Letter Sequence RAI |
|---|
TAC:ME2731, Clarify Application of Setpoint Methodology for LSSS Functions (Withdrawn, Closed) TAC:ME3091, (Withdrawn, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance...
- Supplement, Supplement, Supplement
Results
Other: CNL-14-077, Responses to Degraded Voltage Issue Requests for Additional Information, ML101050203, ML102240630, ML102290358, ML102290360, ML102290361, ML102290362, ML102290363, ML102290364, ML102290365, ML102290366, ML102290367, ML102290368, ML102290383, ML102290384, ML102290385, ML102290386, ML102290387, ML102290388, ML102290389, ML102290390, ML102290391, ML102290392, ML102290403, ML102290404, ML102290405, ML102290406, ML102290407, ML102290408, ML102290409, ML102290410, ML102290411, ML102290414, ML102290439, ML102290440, ML102290441, ML102290442, ML102290443, ML102290444, ML102290445, ML102290446, ML102290447, ML102290448, ML102290458, ML102290459, ML102290460, ML102290461, ML102290462, ML102290463, ML102290464... further results
|
MONTHYEARML0933702752009-11-24024 November 2009 Final Safety Analysis Report, Amendment 95, Cover Letter Project stage: Request ML12192A3682009-12-0909 December 2009 Tennessee Department of Health Public Health Assessment 2009 Project stage: Request ML1001916862010-01-11011 January 2010 Final Safety Analysis Report, Amendment 97, Section 8 - Electric Power Through 8E-12 Project stage: Request ML1001914212010-01-11011 January 2010 Final Safety Analysis Report, Amendment 97 Project stage: Request ML1000800082010-01-11011 January 2010 Notice of Forthcoming Conference Call with Tennessee Valley Authority Sequoyah Nuclear Plant, Units 1 & 2; Watts Bar Unit 1 Project stage: Request ML1002204742010-02-0505 February 2010 IP 37002, Construction Refurbishment Process - Watts Bar Unit 2 Project stage: Request ML1005500072010-03-11011 March 2010 Request for Additional Information Related to Licensees Final Safety Analysis Report Amendment 95 Related to Section 4.2.2, Reactor Vessel Internal Components Project stage: RAI ML1007100112010-03-12012 March 2010 OL - List of Documents for Docketing Referenced on Page 5 of the Site Audit Trip Report Project stage: Request ML1010502032010-04-0808 April 2010 Additional Information Regarding Final Safety Analysis Report, Chapter 7, Instrumentation and Controls Review - Requested Common Q Proprietary Documents Project stage: Other ML1010405732010-04-0909 April 2010 Response to NRC Request for Additional Information Regarding Licensees Final Safety Analysis Report (FSAR) Amendment Related to Section 4.2.2, Reactor Vessel Internal Components Project stage: Response to RAI ML1011701022010-04-27027 April 2010 Notice of Meeting with Tennessee Valley Authority to Discuss Watts Bar Nuclear Plant, Unit 2, Final Safety Analysis Report Submittals Project stage: Request ML1011303512010-05-0505 May 2010 Request for Withholding Information from Public Disclosure (Tac No. ME2731) Project stage: Withholding Request Acceptance ML1013701862010-05-14014 May 2010 OL - FW: Call Summary - TVA Clarification Call Project stage: Request ML1016102902010-05-27027 May 2010 Transmittal of Amendment 99 to Final Safety Analysis Report (FSAR) Project stage: Request ML1015401332010-06-10010 June 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Accident Dose Project stage: RAI ML1016203602010-06-17017 June 2010 Notice of Forthcoming Meeting with Tennessee Valley Authority (TVA) to Discuss the Complete Status of TVA Hydrology Issues Including the Flooding Effects on the TVA Operating Nuclear Plants Project stage: Request ML1019402362010-06-18018 June 2010 Instrumentation and Controls Staff Information Requests Project stage: Request ML1018201562010-06-18018 June 2010 OL - Updated Open Items List Project stage: Request ML1014500842010-06-23023 June 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Reactor Systems, Nuclear Performance and Code Review, Ansd Plant Systems Project stage: RAI ML1015402502010-06-24024 June 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Nuclear Performance and Code Review, Plant Systems, and Testing (Tac Nos. ME2731 and ME3091) Project stage: RAI ML1017903992010-06-28028 June 2010 Request for Additional Information (RAI) Regarding Licensees Final Safety Analysis Report Amendment Related to Section 4.2.2, Reactor Vessel Internal Components Project stage: Request ML1016200062010-06-29029 June 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Nuclear Performance and Code Review (Tac No. ME2731) Project stage: RAI ML1015304742010-07-0202 July 