Letter Sequence RAI |
---|
|
Results
Other: L-09-268, Calculation, 0800777.309, Rev. 0, Sensitivity Study of Temperbead Surface Area Limitations for Large Bore Weld Overlay Repairs Over Ferritic Materials (from 500 to 1,000 Square Inches)., L-10-132, 0800368.408, Revision 0, Summary of Weld Overlay Ultrasonic Examinations for Reactor Coolant Pump Suction and Discharge Nozzle Welds, Core Flood Nozzle Welds, and Cold Leg Drain Nozzle Welds, L-10-133, Summary of Design and Analysis of Weld Overlays (Mode 4 Report), ML093360324, ML093360325, ML093360326, ML093360327, ML093360328, ML093360329, ML093360330, ML093360331, ML100271531, ML101230640
|
MONTHYEARL-09-020, 10 CFR 50.55a Requests for Alternative Dissimilar Metal Weld Repair Methods for Reactor Vessel Nozzles, Reactor Coolant Pump Nozzles, and Reactor Coolant Piping2009-01-30030 January 2009 10 CFR 50.55a Requests for Alternative Dissimilar Metal Weld Repair Methods for Reactor Vessel Nozzles, Reactor Coolant Pump Nozzles, and Reactor Coolant Piping Project stage: Request ML0933603252009-04-0808 April 2009 Calculation, 0800368.311, Rev. 0, Design Loads for the 28 I.D. Reactor Coolant Pump (RCP) Suction and Discharge Nozzles. Project stage: Other ML0933603242009-04-21021 April 2009 Calculation, 0800368.301, Rev 0, Material Properties for Davis-Besse Unit 1, RCP Suction, RCP Discharge, Cold Leg Drain and Core Flood Nozzles Preemptive Weld Overlay Repairs. Project stage: Other ML0933603272009-05-22022 May 2009 Calculation, 0800368.322, Rev. 1, Finite Element Models of the Reactor Coolant Pump Discharge Nozzle with Weld Overlay Repair. Project stage: Other ML0933603282009-05-23023 May 2009 Calculation, 0800368.323, Rev. 1, Thermal and Unit Mechanical Stress Analyses for Reactor Coolant Pump Discharge Nozzle with Weld Overlay Repair. Project stage: Other ML0933603262009-05-27027 May 2009 Calculation, 0800368.320, Rev. 1, Optimized Weld Overlay Sizing for the 28 I.D. Outlet/Discharge Reactor Coolant Pump Nozzle. Project stage: Other ML0915301512009-06-11011 June 2009 Request for Additional Information Related to Relief Requests for Alternative Dissimilar Metal Weld Repair Methods for Reactor Vessel Nozzles, Reactor Coolant Pump Nozzles, and Reactor Coolant Piping Project stage: RAI ML0915504232009-06-15015 June 2009 Request for Additional Information Related to Relief Requests for Alternative Dissimilar Metal Weld Repair Methods for Reactor Vessel Nozzles, Reactor Coolant Pump Nozzles, and Reactor Coolant Piping Project stage: RAI ML0933603292009-07-10010 July 2009 Calculation, 0800368.324, Rev. 0, Residual Stress Analysis of Reactor Coolant Pump Discharge Nozzle with Weld Overlay Repair. Project stage: Other L-09-179, Response to Requests for Additional Information Related to Alternative Dissimilar Metal Weld Repair Methods2009-07-13013 July 2009 Response to Requests for Additional Information Related to Alternative Dissimilar Metal Weld Repair Methods Project stage: Response to RAI ML0933603312009-07-20020 July 2009 Calculation, 0800368.326, Rev. 0, Crack Growth Evaluation of Reactor Coolant Pump Discharge Nozzle with Weld Overlay Repair. Project stage: Other L-09-227, License Amendment Request to Update the Leak-Before-Break Evaluation for the Reactor Coolant Pump Suction and Discharge Nozzle Dissimilar Metal Welds2009-09-28028 September 2009 License Amendment Request to Update the Leak-Before-Break Evaluation for the Reactor Coolant Pump Suction and Discharge Nozzle Dissimilar Metal Welds Project stage: Request ML0927205912009-10-0808 October 2009 RAI Related to Relief Requests for Alternative Dissimilar Metal Weld Repair Methods Project stage: RAI L-09-268, Calculation, 0800777.309, Rev. 0, Sensitivity Study of Temperbead Surface Area Limitations for Large Bore Weld Overlay Repairs Over Ferritic Materials (from 500 to 1,000 Square Inches).2009-11-0202 November 2009 Calculation, 0800777.309, Rev. 0, Sensitivity Study of Temperbead Surface Area Limitations for Large Bore Weld Overlay Repairs Over Ferritic Materials (from 500 to 1,000 Square Inches). Project stage: Other ML0933603302009-11-23023 November 2009 Calculation, 0800368.325, Rev. 0, ASME Code, Section Iii Evaluation of Reactor Coolant Pump Discharge Nozzle with Weld Overlay Repair. Project stage: Other ML0933603232009-11-23023 November 2009 Davis-Besse, Response to Requests for Additional Information Related to Alternative Dissimilar Metal