Semantic search
Jump to navigation
Jump to search
Issue date | From | Title | Project stage | |
---|---|---|---|---|
L-09-020, 10 CFR 50.55a Requests for Alternative Dissimilar Metal Weld Repair Methods for Reactor Vessel Nozzles, Reactor Coolant Pump Nozzles, and Reactor Coolant Piping | 30 January 2009 | FirstEnergy Allen B | 10 CFR 50.55a Requests for Alternative Dissimilar Metal Weld Repair Methods for Reactor Vessel Nozzles, Reactor Coolant Pump Nozzles, and Reactor Coolant Piping | Request |
ML093360325 | 8 April 2009 | FirstEnergy Structural Integrity Associates Ananth R Sadeghi N | Calculation, 0800368.311, Rev. 0, Design Loads for the 28 I.D. Reactor Coolant Pump (RCP) Suction and Discharge Nozzles. | Other |
ML093360324 | 21 April 2009 | FirstEnergy Structural Integrity Associates White S Chintapalli A | Calculation, 0800368.301, Rev 0, Material Properties for Davis-Besse Unit 1, RCP Suction, RCP Discharge, Cold Leg Drain and Core Flood Nozzles Preemptive Weld Overlay Repairs. | Other |
ML093360327 | 22 May 2009 | FirstEnergy Structural Integrity Associates Hiremagalur J Rodamaker S C | Calculation, 0800368.322, Rev. 1, Finite Element Models of the Reactor Coolant Pump Discharge Nozzle with Weld Overlay Repair. | Other |
ML093360328 | 23 May 2009 | FirstEnergy Structural Integrity Associates Hiremagalur J Rodamaker S C | Calculation, 0800368.323, Rev. 1, Thermal and Unit Mechanical Stress Analyses for Reactor Coolant Pump Discharge Nozzle with Weld Overlay Repair. | Other |
ML093360326 | 27 May 2009 | FirstEnergy Structural Integrity Associates Sowah S | Calculation, 0800368.320, Rev. 1, Optimized Weld Overlay Sizing for the 28 I.D. Outlet/Discharge Reactor Coolant Pump Nozzle. | Other |
ML091530151 | 11 June 2009 | Goodwin C Plant Licensing Branch III | Request for Additional Information Related to Relief Requests for Alternative Dissimilar Metal Weld Repair Methods for Reactor Vessel Nozzles, Reactor Coolant Pump Nozzles, and Reactor Coolant Piping | RAI |
ML091550423 | 15 June 2009 | Goodwin C Plant Licensing Branch III | Request for Additional Information Related to Relief Requests for Alternative Dissimilar Metal Weld Repair Methods for Reactor Vessel Nozzles, Reactor Coolant Pump Nozzles, and Reactor Coolant Piping | RAI |
ML093360329 | 10 July 2009 | FirstEnergy Structural Integrity Associates Hiremagalur J Rodamaker S C | Calculation, 0800368.324, Rev. 0, Residual Stress Analysis of Reactor Coolant Pump Discharge Nozzle with Weld Overlay Repair. | Other |
L-09-179, Response to Requests for Additional Information Related to Alternative Dissimilar Metal Weld Repair Methods | 13 July 2009 | FirstEnergy Allen B | Response to Requests for Additional Information Related to Alternative Dissimilar Metal Weld Repair Methods | Response to RAI |
ML093360331 | 20 July 2009 | FirstEnergy Structural Integrity Associates Jing P | Calculation, 0800368.326, Rev. 0, Crack Growth Evaluation of Reactor Coolant Pump Discharge Nozzle with Weld Overlay Repair. | Other |
L-09-227, License Amendment Request to Update the Leak-Before-Break Evaluation for the Reactor Coolant Pump Suction and Discharge Nozzle Dissimilar Metal Welds | 28 September 2009 | FirstEnergy Allen B | License Amendment Request to Update the Leak-Before-Break Evaluation for the Reactor Coolant Pump Suction and Discharge Nozzle Dissimilar Metal Welds | Request |
ML092720591 | 8 October 2009 | Sands S Plant Licensing Branch III | RAI Related to Relief Requests for Alternative Dissimilar Metal Weld Repair Methods | RAI |
L-09-268, Calculation, 0800777.309, Rev. 0, Sensitivity Study of Temperbead Surface Area Limitations for Large Bore Weld Overlay Repairs Over Ferritic Materials (from 500 to 1,000 Square Inches). | 2 November 2009 | FirstEnergy Structural Integrity Associates Ku F Jenson C | Calculation, 0800777.309, Rev. 0, Sensitivity Study of Temperbead Surface Area Limitations for Large Bore Weld Overlay Repairs Over Ferritic Materials (from 500 to 1,000 Square Inches). | Other |
ML093360330 | 23 November 2009 | FirstEnergy Structural Integrity Associates Dixon R D Rodamaker S C | Calculation, 0800368.325, Rev. 0, ASME Code, Section Iii Evaluation of Reactor Coolant Pump Discharge Nozzle with Weld Overlay Repair. | Other |
ML093360323 | 23 November 2009 | FirstEnergy Allen B S | Davis-Besse, Response to Requests for Additional Information Related to Alternative Dissimilar Metal Weld Repair Methods | Response to RAI |
ML100040016 | 15 December 2009 | FirstEnergy Heintz C | Relief Request A-32 and A-33 - Request for Additional Information - Supplemental Information | Supplement |
ML100080573 | 21 January 2010 | Shawn Campbell Plant Licensing Branch III | Unit, Relief Request RR-A33 for the Application of Full Structural Weld Overlays on Dissimilar Metal Welds of Reactor Coolant Piping | Acceptance Review |
ML100271531 | 29 January 2010 | Shawn Campbell Plant Licensing Branch III | Relief Request RR-A32 for the Application of Full Structural Weld Overlays on Dissimilar Metal Welds of Reactor Coolant Piping | Other |
L-10-132, 0800368.408, Revision 0, Summary of Weld Overlay Ultrasonic Examinations for Reactor Coolant Pump Suction and Discharge Nozzle Welds, Core Flood Nozzle Welds, and Cold Leg Drain Nozzle Welds | 25 April 2010 | Structural Integrity Associates White S | 0800368.408, Revision 0, Summary of Weld Overlay Ultrasonic Examinations for Reactor Coolant Pump Suction and Discharge Nozzle Welds, Core Flood Nozzle Welds, and Cold Leg Drain Nozzle Welds | Other |
ML101230640 | 29 April 2010 | FirstEnergy Allen B S | Davis-Besse, Summary of Weld Overlay Ultrasonic Examinations | Other |
L-10-133, Summary of Design and Analysis of Weld Overlays (Mode 4 Report) | 18 June 2010 | FirstEnergy Allen B | Summary of Design and Analysis of Weld Overlays (Mode 4 Report) | Other |