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Mechanical and Civil Engineering Systems Project stage: RAI ML1016000262010-07-0808 July 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report, Amendment Related to Quality and Vendor Branch Review Project stage: RAI ML1015303542010-07-12012 July 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Electrical Engineering Systems Project stage: RAI ML1016002782010-07-12012 July 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Accident Dose Project stage: RAI ML1018001562010-07-15015 July 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Chapter 8, Electric Power Project stage: RAI ML1019506102010-07-30030 July 2010 Request for Additional Information, Licensees Final Safety Analysis Report Amendment Related to Chapters 3.9.1, 3.9.2, and 3.9.3 Project stage: RAI ML1020202812010-07-30030 July 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Chapter 3.11 Project stage: RAI ML1019404742010-07-30030 July 2010 Request for Additional Information, Licensees Final Safety Analysis Report Amendment Related to Chapter 10.4.7 Project stage: RAI ML1023003432010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-12 Sh a (Dwg No. 1-47W610-67-3A, R7) Project stage: Other ML1023003502010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-17 (Dwg No. 1-47W859-3, R18) Project stage: Other ML1023003442010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-13 (Dwg No. 1-47W610-67-4, R17) Project stage: Other ML1023003452010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-11 Sh a (Dwg No. 1-47W610-67-2A, R8) Project stage: Other ML1023003462010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-12 (Dwg No. 1-47W610-67-3, R12) Project stage: Other ML1023003472010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-14 (Dwg No. 1-47W610-67-5, R14) Project stage: Other ML1023003482010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-14 (Dwg No. 1-47W610-67-5A, R2) Project stage: Other ML1023003492010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-16 (Dwg No. 1-47W859-4, R23) Project stage: Other ML1023003512010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-18 (Dwg No. 1-47W859-2, R36) Project stage: Other ML1023003522010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-19 (Dwg No. 1-47W859-1, R47) Project stage: Other ML1023003602010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-23 (Dwg No. 1-47W611-70-1, R9) Project stage: Other ML1023003612010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-20 (Dwg No. 1-47W610-70-1, R23) Project stage: Other ML1023003622010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-21 (Dwg No. 1-47W610-70-2, R29) Project stage: Other ML1023003632010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-21A (Dwg No. 1-47W610-70-2A, R15) Project stage: Other ML1023003642010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-22 (Dwg No. 1-47W610-70-3, R17) Project stage: Other ML1023003652010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-24 (Dwg No. 1-47W611-70-2, R11) Project stage: Other ML1023003672010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-25 (Dwg No. 1-47W611-70-3, R4) Project stage: Other ML1023003682010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-25A (Dwg No. 1-47W611-70-4, R4) Project stage: Other ML1023003692010-08-0505 August 2010 Final Safety Analysis Report Figure 9.3-1 (Dwg No. 1-47W610-32-1, R15) Project stage: Other ML1023003702010-08-0505 August 2010 Final Safety Analysis Report Figure 9.3-2 (Dwg No. 1-47W610-32-2, R19) Project stage: Other 2010-06-10
[Table View] |
Text
September 28, 2010 Mr. Ashok S. Bhatnagar Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
SUBJECT:
WATTS BAR NUCLEAR PLANT, UNIT 2 - REQUEST FOR ADDITIONAL INFORMATION REGARDING FINAL SAFETY ANALYSIS REPORT AMENDMENT RELATED TO SECTIONS 3.2 AND 5.2 (TAC NOS. ME2731 AND ME3091)
Dear Mr. Bhatnagar:
By letters dated November 24, 2009 and January 11, 2010 (Agencywide Documents Access and Management System Accession Nos. ML093370275 and ML100191426), the Tennessee Valley Authority (TVA) submitted Final Safety Analysis Report (FSAR) Amendment Nos. 95 and 97, respectively, for Watts Bar Nuclear Plant, Unit 2. The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the information provided by TVA in FSAR Amendment Nos. 95 and 97.
In an effort to complete the NRC staff review, enclosed is a request for additional information regarding FSAR Sections 3.2, 5.2.1.3, and 5.2.1.4.
A response is required by October 8, 2010.
If you should have any questions, please contact me at 301-415-2048.