Weld Repair Methods Project stage: Response to RAI ML1000400162009-12-15015 December 2009 Relief Request A-32 and A-33 - Request for Additional Information - Supplemental Information Project stage: Supplement ML1000805732010-01-21021 January 2010 Unit, Relief Request RR-A33 for the Application of Full Structural Weld Overlays on Dissimilar Metal Welds of Reactor Coolant Piping Project stage: Acceptance Review ML1002715312010-01-29029 January 2010 Relief Request RR-A32 for the Application of Full Structural Weld Overlays on Dissimilar Metal Welds of Reactor Coolant Piping Project stage: Other L-10-132, 0800368.408, Revision 0, Summary of Weld Overlay Ultrasonic Examinations for Reactor Coolant Pump Suction and Discharge Nozzle Welds, Core Flood Nozzle Welds, and Cold Leg Drain Nozzle Welds2010-04-25025 April 2010 0800368.408, Revision 0, Summary of Weld Overlay Ultrasonic Examinations for Reactor Coolant Pump Suction and Discharge Nozzle Welds, Core Flood Nozzle Welds, and Cold Leg Drain Nozzle Welds Project stage: Other ML1012306402010-04-29029 April 2010 Davis-Besse, Summary of Weld Overlay Ultrasonic Examinations Project stage: Other L-10-133, Summary of Design and Analysis of Weld Overlays (Mode 4 Report)2010-06-18018 June 2010 Summary of Design and Analysis of Weld Overlays (Mode 4 Report) Project stage: Other 2009-06-11
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000346/20234012023-09-13013 September 2023 Security Baseline Inspection Report 05000346/2023401 (Public) L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual IR 05000346/20230112023-08-30030 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000346/2023011 ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000346/20230052023-08-24024 August 2023 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2023005) L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments IR 05000346/20230502023-08-0303 August 2023 Special Inspection Report 05000346/2023050 IR 05000346/20230902023-08-0101 August 2023 EA-23-002 Davis-Besse Nuclear Power Station - NRC Inspection Report No. 05000346/2023090 (Public) ML23178A2742023-08-0101 August 2023 Letter to the Honorable Marcy Kaptur from Chair Hanson Responds to Letter Regarding the License Transfer Application for the Davis-Besse Nuclear Power Station L-23-175, Submittal of Fifth Ten Year Inservice Testing Program2023-08-0101 August 2023 Submittal of Fifth Ten Year Inservice Testing Program IR 05000346/20230022023-07-27027 July 2023 Integrated Inspection Report 05000346/2023002 ML23193A7842023-07-13013 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000346/2023402 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III ML23160A2342023-06-13013 June 2023 Confirmation of Initial License Examination L-23-034, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-13013 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models IR 05000346/20235012023-06-13013 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000346/2023501 L-23-135, Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-31031 May 2023 Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) ML23131A2732023-05-15015 May 2023 Notification of NRC Supplemental Inspection 95001 and Request for Information L-23-101, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 20222023-05-12012 May 2023 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 2022 L-23-131, Readiness for Resumption of NRC Supplemental Inspection2023-05-12012 May 2023 Readiness for Resumption of NRC Supplemental Inspection IR 05000346/20230102023-05-0909 May 2023 Commercial Grade Dedication Inspection Report 05000346/2023010 ML23123A1272023-05-0303 May 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Davis-Besse Nuclear Power Station IR 05000346/20230012023-05-0101 May 2023 Integrated Inspection Report 05000346/2023001 and 07200014/2022001 L-23-092, Occupational Radiation Exposure Report for Year 20222023-04-27027 April 2023 Occupational Radiation Exposure Report for Year 2022 ML23111A1972023-04-26026 April 2023 Information Meeting with Question and Answer Session to Discuss NRC 2022 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Plant Station ML23114A1062023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection CP-202300181, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-20020 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments CP-202300157, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-14014 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments ML23096A1382023-04-11011 April 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-037, and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2023-03-29029 March 2023 and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage ML23066A2892023-03-14014 March 2023 Request for Threshold Determination Under 10 CFR 50.80 and 10 CFR 72.50 for an Amendment to the Voting Agreement ML23066A2592023-03-14014 March 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2, Davis Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit 1 2024-02-02
