Enclosure - Report 22 McGuire, Inspection/Activity Plan 07/01/2009-12-31/2010
ML092440265
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 09/01/2009
From:
NRC/RGN-II
To:
Duke Energy Carolinas
Shared Package
ML092440254 List:
References
Download: ML092440265 (2)


Text

Page 1 of 2 McGuire 09/01/2009 08:09:38 Inspection / Activity Plan Report 22 07/01/2009 - 12/31/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PSB1-RP - RADIATION PROTECTION PUBLIC BASELINE INS 5 1, 2 07/27/2009 07/31/2009 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 1, 2 07/27/2009 07/31/2009 IP 7112101 Access Control to Radiologically Significant Areas 1, 2 07/27/2009 07/31/2009 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 1, 2 07/27/2009 07/31/2009 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 1, 2 07/27/2009 07/31/2009 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 1, 2 07/27/2009 07/31/2009 IP 71151 Performance Indicator Verification PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 3 1, 2 08/17/2009 08/21/2009 IP 7111401 Exercise Evaluation 1, 2 08/17/2009 08/21/2009 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 08/17/2009 08/21/2009 IP 71151 Performance Indicator Verification EB3ISI - UNIT 2 INSERVICE INSPECTION 1 2 09/14/2009 09/18/2009 IP 7111108P Inservice Inspection Activities - PWR EB3SGISI - U2 STEAM GENERATOR ISI 1 2 09/14/2009 09/18/2009 IP 7111108P Inservice Inspection Activities - PWR EB3TI172 - TI-172 RCS DM BUTT WELDS 1 2 09/14/2009 09/18/2009 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds PSB1-RP - RP GROUNDWATER PROTECTION 1 1, 2 02/22/2010 02/26/2010 IP 2515/173 Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative PSB1-RP - RP OCCUPATIONAL BASELINE WEEK 1 2 1, 2 03/15/2010 03/19/2010 IP 7112101 Access Control to Radiologically Significant Areas 1, 2 03/15/2010 03/19/2010 IP 7112102-7112102R ALARA - Required 1, 2 03/15/2010 03/19/2010 IP 7112202 Radioactive Material Processing and Transportation 1, 2 03/15/2010 03/19/2010 IP 71151 Performance Indicator Verification EB3ISI - UNIT 1 ISI 1 1 03/22/2010 03/26/2010 IP 7111108P Inservice Inspection Activities - PWR EB3TI172 - EB3 TI-172 RCS DM BUTT WELDS 1 1, 2 03/22/2010 03/26/2010 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds PSB1-RP - RP OCCUPATIONAL BASELINE WEEK 2 3 1, 2 03/29/2010 04/02/2010 IP 7112101 Access Control to Radiologically Significant Areas 1 03/29/2010 04/02/2010 IP 7112102-7112102R ALARA - Required 1, 2 03/29/2010 04/02/2010 IP 7112202 Radioactive Material Processing and Transportation 1, 2 03/29/2010 04/02/2010 IP 71151 Performance Indicator Verification OL RQ - REQUAL INSPECTION 2 1, 2 06/07/2010 06/11/2010 IP 7111111B Licensed Operator Requalification Program This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 McGuire 09/01/2009 08:09:38 Inspection / Activity Plan Report 22 07/01/2009 - 12/31/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site OL EXAM - INITIAL PREP EXAM 3 1 07/05/2010 07/09/2010 V23332 MCGUIRE/AUGUST 2010 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 1 3 1 08/02/2010 08/06/2010 V23332 MCGUIRE/AUGUST 2010 EXAM AT POWER FACILITIES PSB1EP - EMERGENCY PREPAREDNESS INSPECTION 1 1, 2 08/16/2010 08/20/2010 IP 7111402 Alert and Notification System Testing 1, 2 08/16/2010 08/20/2010 IP 7111403 Emergency Response Organization Augmentation Testing 1, 2 08/16/2010 08/20/2010 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 08/16/2010 08/20/2010 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 08/16/2010 08/20/2010 IP 71151 Performance Indicator Verification EB1-MODS - MODIFICATIONS - 10CFR50.59 3 1, 2 08/30/2010 09/03/2010 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1, 2 09/13/2010 09/17/2010 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 1, 2 10/04/2010 10/08/2010 IP 71152B Identification and Resolution of Problems 1, 2 10/18/2010 10/22/2010 IP 71152B Identification and Resolution of Problems This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure