Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23248A2615 September 2023NRR E-mail Capture - Brunswick Steam Electric Plant, Units 1 and 2 - Acceptance of License Amendment Request to Revise the 10 CFR 50.69 Categorization Process
ML23202A06519 July 2023NRR E-mail Capture - Request for Additional Information - Brunswick Steam Electric Plant, Units 1 and 2, Torus Liner Inspection Alternative Request (L-2022-LLR-0089)Coatings
Incorporated by reference
Through Wall Leak
ML23142A27322 May 2023Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)Incorporated by reference
ML23073A22813 March 2023Duke Fleet- Adoption of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements - Acceptance Review
ML23032A24726 January 2023Document Request Letter for Brunswick Upcoming RP Inspection 2023002
ML23018A18917 January 2023Document Request for RP Inspection at Brunswick Inspection Report 2023-01High Radiation Area
ML23006A0646 January 2023NRR E-mail Capture - Acceptance Review Results for Brunswick, Unit Nos. 1 and 2 - Proposed Alternative Request RA-22-0308
ML23006A1896 January 2023NRR E-mail Capture - Corrected - Acceptance Review Results for Brunswick, Unit Nos. 1 and 2 - Proposed Alternative Request RA-22-0308
NRC-2100-2022, EN 55999 Valcor Coil Shell Assemblies Final Notification (004)12 September 2022EN 55999 Valcor Coil Shell Assemblies Final Notification (004)
NRC 2110-2022, EN 55999 - Valcor Engineering Corporation (009)18 July 2022EN 55999 - Valcor Engineering Corporation (009)
ML22115A14125 April 2022NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition InformationHealth Physics Network
High winds
ML22038A1577 February 2022NRR E-mail Capture - Duke Energy Fleet - Acceptance of License Amendment Request Regarding Adoption of TSTF-541, Revision 2
ML22018A02718 January 20222022 All RFI Responses - Exercise and Program Inspections - Revl
ML21357A04723 December 2021NRR E-mail Capture - Brunswick Steam Electric Plant, Units 1 and 2 - Acceptance of License Amendment Request Regarding Adoption of TSTF-580
ML21361A01223 December 2021NRR E-mail Capture - Accepted for Review - Duke Energy Fleet License Amendment Request to Relocate Emergency Operations Facility
ML21354A86115 December 2021NRR E-mail Capture - Request for Additional Information - Duke Fleet Request RA-19-0352 - Alternative for RPV Closure Stud Exams (L-2020-LLR-0156)Incorporated by reference
Aging Management
Stress corrosion cracking
ML21277A0951 October 2021NRR E-mail Capture - Request for Additional Information - Brunswick Exemption Request from 10CFR 55.47 License Operator Exam Two-year Waiver LimitExemption Request
Fatigue Rule
ML21200A15816 July 2021NRR E-mail Capture - Accepted for Review - Brunswick License Amendment Request to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery
ML21168A00417 June 2021Notification of Inspection and Request for InformationUltimate heat sink
Eddy Current Testing
Through-Wall Leak
Flow Induced Vibration
ML21137A16226 April 2021NRR E-mail Capture - Accepted for Review - Brunswick License Amendment Request to Adopt TSTF-505 Risk-Informed Completion Time (L-2021-LLA-0060)
ML21082A01622 March 2021Accepted for Review - Brunswick License Amendment Request to Change Tech Spec Limit for Standby Liquid Control System Boron Solution Storage Tank Volume L-2021-LLA-0022
ML21075A00312 March 2021Emergency Preparedness Exercise Inspection Request for Information for - Brunswick, Catawba, North Anna, Oconee, Vogtle 1 & 2
ML21049A2634 February 2021NRR E-mail Capture - Request for Additional Information - Duke Energy Fleet License Amendment Request to Revise Emergency PlanFLEX
Siren
ML21019A37713 January 2021002 Radiation Safety Baseline Inspection Information RequestCoronavirus
ML21007A3727 January 2021NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-19-0352 - Proposed Alternative for Reactor Vessel Close Stud Examinations (L-2020-LLR-0156)
ML20323A40718 November 2020NRR E-mail Capture - Request for Additional Information - Brunswick License Exemption Request from 10CFR73 Annual Force on Force Exercise Requirements (EPIC L-2020-LLE-0180)Safeguards Contingency Plan
Exemption Request
Pandemic
Coronavirus
COVID-19
Grace period
ML20309A52129 October 2020Request for Additional Information - Brunswick License Amendment Request to Modify Its Approved 10 CFR 50.69, Risk-Informed Categorization and Treatment of SSC Categorization ProcessProbabilistic Risk Assessment