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 ML23193A7842023-07-13013 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000346/2023402 ML23131A2732023-05-15015 May 2023 Notification of NRC Supplemental Inspection 95001 and Request for Information ML23033A0322023-02-0101 February 2023 NRR E-mail Capture - Request for Additional Information for Davis-Besse's 2022 Steam Generator Inspection Report (L-2022-LRO-0115) ML22357A0302022-12-23023 December 2022 Request for Information for NRC Commercial Grade Dedication Inspection: Inspection Report 05000346/2023010 ML22266A1102022-09-23023 September 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding July 21, 2022, Request for Withholding Information from Public Disclosure ML22214A7042022-08-0202 August 2022 Reissue - Davis-Besse Nuclear Power Station, Unit 1 Notification of Nrc Fire Protection Team Inspection Request for Information: Inspection Report 05000346/2022011 ML22187A0992022-07-0606 July 2022 Notification of NRC Supplemental Inspection (95001) and Request for Information ML22164A8572022-06-13013 June 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Emergency Plan ML22118A6862022-04-28028 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML22112A1092022-04-22022 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Design Basis for the Shield Building ML22055A0872022-02-23023 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Relief Request RP-3 IR 05000346/20210912021-12-17017 December 2021 NRC Inspection Report (05000346/2021091) Preliminary Greater than Green Finding ML21321A3792021-11-16016 November 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML21301A0992021-10-28028 October 2021 Draft Request for Additional Information: Proposed Alternate for Examination of Steam Generator Welds - Energy Harbor Nuclear Corp., Davis-Besse Nuclear Power Station, Unit No. 1 ML21203A3252021-07-28028 July 2021 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team): Inspection Report 05000346/2021011 ML21155A1952021-06-0404 June 2021 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Davis Besse Nuclear Power Station ML21041A5452021-02-10010 February 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Steam Generator Tube Inspection Reports ML21007A3732021-01-0707 January 2021 NRR E-mail Capture - (External_Sender) (External) Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, ML21004A1442020-12-30030 December 2020 NRR E-mail Capture - Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff ML20300A5592020-10-27027 October 2020 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML20154K7642020-06-0202 June 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Adopt TSTF-425 ML20133J9792020-05-14014 May 2020 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML20127H8672020-05-0606 May 2020 NRR E-mail Capture - Beaver Valley, Davis-Besse, and Perry - Request for Additional Information Regarding Request for Exemptions from Part 73 Security Requalification Requirements ML20021A3162020-01-21021 January 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request to Revise Containment Leakage Rate Testing ML19192A2222019-07-18018 July 2019 Request for Additional Information Regarding Application for Order Consenting to Transfer of Licenses and Conforming License Amendments ML19179A1382019-06-28028 June 2019 NRR E-mail Capture - Davis-Besse - Request for Additional Information Regarding the Decommissioning Quality Assurance Program ML19164A1532019-06-13013 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Post-Shutdown Emergency Plan ML19162A3922019-06-11011 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Permanently Defueled Technical Specifications ML19143A0732019-05-29029 May 2019 FENOC Fleet - Beaver Valley, Units 1 and 2; Davis-Besse, Unit 1, Perry, Unit 1 - Supplemental Information Needed for Acceptance of Requested Licensing Action; Application for Order Consenting to License Transfer and Conforming Amendments ML18305B0192018-11-0101 November 2018 18 Davis-Besse Nuclear Power Station - Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information(Rdb) ML18201A4122018-07-19019 July 2018 NRR E-mail Capture - Davis-Besse - Request for Additional Information Regarding License Amendment Request to Adopt NFPA 805 ML18190A4902018-07-0909 July 2018 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team), Inspection Report 05000346/2018011 (DRP-DXB) ML18102B0852018-04-12012 April 2018 NRR E-mail Capture - Follow-up Request for Additional Information (RAI) FENOC FLEET-- Exemption Request for a Physical Barrier Requirement for Beaver ML18043A0102018-02-0909 February 2018 NRR E-mail Capture - FENOC--MG0010-MG0011, MG-0012, MG0013-- Request for Additional Information (RAI) - Exemption Request Security Barrier in Physical Plans ML17355A3722017-12-21021 December 2017 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Adopt NFPA 805 ML17303B1582017-11-0707 November 2017 FENOC-Beaver Valley Power Station, Units 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, Perry Nuclear Power Plant Unit 1 - Generic Letter 2016-01, Request for Supplemental Information ML17257A1402017-09-14014 September 2017 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Adopt NFPA 805 ML17135A3612017-05-12012 May 2017 Information Request for NRC Triennial Evaluations of Changes, Tests, and Experiments (50.59) Baseline Inspection 05000346/2017010 (Jvb) ML17129A4112017-05-0909 May 2017 Request for Additional Information Regarding Evaluation Submitted in Response to License Renewal Commitment No. 54 ML17100A1732017-04-19019 April 2017 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Associated Standard 805 ML16364A2792017-01-23023 January 2017 Request for Additional Information Regarding License Renewal Commitment No. 42 ML16355A0352016-12-19019 December 2016 Ltr 12/19/16 Davis-Besse Nuclear Power Station, Unit 1 - Information Request for an NRC Post-Approval Site Inspection for License Renewal 05000346/2017009 (Bxj) ML16256A0662016-10-18018 October 2016 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Associated Standard 805 ML16196A0152016-07-22022 July 2016 Request for Additional Information Regarding Amendment Request to Revise Emergency Action Level Scheme L-16-122, Completion of Required Action by NRC Order EA-12-051, Reliable Spent Fuel Pool Instrumentation2016-06-24024 June 2016 Completion of Required Action by NRC Order EA-12-051, Reliable Spent Fuel Pool Instrumentation ML16060A0122016-02-29029 February 2016 FENOC - Email RAI to Licensee Regarding LAR for Changes to TS 5.3.1 CAC Nos. MF7118, MF7119, and MF7120 ML16047A1452016-02-22022 February 2016 Supplemental Information Needed for Acceptance of License Amendment Request to Adopt National Fire Protection Associated Standard 805 ML16019A3972016-01-20020 January 2016 Request for Additional Information Related to Amendment Request for Emergency Diesel Generator Minimum Voltage Surveillance Requirements ML15222A1792015-09-21021 September 2015 Request for Additional Information Related to Amendment Request for Emergency Diesel Generator Minimum Voltage Surveillance Requirements (TAC No. MF6060)(L-15-117) 2023-07-13
[Table view] |
Text
~c,
\.~p.~ ~EG(j{ _
....,~
UNITED STATES
.,~ F 0'l',L NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001
/:! "0
<l:
~
~
i;;
October 8, 2009
", ~
1-~ ",0 Mr. Barry S. Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3080 5501 North State Route 2 Oak Harbor, OH 43449-9760
SUBJECT:
DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO.1 - REQUEST FOR ADDITIONAL INFORMATION RELATED TO RELIEF REQUESTS FOR ALTERNATIVE DISSIMILAR METAL WELD REPAIR METHODS FOR REACTOR VESSEL NOZZLES, REACTOR COOLANT PUMP NOZZLES, AND REACTOR COOLANT PIPING (RR-A32 AND RR-A33) (TAC NOS. ME0477 AND ME0478)
Dear Mr. Allen:
By letter to the Nuclear Regulatory Commission (NRC) dated January 30,2009 (Agencywide Documents Access and Management System Accession No. ML090350070), FirstEnergy Nuclear Operating Company submitted two relief requests for proposed alternatives to certain requirements associated with reactor vessel nozzle, reactor coolant pump nozzle, and reactor coolant piping weld repairs, for the Davis-Besse Nuclear Power Station, Unit NO.1.
