MONTHYEARML0603301702006-02-0101 February 2006 Slides on Emergency Diesel Generator Completion Time Extension License Amendment Request Project stage: Request ML0604001982006-02-10010 February 2006 Summary of Meeting with Nuclear Management Company, LLC Regarding Emergency Diesel Generators at Prairie Island Nuclear Generating Plant, Units 1 and 2 (TAC No.'S MC9001 & MC9002) Project stage: Meeting ML0609506132006-04-0404 April 2006 E-Mail, Request for Additional Information on PI LAR - MC9001/MC9002 Project stage: RAI L-PI-06-031, Supplemental to License Amendment Request (LAR) for Extension of Technical Specification (TS) 3.8.1, AC Sources-Operating, Emergency Diesel Generator Completion Time2006-06-16016 June 2006 Supplemental to License Amendment Request (LAR) for Extension of Technical Specification (TS) 3.8.1, AC Sources-Operating, Emergency Diesel Generator Completion Time Project stage: Supplement ML0622100052006-08-0808 August 2006 LAR for EDG Extension and Completion Time Project stage: Other L-PI-06-069, Supplement to License Amendment Request (LAR) for Extension of Technical Specification (TS) 3.8.1, AC Sources-Operating, Emergency Diesel Generator Completion Time (TAC MC9001 & MC9002)2006-08-31031 August 2006 Supplement to License Amendment Request (LAR) for Extension of Technical Specification (TS) 3.8.1, AC Sources-Operating, Emergency Diesel Generator Completion Time (TAC MC9001 & MC9002) Project stage: Supplement ML0624904012006-09-0808 September 2006 Notice of Meeting with Nuclear Management Company, LLC Regarding Extension of Completion Time for Emergency Diesel Generators for Prairie Island Units 1 and 2 Project stage: Meeting L-PI-06-073, Supplement to License Amendment Request (LAR) for Extension of Technical Specification (TS) 3.8.1, AC Sources-Operating, Emergency Diesel Generator Completion Time2006-09-29029 September 2006 Supplement to License Amendment Request (LAR) for Extension of Technical Specification (TS) 3.8.1, AC Sources-Operating, Emergency Diesel Generator Completion Time Project stage: Supplement ML0627202922006-10-20020 October 2006 Summary of September 21, 2006, Category 1 Meeting with Nuclear Management Company, LLC (Nmc), to Discuss Extension of Completion Time for Emergency Diesel Generators Project stage: Meeting L-PI-06-077, Supplement to License Amendment Request for Extension of Technical Specification 3.8.1, AC Sources-Operating, Emergency Diesel Generator Completion Time2006-10-30030 October 2006 Supplement to License Amendment Request for Extension of Technical Specification 3.8.1, AC Sources-Operating, Emergency Diesel Generator Completion Time Project stage: Supplement L-HU-07-009, Supplement to License Amendment Request (LAR) for Extension of Technical Specification (TS) 3.8.1, AC Sources-Operating, Emergency Diesel Generator Completion Time2007-03-15015 March 2007 Supplement to License Amendment Request (LAR) for Extension of Technical Specification (TS) 3.8.1, AC Sources-Operating, Emergency Diesel Generator Completion Time Project stage: Supplement L-PI-07-039, Supplement to License Amendment Request (LAR) for Extension of Technical Specification (TS) 3.8.1, AC Sources-Operating, Emergency Diesel Generator Completion Time2007-05-10010 May 2007 Supplement to License Amendment Request (LAR) for Extension of Technical Specification (TS) 3.8.1, AC Sources-Operating, Emergency Diesel Generator Completion Time Project stage: Supplement ML0713100232007-05-30030 May 2007 Issuance of Amendments Extension of Technical Specifications 3.8.1 AC Source-Operating, Emergency Diesel Generators DG Completion Time Tac Nos. MC9001 and MC9002 Project stage: Approval ML0714900042007-05-30030 May 2007 Extension of Technical Specifications 3.8.1 AC Source-Operating, Emergency Diesel Generator (EDG) Completion Time (Tac Nos. MC9001 and MC9002) Project stage: Other ML0717005682007-07-0505 July 2007 Correction Letter - Extension of Technical Specifications 3.8.1 AC Source-Operating, Emergency Diesel Generators (DG) Completion Time Project stage: Other L-PI-07-061, License Amendment Request (LAR) to Increase the Unit 1 Emergency Diesel Generators' (EDG) Monthly Test Load2007-08-16016 August 2007 License Amendment Request (LAR) to Increase the Unit 1 Emergency Diesel Generators' (EDG) Monthly Test Load Project stage: Request 2006-08-08
[Table View] |
|
---|
Category:Letter type:L
MONTHYEARL-PI-24-044, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-10-21021 October 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program L-PI-24-040, Post-Submittal Package Letter2024-08-23023 August 2024 Post-Submittal Package Letter L-PI-24-036, – Preparation and Scheduling of Operator Licensing Examinations2024-06-28028 June 2024 – Preparation and Scheduling of Operator Licensing Examinations L-PI-24-031, Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2)2024-06-0505 June 2024 Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2) L-PI-24-014, License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption2024-06-0303 June 2024 License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption L-PI-24-030, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.12024-05-22022 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.1 L-PI-24-012, Independent Spent Fuel Storage Installation - License Amendment Request: Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2)2024-04-0202 April 2024 Independent Spent Fuel Storage Installation - License Amendment Request: Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2) L-PI-24-004, Independent Spent Fuel Storage Installation - Annual Effluent Report, January Through December 20232024-02-29029 February 2024 Independent Spent Fuel Storage Installation - Annual Effluent Report, January Through December 2023 L-PI-24-009, Response to Request for Additional Information Prairie Island Nuclear Generating Plant, Unit 2, Alternative RR-09 Safety Injection System and Volume Control System Category C Check Valve Quarterly Testing2024-02-13013 February 2024 Response to Request for Additional Information Prairie Island Nuclear Generating Plant, Unit 2, Alternative RR-09 Safety Injection System and Volume Control System Category C Check Valve Quarterly Testing L-PI-23-034, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System,2024-01-0202 January 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System, L-PI-23-035, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report2023-12-20020 December 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report L-PI-23-033, Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-12-0505 December 2023 Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 L-PI-23-027, Revision to 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals2023-10-0303 October 2023 Revision to 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals L-PI-23-025, License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-09-28028 September 2023 License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 L-PI-23-023, Baffle Former Bolts Alternate Aging Management Strategy2023-09-11011 September 2023 Baffle Former Bolts Alternate Aging Management Strategy L-PI-23-018, License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT2023-07-14014 July 2023 License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT L-PI-23-006, License Amendment Request to Revise Technical Specification 3.7.8 Required Actions2023-06-22022 June 2023 License Amendment Request to Revise Technical Specification 3.7.8 Required Actions L-PI-23-016, 2022 10 CFR 50.46 LOCA Annual Report2023-06-14014 June 2023 2022 10 CFR 50.46 LOCA Annual Report L-PI-23-010, Annual Report of Individual Monitoring2023-04-27027 April 2023 Annual Report of Individual Monitoring L-PI-23-007, Supplement to Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2023-03-28028 March 2023 Supplement to Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) L-PI-23-005, CFR 50.55a Requests Nos. 1-RR-5-15 and 2-RR-5-15, Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)2023-03-0303 March 2023 CFR 50.55a Requests Nos. 1-RR-5-15 and 2-RR-5-15, Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv) L-PI-23-001, Day Steam Generator Tube Inspection Report2023-01-30030 January 2023 Day Steam Generator Tube Inspection Report L-PI-22-047, Resubmittal of Prairie Island Nuclear Generating Plant (PINGP) 2018 Unit 1 180-Day Steam Generator Tube Inspection Report2022-12-21021 December 2022 Resubmittal of Prairie Island Nuclear Generating Plant (PINGP) 2018 Unit 1 180-Day Steam Generator Tube Inspection Report L-PI-22-020, Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2022-12-0202 December 2022 Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) L-PI-22-040, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-10-0606 October 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections L-PI-22-037, Updated Approach for Prairie Island Unit 1 and Unit 2 Baffle Former Bolts2022-09-20020 September 2022 Updated Approach for Prairie Island Unit 1 and Unit 2 Baffle Former Bolts L-PI-22-032, CFR 50.46 LOCA Annual Report2022-06-16016 June 2022 CFR 50.46 LOCA Annual Report L-PI-22-033, Response to Request for Additional Information Prairie Island Nuclear Generating Plant, Units 1 and 2, Amendment to Adopt 24-Month Operating Cycles2022-06-10010 June 2022 Response to Request for Additional Information Prairie Island Nuclear Generating Plant, Units 1 and 2, Amendment to Adopt 24-Month Operating Cycles L-PI-22-003, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-06-0707 June 2022 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections L-PI-22-024, Supplement to Application for License Amendment to Implement 24-Month Operating Cycle2022-03-0707 March 2022 Supplement to Application for License Amendment to Implement 24-Month Operating Cycle L-PI-21-047, Response to Request for Additional Information 24-Month Cycle Amendment Prairie Island Nuclear Generating Plant, Units 1 and 22021-12-0707 December 2021 Response to Request for Additional Information 24-Month Cycle Amendment Prairie Island Nuclear Generating Plant, Units 1 and 2 L-PI-21-045, Response to Request for Additional Information Cooling Water System License Amendment Request2021-11-0404 November 2021 Response to Request for Additional Information Cooling Water System License Amendment Request L-PI-21-029, Exigent License Amendment Request to Revise Technical Specification 3.7.8 to Allow a One-Time Extension of the Completion Time of Required Action B.12021-10-0707 October 2021 Exigent License Amendment Request to Revise Technical Specification 3.7.8 to Allow a One-Time Extension of the Completion Time of Required Action B.1 L-PI-21-006, License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, to Incorporate Installed Bypass Test Capability for the Power Range RTS Functions2021-10-0202 October 2021 License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, to Incorporate Installed Bypass Test Capability for the Power Range RTS Functions L-PI-21-032, Response to Request for Additional Information Amendment Request to Adopt TSTF-471 and 571-T for Prairie Island2021-09-30030 September 2021 Response to Request for Additional Information Amendment Request to Adopt TSTF-471 and 571-T for Prairie Island L-PI-21-016, Application for License Amendment to Implement 24-Month Operating Cycle2021-08-0606 August 2021 Application for License Amendment to Implement 24-Month Operating Cycle L-PI-21-027, 2020 10 CFR 50.46 LOCA Annual Report2021-06-28028 June 2021 2020 10 CFR 50.46 LOCA Annual Report L-PI-21-023, Independent Spent Fuel Storage Installation - 2020 Annual Radiological Environmental Monitoring Program Report2021-05-14014 May 2021 Independent Spent Fuel Storage Installation - 2020 Annual Radiological Environmental Monitoring Program Report L-PI-21-007, Application to Revise Technical Specifications to Adopt TSTF-471, Eliminate Use of the Term Core Alterations in Actions and Notes2021-04-19019 April 2021 Application to Revise Technical Specifications to Adopt TSTF-471, Eliminate Use of the Term Core Alterations in Actions and Notes L-PI-20-050, Request for a One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements, Due to COVID-19 Pandemic2020-10-0707 October 2020 Request for a One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements, Due to COVID-19 Pandemic L-PI-20-051, Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2020-09-28028 September 2020 Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements L-PI-20-026, Response to Request for Additional Information: License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiativ2020-09-0101 September 2020 Response to Request for Additional Information: License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 L-PI-20-035, = Request for Revision to Reactor Vessel Material Surveillance Capsule Removal Schedule2020-07-28028 July 2020 = Request for Revision to Reactor Vessel Material Surveillance Capsule Removal Schedule L-PI-20-023, Independent Spent Fuel Storage Installation, Response to Request for Additional Information: License Amendment Request to Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI)2020-06-10010 June 2020 Independent Spent Fuel Storage Installation, Response to Request for Additional Information: License Amendment Request to Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI) L-PI-20-014, Supplement to License Amendment Request: Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI2020-04-29029 April 2020 Supplement to License Amendment Request: Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI L-PI-20-004, License Amendment Request to Revise Technical Specifications (TS) to Remove Note I from Limiting Condition for Operating (LCO) 3.4.12 and LCO 3.4.132020-03-30030 March 2020 License Amendment Request to Revise Technical Specifications (TS) to Remove Note I from Limiting Condition for Operating (LCO) 3.4.12 and LCO 3.4.13 L-PI-20-001, License Amendment Request to Address Issues Identified in Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Revision 1, and NSAL-15-12020-01-29029 January 2020 License Amendment Request to Address Issues Identified in Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Revision 1, and NSAL-15-1 L-PI-19-041, Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2019-12-23023 December 2019 Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements L-PI-19-031, License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2019-12-16016 December 2019 License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-PI-19-040, License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency2019-10-0707 October 2019 License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency 2024-08-23
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARL-PI-24-044, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-10-21021 October 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program L-PI-24-014, License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption2024-06-0303 June 2024 License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption ML24155A2222024-05-28028 May 2024 Methodology Evaluation Report for Elimination of Response Time Testing Prairie Island Reactor Trip System Rev. 1 ML23215A1672023-12-15015 December 2023 Acceptance of Requested Licensing Action Amendment Request to Revise Surveillance Requirement 3.8.1.2 Note 3 L-PI-23-025, License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-09-28028 September 2023 License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 L-PI-23-006, License Amendment Request to Revise Technical Specification 3.7.8 Required Actions2023-06-22022 June 2023 License Amendment Request to Revise Technical Specification 3.7.8 Required Actions L-PI-23-007, Supplement to Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2023-03-28028 March 2023 Supplement to Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) L-PI-22-040, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-10-0606 October 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections L-PI-22-003, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-06-0707 June 2022 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections L-PI-22-024, Supplement to Application for License Amendment to Implement 24-Month Operating Cycle2022-03-0707 March 2022 Supplement to Application for License Amendment to Implement 24-Month Operating Cycle ML21320A2262021-11-15015 November 2021 License Amendment Request: Standard Emergency Plan and Consolidated Emergency Operations Facility for the Monticello Nuclear Generating Plant and the Prairie Island Nuclear Generating Plant L-PI-21-006, License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, to Incorporate Installed Bypass Test Capability for the Power Range RTS Functions2021-10-0202 October 2021 License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, to Incorporate Installed Bypass Test Capability for the Power Range RTS Functions L-PI-21-016, Application for License Amendment to Implement 24-Month Operating Cycle2021-08-0606 August 2021 Application for License Amendment to Implement 24-Month Operating Cycle L-PI-21-007, Application to Revise Technical Specifications to Adopt TSTF-471, Eliminate Use of the Term Core Alterations in Actions and Notes2021-04-19019 April 2021 Application to Revise Technical Specifications to Adopt TSTF-471, Eliminate Use of the Term Core Alterations in Actions and Notes L-PI-20-051, Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2020-09-28028 September 2020 Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements L-PI-20-004, License Amendment Request to Revise Technical Specifications (TS) to Remove Note I from Limiting Condition for Operating (LCO) 3.4.12 and LCO 3.4.132020-03-30030 March 2020 License Amendment Request to Revise Technical Specifications (TS) to Remove Note I from Limiting Condition for Operating (LCO) 3.4.12 and LCO 3.4.13 ML20058F9432020-02-27027 February 2020 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - License Amendment Request: Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules Revision 4 L-PI-20-001, License Amendment Request to Address Issues Identified in Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Revision 1, and NSAL-15-12020-01-29029 January 2020 License Amendment Request to Address Issues Identified in Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Revision 1, and NSAL-15-1 L-PI-19-031, License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2019-12-16016 December 2019 License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-PI-19-040, License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency2019-10-0707 October 2019 License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency L-PI-19-006, Emergency License Amendment Request Regarding One-Time Extension for Technical Specification Completion Time Requirements2019-01-29029 January 2019 Emergency License Amendment Request Regarding One-Time Extension for Technical Specification Completion Time Requirements L-PI-18-064, License Amendment Request (LAR) to Revise Current Licensing Basis, Supplement 12018-12-0404 December 2018 License Amendment Request (LAR) to Revise Current Licensing Basis, Supplement 1 L-PI-18-014, License Amendment Request (LAR) to Revise Current Licensing Basis2018-10-0202 October 2018 License Amendment Request (LAR) to Revise Current Licensing Basis L-PI-18-031, License Amendment Request to Adopt TSTF-439, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an Lco.2018-06-26026 June 2018 License Amendment Request to Adopt TSTF-439, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an Lco. L-PI-18-005, License Amendment Request to Revise License Condition Associated with Implementation of NFPA 8052018-05-18018 May 2018 License Amendment Request to Revise License Condition Associated with Implementation of NFPA 805 ML17090A2012017-03-31031 March 2017 License Amendment Request to Revise Technical Specification for Plant/Unit Staff Qualifications Education and Experience Eligibility Requirements for Licensed Operators ML17094A5762017-03-29029 March 2017 License Amendment Request to Revise Emergency Action Level (EAL) Scheme ML17055C3592017-02-23023 February 2017 License Amendment Request: Revision to Emergency Plan Staff Augmentation Response Times L-PI-16-060, License Amendment Request to Revise Technical Specification 3.8.7 to Remove Non-Conservative Required Action2016-08-31031 August 2016 License Amendment Request to Revise Technical Specification 3.8.7 to Remove Non-Conservative Required Action L-PI-16-020, License Amendment Request Regarding One-Time Extension for Technical Specification Surveillance Requirement 3.8.4.3. DC Sources- Operating.2016-04-0707 April 2016 License Amendment Request Regarding One-Time Extension for Technical Specification Surveillance Requirement 3.8.4.3. DC Sources- Operating. L-PI-16-003, Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated Line Item Improvement Process2016-01-25025 January 2016 Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated Line Item Improvement Process ML15327A2282015-11-17017 November 2015 License Amendment Request for Spent Fuel Pool Criticality Technical Specification Changes L-PI-15-087, Enclosures 7 & 8: Modeling of Fuel Assemblies Containing Both Ifba and Gadolinia Absorber Rods with Westinghouse Core Design Code Systems and Affidavit2015-10-31031 October 2015 Enclosures 7 & 8: Modeling of Fuel Assemblies Containing Both Ifba and Gadolinia Absorber Rods with Westinghouse Core Design Code Systems and Affidavit L-PI-15-030, Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process2015-06-29029 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process L-PI-14-034, License Amendment Request (LAR) to Revise Technical Specification (TS) 3.3.3, Event Monitoring (EM) Instrumentation, and Additional Conditions Related to Alternative Source Term License Amendment Implementation2014-12-11011 December 2014 License Amendment Request (LAR) to Revise Technical Specification (TS) 3.3.3, Event Monitoring (EM) Instrumentation, and Additional Conditions Related to Alternative Source Term License Amendment Implementation L-PI-14-072, License Amendment Request (LAR) to Revise the Licensing Basis Analysis for a Waste Gas Decay Tank Rupture2014-08-21021 August 2014 License Amendment Request (LAR) to Revise the Licensing Basis Analysis for a Waste Gas Decay Tank Rupture L-PI-14-037, License Amendment Request (LAR) to Revise Technical Specification (TS) 3.8.1, AC Sources- Operating, Emergency Diesel Generator Voltage and Frequency Limits2014-06-0909 June 2014 License Amendment Request (LAR) to Revise Technical Specification (TS) 3.8.1, AC Sources- Operating, Emergency Diesel Generator Voltage and Frequency Limits ML14126A7272014-05-0505 May 2014 Supplement to License Amendment Request (LAR) for Cyber Security Plan Implementation Date Extension L-PI-13-102, License Amendment Request (LAR) to Revise Staff Augmentation Times in the Prairie Island Nuclear Generating Plant (PINGP) Emergency Plan2013-12-20020 December 2013 License Amendment Request (LAR) to Revise Staff Augmentation Times in the Prairie Island Nuclear Generating Plant (PINGP) Emergency Plan ML13333B6742013-11-27027 November 2013 License Amendment Request (LAR) for Northern States Power Company, Minnesota (NSPM) Cyber Security Plan Implementation Date Extension L-PI-13-076, Supplement to License Amendment Request for Exception to Technical Specification 5.5.14 Testing Requirements Associated with Steam Generator Replacement2013-07-25025 July 2013 Supplement to License Amendment Request for Exception to Technical Specification 5.5.14 Testing Requirements Associated with Steam Generator Replacement L-PI-13-071, Supplement to License Amendment Request (LAR) to Revise Emergency Plan (EP) Emergency Action Levels (Eals): RA 1.2 and Fuel Clad Barrier Loss Criteria2013-07-23023 July 2013 Supplement to License Amendment Request (LAR) to Revise Emergency Plan (EP) Emergency Action Levels (Eals): RA 1.2 and Fuel Clad Barrier Loss Criteria L-PI-13-030, License Amendment Request (LAR) to Add a Methodology to Technical Specification (TS) 5.6.5, Core Operating Limits Report (Colr).2013-05-23023 May 2013 License Amendment Request (LAR) to Add a Methodology to Technical Specification (TS) 5.6.5, Core Operating Limits Report (Colr). L-PI-13-017, License Amendment Request (LAR) to Revise Technical Specification (TS) 3.5.3, ECCS (Emergency Core Cooling System) - Shutdown2013-02-20020 February 2013 License Amendment Request (LAR) to Revise Technical Specification (TS) 3.5.3, ECCS (Emergency Core Cooling System) - Shutdown L-PI-12-110, License Amendment Request (LAR) to Revise Emergency Plan (EP) Emergency Action Levels (Eals): RA1.2 and Fuel Clad Barrier Loss Criteria2012-12-13013 December 2012 License Amendment Request (LAR) to Revise Emergency Plan (EP) Emergency Action Levels (Eals): RA1.2 and Fuel Clad Barrier Loss Criteria ML12278A4052012-09-28028 September 2012 Prairie Island, Units 1 and 2, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors L-PI-12-054, Application to Revise Technical Specifications Associated with Steam Generator Replacement and Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection2012-07-25025 July 2012 Application to Revise Technical Specifications Associated with Steam Generator Replacement and Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection L-PI-12-055, License Amendment Request for Exception to Technical Specification 5.5.14 Testing Requirements Associated with Steam Generator Replacement2012-07-25025 July 2012 License Amendment Request for Exception to Technical Specification 5.5.14 Testing Requirements Associated with Steam Generator Replacement L-PI-12-028, License Amendment Request (LAR) to Revise Technical Specification (TS) 3.8.1, AC Sources - Operating Emergency Diesel Generator Voltage Limits2012-05-15015 May 2012 License Amendment Request (LAR) to Revise Technical Specification (TS) 3.8.1, AC Sources - Operating Emergency Diesel Generator Voltage Limits L-PI-11-037, License Amendment Request to Add Diesel Fuel Oil License Bases and Revise Technical Specifications 3.7.8 Re Cooling Water System & 3.8.3 Re Diesel Fuel Oil2011-08-11011 August 2011 License Amendment Request to Add Diesel Fuel Oil License Bases and Revise Technical Specifications 3.7.8 Re Cooling Water System & 3.8.3 Re Diesel Fuel Oil 2024-06-03
[Table view] Category:Technical Specifications
MONTHYEARML24221A3622024-09-27027 September 2024 Issuance of Amendment Nos. 245 and 233 Revise Technical Specification 3.8.1, AC Sources-Operating, Surveillance Requirement 3.8.1.2, Note 3 ML24071A1162024-05-0101 May 2024 Issuance of Amendment Nos. 244 and 232 Revise TS 3.7.8, Cooling Water (Cl) System ML24008A1292024-03-0505 March 2024 Enclosure 2 - PI ISFSI Amendment 12 Section 4.0 Design Features Technical Specifications ML22357A1002023-03-31031 March 2023 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendments Standard Emergency Plan and Consolidated Emergency Operations Facility ML22181A0002022-08-17017 August 2022 Issuance of Amendments Reactor Trip System Power Range Instrumentation Channels L-PI-22-003, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-06-0707 June 2022 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML22061A2062022-04-0101 April 2022 Issuance of Amendments TSTF-471, Rev. 1, TSTF-571-T, and Administrative Changes to Technical Specification Section 5.0 L-PI-21-029, Exigent License Amendment Request to Revise Technical Specification 3.7.8 to Allow a One-Time Extension of the Completion Time of Required Action B.12021-10-0707 October 2021 Exigent License Amendment Request to Revise Technical Specification 3.7.8 to Allow a One-Time Extension of the Completion Time of Required Action B.1 ML20346A0202021-03-15015 March 2021 Issuance of Amendment Nos. 235 and 223, Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML20356A0022021-02-0505 February 2021 Issuance of Amendment Nos. 234 and 222, Revise Technical Specifications 3.2.1 and 5.6.5 Identified in Westinghouse Nuclear Safety Advisory Letters NSAL-09-05, Revision 1, and NSAL-15-1 ML20210M0142020-09-0808 September 2020 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendment Nos. 204, 231, and 219 TSTF-529 Clarify Use and Application Rules L-PI-20-001, License Amendment Request to Address Issues Identified in Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Revision 1, and NSAL-15-12020-01-29029 January 2020 License Amendment Request to Address Issues Identified in Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Revision 1, and NSAL-15-1 L-PI-19-041, Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2019-12-23023 December 2019 Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements L-PI-19-040, License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency2019-10-0707 October 2019 License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency ML19045A4802019-04-16016 April 2019 Issuance of Amendment Nos. 226 and 214 Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B ML19029A0942019-01-29029 January 2019 Issuance of Amendment No. 213, One-Time Technical Specification Change to Extend Completion Time for EDGs D5 and D6 (Emergency Circumstances) ML17362A2022018-03-0505 March 2018 Issuance of Amendment Concerning Revision to the Prairie Island Nuclear Generating Plant, Units 1 and 2 Emergency Plan (CAC Nos. MF9345 and MF9346; EPID L-2017-LLA-0175) ML16133A4062016-06-16016 June 2016 Issuance of Amendment Nos. 217 and 205, Adoption of Technical Specifications Task Force TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation (CAC Nos. MF6449 and MF6450) ML15264A2092015-11-30030 November 2015 Issuance of Amendment Nos. 216 and 204 Regarding Revisions to Technical Specification 3.3.3 and Renewed Facility Operating License ML15229A1762015-08-26026 August 2015 Issuance of Amendment Nos. 215 and 203 Regarding Revision to Licensing Basis Analysis for a Waste Gas Decay Tank Rupture ML15209A5122015-07-17017 July 2015 Technical Specifications - Updating Instructions -Effective Date: 7/24/2015 ML15209A5092015-07-17017 July 2015 Technical Specifications - Updating Instructions L-PI-15-030, Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process2015-06-29029 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process ML15086A0462015-05-21021 May 2015 Issuance of Amendment Nos. 214 and 202 Regarding Revisions to Technical Specification 3.8.1, AC Sources - Operating ML15062A0132015-05-20020 May 2015 Issuance of Amendments 213 and 201 to Revise TS 3.5.3, ECCS - Shutdown L-PI-15-004, Supplement to License Amendment Request (LAR) to Revise Technical Specification (TS) 3.5.3, ECCS (Emergency Core Cooling System)- Shutdown2015-02-26026 February 2015 Supplement to License Amendment Request (LAR) to Revise Technical Specification (TS) 3.5.3, ECCS (Emergency Core Cooling System)- Shutdown L-PI-14-034, License Amendment Request (LAR) to Revise Technical Specification (TS) 3.3.3, Event Monitoring (EM) Instrumentation, and Additional Conditions Related to Alternative Source Term License Amendment Implementation2014-12-11011 December 2014 License Amendment Request (LAR) to Revise Technical Specification (TS) 3.3.3, Event Monitoring (EM) Instrumentation, and Additional Conditions Related to Alternative Source Term License Amendment Implementation ML14058A2072014-02-19019 February 2014 Technical Specifications (3801 TS Markup) ML13214A0292013-08-0202 August 2013 Correction Letter for License Amendment Nos. 207 (Unit 1) and 194 (Unit 2) ML13113A4002013-07-0202 July 2013 License Amendments TSTF-510 L-PI-13-030, License Amendment Request (LAR) to Add a Methodology to Technical Specification (TS) 5.6.5, Core Operating Limits Report (Colr).2013-05-23023 May 2013 License Amendment Request (LAR) to Add a Methodology to Technical Specification (TS) 5.6.5, Core Operating Limits Report (Colr). ML13093A3442013-05-0909 May 2013 License Amendments for Fuel Oil System and TSTF-501 L-PI-12-028, License Amendment Request (LAR) to Revise Technical Specification (TS) 3.8.1, AC Sources - Operating Emergency Diesel Generator Voltage Limits2012-05-15015 May 2012 License Amendment Request (LAR) to Revise Technical Specification (TS) 3.8.1, AC Sources - Operating Emergency Diesel Generator Voltage Limits L-PI-12-013, Response to Requests for Additional Information Associated with Adoption of the Alternative Source Term (AST) Methodology2012-02-24024 February 2012 Response to Requests for Additional Information Associated with Adoption of the Alternative Source Term (AST) Methodology ML1129011152011-12-0101 December 2011 Issuance of Amendments Revision of Technical Specifications 5.2.1, Onsite and Offsite Organizations and TS 5.3, Plant Staff Qualifications. L-PI-11-037, License Amendment Request to Add Diesel Fuel Oil License Bases and Revise Technical Specifications 3.7.8 Re Cooling Water System & 3.8.3 Re Diesel Fuel Oil2011-08-11011 August 2011 License Amendment Request to Add Diesel Fuel Oil License Bases and Revise Technical Specifications 3.7.8 Re Cooling Water System & 3.8.3 Re Diesel Fuel Oil ML11172A0202011-06-27027 June 2011 Technical Specifications, Unit 1, Renewed Facility Operating License for Prairie Island Nuclear Generating Plant ML11172A0222011-06-27027 June 2011 Technical Specifications, Unit 2, Renewed Facility Operating License for Prairie Island Nuclear Generating Plant L-PI-11-016, License Amendment Request (LAR) to Revise Surveillance Requirement (SR) Footnote in Technical Specification (TS) 3.8.1, AC Sources - Operating.2011-02-0303 February 2011 License Amendment Request (LAR) to Revise Surveillance Requirement (SR) Footnote in Technical Specification (TS) 3.8.1, AC Sources - Operating. L-PI-10-104, Supplement to Exigent License Amendment Request to Modify Technical Specifications Surveillance Requirement 3.8.1.102010-10-20020 October 2010 Supplement to Exigent License Amendment Request to Modify Technical Specifications Surveillance Requirement 3.8.1.10 ML1025715492010-09-16016 September 2010 Correction to Amendment Nos. 195 and 184 Regarding Technical Specification Changes to Control Room Habitability Requirements ML0925703672009-09-15015 September 2009 Correction to Technical Specifications (TAC Nos. MD9142 and MD9143) L-PI-08-080, License Amendment Request (LAR) to Revise Emergency Diesel Generator (EDG) Test Loads in Surveillance Requirement (SR) 3.8.1.3 and SR 3.8.1.92008-11-0404 November 2008 License Amendment Request (LAR) to Revise Emergency Diesel Generator (EDG) Test Loads in Surveillance Requirement (SR) 3.8.1.3 and SR 3.8.1.9 ML0826815912008-09-22022 September 2008 (PINGP-1 and 2), Technical Specifications ISFSI, Issuance of Amendments to Conform the Facility Operating Licenses to Reflect Transfer of Operating Authority (TAC L24245) ML0826812912008-09-22022 September 2008 Revised Operating Licenses & Technical Specifications, Issuance of Amendments to Conform the Facility Operating Licenses to Reflect Transfer of Operating Authority (TAC L24245, MD9622 and MD9623) ML0820504452008-07-18018 July 2008 Tech Spec Pages for Amendments 186 & 176 Adopting Provisions of Regulatory Guide (Rg) 1.52 Revision 3 ML0818402342008-06-27027 June 2008 Prairie, Units 1 and 2, Tech Spec Pages for Amendments 185 and 175 Regarding Incorporation of TS Task Force Travelers TSTF-479, TSTF-485 and TSTF-497 ML0812705062008-05-0101 May 2008 Submittal of Entire Re-Issue of ISFSI Technical Specifications ML0801404252008-01-28028 January 2008 Issuance of Amendments (TAC Nos. MD4209 & MD4210) - Tech Specs ML0735204002007-12-14014 December 2007 Technical Specifications in Support of Containment Sump Resolution 2024-09-27
[Table view] |
Text
Prairie Island Nuclear Generating Plant Operated by Nuclear Management Company, LLC AUG 1 6 2007 L-PI-07-061 10 CFR 50.90 U S Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant Unit 1 Docket 50-282 License No. DPR-42 License Amendment Request (LAR) to Increase the Unit 1 Emergencv Diesel Generators' (EDG) Monthly Test Load
References:
- 1) Supplement to License Amendment Request (LAR) For Extension Of Technical Specification (TS) 3.8.1, "AC Sources-Operating," Emergency Diesel Generator Completion Time (TAC Nos. MC9001 and MC9002),
dated May 10,2007, Accession No. ML071310108.
Pursuant to 10 CFR 50.90, the Nuclear Management Company, LLC (NMC) hereby requests an amendment to the Technical Specifications (TS) for the Prairie Island Nuclear Generating Plant (PINGP) Unit 1 to revise Surveillance Requirement (SR) 3.8.1.3 to require testing at or above 2500 kW. This LAR fulfills the commitment made in Reference 1 to submit an LAR by August 31, 2007 which will require the Unit 1 monthly Emergency Diesel Generators load test (SR 3.8.1.3) to be performed at or above 90% of the diesel generator's continuous power rating. NMC has evaluated the proposed changes in accordance with 10 CFR 50.92 and concluded that they involve no significant hazards consideration.
The enclosure to this letter contains the licensee's evaluation of the proposed changes.
NMC requests approval of this LAR within one calendar year of the submittal date.
Upon NRC approval, NMC requests 90 days to implement the associated changes. In accordance with 10 CFR 50.91, NMC is notifying the State of Minnesota of this LAR by transmitting a copy of this letter and enclosure to the designated State Official.
If there are any questions or if additional information is needed, please contact Mr. Dale Vincent, P.E., at 1-651-388-1121, extension 4107.
1717 Wakonade Drive East Welch, Minnesota 55089-9642 Telephone: 651.388.1121
Document Control Desk Page 2 Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.
This LAR fulfills a commitment made in Reference 1.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on AUG 1 6 2007 Michael D. wadley 0 Site Vice President, Prairie lslaS(d Nuclear Generating Plant Units 1 and 2 Nuclear Management Company, LLC
Enclosure:
Evaluation of Proposed Changes cc: Administrator, Region Ill, USNRC Project Manager, Prairie Island, USNRC Resident Inspector, Prairie Island, USNRC State of Minnesota
ENCLOSURE Evaluation of the Proposed Changes License Amendment Request (LAR) to Increase the Unit 1 Emergency Diesel Generators' (EDG) Monthly Test Load
- 1.
SUMMARY
DESCRIPTION
- 2. DETAILED DESCRIPTION 2.1 Proposed Changes
2.2 Background
- 3. TECHNICAL EVALUATION
- 4. REGULATORY SAFETY ANALYSIS 4.1 Applicable Regulatory Requirementslcriteria 4.2 Precedent 4.3 Significant Hazards Consideration 4.4 Conclusions
- 5. ENVIRONMENTAL CONSIDERATION
- 6. REFERENCES ATTACHMENTS:
- 1. Technical Specification Pages (Markup)
- 2. Bases Pages (Markup) (For information only)
- 3. Technical Specification Pages (Retyped)
Page 1 of 9
Enclosure NMC Unit 1 EDG Test Load
- 1.
SUMMARY
DESCRIPTION This LAR is a request to amend Operating License DPR-42 for Prairie Island Nuclear Generating Plant (PINGP) Unit 1.
The Nuclear Management Company, LLC (NMC) requests Nuclear Regulatory Commission (NRC) review and approval of proposed revisions to Technical Specification (TS) 3.8.1, "AC Sources-Operating1',Surveillance Requirement (SR) 3.8.1.3 which will increase the Unit 1 EDG's test load to 2500 kW. The Technical Specifications, with the revisions proposed in this LAR, meet applicable regulatory guidance.
- 2. DETAILED DESCRIPTION 2.1 Proposed Changes Brief descriptions of the associated proposed TS changes are provided below along with discussions of the justification for each change. The specific wording changes to the TS are provided in Attachments 1 and 3 to this enclosure.
TS 3.8.1, "AC Sources-Operating": This LAR proposes to revise SR 3.8.1.3 to require testing the Unit 1 EDGs at or above 2500 kW. This change is acceptable because this test load is consistent with the guidance of Regulatory Guide (RG) 1.9, "Application and Testing of Safety-Related Diesel Generators in Nuclear Power Plants" (RG 1.9), is greater than the calculated load these diesel generators would be challenged with during a Unit 1 design basis loss of coolant accident coincident with a loss of offsite power, and is less than the continuous rating of these EDGs.
Although Bases changes are not a part of this LAR, Attachment 2 to this enclosure includes marked up Bases pages for information. The changes proposed in are directly related to the changes proposed to TS 3.8.1.
In summary these changes are acceptable because they are consistent with current regulatory guidance.
2.2 Background Currently SR 3.8.1.3 requires the Unit 1 EDGs to be tested every 31 days at or above 1650 kW which is below the calculated load these diesel generators would be challenged with during a Unit 1 design basis loss of coolant accident coincident with a loss of offsite power and is not consistent with current regulatory guidance. In Reference 1, NMC committed to submit an LAR to increase the Unit 1 EDG TS-required minimum monthly test load at or above 90% of the continuous rating which is Page 2 of 9
Enclosure NMC Unit 1 EDG Test Load consistent with regulatory guidance. This LAR is submitted in fulfillment of the NMC commitment.
With the TS changes proposed in this LAR the plant will continue to operate safely and the health and welfare of the public is protected.
- 3. TECHNICAL EVALUATION PlNGP is a two unit plant located on the right bank of the Mississippi River approximately 6 miles northwest of the city of Red Wing, Minnesota. The facility is owned by Northern States Power Company (NSP) and operated by NMC. Each unit at PlNGP employs a two-loop pressurized water reactor designed and supplied by Westinghouse Electric Corporation. The initial PlNGP application for a Construction Permit and Operating License was submitted to the Atomic Energy Commission (AEC) in April 1967. The Final Safety Analysis Report (FSAR) was submitted for application of an Operating License in January 1971. Unit 1 began commercial operation in December 1973 and Unit 2 began commercial operation in December 1974.
The PlNGP was designed and constructed to comply with NSP's understanding of the intent of the AEC General Design Criteria (GDC) for Nuclear Power Plant Construction Permits, as proposed on July 10, 1967. PlNGP was not licensed to NUREG-0800, "Standard Review Plan (SRP)."
Unit 1 EDG Description The Unit 1 EDGs, D l and D2, are Fairbanks-Morse opposed piston EDGs which provide onsite standby power sources for the 4160 Volt safeguards buses 15 and 16.
These EDGs are each rated at 2750 kW continuous (8750 hour0.101 days <br />2.431 hours <br />0.0145 weeks <br />0.00333 months <br /> basis), 0.8 power factor, 900 rpm, 4160 Volt, three phase, 60 Hertz, synchronous generators. The 1000 hour0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> rating of each EDG is 3000 kW. The 30 minute rating of each unit is 3250 kW maximum.
Current TS Requirements and Basis SR 3.8.1.3 requires that every 31 days:
Verify each DG [diesel generator] is synchronized and loaded and operates for 2 60 minutes at a load:
- a. Unit 1; 2 1650 kW; and
- b. Unit 2; 2 5100 kW and 5 5300 kW.
The Unit 1 EDG test load was established in license amendments 91 and 84 for PlNGP Units 1 and 2, respectively, dated October 27, 1989. The LAR dated March 17, 1986 which provided the basis for these license amendments stated, "The requirement to load the engine to 1650 kW will conform to the manufacturer's recommendation to load Page 3 of 9
Enclosure NMC Unit 1 EDG Test Load the engine to at least 60% of rated load . . ." Prior to 1989, the TS required the monthly load test for the Unit 1 EDGs to be performed at a lower load.
Proposed Changes This LAR proposes to revise SR 3.8.1.3 to require testing every 31 days as follows:
Verify each DG is synchronized and loaded and operates for 2 60 minutes at a load:
- a. Unit 1; ,2500 kW; and
- b. Unit 2; 2 5100 kW and 5 5300 kW.
The proposed test load of 2500 kW is greater than 90% of the 2750 kW continuous rating of the Unit 1 EDGs.
Technical Basis for Change This LAR proposes to increase the TS-required monthly test load to 2500 kW which is slightly greater than 90% of the Unit 1 EDG continuous rating of 2750 kW. This test load is consistent with the guidance of RG 1.9, Revision 4, Section C, Regulatory Position 2.2.3, "Load Run (Load Acceptance) Test", which states:
Clause 7.5.2 of IEEE Std 387-1995 should be supplemented as follows:
This test involves demonstrating 90-1 00 percent of the continuous rating of the emergency diesel generator, for an interval of not less than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and until attainment of temperature equilibrium. This test may be accomplished by synchronizing the generator with offsite power. The loading and unloading of an emergency diesel generator during this test should be gradual and based on a prescribed schedule that is selected to minimize stress and wear on the diesel generator.
This test is also consistent with RG 1.9, Revision 4, Table 1, which shows that this test should be performed monthly. The changes proposed in this LAR do not involve system modifications involving the plant EDGs. Although this LAR is consistent with the RG 1.9, Revision 4, guidance for Unit 1 EDG monthly test loading, this LAR does not commit to compliance with the provisions of RG 1.9, Revision 4.
In Reference 1, NMC committed to submit an LAR to increase the Unit 1 EDG monthly test load to greater than or equal to 90% of the continuous rated load. Since the continuous rated load of the Unit 1 EDGs is 2750 kW, the proposed minimum test load of 2500 kW meets this commitment.
The TS changes proposed in this LAR will increase the TS required minimum monthly test load for the Unit 1 EDGs. Since current plant procedures require testing at or above the proposed 2500 kW test load, this TS change does not change the actual Page 4 of 9
Enclosure NMC Unit 1 EDG Test Load load at which the Unit 1 EDGs are tested and does not cause an additional testing burden on the plant.
Conclusions This LAR proposes TS changes which will require the Unit 1 EDGs to be tested at or above 2500 kW which is above 90% of their continuous rated loading. This change is consistent with current regulatory guidance and plant testing procedures. Operation and maintenance of the Prairie Island Nuclear Generating Plant with the proposed TS revisions will continue to protect the health and safety of the public.
- 4. REGULATORY SAFETY ANALYSIS 4.1 Applicable Renulatow RequirementsICriteria Title 10 Code of Federal Regulations 50.36, "Technical specifications~':
(c) Technical specifications will include items in the following categories:
3 ) Sun/eillance requirements. Surveillance requirements are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met.
This license amendment request proposes to increase the required test load for Unit 1 emergency diesel generators in the monthly Surveillance Requirement for load testing.
With these changes, the Technical Specifications will continue to assure that the necessary quality of these systems and their components is maintained and the limiting conditions for operation of these systems will continue to be met.
Thus with the changes proposed in this license amendment request, the requirements of Title 10 CFR 50.36 continue to be met.
General Design Criteria The construction of the Prairie Island Nuclear Generating Plant was significantly complete prior to issuance of 10 CFR 50, Appendix A, General Design Criteria. The Prairie Island Nuclear Generating Plant was designed and constructed to comply with the Atomic Energy Commission General Design Criteria as proposed on July 10, 1967 (AEC GDC) as described in the plant Updated Safety Analysis Report. AEC GDC proposed Criterion 39 provides design guidance for the operating capability of systems to control gaseous radioactive effluents.
Page 5 of 9
Enclosure NMC Unit 1 EDG Test Load Criterion 39 - Emergency Power For Engineered Safety Features Alternate power systems shall be provided and designed with adequate independency, redundancy, capacity, and testability to permit the functioning required of the engineered safety features. As a minimum, the onsite power system and the offsite power system shall each, independently, provide this capacity assuming a failure of a single active component in each power system.
AEC GDC Criterion 39 is partially met through the redundant source of emergency power from four emergency diesel generators installed at the plant. This license amendment request proposes changes to the Technical Specifications which will increase the monthly required test load for the Unit 1 emergency diesel generators which assures that these diesel generators have the capacity to perform their required function. With these changes, the AEC GDC stated above will continue to be met when the plant is operated with the plant Technical Specifications revised as proposed. Thus with the changes proposed in this license amendment request, the requirements of AEC GDC 39 continue to be met and the plant Technical Specifications will continue to provide the basis for safe plant operation.
Renulatorv Guide 1.9, "Application and Testing of Safety-Related Diesel Generators in Nuclear Power Plants", Revision 4 Regulatory Guide 1.9, Revision 4, describes methods acceptable to the NRC Staff for implementing the requirements of NRC regulations with respect to emergency diesel generators. Section C, Regulatory Position 2.2.3 and Table 1 of this Regulatory Guide provide guidance that monthly load tests should be performed between 90% and 100%
of the emergency diesel generator continuous rated load. This license amendment request proposes to revise the Prairie Island Nuclear Generating Plant Technical Specifications for Unit 1 to be consistent with the monthly emergency diesel generator test load guidance of this Regulatory Guide.
With these changes, the monthly test load for the Unit 1 emergency diesel generators is consistent with the loading and scheduling guidance of Regulatory Guide 1.9, Revision 4.
4.2 Precedent The Nuclear Regulatory Commission previously increased the Technical Specification required test load for the Prairie Island Nuclear Generating Plant emergency diesel generators, D l and D2, in license amendments 91 and 84, for Units 1 and 2 respectively, issued October 27, 1989, Accession Number ML022210226.
4.3 Siqnificant Hazards Consideration The Nuclear Management Company has evaluated whether or not a significant hazards consideration is involved with the proposed amendment by focusing on the three Page 6 of 9
Enclosure NMC Unit 1 EDG Test Load standards set forth in 10 CFR 50.92, "Issuance of amendment," as discussed below:
- 1. Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No This license amendment request proposes Technical Specification Surveillance Requirement changes which will increase the monthly test load for the Unit 1 emergency diesel generators to a load greater than 90% of their continuous rated load which is consistent with the guidance of Regulatory Guide 1.9, "Application and Testing of Safety-Related Diesel Generators in Nuclear Power Plants". Revision 4.
The emergency diesel generators are not accident initiators and therefore, these changes do not involve a significant increase the probability of an accident. The proposed changes increase the test load requirements, are consistent with current regulatory guidance for testing emergency diesel generators, and will continue to assure that this equipment performs its design function. Thus these changes do not involve a significant increase in the consequences of an accident.
Therefore, the proposed changes do not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No This license amendment request proposes Technical Specification Surveillance Requirement changes which will increase the monthly test load for the Unit 1 emergency diesel generators to a load greater than 90% of their continuous rated load which is consistent with the guidance of Regulatory Guide 1.9, "Application and Testing of Safety-Related Diesel Generators in Nuclear Power Plants", Revision 4.
The changes proposed for the emergency diesel generators do not change any system operations or maintenance activities. Testing requirements will be revised and will continue to demonstrate that the Limiting Conditions for Operation are met and the system components are functional. The revised test load is consistent with current plant procedures and practices. These changes do not create new failure modes or mechanisms and no new accident precursors are generated.
Page 7 of 9
Enclosure NMC Unit 1 EDG Test Load Therefore, the proposed changes do not create the possibility of a new or different kind of accident from any previously evaluated.
- 3. Does the proposed amendment involve a significant reduction in a margin of safety?
Response: No This license amendment request proposes Technical Specification Surveillance Requirement changes which will increase the monthly test load for the Unit 1 emergency diesel generators to a load greater than 90% of their continuous rated load which is consistent with the guidance of Regulatory Guide 1.9, "Application and Testing of Safety-Related Diesel Generators in Nuclear Power Plants". Revision 4.
Current plant procedures require the Unit 1 emergency diesel generators to be load tested above 90% of their continuous rated load each month. This license amendment request proposes to make testing above 90% of the Unit 1 emergency diesel generator's continuous rated load a Technical Specification requirement. Since this change is an increase in the test requirements and the change is consistent with current regulatory guidance, this change does not involve a significant reduction in a margin of safety.
Therefore, the proposed changes do not involve a significant reduction in a margin of safety.
Based on the above, the Nuclear Management Company concludes that the proposed amendment does not involve a significant hazards consideration under the standards set forth in 10 CFR 50.92(c) and, accordingly, a finding of "no significant hazards consideration" is justified.
4.4 Conclusions In conclusion, based on the considerations discussed in above, ( I ) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
- 5. ENVIRONMENTAL CONSIDERATION A review has determined that the proposed amendment would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, or would change an inspection or surveillance requirement. However, the proposed amendment does not involve (i) a significant Page 8 of 9
Enclosure NMC Unit 1 EDG Test Load hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(~)(9).Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.
- 6. REFERENCES
- 1. Supplement to License Amendment Request (LAR) For Extension Of Technical Specification (TS) 3.8.1, "AC Sources-Operating," Emergency Diesel Generator Completion Time (TAC Nos. MC9001 and MC9002), dated May 10, 2007, Accession Number ML071310108.
Page 9 of 9
ENCLOSURE, ATTACHMENT 1 Technical Specification Pages (Markup) 3.8.1-7 1 page follows
AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.8.1.3 ........................... NOTES ...........................
I. DG loadings may include gradual loading in consideration of manufacturer's recomendations.
- 2. Momentary transients outside the load range do not invalidate this test.
- 3. This Surveillance shall be conducted on only one DG at a time.
- 4. This SR shall be preceded by and immediately follow without shutdown a successful performance of SR 3.8.1.2 or SR 3.8.1.6.
Verify each DG is synchronized and loaded and 3 1 days operates for 2 60 minutes at a load:
- a. Unit 1;>250.Q%%kW; and
- b. Unit 2; > 5 100 kW and 5 5300 kW.
SR 3.8.1.4 Verify fuel oil level above lower limit switch in each 3 1 days day tank.
SR 3.8.1.5 Verify the fuel oil transfer system operates to transfer 3 1 days fuel oil from storage tank to the day tank.
Prairie Island Unit 1 - Amendment No. 45%
Units 1 and 2 Unit 2 - Amendment No. 4-49
ENCLOSURE, ATTACHMENT 2 Bases Pages (Markup)
(For Information Only) 1 page follows
AC Sources-Operating B 3.8.1 BASES SURVEILLANCE SR 3.8.1.2 and SR 3.8.1.6 (continued)
REQ-Since SR 3.8.1.6 requires a 10 second start, it is more restrictive than SR 3.8.1.2, and it may be performed in lieu of SR 3.8.1.2. This is the intent of Note 1 of SR 3.8.1.2.
The 3 1 day Frequency for SR 3.8.1.2 and the 184 day Frequency for SR 3.8.1.6 provide adequate assurance of DG OPERABILITY, while minimizing degradation resulting from testing.
This Surveillance verifies that the DGs are capable of synchronizing with the offsite electrical system and accepting loads greater than or equal to 90% of thecontin1~~1us rati~ig-01the D G
, J)
(Ref. 2). The Unit 1 and Unit 2 diesel generators have different loading requirements since their individual loads are different. As an example, the Unit 2 diesel generators supply emergency power to the cooling water pump whereas the Unit 1 diesel generators do not. A minimum run time of 60 minutes is required to stabilize engine temperatures, while minimizing the time that the DG is connected to the offsite source.
The 3 1 day Frequency for this Surveillance is consistent with SR 3.8.1.2.
This SR is modified by four Notes. Note 1 indicates that diesel engine runs for this Surveillance may include gradual loading, as recommended by the manufacturer, so that mechanical stress and wear on the diesel engine are minimized. Note 2 states that momentary transients, because of changing loads or system Prairie Island Unit 1 - 8 Revision Units 1 and 2 B 3.8.1-17Unit 2 - I \
Revision
ENCLOSURE, ATTACHMENT 3 Technical Specification Pages (Retyped) 3.8.1-7 1 page follows
AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.8.1.3 ........................... NOTES ...........................
- 1. DG loadings may include gradual loading in consideration of manufacturer's recomendations.
- 2. Momentary transients outside the load range do not invalidate this test.
- 3. This Surveillance shall be conducted on only one DG at a time.
- 4. This SR shall be preceded by and immediately follow without shutdown a successful performance of SR 3.8.1.2 or SR 3.8.1.6.
Verify each DG is synchronized and loaded and 3 1 days operates for 2 60 minutes at a load:
- a. Unit 1; 2 2500 kW; and
- b. Unit 2; 2 5 100 kW and 5 5300 kW SR 3.8.1.4 Veri@ fuel oil level above lower limit switch in each 3 1 days day tank.
SR 3.8.1.5 Veri@ the fuel oil transfer system operates to transfer 3 1 days fuel oil from storage tank to the day tank.
Prairie Island Unit 1 - Amendment No. 45%