ML20294A06420 October 2020NRR E-mail Capture - Accepted for Review - Duke Energy Fleet License Amendment Request to Adopt TSTF-582 RPV Water Inventory Control Enhancements(L-2020-LLA-0218)Water Inventory Control
ML20297A31013 October 2020NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0191 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI - IWA-5120, IWA-5213, IWA-5241, IWA-5242, and IWA-5250 (L-2020-LLR-0126)Incorporated by reference
ML20297A3087 October 2020NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0263 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI for Repair/Replacement (L-2020-LLR-0124)Incorporated by reference
ML20297A3096 October 2020NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0262 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI - IWA-4540(b) (L-2020-LLR-0125)Incorporated by reference
ML20275A2971 October 2020NRR E-mail Capture - Request for Additional Information - Brunswick Request for Alternate Examination of Reactor Vessel Nozzles
ML21033A8565 August 2020NRR E-mail Capture - Accepted for Review - Brunswick Relief Request for RPV Nozzle-to-Vessel Weld and Inner Radii Examination Requirements EPID-L-2020-LLR-0091
ML20121A12629 April 2020Radiation Safety Baseline Inspection Information RequestOffsite Dose Calculation Manual
COVID-19
ML20111A12120 April 2020NRR E-mail Capture - Accepted for Review - Brunswick Request for Alternative to Examination Category B-N-1 (VT-3) Visual Examination of Accessible Areas of the Reactor Vessel Interior - EPID: L-2020-LLR-0048
ML20017A16017 January 2020E-mail Notification of Inspection and Request for Additional InformationNon-Destructive Examination
Nondestructive Examination
Incorporated by reference
Flow Accelerated Corrosion
Liquid penetrant
ML19283D0859 October 2019Request for Additional Information - Brunswick Atrium 11 LAR
ML19252A4578 September 2019(FEMA Email 09-08-19) Tentative Notification of Brunswick Preliminary Capability Assessment Results
ML19252A4096 September 2019(E-mail to FEMA 09-06-19) FEMA Notification for Planned Restart of Brunswick Units 1 and 2
ML19219A2137 August 2019NRR E-mail Capture - Duke Energy Fleet - Acceptance of Requested Licensing Action Amendment Requests to Relocate the TSs Staff Qualification Requirements to the Duke Energy Corporation QAPD
ML19179A13127 June 2019NRR E-mail Capture - Brunswick RAIs - LAR to Revise TS 5.5.12, Primary Containment Leakage Rate Testing Program for Permanent Extension of Maximum Appendix J Test Intervals (L 2019-LLA-0031)
ML19177A01225 June 2019NRR E-mail Capture - Draft Brunswick RAIs - LAR to Revise TS 5.5.12, Primary Containment Leakage Rate Testing Program for Permanent Extension of Maximum Appendix J Test Intervals (L 2019-LLA-0031)
ML19162A39011 June 2019NRR E-mail Capture - Brunswick Steam Electric Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Fourth 10-Year Inservice Inspection Interval ISI-12
ML19162A39111 June 2019NRR E-mail Capture - Duke Energy Fleet - Acceptance of Requested Licensing Action Relief Request (19-GO-001) Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination in Lieu of Radiography
ML19092A1151 April 2019NRR E-mail Capture - Brunswick Steam Electric Plant, Unit Nos. 1 and 2 - Acceptance of Requested Licensing Action Amendment Request to Modify Surveillance Requirements for Safety Relief Valves (L-2019-LLA-0043)
ML19092A1141 April 2019NRR E-mail Capture - Brunswick Plant, Unit 1 and 2 - Acceptance of Requested Licensing Action Amendment Request to Modify TS 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (L-2019-LLA-0031)
ML19067A2717 March 2019NRR E-mail Capture - Brunswick 3rd Round RAI - LAR to Allow Implementation of the Provisions 10 CFR 50.69High winds
Internal Flooding
Probabilistic Risk Assessment
Tornado Generated Missile
Large early release frequency
ML19065A0966 March 2019NRR E-mail Capture - Brunswick RAIs - LAR to Revise Allowable Value for TS 3.3.8.1 Time Delay on Loss of VoltageAnticipated operational occurrence
ML19058A07426 February 2019NRR E-mail Capture - Draft Brunswick RAIs - LAR to Revise Allowable Value for TS 3.3.8.1 Time Delay on Loss of VoltageAnticipated operational occurrence
ML19056A22125 February 2019NRR E-mail Capture - Brunswick Draft 3rd Round RAI - LAR to Allow Implementation of the Provisions 10 CFR 50.69High winds
Internal Flooding
Probabilistic Risk Assessment
Tornado Generated Missile
Large early release frequency