Sincerely,
/RA/
Justin C. Poole, Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391
Enclosure:
Request for Additional Information cc w/encl: Distribution via Listserv
Mr. Ashok S. Bhatnagar Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
SUBJECT:
WATTS BAR NUCLEAR PLANT, UNIT 2 - REQUEST FOR ADDITIONAL INFORMATION REGARDING FINAL SAFETY ANALYSIS REPORT AMENDMENT RELATED TO SECTIONS 3.2 AND 5.2 (TAC NOS. ME2731 AND ME3091)
Dear Mr. Bhatnagar:
By letters dated November 24, 2009 and January 11, 2010 (Agencywide Documents Access and Management System Accession Nos. ML093370275 and ML100191426), the Tennessee Valley Authority (TVA) submitted Final Safety Analysis Report (FSAR) Amendment Nos. 95 and 97, respectively, for Watts Bar Nuclear Plant, Unit 2. The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the information provided by TVA in FSAR Amendment Nos. 95 and 97.
In an effort to complete the NRC staff review, enclosed is a request for additional information regarding FSAR Sections 3.2, 5.2.1.3, and 5.2.1.4.
A response is required by October 8, 2010.
If you should have any questions, please contact me at 301-415-2048.
Sincerely,
/RA/
Justin C. Poole, Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391
Enclosure:
Request for Additional Information cc w/encl: Distribution via Listserv DISTRIBUTION:
RidsOgcRp Resource RidsRgn2MailCenter Resource PUBLIC RidsNrrDorlLpwb Resource RidsNrrDeEmcb Resource LPWB Reading File RidsNrrLABClayton Resource RidsNrrPMWattsBar2 Resource RidsAcrsAcnw_MailCTR Resource RidsNrrDorlDpr JBillerbeck, NRR ADAMS Accession No. ML102630598
- via memo OFFICE LPWB/PM LPWB/LA EMCB/BC OGC LPWB/BC NAME JPoole BClayton MKhanna*
DRoth SCampbell DATE 09 / 21 /10 09 / 21 /10 9/9/10 09 / 27 /10 09 / 28 /10 OFFICIAL AGENCY RECORD
Enclosure REQUEST FOR ADDITIONAL INFROMATION WATTS BAR NUCLEAR PLANT, UNIT 2 FINAL SAFETY ANALYSIS REPORT AMENDMENTS 95 AND 97 TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-391 EMCB RAI 3.2-1 The Nuclear Regulatory Commission (NRC) staff noted a number of instances in the review of Section 3.2 and corresponding tables and figures of Amendment 95 to the Watts Bar Nuclear Plant (WBN), Unit 2, Final Safety Analysis Report (FSAR) (Reference 1), where editorial modifications may be necessitated in subsequent revisions to the WBN, Unit 2 FSAR. Please review the following NRC staff notations and rectify, as necessary.
- 1) In Table 3.2-2, page 9, of Reference 1, Upper Containment and CRDM & Instrument Room Cooling appear not to be components themselves, but rather equipment location/
category headings. If these are in fact headings, then shouldnt the information columns be blank?
- 2) In Table 3.2-2, pages 11 and 12, of Reference 1, was it intentional to delete the Rad Source column information for the Main Steam Relief Valves and Safety Valves when relocating them in Table 3.2-2 from page 12 to page 11? If not, then this information should be restored.
- 3) In Table 3.2-2, page 12, of Reference 1, the TVA/ANS Safety Class column information is missing for the Spent Fuel Purification Pumps.
- 4) In Table 3.2-2, page 17, of Reference 1, the Seismic column information is missing for Essential Raw Cooling Water System Discharge Header Air Release Valves & Piping.
EMCB RAI 5.2.1.4-1 In using Code Case 1423-2 for Reactor Coolant Piping/Branch Nozzles, as shown in Table 5.2-8, page 3, of Reference 2, did Tennessee Valley Authority implement the limitations and modifications identified in Regulatory Guide (RG) 1.84 for use of this code case? If not, then please provide a supporting justification/basis for not implementing the limitations and modifications identified in RG 1.84 for the use of Code Case 1423-2. Also, in Section 5.2.1.4 of Reference 2, the Class 1 Code Case List does not include Code Case 1423-2 for Reactor Coolant Piping, even though this Code Case is mentioned in Table 5.2-8. Please confirm whether this Code Case will be added in Section 5.2.1.4 for completeness.
References
- 1)
Letter from M. Bajestani, Tennessee Valley Authority, to NRC Document Control Desk, Watts Bar Nuclear Plant (WBN) - Unit 2 - Final Safety Analysis Report (FSAR),
Amendment 95, dated November 24, 2009. (ADAMS Accession Nos.: ML093370275 (letter), ML093370582 (Section 3.0 - 3.5.A-4))
- 2)
Letter from M. Bajestani, Tennessee Valley Authority, to NRC Document Control Desk, Watts Bar Nuclear Plant (WBN) - Unit 2 - Final Safety Analysis Report (FSAR),
Amendment 97, dated January 11, 2010. (ADAMS Accession Nos.: ML100191421 (letter), ML100200448 (Section 5 thru page 5.6-7))