Email - from: Williams, Charles R. to: Lake, Louis; Thomas, George; Nausdj@Ornl.Gov Cc: Herrin, Dennis W. (Charles.Williams@Pgnmail.Com) Dated Tuesday, November 24, 2009 7:10 Am Subject: Refute 2.8 for Review Attachments: Fm 2.8.ppt; Pictur
ML102920354
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/24/2009
From: Williams C
Progress Energy Co
To: Lake L, Naus D, George Thomas
NRC/RGN-II, Oak Ridge
References
FOIA/PA-2010-0116
Download: ML102920354 (8)


Text

t' Franke, Mark From: Williams, Charles R. [Charles.Williams@pgnmail.com]

Sent: Tuesday, November 24, 2009 7:10 AM To: Lake, Louis; Thomas, George; nausdj@ornl.gov Cc: Herrin, Dennis W.

Subject:

Refute 2.8 for Review ,

Attachments: FM 2.8.ppt; Picture 01 3.jpg; 4 jan 73 emailsize.jpg; 5 april 73.bmp.jpg; DSC04768.JPG; DSC04776.JPG; Picture 006.jpg Mr Lake, I am resending due to difficulty with opening/reading the previous attachments. Again, this is prelim. Call me with questions. It looks like I will need to send each one as separate emails to keep from mixing documents.

Thank you, Charles Williams 919-516-7417 1

?/ý ?5--ý

2.8 Inadequate Support of Tendons during Pouring May identify additional perspective on this D eýmýnaý issue as RCA related efforts proceeds

Description:

If the tendons are not supported well, they may move during concrete pouring resulting in either or both, (1) localized friction between the tendon and its sleeve and (2) non-uniform stress in the concrete over the length of the tendon.

Data to be Collected and Analyzed:

Examine supports of hoop sleeves during construction.

(1) Examine supports of vertical sleeves during construction.

(2) Examine sleeve location and condition during demolition.

See Exhibit 1 as an example of a few pictures that show spacing during construction and SGR hole cutting.

Verified Refuting Evidence: Verified Supporting Evidence:

1. Photos from original construction demonstrate the support system.
2. Photos taken during demolition show that the sleeves were evenly distributed in the zone and not deformed.

Reviewed by: Dr. Avi Mor, 352-795-6486, ext 1030 -

PII CR3 Team Office 11/23/2009 1*ot relca~c to ~th.rd party vvithuut 1 P~B~D2~

L J t

I I

I JAN 73 REACTOR BLDG EQUIP ACCESS OPENING

I 5 APRIL 73 REACTOR BLDG EXT WALL 300° 1360 0

  • '.11 J
} ~4 4 I 4',. ~*

4,

lit IL