Letter Sequence RAI |
|---|
TAC:ME4074, Clarify Application of Setpoint Methodology for LSSS Functions (Withdrawn, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance...
- Supplement, Supplement, Supplement
Results
Other: CNL-14-077, Responses to Degraded Voltage Issue Requests for Additional Information, ML101050203, ML102240630, ML102290358, ML102290360, ML102290361, ML102290362, ML102290363, ML102290364, ML102290365, ML102290366, ML102290367, ML102290368, ML102290383, ML102290384, ML102290385, ML102290386, ML102290387, ML102290388, ML102290389, ML102290390, ML102290391, ML102290392, ML102290403, ML102290404, ML102290405, ML102290406, ML102290407, ML102290408, ML102290409, ML102290410, ML102290411, ML102290414, ML102290439, ML102290440, ML102290441, ML102290442, ML102290443, ML102290444, ML102290445, ML102290446, ML102290447, ML102290448, ML102290458, ML102290459, ML102290460, ML102290461, ML102290462, ML102290463, ML102290464... further results
|
MONTHYEARML0933702752009-11-24024 November 2009 Final Safety Analysis Report, Amendment 95, Cover Letter Project stage: Request ML12192A3682009-12-0909 December 2009 Tennessee Department of Health Public Health Assessment 2009 Project stage: Request ML1001916862010-01-11011 January 2010 Final Safety Analysis Report, Amendment 97, Section 8 - Electric Power Through 8E-12 Project stage: Request ML1001914212010-01-11011 January 2010 Final Safety Analysis Report, Amendment 97 Project stage: Request ML1002204742010-02-0505 February 2010 IP 37002, Construction Refurbishment Process - Watts Bar Unit 2 Project stage: Request ML1005500072010-03-11011 March 2010 Request for Additional Information Related to Licensees Final Safety Analysis Report Amendment 95 Related to Section 4.2.2, Reactor Vessel Internal Components Project stage: RAI ML1007100112010-03-12012 March 2010 OL - List of Documents for Docketing Referenced on Page 5 of the Site Audit Trip Report Project stage: Request ML1010502032010-04-0808 April 2010 Additional Information Regarding Final Safety Analysis Report, Chapter 7, Instrumentation and Controls Review - Requested Common Q Proprietary Documents Project stage: Other ML1010405732010-04-0909 April 2010 Response to NRC Request for Additional Information Regarding Licensees Final Safety Analysis Report (FSAR) Amendment Related to Section 4.2.2, Reactor Vessel Internal Components Project stage: Response to RAI ML1011701022010-04-27027 April 2010 Notice of Meeting with Tennessee Valley Authority to Discuss Watts Bar Nuclear Plant, Unit 2, Final Safety Analysis Report Submittals Project stage: Request ML1011303512010-05-0505 May 2010 Request for Withholding Information from Public Disclosure (Tac No. ME2731) Project stage: Withholding Request Acceptance ML1016102902010-05-27027 May 2010 Transmittal of Amendment 99 to Final Safety Analysis Report (FSAR) Project stage: Request ML1016203602010-06-17017 June 2010 Notice of Forthcoming Meeting with Tennessee Valley Authority (TVA) to Discuss the Complete Status of TVA Hydrology Issues Including the Flooding Effects on the TVA Operating Nuclear Plants Project stage: Request ML1014500842010-06-23023 June 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Reactor Systems, Nuclear Performance and Code Review, Ansd Plant Systems Project stage: RAI ML1015402502010-06-24024 June 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Nuclear Performance and Code Review, Plant Systems, and Testing (Tac Nos. ME2731 and ME3091) Project stage: RAI ML1017903992010-06-28028 June 2010 Request for Additional Information (RAI) Regarding Licensees Final Safety Analysis Report Amendment Related to Section 4.2.2, Reactor Vessel Internal Components Project stage: Request ML1016200062010-06-29029 June 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Nuclear Performance and Code Review (Tac No. ME2731) Project stage: RAI ML1015304742010-07-0202 July 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Mechanical and Civil Engineering Systems Project stage: RAI ML1016000262010-07-0808 July 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report, Amendment Related to Quality and Vendor Branch Review Project stage: RAI ML1015303542010-07-12012 July 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Electrical Engineering Systems Project stage: RAI ML1018001562010-07-15015 July 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Chapter 8, Electric Power Project stage: RAI ML1020202812010-07-30030 July 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Chapter 3.11 Project stage: RAI ML1023003322010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-9 (Dwg No. 1-47W611-67-5, R10) Project stage: Other ML1022904662010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-3 (Dwg No. 1-47W845-3, R23) Project stage: Other ML1023003332010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-10 (Dwg No. 1-47W610-67-1, R27) Project stage: Other ML1023003342010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-10 Sh a (Dwg No. 1-47W610-67-1A, R16) Project stage: Other ML1023003352010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-11 (Dwg No. 1-47W610-67-2, R15) Project stage: Other ML1023003432010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-12 Sh a (Dwg No. 1-47W610-67-3A, R7) Project stage: Other ML1023003442010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-13 (Dwg No. 1-47W610-67-4, R17) Project stage: Other ML1023003452010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-11 Sh a (Dwg No. 1-47W610-67-2A, R8) Project stage: Other ML1023003462010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-12 (Dwg No. 1-47W610-67-3, R12) Project stage: Other ML1023003472010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-14 (Dwg No. 1-47W610-67-5, R14) Project stage: Other ML1023003482010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-14 (Dwg No. 1-47W610-67-5A, R2) Project stage: Other ML1023003492010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-16 (Dwg No. 1-47W859-4, R23) Project stage: Other ML1023003502010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-17 (Dwg No. 1-47W859-3, R18) Project stage: Other ML1023003512010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-18 (Dwg No. 1-47W859-2, R36) Project stage: Other ML1023003522010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-19 (Dwg No. 1-47W859-1, R47) Project stage: Other ML1023003602010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-23 (Dwg No. 1-47W611-70-1, R9) Project stage: Other ML1023003612010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-20 (Dwg No. 1-47W610-70-1, R23) Project stage: Other ML1023003622010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-21 (Dwg No. 1-47W610-70-2, R29) Project stage: Other ML1023003632010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-21A (Dwg No. 1-47W610-70-2A, R15) Project stage: Other ML1023003642010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-22 (Dwg No. 1-47W610-70-3, R17) Project stage: Other ML1023003652010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-24 (Dwg No. 1-47W611-70-2, R11) Project stage: Other ML1023003672010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-25 (Dwg No. 1-47W611-70-3, R4) Project stage: Other ML1023003682010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-25A (Dwg No. 1-47W611-70-4, R4) Project stage: Other ML1023003692010-08-0505 August 2010 Final Safety Analysis Report Figure 9.3-1 (Dwg No. 1-47W610-32-1, R15) Project stage: Other ML1023003702010-08-0505 August 2010 Final Safety Analysis Report Figure 9.3-2 (Dwg No. 1-47W610-32-2, R19) Project stage: Other ML1023003732010-08-0505 August 2010 Final Safety Analysis Report Figure 9.3-6 (Dwg No. 1-47W848-1, R24) Project stage: Other ML1022903682010-08-0505 August 2010 Final Safety Analysis Report Figure 8.3-14B (Dwg No. 1-45W760-82-1, R17) Project stage: Other ML1022903652010-08-0505 August 2010 Final Safety Analysis Report Figure 8.3-7 (Dwg No. 1-45W760-211-9, R16) Project stage: Other 2010-05-05
[Table View] |
Text
September 7, 2010 Mr. Ashok S. Bhatnagar Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
SUBJECT:
WATTS BAR NUCLEAR PLANT, UNIT 2 - REQUEST FOR ADDITIONAL INFORMATION REGARDING SECTION 3.5 OF THE PRESERVICE INSPECTION PROGRAM PLAN (TAC NO. ME4074)
Dear Mr. Bhatnagar:
By letter dated June 17, 2010 (Agencywide Documents Access and Management System Accession No. ML101680561), the Tennessee Valley Authority (TVA) submitted the Preservice Inspection Program Plan (PSIPP) as part of the Final Safety Analysis Report for Watts Bar Nuclear Plant, Unit 2. The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the information provided by TVA.
In an effort to complete the NRC staff review, enclosed is a request for additional information (RAI) regarding Section 3.5 of the PSIPP.
A response is required within 30 days of receipt of this letter.
If you should have any questions, please contact me at 301-415-2048.
Sincerely,
/RA/
Justin C. Poole, Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391
Enclosure:
RAI cc w/encl: Distribution via Listserv
Mr. Ashok S. Bhatnagar Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
SUBJECT:
WATTS BAR NUCLEAR PLANT, UNIT 2 - REQUEST FOR ADDITIONAL INFORMATION REGARDING SECTION 3.5 OF THE PRESERVICE INSPECTION PROGRAM PLAN (TAC NO. ME4074)
Dear Mr. Bhatnagar:
By letter dated June 17, 2010 (Agencywide Documents Access and Management System Accession No. ML101680561), the Tennessee Valley Authority (TVA) submitted the Preservice Inspection Program Plan (PSIPP) as part of the Final Safety Analysis Report for Watts Bar Nuclear Plant, Unit 2. The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the information provided by TVA.