The NRC staff is reviewing your submittal and has determined that additional information is required to complete the review. The specific information requested is addressed in the enclosure to this letter. During a discussion with your staff on September 29, 2009, it was agreed that you would provide a response within 45 days from the date of this letter.
The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRC's goal of efficient and effective use of staff resources. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-4037.
Sincerely, Steph P. Sands, Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclea:- Reactor Regulation Docket No. 50-346
Enclosure:
Request for Additional Information cc w/encl: Distribution via Listserv
REQUEST FOR ADDITIONAL INFORMATION DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO.1 DOCKET NO. 50-346 By letter dated January 30, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession No. Ml090350070), FirstEnergy Nuclear Operating Company (the licensee) submitted for staff review and approval Requests RR-A32 and RR-A33 to install optimized weld overlays (OWOl) or full structural weld overlays (FSWOl) on Alloy 82/182 dissimilar metal welds (DMWs) at reactor coolant pump nozzles, core flood nozzles, and cold-leg drain nozzles at the Davis Besse Nuclear Power Station.
By letter dated July 13, 2009, the licensee responded to the staff's request for additional information (RAI) and revised the relief requests accordingly (ADAMS Accession No.
Ml091950627). To complete its review, the staff requests the following clarification on some of the licensee's RAI response. The staff is also providing additional comments on the submittal as follows.
Questions and Comments Related to Relief Request RR-A32 (the OWOl design)
- 1. Your Response to Question 1.2.b(1), (2) and (3) states that if the pre-installation examination detects an embedded (Le., subsurface) flaw and the flaw is accepted by the American Society of Mechanical Engineers (ASME) Code,Section XI, IWA-3300 and/or IWB-3640, an OWOl will be applied. If the flaw is judged to be unacceptable, a FSWOl will be applied.
It appears that RR-A32 may be used to repair embedded flaws even though RR-A32 provides requirements only for inside-surface-connected flaws. The Nuclear Regulatory Commission (NRC) staff notes that IWB-3640 allows a maximum flaw (surface connected or subsurface) of 75 percent flaw to remain in the DMW. This implies that the OWOl may be applied to a DMW that may contain an embedded flaw of 75 percent through-wall. The NRC staff does not agree that an embedded flaw of 75 percent through-wall in the DMW can be repaired by the OWOL.
The NRC staff's position is that any embedded flaw whose depth is greater than 50 percent through-wall should be repaired by the FSWOL. Any embedded flaw whose depth is equal to or less than 50 percent through-wall may be repaired by the OWOL. If any part of an embedded flaw is located in the outer 25 percent of the DMW wall thickness, the OWOl cannot be used to repair the DMW. The outer 25 percent wall thickness should be free of flaws because it provides structural support to the OWOL. Discuss if this is the same position that would be used for the repair of embedded flaws per RR-A32.
- 2. Your Response to 1.8c. The revised Section A2.2(2) states that" ... For repair [of] axial flaws in the underlying base material or weld, the flaws shall be assumed to be 75 percent through the original wall thickness of the item for the entire axial length of the flaw or combined flaws, as applicable ..." However, due to limitation on the ultrasonic test (UT) of axial flaws in the DMW, Section A2.2 also states that "A design requirement is added to show that ASIVIE Code Section XI design criteria are met for a 100 percent through-wall axial flaw ...". In response to Question 1.8a, you confirmed that the OWOl design assumes that an inside surface connected axial flaw in the DMW is 100 percent through-wall. Explain why Section A2.2(2) still discusses a 75 percent through-wall axial flaw in the DMW even though in other parts of A2.2, a 100 percent through-wall flaw was assumed.
ENCLOSURE
-2
- 3. Your Response to 1.11 a and 1.11 b. In response to Question 1.11 a, you stated that the subject piping may be in either water-backed or dry condition when the aWOL is installed. In response to Question 1.11 b, you stated that the residual stress analysis assumed the piping was dry. (a) Describe briefly the overlay welding procedures with regard to when the pipe will be dry and when the pipe will be filled with water. (b) If the aWOL is installed when the piping has water inside, discuss whether the residual stresses analyzed for the dry piping condition would bound the residual stresses for the water-backed pipe condition. (c) In addition to the changes in residual stresses in the pipe, the staff concerns the potential for martensite formation which would cause embrittlement during temper bead welding. Discuss how the Procedure Qualification Report considers the cooling rate of the water vs. no water in the pipe for the field installation to minimize the potential of base metal embrittlement.
