Email from K. Manoly to P. Hiland, Subject: Request for Special Inspection at Crystal River Containment Crack
ML100750474
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/08/2009
From: Kamal Manoly
Division of Engineering
To: Hiland P
Division of Engineering
References
FOIA/PA-2010-0010
Download: ML100750474 (2)


Text

Oil, Tracy From: Manoly, Kamal Sent: Thursday, October 08, 2009 6:13 PM To: Hiland, Patrick Cc:

Subject:

(b)(5)

Skeen, David; Khanna, Meena K.

RE: REQUEST: Special Inspection at Crystal River RE Containment Crack-Exemption5 From: Hiland, Patrick Sent: Thursday, October 08, 2009 3:51 PM To: Manoly, Kamal Cc: Skeen, David; Khanna, Meena

Subject:

RE: REQUEST: Special Inspection at Crystal River RE Containment Crack lExemption 5 From: Manoly, Kamal Sent Thursday, October 08, 2009 2:55 PM To: Hiland, Patrick; Skeen, David

Subject:

RE: REQUEST: Special Inspection at Crystal River RE Containment Crack 7Exemption 5 (b)(5)

From: Hiland, Patrick Sent: Thursday, October 08, 2009 11:03 AM To: Palge, Jason Cc: Brown, Eva; Saba, Farldeh; Farzam, Farhad; Thomas, George; Howe, Allen; Glitter, Joseph; Nelson, Robert; Sykes, Marvin; Boyce, Tom (NRR); Khanna, Meena; Manoly, Kamal; Skeen, David

Subject:

RE: REQUEST: Special Inspection at Crystal River RE Containment Crack Importance: High NRR/DE will provide the on-site participant for this Special Inspection. Since we have two qualified staffers, we will let you know by COB today.

From: Paige, Jason Sent: Thursday, October 08, 2009 9:17 AM To: Boyce, Tom (NRR); Khanna, Meena; Manoly, Kamal; Hiland, Patrick; Skeen, David Cc: Brown, Eva; Saba, Farldeh; Farzam, Farhad; Thomas, George; Howe, Allen; Glitter, Joseph; Nelson, Robert; Syk Marvin

Subject:

REQUEST: Special Inspection at Crystal River RE Containment Crack All, The region plans on performing a special inspection at Crystal River, regarding the containment crack, tentatively starting on Monday, October 12, 2009, lasting for three months. The purpose of the inspection is for the NRC to be proactive on this issue and to determine the acceptability of Crystal River's containment before 1

S.

they begin moving fuel back into the core. Also, this will allow an open means of communication to members of the public. The region will conduct a public meeting sometime after Thanksgiving.

REQUEST: The region is requesting names from HQs to provide expertise support during this inspection but also an expert to assist in the inspection. Can you provide the names to me by COB today (10/8)?

Thank you, Jason Paige, Turkey Point Project Manager Plant Ucensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Phone: (301) 415-5888 2