In an effort to complete the NRC staff review, enclosed is a request for additional information (RAI) regarding Section 3.5 of the PSIPP.
A response is required within 30 days of receipt of this letter.
If you should have any questions, please contact me at 301-415-2048.
Sincerely,
/RA/
Justin C. Poole, Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391
Enclosure:
RAI cc w/encl: Distribution via Listserv DISTRIBUTION:
RidsOgcRp Resource RidsRgn2MailCenter Resource PUBLIC RidsNrrDorlLpwb Resource RidsNrrDeEmcb Resource LPWB Reading File RidsNrrLABClayton Resource RidsNrrPMWattsBar2 Resource RidsAcrsAcnw_MailCTR Resource RidsNrrDorlDpr ADAMS Accession No. ML102420625
- via memo OFFICE LPWB/PM LPWB/LA EMCB/BC OGC LPWB/BC NAME JPoole BClayton MKhanna*
DRoth SCampbell DATE 09 / 7 /10 08 / 30 /10 8/23/10 09 / 03 /10 09 / 07 /10 OFFICIAL AGENCY RECORD
REQUEST FOR ADDITIONAL INFROMATION WATTS BAR NUCLEAR PLANT, UNIT 2 PRESERVICE INSPECTION PROGRAM PLAN TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-391 EMCB RAI PSIPP-1 In Section 3.5.3 of the Preservice Inspection Program Plan (Reference 1), the applicant states that, The rules of IWB shall be applied to those components that are classified [as] ASME
[American Society of Mechanical Engineers Boiler and Pressure Vessel Code] Class 1 or TVA
[Tennessee Valley Authority] Class A. Please confirm that TVA has met the requirements of ASME Section XI, Subarticle IWB-1200, Components Subject to Examination. Additionally, please indicate whether any variance exists between the scopes of inspection required under Subsection IWB for Watts Bar Nuclear Plant (WBN) Unit 2 and WBN Unit 1. If variances are present that exclude components at WBN Unit 2 from the inspection requirements of Subsection IWB, please provide justification for the exclusion of those components within the WBN Unit 2 Subsection IWB inspection plan.
EMCB RAI PSIPP-2 In Section 3.5.4 of Reference 1, the applicant states that, The rules of IWC shall be applied to those components that are classified [as] ASME Class 2 or TVA Class B. Please confirm that TVA has met the requirements of ASME Section XI, Subarticle IWC-1200, Components Subject to Examination. Additionally, please indicate whether any variance exists between the scopes of inspection required under Subsection IWC for WBN Unit 2 and WBN Unit 1. If variances are present that exclude components at WBN Unit 2 from the inspection requirements of Subsection IWC, please provide justification for the exclusion of those components within the WBN Unit 2 Subsection IWC inspection plan.
EMCB RAI PSIPP-3 In Section 3.5.5 of Reference 1, the applicant states that, The rules of IWD shall be applied to those components that are classified [as] ASME Class 3 or TVA Class C or D. Please confirm that TVA has met the requirements of ASME Section XI, Subarticle IWD-1200, Components Subject to Examination. Additionally, please indicate whether any variance exists between the scopes of inspection required under Subsection IWD for WBN Unit 2 and WBN Unit 1. If variances are present that exclude components at WBN Unit 2 from the inspection requirements of Subsection IWD, please provide justification for the exclusion of those components within the WBN Unit 2 Subsection IWD inspection plan.
Enclosure
2 EMCB RAI PSIPP-4 In Section 3.5.6 of Reference 1, the applicant states that, The requirements of IWF shall be applied to component supports classified [as] ASME Class 1, 2, and 3 or TVA Class A, B, C, and D as describe[d] above. Please confirm that TVA has met the requirements of ASME Section XI, Subarticle IWF-1300, Support Examination Boundaries, including the requirements associated with Figure IWF 1300-1, Illustration of Typical Support Examination Boundaries.
Additionally, please indicate whether any variance exists between the scopes of inspection required under Subsection IWF for WBN Unit 2 and WBN Unit 1. If variances are present that exclude components at WBN Unit 2 from the inspection requirements of Subsection IWF, please provide justification for the exclusion of those components within the WBN Unit 2 Subsection IWF inspection plan.
Reference Letter from M. Bajestani, Tennessee Valley Authority, to NRC Document Control Desk, Watts Bar Nuclear Plant (WBN) Unit 2 - Preservice Inspection Program Plan and Additional Information, dated June 17, 2010 (Agencywide Documents Access and Management System Accession No. ML101680561).