- 4. Your Response to Q1.13b-Preservice and Inservice Examination Requirements (a) Preservice examination Item (1) requires that UT locates and measures any planar flaws that have propagated into the outer 25 percent of the base metal. Preservice Examination Item (2) requires that the planar flaws in the outer 25 percent of the base metal satisfy the design analysis requirements of Section [A]2.2. The planar flaws in the outer 25 percent region apply only to axial flaws. In the circumferential direction, UT is qualified to locate and size the planar flaws in the outer 50 percent of the base metal. There should be two acceptance criteria for preservice examination: one for the axial planar flaws and one for the circumferential planar flaws. Explain and justify the 25 percent through-wall flaw requirement for the circumferential planar flaws in Preservice Examination Items (1) and (2).
(b) Preservice Examination Item (2) states that "... Planar flaws in the outer 25 percent of the base metal thickness shall meet the design analysis requirements of 2.2 ...." The reference should be Section A2.2.
(c) Inservice Examination Item (2) should be revised to read "For welds whose pre-overlay examination, post-overlay acceptance examination, and preservice examination did not reveal any planar flaws, the examination volume in Fig. A2-2 shall be ultrasonically examined within 10 years following application of the optimized weld overlay... " The underline and strikeout are suggested revisions to the proposed requirement. In order to not inspect the overlaid DMW during the first or second refueling outage, the DMW should not contain any planar flaws (embedded or inside-surface connected) based on pre-overlay, post-overlay and preservice examinations.
The NRC staff suggests the above revision (underline and strikeout) because of the following reasons. (1) Besides inside-surface connected flaws, no subsurface flaws should exist in the overlaid DMW in order for the DMW to be considered for a 1a-year inspection frequency. A subsurface flaw may grow as a result of overlay installation and needs to be monitored. The aWOL takes credit for the outer 25 percent of the wall thickness to support the pipe loads.
Therefore, the inspection of the aWOL should be more stringent than that for the FSWOL.
Therefore, only a DMW without any surface or subsurface flaws is allowed to be not inspected during the first or second refueling outage after the aWOL installation. (2) After weld overlay installation, a flaw that was not detected during the pre-installation examination may occur in the overlaid DMW and may be detected by the acceptance or preservice examination. In this case, the flaw may be allowed to remain in service in the aWOL or original DMW per the
-3 requirements of acceptance and preservice examinations. Therefore, the post-overlay acceptance and preservice examinations should be included in Inservice Examination Item (2) above to ensure that the overlaid DMW contains no planar flaws in order for the weld to be eligible for a 1O-year inspection frequency.
(d) Inservice Examination Item (3) should be revised to read "... For welds whose pre-overlay examination, post-overlay acceptance examination, or preservice examination reveal planer flaws, the examination volume in Fig. A2-2 shall be ultrasonically examined once during the first or second refueling outage following application of the optimized weld overlay... " The reason for the staff suggested wording and removal of "inside surface connected" is the same as above Question 4(c).
(e) Inservice Examination Items (2) and (3) allow the OWOl to be placed in a sample inspection where 25 percent of the population (a total of 4 DMWs) will be examined once each inspection interval. The NRC staff thinks that all DMWs with OWOl need to be examined once per inspection interval and should not be placed in a sample inspection population. If a flaw develops in the outer 25 percent wall thickness region of the original DMW, the OWOl's ability to maintain the pressure boundary may be reduced because the OWOl by itself cannot support the pipe loading without taking credit for 25 percent wall thickness of the base metal. Therefore, all DMWs with OWOls need to be inspected periodically.
(f) Inservice Examination Item (1) requires that" ... The weld overlay inspection interval shall not be greater than the life of the overlay as determined in A1.3(a) above ... " Section A1.3 is in of the relief request submital, but Section A1.3(a) does not exist. Also, Section A1.3 discusses inspectability considerations--not inspection intervals. Please clarify the reference of A1.3(a).
(g) Inservice Examination Item (5) requires that "... If a planar circumferential flaw is detected in the outer 50 percent of the base material thickness or if a planar axial flaw is detected in the outer 25 percent of the base material thickness, it shall meet the design analysis requirements of A2.2 ...." Please explain the above requirement in detail, specifically the design analysis requirements of A2.2. For example, explain how a planar flaw that occurs in the outer 50 percent of the base metal meets the design analysis requirements of A2.2. Clarify whether the SUbject planar flaw is a subsurface flaw or an inside-surface connected flaw.
- 5. Your Response to 1.18.1.a-Temper bead weld area on ferritic material (a) In response to Question 1.18.1.a, you stated that two or more residual stress analyses of different surface areas over the ferritic material will be prepared. (1) Provide the dimensions of the weld surface areas on the ferritic base metal that will be modeled in the residual stress analysis. (2) Discuss whether the analyzed weld surface areas bound the weld surface area on the ferritic material for the actual installed OWOL. (3) Please provide drawings of the weld overlay design including overlay dimensions on the reactor coolant pump discharge and suction nozzle and pipe configuration (the safe end and elbow). The drawing should identify where the weld overlay begins and ends on the pump discharge and suction pipe with proper dimensions.
(b) In the original submittal dated January 30, 2009, you proposed a weld surface area on ferritic metal of 600 square inches. In the revised submittal dated July 13, 2009, the weld
-4 surface area is increased to 700 square inches. You referenced Electric Power Research Institute (EPRI) Report 1011898, November 2005, as the technical basis. EPRI did not perform a stress analysis based on 700 square inch area. However, EPRI concluded that users may justify repairs beyond 500 square inches by additional analysis and evaluation. The NRC staff is concerned with the potential for distortion; additional stresses imposed on the pipe, elbow and nozzle; changes to the microstructure of the base metal (formation of martensite); and other detrimental impact on the base metal. To demonstrate the acceptability of the proposed 700 square inches of weld area on the subject pipe configuration using ambient temperature temper bead welding, the licensee may propose the following options:
(1) Provide information that show favorable operating experience for similar weld overlays that have been installed in the field. The licensee may use applicable operating experience from outside of nuclear power plants, e.g., fossil power plants, natural gas pipe lines, chemical plants, and refinery plants; (2) Provide information from mockups that show favorable stress conditions and acceptable overlay product; or (3) Perform a finite element analysis that is similar to the analysis performed by EPRI in its qualification of the 100 and 300 square-inch weld areas to show favorable stress distribution and no distortion.
(c) In response to 1.18.a, you stated that" ... This [stress analysis for the 700 square inch area]
summary document will reference the calculations from which the residual stress and radial displacement information is extracted and will be forwarded to the NRC as discussed within Commitment 1 attached to FENOC's correspondence dated January 30, 2009,.." As stated in the January 30, 2009, submittal, the reports in Commitment 1 will be submitted to the NRC prior to entry to Mode 4 of operation. The Mode 4 schedule is not adequate because the staff needs the stress analysis information as a basis for its safety evaluation of RR-A32 and RR-A33.
Therefore, we request that the analysis that demonstrates the validity of a 700 square inch area be submitted as part of your response to this RAI. The analysis report should include sufficiently detailed information (e.g., assumptions, models, methodology, results, and conclusions).
- 6. Your Response to 1.21. The proposed revision to paragraph 3.2(a) in Attachment 5 of the relief request is different from the licensee's response to Question 1.21. Also, there is a typographical error in the alternative ("though-base-metal position" should be "through-base metal position"). The same typographical error appears in RR-A33, Attachment 2.
- 7. Section A2.2, Residual Stress Analysis, Item (1) states that "... The resulting residual stresses on the inside surface over the entire length of primary water stress-corrosion cracking (PWSCC) susceptible material under the optimized weld overlay shall be less than or equal to 10,000 pounds per square inch tensile ... "
ASME Code,Section XI, Code Case N-770 (Reference 1) has established that as part of an effective stress improvement mitigation technique, a compressive stress state is required on the wetted surface of all susceptible material used in dissimilar metal (DM) weld applications. This is consistent with the staff position and was developed, in part, due to the uncertainties in precise finite element stress modeling of the wetted surface of DM welds. Further, the staff position was not established to define a stress level at which crack initiation could not occur, but rather to provide a conservative stress value that along with calculated stress levels throughout the volume of the weld will provide a basis for reasonable assurance of structural integrity for a
-5 stress improved DM weld. Please provide additional basis, including supporting data, analyses and operational experience, to support allowing a wetted surface stress threshold of 10 ksi.
Reference 1: ASME Code,Section XI, Code Case N-770, Alternative Examination Requirements and Acceptance Standards for Class 1 PWR Piping and Vessel Nozzle Butt Welds Fabricated with UNS N06082 or UNS W86182 Weld Filler Material With or Without Application of Listed Mitigation ActivitiesSection XI, Division 1, Appendix I.
- 8. Section A1.5 of RR-A32 Attachment 1 discusses the leak-before-break evaluation with respect to the OWOL. The OWOl have less thickness than the full structural weld overlays (FSWOl). The OWOl is unable, by itself, to satisfy structural integrity design requirements.
Instead, the OWOl design requires a portion of the underlying Alloy 82/182 DM weld material to remain intact and carry a portion of the loads. This original weld material is susceptible to cracking. In order to understand potential limitations of OWOls, the NRC staff has considered the possibility that either the OWOl design or installation process does not perform as expected, or a large pre-existing crack was missed by nondestructive examination (NDE), and a crack grows in the original weld after the OWOl is applied. During initial phases of crack growth, bending and residual stress variations and metallurgical inhomogeneity would lead to uneven growth. However, once a portion of a surface crack grew deep enough to encounter the crack resistant overlay material, it would stop growing in the depth direction at that azimuthal location. Other segments of the crack could continue to grow deeper until they also reach the overlay interface. This could continue until the remaining uncracked ligament of original weld material is insufficient to adequately reinforce the OWOl material, at which point the mitigated weld may fail without prior leakage during a design basis event.
In a FSWOl, the corrosion and PWSCC resistance of the overlay material can be credited to prevent crack growth into the overlay in the event that a large pre-existing crack was missed by NDE, or in the event that design deficiencies or misapplication of the FSWOl resulted in unanticipated tensile residual stress fields. If large cracks occur in the original DM weld material under a FSWOl, the FSWOl can withstand full design loading without failing; the PWSCC resistant material preserves the FSWOl load carrying ability and minimizes the likelihood of pipe rupture. In contrast, if the same deficiency in design or application affects the OWOl, the OWOl material, precisely because it is resistant to PWSCC, can cause small circumferential cracks in the original dissimilar metal weld to grow deep around the entire circumference, in which case the OWOl may become unable to withstand its design loading. In light of this possibility, please explain why application of an OWOl to a DMW is an appropriate mitigation method, and why its application will not invalidate previously approved leak-before- break analyses.
Questions and Comments Related to Relief Request RR-A33 (the FSWOl Design)
- 9. Your Response to 2.10. Section A1.4(c)(4) of RR-A33 states that ..... If 100 percent of the susceptible material is not examined in the pre and post mitigation volume examinations, the inspection frequency of (3) above for cracked items shall be applied with the following exceptions ..." Section A1.4(c)(4)(b) states that .....the weld may be placed in the 25 percent inspection sample population as noted in (3) above... " Section (3) referred to in the above statements does not provide inspection frequency nor sample inspection requirements. Please verify whether Section (3) in the aforementioned statements is correct.
-6
- 10. Section 1.4(c)(1) of RR-A33 should be revised to read: "... For welds whose pre-overlay examination, post-overlay acceptance examination, or preservice examination did not reveal any planer flaws, the welds shall be placed into a population of full structural weld overlays to be examined on a sample basis... "
- 11. Section 1.4(c)(1) (2) of RR-A33 should be revised to read: "... For welds whose pre-overlay examination, post-overlay acceptance examination, or preservice examination reveal planar flaws, or for which a pre-overlay examination was not performed, the weld overlay shall be ultrasonically examined during the first or second refueling outage following application ...."
ML092720591 NRR-088 OFFICE LPL3-2/PM LPL3-2/LA LPL3-2/BC NAME SSands THarris SCampbel1 DATE 10/2/09 10/01/09 10/8/09