Category:Letter
MONTHYEAR05000306/LER-2024-002, Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to High Negative Neutron Flux Rate Trip2024-12-19019 December 2024 Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to High Negative Neutron Flux Rate Trip L-PI-24-051, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification (TS) Definitions and Adopt Plant Specific Methods for Response Time Testing (Rtt)2024-12-18018 December 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification (TS) Definitions and Adopt Plant Specific Methods for Response Time Testing (Rtt) ML24354A2952024-12-18018 December 2024 ISFSI and Monticello Nuclear Generating Plant - Independent Spent Fuel Storage Installation Decommissioning Funding Plans IR 05000282/20244022024-12-17017 December 2024 Cyber Security Inspection Report 05000282/2024402 and 05000306/2024402 (Public) IR 05000282/20240032024-11-13013 November 2024 Integrated Inspection Report 05000282/2024003, 05000306/2024003 & 07200010/2024001 ML24310A1682024-11-0505 November 2024 Core Operating Limits Report (COLR) for Cycle 34, Revision 0 ML24298A0552024-10-30030 October 2024 Response to Alternative RR-10, Auxiliary Feedwater Valve Testing IR 05000282/20244032024-10-25025 October 2024 – Security Baseline Inspection Report 05000282/2024403 and 05000306/2024403 05000282/LER-2024-001-01, Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies2024-10-22022 October 2024 Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies L-PI-24-044, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-10-21021 October 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program ML24277A1012024-10-0303 October 2024 Closure of Interim Report of a Potential Deviation or Failure to Comply Associated with Bentley Systems Incorporated Autopipe Software ML24221A3622024-09-27027 September 2024 Issuance of Amendment Nos. 245 and 233 Revise Technical Specification 3.8.1, AC Sources-Operating, Surveillance Requirement 3.8.1.2, Note 3 ML24241A1682024-09-23023 September 2024 Transmittal Letter Amendment No. 13 to Materials License No. Special Nuclear Material-2506 for the Prairie Island Independent Spent Fuel Storage Installation 05000282/LER-2024-001, Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies2024-09-16016 September 2024 Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies IR 05000282/20243012024-09-13013 September 2024 NRC Initial License Examination Report 05000282/2024301 and 05000306/2024301 IR 05000282/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Report 05000282/2024005 and 05000306/2024005) L-PI-24-040, Post-Submittal Package Letter2024-08-23023 August 2024 Post-Submittal Package Letter IR 05000282/20245012024-08-0505 August 2024 Emergency Preparedness Inspection Report 05000282/2024501 and 05000306/2024501 ML24213A1592024-07-31031 July 2024 Operator Licensing Examination Approval - Prairie Island Nuclear Generating Plant IR 05000282/20240022024-07-30030 July 2024 Integrated Inspection Report 05000282/2024002 and 05000306/2024002 ML24208A1502024-07-26026 July 2024 Independent Spent Fuel Storage Installation - Submittal of Quality Assurance Topical Report (NSPM-1) ML24197A2012024-07-15015 July 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000282/2024004 IR 05000282/20240102024-06-28028 June 2024 Comprehensive Engineering Team Inspection Report 05000282/2024010 and 05000306/2024010 L-PI-24-036, – Preparation and Scheduling of Operator Licensing Examinations2024-06-28028 June 2024 – Preparation and Scheduling of Operator Licensing Examinations ML24158A5912024-06-0606 June 2024 CFR 50.46 LOCA Annual Report L-PI-24-031, Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2)2024-06-0505 June 2024 Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2) L-PI-24-014, License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption2024-06-0303 June 2024 License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption ML24155A1922024-05-31031 May 2024 Refueling Outage Unit 2 R33 Owners Activity Report for Class 1, 2, 3 and Mc Inservice Inspections 05000306/LER-2024-001-01, Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump2024-05-31031 May 2024 Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump ML24149A3712024-05-29029 May 2024 (Ping) - Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection ML24262A1992024-05-29029 May 2024 L-PI-24-018 PINGP 75 Day Letter L-PI-24-030, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.12024-05-22022 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.1 ML24141A1292024-05-22022 May 2024 Northern States Power Company - Use of Encryption Software for Electronic Transmission of Safeguards Information ML24141A0452024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML24128A2572024-05-16016 May 2024 ISFSI A13 Acceptance Letter IR 05000282/20240012024-05-15015 May 2024 Integrated Inspection Report 05000282/2024001 and 05000306/2024001 ML24130A2362024-05-0909 May 2024 Independent Spent Fuel Storage Installation - 2023 Annual Radiological Environmental Monitoring Program Report ML24130A2392024-05-0909 May 2024 2023 Annual Radioactive Effluent Report ML24071A1162024-05-0101 May 2024 Issuance of Amendment Nos. 244 and 232 Revise TS 3.7.8, Cooling Water (Cl) System ML24128A0882024-04-30030 April 2024 Submittal of Updated Safety Analysis Report (Usar), Revision 38 05000306/LER-2024-001, Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump2024-04-29029 April 2024 Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump ML24089A2382024-04-29029 April 2024 Summary of Nuclear Property Insurance IR 05000282/20244012024-04-25025 April 2024 – Security Baseline Inspection Report 05000282/2024401 and 05000306/2024401 ML24100A8042024-04-24024 April 2024 – Alternative Request RR-09 for Safety Injection and Volume Control System Category C Check Valve Inservice Testing ML24114A0882024-04-23023 April 2024 Annual Report of Individual Monitoring for the Prairie Island Nuclear Generating Plant (PINGP) ML24113A1182024-04-12012 April 2024 NRC Letter Re NRC Office of Investigations Report No. 3-2023-004 ML24100A1212024-04-0909 April 2024 Submittal of Revised Pressure and Temperature Limits Report ML24093A2832024-04-0202 April 2024 Nuclear Material Transaction Report L-PI-24-012, Independent Spent Fuel Storage Installation - License Amendment Request: Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2)2024-04-0202 April 2024 Independent Spent Fuel Storage Installation - License Amendment Request: Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2) ML24089A2402024-03-29029 March 2024 Guarantee of Payment of Deferred Premiums 2024-09-27
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24330A0502024-11-12012 November 2024 Final RAI for LAR to Revise TS Definitions and Adopt Plant Specific Methods for Rtt ML24197A2012024-07-15015 July 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000282/2024004 ML24149A3712024-05-29029 May 2024 (Ping) - Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection ML24141A0452024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML24116A2532024-04-25025 April 2024 Final Request for Additional Information for LAR to Revise SR 3.8.1.2 Note 3 (EPID: L- 2023-LLA-0135) ML24045A0862024-02-12012 February 2024 Final RAI for Alternative RR-09 ML23335A1152023-12-0101 December 2023 NRR E-mail Capture - Prairie Island Units 1 and 2 - Request for Additional Information LAR to Revise TS 3.7.8 Required Actions ML23248A3462023-09-0505 September 2023 NRR E-mail Capture - Request for Additional Information for Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant - Decommissioning Funding Status Reports ML23214A2032023-08-0202 August 2023 Request for Information for an NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000282/2024010; 05000306/2024010 ML23199A0922023-07-18018 July 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000306/2023004 ML23096A3082023-04-0707 April 2023 Notification of Inspection an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23055B0562023-02-27027 February 2023 Request for Information for NRC Commercial Grade Dedication Inspection Inspection Report 05000282/2023010 and 05000306/2023010 ML23053A1432023-02-22022 February 2023 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Prairie Island Nuclear Generating Plant ML22166A4112022-06-15015 June 2022 NRR E-mail Capture - Request for Additional Information Prairie Island Nuclear Generating Plant, Unit 2, Alternative RR-08, PIV Leakage ML22160A6022022-06-0909 June 2022 NRR E-mail Capture - Draft Request for Additional Information Prairie Island Nuclear Generating Plant, Units 1 and 2, 24-Month Operating Cycle Amendment ML22130A5792022-05-11011 May 2022 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML22131A2652022-05-11011 May 2022 NRR E-mail Capture - Request for Additional Information Xcel Energy Amendment Request to Create a Common Eplan and EOF for Monticello and Prairie Island ML21321A0452021-11-10010 November 2021 Request for Additional Information: Prairie Island 24-Month Cycle Amendment Request ML21305A0102021-10-29029 October 2021 NRR E-mail Capture - Request for Additional Information Prairie Island Cooling Water Amendment ML21252A0122021-08-30030 August 2021 NRR E-mail Capture - Request for Additional Information Amendment Request to Adopt TSTF-471 and 517-T for Prairie Island ML21147A5232021-06-0303 June 2021 Prarie Island Nuclear Generating Plant, Units 1 and 2 - Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML21131A0752021-05-10010 May 2021 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000282/2021004; 05000306/2021004 IR 05000282/20210122021-04-0909 April 2021 Information Request to Support Upcoming Temporary Instruction 2515/194 Inspection; Inspection Report 05000282/2021012 and 05000306/2021012 ML21062A0532021-03-0202 March 2021 Information Request to Support Upcomng Problem Identification and Resolution (Pi&R) Inspection at the Prairie Island Nuclear Generating Plant ML21033A6112021-02-0101 February 2021 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000282/2021010 and 05000306/2021010 ML20343A1292020-12-0808 December 2020 NRR E-mail Capture - Request for Additional Information ML20192A1442020-07-0707 July 2020 NRR E-mail Capture - Request for Additional Information Prairie Island License Amendment Request to Adopt TSTF-505 ML20189A1782020-07-0606 July 2020 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000282/2020004; 05000306/2020004 ML20133K0692020-05-14014 May 2020 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML20077K6242020-04-13013 April 2020 License Amendment Request - Request for Additional Information ML20052F4102020-02-21021 February 2020 Notification of Nrc Design Bases Assurance Inspection (Programs) (05000282/202010; 05000306/202010) and Initial Request for Information ML20035F1552020-02-0404 February 2020 NRR E-mail Capture - Request for Additional Information Monticello and Prairie Island Alternative Requests to Adopt Code Cases N-786-3 and N-789-3 (Epids: L-2019-LLR-0078 and L-2019-LLR-0079) ML20023C2382020-01-23023 January 2020 Request for Information for the Upcoming Post-Approval Site Inspection for License Renewal (Phase IV) ML19233A0032019-08-14014 August 2019 NRR E-mail Capture - Request for Additional Information Prairie Island Relief Requests 1-RR-10 and 2-RR-10 ML19057A1652019-02-26026 February 2019 NRR E-mail Capture - Request for Additional Information Prairie Island 50.69 Amendment Request ML18313A0832018-11-0707 November 2018 NRR E-mail Capture - Request for Additional Information Prairie Island NFPA-805 License Condition Modification Amendment Request ML18264A1912018-09-19019 September 2018 NRC Information Request (9/19/2018); Part B Items (Onsite) IP 71111.08 - E-Mailed 09/19/18 (DRS-M.Holmberg) ML18235A2982018-08-23023 August 2018 NRR E-mail Capture - Request for Additional Information Prairie Island TSTF-425 License Amendment Request ML18169A4202018-06-25025 June 2018 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment to Modify Renewed Facility Operating License Paragraph 2.C(4)(c) ML18025C0152018-01-24024 January 2018 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team): Inspection Report 05000282/2018011; 05000306/2018011 (DRS-A.Dunlop) ML17277B3332017-10-0404 October 2017 NRR E-mail Capture - Request for Additional Information Prairie Island Special Heavy Lifting Devices LAR ML17249A9232017-09-0606 September 2017 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000282/2017004; 05000306/2017004 (Exf) ML17235A9982017-08-23023 August 2017 NRR E-mail Capture - Request for Additional Information Prairie Island EAL Scheme Change ML17221A3892017-08-0909 August 2017 NRR E-mail Capture - Request for Additional Information for Prairie Island Nuclear Generating Plant License Amendment Request Dated February 23, 2017 Emergency Response Organization ML17219A0762017-08-0707 August 2017 NRR E-mail Capture - Request for Additional Information for Prairie Island Nuclear Generating Plant License Amendment Request Dated February 23, 2017 Emergency Response Organization ML17038A5132017-02-0707 February 2017 NRR E-mail Capture - Prairie Island NFPA 805 LAR, PRA RAI 21.01 ML17018A4272017-01-18018 January 2017 NRR E-mail Capture - Request for Additional Information: Prairie Island License Amendment Request to Revise Technical Specification 3.8.7 to Remove Non-Conservative Required Action ML16326A3532016-11-18018 November 2016 NRR E-mail Capture - Draft Request for Information Related to Prairie Island NFPA-805 License Amendment ML16265A1652016-09-20020 September 2016 Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information; Inspection Report 05000282/2016004; 05000306/2016004 (Gfo) ML16189A2052016-07-0707 July 2016 Notification of NRC Inspection and Request for Information 2024-07-15
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 26, 2009 Mr. Michael D. Wadley Site Vice President Prairie Island Nuclear Generating Plant Northern States Power Company - Minnesota 1717 Wakonade Drive East Welch, MN 55089
SUBJECT:
PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 REQUEST FOR ADDITIONAL INFORMATION RELATED TO LICENSE AMENDMENT REQUEST FOR TECHNICAL SPECIFICATIONS CHANGES TO REVISE EMERGENCY DIESEL GENERATOR TEST LOADS IN SURVEILLANCE REQUIREMENT (SR) 3.8.1.3 AND SR 3.8.1.9 (TAC NOS. ME0086 AND ME0087)
Dear Mr. Wadley:
By letter to the U.S. Nuclear Regulatory Commission (NRC) dated November 4,2008, Northern States Power Company, a Minnesota corporation (the licensee), doing business as Xcel Energy, submitted a request for Technical Specification (TS) changes to revise emergency diesel generator test loads in TS Surveillance Requirement (SR) 3.8.1.3 and SR 3.8.1.9 for the Prairie Island Nuclear Generating Plant, Units 1 and 2.
The NRC staff is reviewing your submittal and has determined that additional information is required to complete the review. The specific information requested is addressed in the enclosure to this letter. During a discussion with your staff on June 25, 2009, it was agreed that you would provide a response by August 14, 2009.
The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRC's goal of efficient and
M. Wadley -2 effective use of staff resources. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-4037.
Sincerely,
~<~""&~
Thomas J. Wengert, Senior Project lVIanager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-282 and 50-306
Enclosure:
Request for Additional Information cc w/encl: Distribution via ListServ
REQUEST FOR ADDITIONAL INFORMATION PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 DOCKET NOS. 50-282 AND 50-306 In reviewing the Northern States Power Company, a Minnesota corporation (NSPM, the licensee), doing business as Xcel Energy, submittal dated November 04, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML083110125), which requested Technical Specification (TS) changes to revise emergency diesel generator test loads in TS Surveillance Requirement (SR) 3.8.1.3 and SR 3.8.1.9 for the Prairie Island Nuclear Generating Plant, Units 1 and 2 (PINGP), the U.S. Nuclear Regulatory Commission (NRC) staff has determined that the following information is needed to complete its review:
Background
Page 15 of 30 of the license amendment request (LAR) dated November 04, 2008, states:
"The design report did invoke Regulatory Guide (RG) 1.9, "Selection, Design and Qualification of Diesel Generator Units Used As Standby (On-site) Electric Power Systems at Nuclear Power Plants", Revision 2, December 1979, and RG 1.108, "Periodic Testing of Diesel Units Used As On-site Electric Power Systems at Nuclear Power Plants", Revision 1, August 1977; however, they were applied for design purposes and not committed to for operation or surveillance testing.
The LAR which incorporated 05 and 06, Reference 7, submitted March 20,1992, did not reference any regulatory guidance as the basis for the proposed emergency diesel generator (EDG) surveillance requirements. Likewise, license amendments 103 and 96, Reference 3, which approved use of 05 and 06 did not cite any regulatory guidance as the basis [for] the EDG surveillance test requirements."
The NRC staff has identified the following documents that demonstrate that the licensee intends to comply with RG 1.9:
- 1. Page 8.4-9 of Revision 29 of the PINGP Updated Safety Analyses Report (USAR) states that the Unit 2 EDGs meet the requirements of RG 1.9, Revision 2, except portions of the 1984 Edition of the Institute of Electrical and Electronics Engineers, Inc. (IEEE)
Standard 387 were implemented in the factory testing.
RG 1.9 Revision 2 provides testing guidelines. Specifically, Section C Position 14 states:
"Load equal to the continuous rating [of EDG] should be applied for the time required to reach engine temperature equilibrium, at which time, the rated short-time load should be applied for a period of two hours. Immediately following the 2-hour short-time load test, load equal to the continuous rating should be applied for 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br />." The PINGP USAR does not take exception to any sections of RG 1.9, Revision 2.
- 2. The LAR submitted to the NRC on October 29,2007 (ADAMS Accession No. ML073020289) to add power factor testing to the EDG 24-hour test cites the following:
Enclosure
-2 The proposed TS change is consistent with the guidance provided in NUREG-1431, "Standard Technical Specifications, Westinghouse Plants", Revision 3.1 (NUREG-1431),
SR 3.8.1.14. This change is acceptable because it is more restrictive than the current TS and is consistent with the intent of Regulatory Guide (RG) 1.9, "Application and Testing of Safety-Related Diesel Generators in Nuclear Power Plants", Revision 4 (RG 1.9).
- 3. The LAR submitted to the NRC on August 16, 2007 (ADAMS Accession No. ML072320401) to Increase the Unit 1 EDG Monthly Test Load identified RG 1.9 Rev. 4 as "Applicable Regulatory Requirements/Criteria" and specifically cited consistency with the guidance of RG 1.9, Revision 4, Section C, Regulatory Position 2.2.3, "Load Run (Load Acceptance) Test."
- 4. Nuclear Management Company, LLC (NMC) (a predecessor license holder to NSPM) submitted a LAR for extension of TS 3.8.1, "AC Sources-Operating," Emergency Diesel Generator Completion Time, dated November 21,2005 (ADAMS Accession No. ML053260088). Page 32 of 33 of this application provides the following information in section 5.2 "Applicable Regulatory Requirements/Criteria":
- Regulatory Guide 1.9, "Selection, Design and Qualification of Diesel Generator Units Used as Standby (Onsite) Electric Power Systems at Nuclear Power Plants."
This Regulatory Guide describes an acceptable basis for the selection of diesel generator sets of sufficient capacity and margin to implement 10 CFR 50 Appendix A General Design Criterion 17. The changes proposed in the license amendment request will allow an emergency diesel generator to be inoperable for 14 days (7 days more than the current Technical Specifications allow). These changes do not impact the capacity or margin of the emergency diesel generators; thus this license amendment request does not change the plant compliance with this Regulatory Guide.
- 5. The NRC staff issued PINGP License Amendment Nos. 103 and 96 dated December 17, 1992 (ADAMS Accession No. ML022240504) based on the testing frequency and parameters submitted by the licensee in the amendment request dated March 20, 1992.
The NRC staff approval of the amendment request delineates that TS section 4.6.A.3.c is revised to add 18-month full load carrying capacity tests of each EDG for an interval of not less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, of which 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> are at a load equal to 105 -110 percent of the continuous rating of an EDG and 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> are at a load equal to 90 -100 percent of the continuous rating. This is in compliance with RG 1.9 Revision 2. The TS Basis document included with the submittal cites RG 1.9 as a compliance guide. The proposed test values satisfy the intent of RG 1.9 Revision 2 Section C Position 14. The NRC staff noted in the safety evaluation that the allowed outage time for the EDG was not reduced from seven days to the (then existing) criterion of three days due to the diversity in design and ratings provided by the D5 and D6 EDGs, and the increased reliability of the onsite power supply.
Request for Additional Information In order for the NRC staff to complete its review of the amendment request, the following additional information is required.
- 3
- 1. Describe the differences between the apparent compliance with RG 1.9 cited in the above examples of LARs and the statements made in the proposed LAR dated November 04,2008. Specifically, describe how the proposed changes for reducing the 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and the 22 hour2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> testing ranges for EDGs D5 and D6 maintain compliance with the requirements of RG 1.9.
- 2. On page 15 of 30 of the LAR, the licensee provides a discussion on why this proposed amendment "... does not involve a re-rate or de-rate ..." of the D5 and D6 EDGs at PINGP Unit 2. Provide an evaluation of the consequences of permanently de-rating EDGs D5 and D6 to comply with the testing requirement of RG 1.9, as well as enveloping the worst case accident load profile.
- 3. The discussion in the LAR indicates that the reliability of EDGs D5 and D6 has been impacted by the TS required load testing. Provide details for EDG target reliability assumed for compliance with 10 CFR 50.63 (Station Blackout Rule) and the reliability indicator for the last 20, 50, and 100 demands.
M. Wadley -2 effective use of staff resources. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-4037.
Sincerely, IRAJ Thomas J. Wengert, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-282 and 50-306
Enclosure:
Request for Additional Information cc w/encl: Distribution via ListServ DISTRIBUTION:
PUBLIC LPL3-1 R/F RidsNrrDorlLpl3-1 Resource RidsN RRPMPrairielsland Resource RidsNrrLABTully Resource RidsNrrDeEeeb Resource RidsAcrsAcnw MailCTR Resource RidsOgcRp Resource RidsNrrDirsltsb Resource RidsRgn3MailCenter Resource RidsNrrDorlDpr Resource G. Matharu, NRR ADAMS Accession Number' ML091540227 OFFICE LPL3-1/PM LPL3-1/LA NRR/DE/EEEB/BC LPL3-1/BC NAME TWengert BTuily GWilson LJames DATE 06/22/09 06/22/09 06/25/09 06/26/09 OFFICIAL RECORD COPY