifier: NRR_DRMA Email Number: 859 Mail Envelope Properties (MN2PR09MB5531930004A935ABAF39140AE50D0)

Subject:

Acceptance Review - Duke Fleet - RA-20-0262 - Request to Use a Provision of a Later Edition of the ASME B&PV Code,Section XI - IWA-4540(b) (L-2020-LLR-0125)

Sent Date: 10/6/2020 3:25:05 PM Received Date: 10/6/2020 3:25:06 PM From: Mahoney, Michael Created By: Michael.Mahoney@nrc.gov Recipients:

"Art Zaremba" <Arthur.Zaremba@duke-energy.com>

Tracking Status: None "Sigmon, Chet Austin" <Chet.Sigmon@duke-energy.com>

Tracking Status: None Post Office: MN2PR09MB5531.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3994 10/6/2020 3:25:06 PM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: