ML080990433

From kanterella
Jump to navigation Jump to search
Summary of Annual Assessment Meeting with FPL Energy Seabrook
ML080990433
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 04/07/2008
From: Arthur Burritt
Reactor Projects Branch 3
To:
BURRITT, AL
References
MN 08-011
Download: ML080990433 (3)


Text

April 7, 2008 MN 08-011 LICENSEE: FPL ENERGY SEABROOK, LLC.

FACILITY: SEABROOK GENERATING STATION

SUBJECT:

SUMMARY

OF MARCH 25, 2008, ANNUAL ASSESSMENT MEETING WITH FPL ENERGY SEABROOK On March 25, 2008, at 4:00 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted an annual assessment meeting with FPL Energy Seabrook, LLC (FPL Energy) at the Seabrook Town Hall in Seabrook, NH. The NRC requested the meeting to discuss its assessment of FPL Energy safety performance at Seabrook for the period of January 1, through December 31, 2007, as documented in the NRC annual assessment letter dated March 3, 2008.

The NRC presentation included a discussion of the Reactor Oversight Process, 2007 performance assessment results, and an overview of the remaining planned inspections at Seabrook for calendar year 2008. The NRCs overall assessment was that FPL energy operated Seabrook in a manner that preserved public health and safety and the environment.

FPL Energy stated that they were in general agreement with the NRCs assessment and discussed planned areas for improvement.

A number of state and local officials, FPL Energy employees and local media observed this meeting and were offered the opportunity to ask the NRC questions regarding FPL Energys performance and the role of the agency in ensuring safe plant operations. The question and answer period accommodated all individuals who desired to speak or ask questions after the business portion of the meeting was completed. Feedback forms submitted by the public following the meeting will be evaluated. The NRCs assessment letter can be found in ADAMS with accession number ML080600389. The meeting notice with the attached meeting agenda can be found in ADAMS with accession number ML080720018, and the meeting slides can be found in ADAMS with accession number ML080930025. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Arthur L. Burritt, Chief Projects Branch 3 Division of Reactor Projects Attachments: Principal Meeting Attendees and Observers

2 March 25, 2008 NRC-FPL Energy Annual Assessment Meeting Principal Meeting Attendees and Observers NRC Attendees: A. Burritt, Chief, Projects Branch 3, Division of Reactor Projects W. Raymond, Senior Resident Inspector P. Presby, Resident Inspector (acting)

R. Moore, Reactor Engineer, NSPDP FPL Energy Attendees: G. St. Pierre, Site Vice President P. Freeman, Plant General Manager R. Noble, Engineering Manager Observers: A number of other individuals were present that represented FPL Energy, the states of New Hampshire and Massachusetts and the local media. No members of the general public attended.

3 Distribution:

S. Collins, RA M. Dapas, ORA D. Lew, DRP\

J. Clifford, DRP A. Burritt, DRP L. Cline, DRP W. Raymond, DRP P. Presby, DRP R. Moore, DRP G. Malone, DRP D. Schroeder, DRP H. Balian, DRP J. Tomlinson, DRP S. Williams, RI OEDO J. Lubinski, NRR ADAMS: ML080990433 SUNSI REVIEW COMPLETE: ______LC____(Reviewers Initials)

Document Name: G:\DRP\BRANCH3\COMMUNICATIONS\EXTERNAL\PUBLIC MEETINGS\2008 ANNUAL ASSESSMENT MEETINGS\SEABROOK\SB 3-25-08 MEETING

SUMMARY

.DOC After declaring this document AAn Official Agency Record@ it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME LCline/LC ABurritt/ALB DATE 04/ 07/08 04/07/08 OFFICIAL RECORD COPY