Technical Requirements Manual, Revision 33
ML071090070
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 04/10/2007
From: Gerlach R
Susquehanna
To:
Document Control Desk, NRC/NRR/ADRO
References
Download: ML071090070 (48)


Text

Apr. 10, 2007 Page 1 of 3 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2007-14301 USER INFORMATION:

GERLACH*ROSE M EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION:

TO: GERLACH*ROSE M 04/10/2007 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.

ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.

TRM2 - TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 04/07/2007 ADD MANUAL TABLE OF CONTENTS DATE: 04/09/2007 CATEGORY: DOCUMENTS TYPE: TRM2

-ýOc I

Apr. 10, 2007 Page 2 of 3 ID: TEXT 2.2 REMOVE: REV:5 ADD: REV: 6 CATEGORY: DOCUMENTS TYPE: TRM2 ID: TEXT 3.1.3 REMOVE: REV:2 ADD: REV: 3 CATEGORY: DOCUMENTS TYPE: TRM2 ID: TEXT 3.10.2 REMOVE: REV:0 ADD: REV: 1 CATEGORY: DOCUMENTS TYPE: TRM2 ID: TEXT 3.3.9 REMOVE: REV:1 ADD: REV: 2 CATEGORY: DOCUMENTS TYPE: TRM2 ID: TEXT LOES REMOVE: REV:32 ADD: REV: 33 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL

Apr. 10, 2007 Page 3 of 3 USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

SSES MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date: 0 4/09/2007 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 33 04/09/2007

Title:

LIST OF EF]FECTIVE SECTIONS TEXT TOC 9 12/14/2006

Title:

TABLE OF CONTENTS 0 11/19/2002

\

TEXT 1.1

Title:

USE AND APPLICATION DEFINITIONS

"\

'\

TEXT 2.1 1 02/04/2005\

Title:

PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS//,

TEXT 2.2 6 04/09/2007,

Title:

PLANT PROGRAMS AND SETPOINTS INSTRUMENT/TRIP SETPOINT TABLE TEXT 3.0 /2 <01/29/2007

Title:

APPLICABILITY TECHNICAL\,REQUIREMENT

"\N \. 'N FOR OPERATION (TRO) APPLICABILITY TEXT 3.1.1 0 11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD 1 2 INJECTION TEXT '/7 (ATWS\-ARI)

\ N " INSTRUMENTATION TEXT 3.1.2 / 0 11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT 3.1.3 3 04/09/2007

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0 11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT 3.2.1 6 04/03/2007

Title:

CORE OPERATING LIMITS CORE OPERATING LIMITS REPORT (COLR)

Report Date: 04/09/07 Pagel1 Page . of 15 15 Report Date: 04/09/07

SSES MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.3.1 0 11/19/2002

Title:

INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 1 04/26/2006

Title:

INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 1 04/26/2006

Title:

INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 2 06/13/2006

Title:

INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0 11/19/2002

Title:

INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK S TEXT 3.3.6

Title:

INSTRUMENTATION 2 10/19/2005 TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 0 .11/19/2002

Title:

INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1 10/22/2003

Title:

INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3.3.9 2 04/09/2007

Title:

INSTRUMENTATION LPRM UPSCALE ALARM INSTRUMENTATION TEXT 3.3.10 1 12/14/2004

Title:

INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1 10/22/2003

Title:

INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.4.1 1 04/26/2006

Title:

REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY Report Date: 04/09/07 Page2 of i_55 Report Date: 04/09/07 Page 2. of 15

SSES MANUAL SManual Manual Name: TRM2

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.4.2 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM STRUCTURAL INTEGRITY TEXT 3.4.3 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS)

TEXT 3.4.4 1 12/14/2004

Title:

REACTOR COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT 3.4.5 1 04/26/2006

Title:

REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS TEXT 3.5.1 1 02/04/2005

Title:

ECCS AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 0 11/19/2002

Title:

ECCS AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0 11/19/2002

Title:

ECCS AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0 11/19/2002

Title:

CONTAINMENT VENTING OR PURGING TEXT 3.6.2 0/ 11/19/2002

Title:

CONTAINMENT SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0 11/19/2002

Title:

CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION TEXT 3.6.4 0 11/19/2002

Title:

CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1 0 11/19/2002

Title:

PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN Page 3 1 of 15 Report Date: 04/09/07

SSES MANUJAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.2 0 11/19/2002

Title:

PLANT SYSTEMS ULTIMATE HEAT SINK (UHS) AND GROUND WATER LEVEL TEXT 3.7.3.1 S 1 04/26/2006

Title:

PLANT SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT 3.7.3.2 2 04/26/2006

Title:

PLANT SYSTEMS SPRAY AND SPRINKLER SYSTEMS TEXT 3.7.3.3 2 08/18/2005

Title:

PLANT SYSTEMS C02 SYSTEMS TEXT 3.7.3.4 1 04/26/2006

Title:

PLANT SYSTEMS HALON SYSTEMS TEXT 3.7.3.5 1 04/26/2006

Title:

PLANT SYSTEMS FIRE HOSE STATIONS TEXT 3.7.3.6 1 04/26/2006

Title:

PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES 1 04/26/2006 TEXT-3.7.3.7

Title:

PLANT SYSTEMS FIRE RATED ASSEMBLIES 6 12/14/2006 TEXT 3.7.3.8

Title:

PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION TEXT 3.7.4 1 04/26/2006

Title:

PLANT SYSTEMS SOLID RADWASTE SYSTEM TEXT 3.7.5.1 0 11/19/2002

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2 0 11/19/2002

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE Report Date: 04/09/07 Report Date: 04/09/07 Page 44 Page of of 15 15

SSES MANUJAL

'Manual Manual Name: TRM2

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 1 04/26/2006 TEXT 3.7.5.3

Title:

PLANT SYSTEMS.LIQUID HOLDUP TANKS 1 03/01/2005 TEXT 3.7.6

Title:

PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION 0 11/19/2002 TEXT 3.7.7

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT 3.7.8 5 10/12/2006

Title:

PLANT SYSTEMS SNUBBERS TEXT 3.7.9 1 08/28/2006

Title:

PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1 12/14/2004

Title:

PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS) 2 02/04/2005 TEXT 3.8.1

Title:

ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES 1 12/14/2004 TEXT 3.8.2.1 ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

Title:

CONTINUOUS 2 12/14/2004 TEXT 3.8.2.2 PROTECTION -

(MOV) THERMAL OVERLOAD

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES AUTOMATIC TEXT 3.8.3 0 11/19/2002

Title:

ELECTRICAL POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT 3.8.4 1 02/04/2005

Title:

ELECTRICAL POWER 24 VDC ELECTRICAL SUBSYSTEM TEXT 3.8.5 0 11/19/2002

Title:

ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION of i~ Report Date: 04/09/07 Report Date: 04/09/07 Page ~- of 15

SSES MANUAL SManual Manual Name: TRM2

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.8.6 0 11/19/2002

Title:

ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8.7 0 12/14/2006

Title:

BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT 3.9.1 0 11/19/2002

Title:

REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0 11/19/2002

Title:

REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0 11/19/2002

Title:

REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1 04/26/2006

Title:

MISCELLANEOUS SEALED SOURCE CONTAMINATION TEXT.3.10.2 1 04/09/2007

Title:

MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 1. 04/26/2006

Title:

MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT 3.10.4 1 08/28/2006

Title:

MISCELLANEOUS LEADING EDGE FLOW METER (LEFM)

TEXT 3.11.1.1 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3.11.1.2 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3.11.1.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM Report Date: 04/09/07 Page66 Page of of 15 15 Report Date: 04/09/07

SSES MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.1.4 1 12/14/2004

Title:

RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.1.5 1 12/14/2004

Title:

RADIOACTIVE EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT 3.11.2.1 3 04/26/2006

Title:

RADIOACTIVE EFFLUENTS DOSE RATE 1 04/26/2006 TEXT 3.11.2.2

Title:

RADIOACTIVE EFFLUENTS DOSE - NOBLE GASES TEXT 3.11.2.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE FORM TEXT 3.11.2.4 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS GASEOUS RADWASTE TREATMENT SYSTEM TEXT 3.11.2.5 3 11/14/2006

Title:

RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM TEXT 3.11.2.6 2 12/14/2004

Title:

RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS TOTAL DOSE TEXT 3.11.4.1 3 04/26/2006

Title:

RADIOACTIVE EFFLUENTS MONITORING PROGRAM TEXT 3.11.4.2 2 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11.4.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM Report Date: 04/09/07 Page 77 of of i~

15 Report Date: 04/09/07

SSES MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.12.1 0 11/19/2002

Title:

LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT 3.12.2 1 10/12/2006

Title:

LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0 11/19/2002

Title:

LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENTS TEXT B3.0 2 01/29/2007

Title:

APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT B3.1.1 0 11/19/2002

Title:

REACTIVITY CONTROL SYSTEM BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.1.2 0 11/19/2002

Title:

REACTIVITY CONTROL SYSTEM BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3.1.3 2 11/22/2005

Title:

REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0 11/19/2002

Title:

REACTIVITY CONTROL SYSTEM BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0 11/19/2002

Title:

CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)

TEXT B3.3.1 0 11/19/2002

Title:

INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 0 11/19/2002

Title:

INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3 1 02/04/2005

Title:

INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION Page 8 . of 15 Report Date: 04/09/07

SSES MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.3.4 2 06/13/2006

Title:

INSTRUMENTATION BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT B3.3.5 1 06/13/2006

Title:

INSTRUMENTATION BASES THIS PAGE INTENTIONALLY LEFT BLANK TEXT B3.3.6 3 10/19/2005

Title:

INSTRUMENTATION BASES TRM ISOLATION ACTUATION INSTRUMENTATION TEXT B3.3.7 0 11/19/2002

Title:

INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT B3.3.8 1 10/22/2003

Title:

INSTRUMENTATION BASES TRM RPS INSTRUMENTATION TEXT B3.3.9 1 11/22/2004

Title:

INSTRUMENTATION BASES LPRM UPSCALE ALARM INSTRUMENTATION TEXT B3.3.10 0 11/19/2002

Title:

INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS TEXTB3.3.11 1 10/22/2003

Title:

INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION TEXT B3.4.1 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES STRUCTURAL INTEGRITY TEXT B3.4.3 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM' BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT Page 9 of 15 Report Date: 04/09/07

SSES MANUAL SManual Manual Name: TRM2

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.4.5 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS TEXT B3.5.1 0 11/19/2002

Title:

ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 0 11/19/2002

Title:

ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 0 11/19/2002

Title:

ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0 11/19/2002

Title:

CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0 11/19/2002

Title:

CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 0 11/19/2002

Title:

CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1 12/14/2004

Title:

CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1 0 11/19/2002

Title:

PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)

TEXT B3.7.2 0 11/19/2002

Title:

PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UHS) GROUND WATER LEVEL TEXT B3.7.3.1 1 04/26/2006

Title:

PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT B3.7.3.2 2 04/26/2006

Title:

PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS Page 10 of .15 Report Date: 04/09/07

SSES MANUJAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.3.3 0 11/19/2002

Title:

PLANT SYSTEMS BASES C02 SYSTEMS TEXT B3.7.3.4 1 04/26/2006

Title:

PLANT SYSTEMS BASES HALON SYSTEMS TEXT B3.7.3.5 1 04/26/2006

Title:

PLANT SYSTEMS BASES FIRE HOSE STATIONS

.TEXT B3.7.3.6 1 04/26/2006

Title:

PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT B3.7.3.7 0 11/19/2002

Title:

PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES TEXT B3.7.3.8 1 01/12/2004

Title:

PLANT SYSTEMS BASES FIRE DETECTION INSTRUMENTATION TEXT B3.7.4 0 11/19/2002

Title:

PLANT SYSTEMS. BASES SOLID RADWASTE SYSTEM TEXT ,B3.7.5.1 0 11/19/2002

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT B3.7.5.2 0 11/19/2002

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3 0 11/19/2002

Title:

PLANT SYSTEMS BASES LIQUID HOLDUP TANKS TEXT B3.7.6 1 03/01/2005

Title:

PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION TEXT B3.7.7 0 11/19/2002

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION Page 11 of .15 Report Date: 04/09/07

SSES MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.8 2 10/12/2006

Title:

PLANT SYSTEMS BASES SNUBBERS TEXT B3.7.9 1 12/14/2004

Title:

PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1 12/14/2004

Title:

PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.8.1 1 02/04/2005

Title:

ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT B3.8.2.1 0 11/19/2002

Title:

ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

CONTINUOUS TEXT B3.8.2.2 1 09/17/2004

Title:

ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

AUTOMATIC TEXT B3.8.3 0 11/19/2002

Title:

ELECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT B3.8.4 0 11/19/2002

Title:

ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5 0 11/19/2002

Title:

ELECTRICAL POWER BASES. DEGRADED VOLTAGE.PROTECTION TEXT B3.8.6 1 02/04/2005

Title:

ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7 0 12/14/2006

Title:

BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT B3.9.1 0 11/19/2002

Title:

REFUELING OPERATIONS BASES DECAY TIME Report Date: 04/09/07 12 Page 12 of ot 15

.15 Report Date: 04/09/07

SSES M~IANUAL SManual Manual Name: TRM2

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 0 11/19/2002 TEXT B3.9.2

Title:

REFUELING OPERATIONS BASES COMMUNICATIONS 0 11/19/2002 TEXT B3.9.3

Title:

REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0 11/19/2002

Title:

MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 0 11/19/2002

Title:

MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0 11/19/2002

Title:

MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI) 0 11/19/2002 TEXT B3.10.4

Title:

MISCELLANEOUS BASES LEADING EDGE FLOW METER (LEFM)

TEXT B3.11.1.1 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3.11.1.2 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE 0 11/19/2002 TEXT B3.11.1.3

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM TEXT B3.11.1.4 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.1.5 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT B3.11.2.1 1 12/14/2004

Title:

RADIOACTIVE EFFLUENTS BASES DOSE RATE Report Date: 04/09/07 i3~

Page 13 of h15 Report Date: 04/09/07

SSES MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.11.2.2 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES DOSE - NOBLE GASES 0 11/19/2002 TEXT B3.11.2.3

Title:

RADIOACTIVE EFFLUENTS BASES DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATES FORM TEXT B3.11.2.4 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3.11.2.5 4 11/14/2006

Title:

RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM TEXT B3.11.2.6 1 01/27/2004

Title:

RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3.11.4.1 2 01/06/2006

Title:

RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXTB3.11.4.2 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 0 11/19/2002

Title:

LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 0 11/19/2002

Title:

LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS.

TEXT B3.12.3 0 11/19/2002

Title:

LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Report Date: 04/09/07 Page 14 14 of 15 15 Report Date: 04/09/07

SSES MANUAL Manual Name: TRM2 SManual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 4.1 0 09/27/2003

Title:

ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4. 2 0 09/27/2003

Title:

ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION TEXT 4.3 0 09/27/2003

Title:

ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION 0 09/27/2003 TEXT 4.4

Title:

ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS TEXT 4.5 0 09/27/2003

Title:

ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 4.6 0 09/27/2003

Title:

ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM TEXT 4.7 0 09/27/2003

Title:

ADMINISTRATIVE CONTROLS TRAINING Report Date: 04/09/07 Page 1.5 Page 15 of i~

15 Report Date: 04/09/07

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 33 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date TOC TABLE OF CONTENTS 11/29/2006 1.0 USE AND APPLICATION Page TRM / 1.0-1 08/31/1998 Page TRM / 1.0-2 10/04/2002 Page TRM / 1.0-3 08/31/1998 2.0 PLANT PROGRAMS Page 2.0-1 08/31/1998 Pages TRM / 2.0-2 and TRM 2.0-3 01/28/2005 Page TRM /.2..0-4 06/25/2002 Page TRM / 2.0-5 04/12/1999 Pages TRM / 2.0-6 and TRM / 2.0-7 03/27/2007 Page TRM / 2.0-8 12/03/2004 Pages TRM / 2.0-9 through TRM / 2.0-11 11/15/2004 Page TRM / 2.0-12 03/27/2007 Pages TRM /2.0-13 and TRM / 2.0-14 11/15/2004 Page TRM / 2.0-15 11/15/2005 3.0 APPLICABILITY Pages TRM / 3.0-1 and TRM / 3.0-2 01/10/2007 Page TRM / 3.0-3 03/15/2002 Page TRM / 3.0-4 11/30/2005 3.1 REACTIVITY CONTROL SYSTEMS Pages 3.1-1 through 3.1-5 08/31/1998 Pages TRM / 3.1-6 through TRM/[3.1-8 03/27/2007 Pages TRM / 3.1-9 andTRM,/381-9a 02/18/1999 Page TRM/3.1-10-/'/, , 02/18/1999 3.2 CORE OPERATING LIMITS REPORT Page TRM / 3.2-1 08/31/1998 PagesTRM / 3:2-2,through TRM / 3.2-48 03/08/2007 3.3 INSTRUMENTATION Pages \TRM// 3.3-1 through TRM / 3.3-3 07/16/1999 Page TRM / 3.3-4 03/31/2006 Pages 3.3-5 and 3.3-6 08/31/1998 Page TRM 3.3-7 03/31/2006 Page 3.3-8 08/31/1998 Pages TRM / 3.3-9 and TRM / 3.3-9a 12/17/1998 Page TRM / 3.3-10 05/30/2006 Page TRM / 3.3-11 06/02/2005 Page TRM / 3.3-11a 05/30/2006 Page TRM / 3.3-12 03/30/2001 Page TRM / 3.3-13 09/13/2005 Page TRM / 3.3-14 12/14/1998 Page TRM / 3.3-15 10/22/2003 SUSQUEHANNA - UNIT 2 TRM /LOES-1 EFFECTIVE DATE 03/27/2007

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 33 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page TRM / 3.3-16 06/27/2001 Pages TRM / 3.3-17 and TRM / 3.3-18 06/14/2002 Pages TRM / 3.3-19 and TRM / 3.3-20 10/22/2003 Page TRM / 3.3-21 03/27/2007 Page TRM / 3.3-21a 11/15/2004 03/27/2007 Pages TRM /3.3-21b through TRM / 3.3-21d Page TRM / 3.3-22 12/03/2004 05/16/2003 Pages TRM / 3.3-23 and TRM / 3.3-24 Page TRM / 3.3-25 10/22/2003 3.4 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 03/31/2006 Pages 3.4-2 through 3.4-5 10/23/1.998 Pages 3.4-6 through 3.4-11 08/31/1998 Page TRM / 3.4-12 12/03/2004 Page TRM / 3.4-13 03/31/2006 3.5 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 01/28/2005 Pages 3.5-2 and 3.5-3 08/31/1998 Page TRM / 3.5-4 04/17/2000 Pages 3.5-5 through 3.5-7 08/31/1998 3.6 CONTAINMENT Pages 3.6-1 through 3.6-4 08/31/1998 Page TRM / 3.6-5 01/07/2002 Page 3.6-6 08/31/1998 Pages TRM / 3.6-7 through TRM / 3.6-9 12/31/2002 3.7 PLANT SYSTEMS Pages TRM / 3.7-1 and TRM / 3.7-2 07/29/1999 Page 3.7-3 08/31/1998 Pages TRM / 3.7-4 and TRM / 3.7-5 03/31/2006 Pages TRM / 3.7-6 through TRM / 3.7-8 08/02/1999 Page TRM / 3.7-9 03/31/2006 Page TRM / 3.7-10 08/16/2005 Page TRM / 3.7-11 01/21/2000 Pages TRM / 3.7-12 and TRM / 3.7-13 08/02/1999 Page TRM / 3.7-14 08/09/2005 Pages TRM / 3.7-15 and TRM / 3.7-16 08/02/1999 Page TRM / 3.7-17 03/31/2006 Page TRM / 3.7-18 08/02/1999 Page TRM / 3.7-19 03/31/2006 Pages TRM / 3.7-20 through TRM / 3.7-22 08/02/1999 Pages TRM / 3.7-23 and TRM / 3.7-24 03/31/2006 Pages TRM / 3.7-25 through TRM / 3.7-27 08/02/1999 Page TRM / 3.7-28 11/29/2006 TRM / LOES-2 EFFECTIVE DATE 03/27/2007 SUSQUEHANNA - UNIT SUSQUEHANNA -

UNIT 22 TRM / LOES-2 EFFECTIVE DATE 03/27/2007

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 33 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page TRM / 3.7-29 11/16/2001 Page TRM / 3.7-30 11/30/2005 Page TRM / 3.7-31 11/16/2001 Page TRM / 3.7-32 01/09/2004 Page TRM / 3.7-33 10/05/2002 Page TRM / 3.7-34 03/31/2006 Pages TRM / 3.7-35 and TRM / 3.7-36 02/01/1999 Pages 3.7-37 through 3.7-38 08/31/1998 Page TRM / 3.7-39 03/31/2006 Pages TRM / 3.7-40 and TRM / 3.7-40a 02/14/2005 Pages 3.7-41 and 3.7-42 08/31/1998 Pages TRM / 3.7-43 through TRM / 3.7-48 10/05/2006 Pages TRM / 3.7-48a and TRM / 3.7-48b 10/05/2006 Page TRM / 3.7-49 03/09/2001 Page TRM / 3.7-50 08/16/2006 Page TRM / 3.7-51 12/03/2004 Page TRM / 3.7-52 04/15/2003 07/29/1999 Page TRM / 3.7-53 3.8 ELECTRICAL POWER Page TRM / 3.8-1 04/02/2002 Pages TRM / 3.8-2 and TRM / 3.8-3 01/28/2005 Page TRM / 3.8-4 01/31/2005 Pages TRM / 3.8-5 and TRM / 3.8-6 04/02/2002 Pages TRM / 3.8-7 through TRM / 3.8-10 12/03/2004 Page TRM / 3.8-11 08/10/2004 Page TRM / 3.8-12 12/03/2004 Pages 3.8-13 and 3.8-14 08/31/1998 Page TRM / 3.8-15 01/28/2005 Pages TRM / 3.8-16 and TRM / 3.8-17 04/02/2002 Page 3.8-18 02/01/1999 Page TRM / 3.8-19 04/02/2002 Page TRM / 3.8-20 02/01/1999 Pages TRM / 3.8-21 through TRM / 3.8-23 06/06/1999 Pages 3.8-24 and 3.8-25 08/31/1998 Pages TRM / 3.8-26 through TRM / 3.8-29 11/29/2006 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 08/31/1998 3.10 MISCELLANEOUS Page TRM / 3.10-1 03/31/2006 Pages 3.10-2 through 3.10-4 08/30/1998 Pages TRM / 3.10-5 and TRM / 3.10-6 03/27/2007 Page TRM / 3.10-7 03/31/2006 Page TRM / 3.10-8 08/16/2006 TRM / LOES-3 EFFECTIVE DATE 03/27/2007 SUSQUEHANNA - UNIT SUSQUEHANNA - UNIT 22 TRM / LOES-3 EFFECTIVE DATE 03/27/2007

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 33 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date 3.11 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 03/31/2006 Pages 3.11-2 through 3.11-3 08/31/1998 Page TRM / 3.11-4 03/31/2006 Page 3.11-5 08/31/1998 Page TRM / 3.11-6 03/31/2006 Pages 3.11-7 through 3.11-9 08/31/1998 Page TRM / 3.11-10 12/03/2004 Pages 3.11-11 and 3.11-12 08/31/1998 Page 3.11-13 09/01/1998 Page TRM / 3.11-14 12/03/1004 Pages 3.11-15 and 3.11-16 09/01/1998 Page TRM / 3.11-17 03/31/2006 Page 3.11-18 08/31/1998 Page TRM / 3.11-19 08/15/2005 Pages TRM / 3.11-20 and TRM / 3.11-21 03/31/2006 Page TRM / 3.11-22 04/02/2002 Page TRM / 3.11-23 11/14/2006 Page TRM / 3.11-24 05/13/2005 Page 3.11-25 09/01/1998 Pages TRM / 3.11-26 through TRM / 3.11-28 01/21/2004 Page TRM / 3.11-29 12/03/2004 Pages TRM 3.11-30 through TRM / 3.11-32 01/21/2004 Page TRM / 3.11-33 03/31/2006 Page 3.11-34 08/31/1998 Page TRM / 3.11-35 03/31/2006 Pages TRM / 3.11-36 through TRM / 3.11-39 11/30/2005 Pages 3.11-40 through 3.11-44 08/31/1998 Page TRM / 3.11-45 03/31/2006 Page 3.11-46 08/31/1998 Page TRM / 3.11-47 03/31/2006 3.12 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-3 02/05/1999 Page TRM / 3.12-4 09/30/2006 Page TRM / 3.12-5 02/05/1999 4.0 ADMINISTRATIVE CONTROLS Pages 4.0-1 through 4.0-8 08/31/1998 TRM / LOES-4 EFFECTIVE DATE 03/27/2007 UNIT 22 SLISOUEHANNA - UNIT SUSQUEHANNA TRM / LOES-4 EFFECTIVE DATE 03/27/2007

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 33 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B 3.0 APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM / B 3.0-3 08/31/1998 Page TRM / B 3.0-4 01/10/2007 Pages TRM / B 3.0-5 through TRM / B 3.0-10 08/31/1998 Pages TRM / B 3.0-11 and TRM / B 3.0-12 03/15/2002 Pages TRM / B 3.0-13 and TRM / B 3.0-14 11/30/2005 Page TRM / B 3.0-15 03/15/2002 B 3.1 REACTIVITY CONTROL SYSTEMS BASES Pages TRM / B 3.1-1 through TRM / B 3.1-3 07/13/1999 Page B 3.1-4 08/31/1998 Pages TRM / B 3.1-5 through TRM / B 3.1-7 03/27/2007 Page TRM / B 3.1-8 02/18/1999 B 3.2 CORE OPERATING LIMITS BASES Page B 3.2-1 08/31/1998 B 3.3 INSTRUMENTATION BASES Page TRM / B 3.3-1 04/07/2000 Page B 3.3-2 08/31/1998 Pages TRM / B 3.3-3 and TRM / B 3.3-3A 01/31/2005 Pages TRM / B 3.3-4 through TRM / B 3.3-7 05/30/2006 Pages TRM / B 3.3-8 and TRM / B 3.3-9 03/30/2001 Page B 3.3-10 08/31/1998 Pages TRM / B 3.3-11 and TRM / B 3.3-12 09/13/2005 Page TRM / B 3.3-13 12/03/2004 Page TRM / B 3.3-14 06/25/2002 Page TRM / B 3.3-14a 06/14/2002 Page TRM / B 3.3-14b 06/14/2002 Page TRM / B 3.3-15 10/22/2003 Page TRM / B 3.3-16 10/22/2003 Page TRM / B 3.3-17 10/22/2003 Pages TRM / B 3.3-18 and TRM / B 3.3-19 03/27/2007 Pages TRM / B 3.3-19a through TRM / B 3.3-19e 03/27/2007 Pages TRM / B 3.3-20 and TRM / B 3.3-21 05/16/2003 Page TRM / B 3.3-22 10/22/2003 Page TRM / B 3.3-23 05/16/2003 B 3.4 REACTOR COOLANT SYSTEM BASES Pages B 3.4-1 through B 3.4-4 08/31/1998 Page TRM / B 3.4-5 10/15/1999 Page B 3.4-6 08/31/1998 B 3.5 ECCS AND RCIC BASES Pages B 3.5-1 through B 3.5-5 08/31/1998 SUSQUEHANNA - UNIT 2 TRM / LOES-5 EFFECTIVE DATE 03/27/2007

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 33 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B 3.6 CONTAINMENT BASES Page TRM / B 3.6-1 07/26/2001 Page TRM / B 3.6-2 02/01/1999 Page B 3.6-3 08/31/1998 Page TRM / B 3.6-4 09/23/1999 Page TRM / B 3.6-5 01/07/2002 Page TRM / B 3.6-6 12/03/2004 Pages TRM / B 3.6-7 through TRM / B 3.6-11 12/31/2002 B 3.7 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 08/31/1998 Page TRM / B 3.7-3 08/02/1999 Page TRM / B 3.7-4 03/31/2006 Page TRM / B 3.7-5 08/02/1999 Pages TRM / B 3.7-6 and TRM / B 3.7-6a 03/31/2006 Pages TRM / B 3.7-7 and TRM / B 3.7-7a 08/02/1999 Page TRM / B 3.7-8 08/02/1999 Page TRM / B 3.7-9 03/31/2006 Page TRM / B 3.7-10 08/02/1999 Pages TRM / B 3.7-1Oa through TRM / B 3.7-11a 03/31/2006 Pages TRM / B 3.7-12 through TRM / B 3.7-14 08/02/1999 Pages TRM / B 3.7-14a and TRM / B 3.7-14b 01/09/2004 Pages TRM / B 3.7-15 and TRM / B 3.7-16 02/01/1999 Pages B 3.7-17 through B 3.7-20 08/31/1998 Pages TRM / B 3.7-21 and TRM / B3.7-21a 02/14/2005 Pages TRM / B 3.7-22 and TRM / B 3.7-23 04/07/2000 Pages TRM / B 3.7-24 through TRM / B 3.7-30 10/05/2006 Pages TRM / B 3.7-30a and TRM / B 3.7-30b 10/05/2006 Page TRM / B 3.7-31 12/03/2004 Page TRM / B 3.7-32 03/09/2001 Page TRM / B 3.7-33 04/15/2003 Page TRM / B 3.7-34 12/03/2004 Page TRM / B 3.7-35 07/05/2000 B 3.8 ELECTRICAL POWER BASES Page TRM / B 3.8-1 04/02/2002 Pages TRM / B 3.8-2 and TRM / B 3.8-2a 01/28/2005 Page TRM / B 3.8-3 04/02/2002 Page TRM / B 3.8-3a 04/02/2002 Page TRM / B 3.8-4 04/02/2002 Page TRM / B 3.8-4a 08/10/2004 Page TRM / B 3.8-5 08/31/1998 Pages TRM / B 3.8-6 through TRM / B 3.8-16 04/02/2002 Page TRM / B 3.8-17 01/28/2005 Pages TRM / B 3.8-18 through TRM / B 3.8-24 11/29/2006 SUSQUEHANNA - UNIT 2 TRM / LOES-6 EFFECTIVE DATE 03/27/2007

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 33 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 08/31/1998 Pages B 3.9-3 through B 3.9-7 10/23/1998 B 3.10 MISCELLANEOUS BASES Page B 3.10-1 08/31/1998 Pages TRM / B 3.10-2 and TRM / B 3.10-3 03/27/2007 Pages TRM / B 3.10-4 and TRM / B 3.10-5 08/23/1999 Pages TRM / B 3.10-6 and TRM / 3.10-7 04/17/2002 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 08/31/1998 Page TRM / B 3.11-10 02/01/1999 Pages TRM/B 3.11-11 and TRM/B 3.11-11a 04/07/2000 Pages TRM/B 3.11-12 and TRM/B 3.11-13 02/01/1999 Page TRM / B 3.11-14 12/03/2004 Page TRM / B 3.11-15 02/01/1999 Pages B 3.11-16 through B 3.11-19 08/31/1998 Page TRM / B 3.11-20 04/02/2002 Page TRM / B 3.11-20a 04/02/2002 Page TRM / B 3.11-21 05/13/2005 Pages TRM / B 3.11-22 and TRM / B 3.11-23 11/14/2006 Page TRM / B 3.11-23a 05/13/2005 Pages TRM / B 3.11-24 and TRM / B 3.11-25 01/21/2004 Pages B 3.11-26 through B 3.11-27 08/31/1998 Pages TRM / B 3.11-28 and TRM / B 3.11-29 11/30/2005 Page TRM / B 3.11-30 12/03/2004 Pages B 3.11-31 through B 3.11-35 08/31/1998 02/12/1999 Page TRM / B 3.11-36 B.3.12 LOADS CONTROL PROGRAM BASES Pages TRM / B 3.12-1 through TRM / B 3.12-3 02/05/1999 TRM2 texi LOES.doc 03/26/2007 TRM / LOES-7 EFFECTIVE DATE 03/27/2007 SUSQUEHANNA-UNIT2 SUSQUEHANNA - UNIT 2 TRM / LOES-7 EFFECTIVE DATE 03/27/2007

Instrument Trip Setpoint Program PPL Rev. 6 2.2 2.0 PLANT PROGRAMS AND SETPOINTS 2.2 Instrument Trip Setpoint Table The Instrument Trip Setpoint Limits in Table 2.2-1 are the Trip Setpoint value limits that were contained in the Instrumentation Setpoint tables for protection systems and other functions important to safety that were included in the scope of the original Standard Technical Specifications. Actual instrument setpoints are established utilizing the Allowable Values specified in the Technical Specifications and Technical Requirements. Allowable Values are established in the Reference LCOs and TROs identified in this Table. TRO references are enclosed in square brackets.

Instrumentation process setpoints for the listed subsystems and trip functions are set consistent with the Trip Setpoint Limit Column of Table 2.2-1. Actual setpoints are established in accordance with engineering procedures.

Alarm setpoints and other non-protection system trip settings as may be found in the Technical Specifications or in the Technical Requirements are not included in this table.

Reference NDAP-QA-1104 Setpoint Change Control SUSQUEHANNA - UNIT 2 TRM / 2.0-5 EFFECTIVE DATE 04/02/1999

Instrument Trip Setpoint Program 2.2 PPL Rev. 6 TABLE 2.2-1 (Page 1 of 8)

INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO [TRO] TRIP FUNCTION TRIP SETPOINT 2.2.1 Reactor Protection 2.2.1.1 3.3.1.1 Intermediate Range Monitor, Neutron Flux - _ 120/125 divisions of full~scale High 2.2.1.2 3.3.1.1 Average Power Range Monitor, Neutron Flux - *15% of RATED THERMAL POWER High (Setdown) 2.2.1.3 3.3.1.1 Average Power Range Monitor, Simulated 0.62 W + 62.2%

Thermal Power - High Two Loop Operation 3.3.1.1 Average Power Range Monitor, Simulated 0.62 (W - AW) + 6 2 .2 %(b) 2.2.1.4 Thermal Power - High Single Loop Operation 2.2.1.5 3.3.1.1 Average Power Range Monitor, Simulated < 113.5% of RATED THERMAL Thermal Power - High Flow Clamp POWER 2.2.1.6 3.3.1.1 Average Power Range Monitor, Neutron Flux - < 118% of RATED THERMAL High POWER 2.2.1.7 3.3.1.1 Reactor Vessel Steam Dome Pressure - High < 1087 psig 3.3.1.1 Reactor Vessel Water Level - Low, Level 3 > 13.0 inches(a) 2.2.1.8 2.2.1.9 3.3.1.1 Main Steam Isolation Valve - Closure _ 10% closed 2.2.1.10 This Section Not Used 2.2.1.11 3.3.1.1 Drywell Pressure - High

  • 1.72 psig 2.2.1.12 3.3.1.1 Scram Discharge Volume Water Level - High - *65 gallons Level Transmitter 2.2.1.13 3.3.1.1 Scram Discharge Volume Water Level - High - *61 gallons Float Switch 2.2.1.14 3.3.1.1 Turbine Stop Valve- Closure

(S)see Figure 2.2-1.

(b) For single loop operation, the value of AW = 8.7.

SUSQUEHANNA - UNIT 2 TRIM / 2.0-6 EFFECTIVE DATE 03/27/2007

Instrument Trip Setpoint Program PPL Rev. 6 2.2 TABLE 2.2-1 (Page 2 of 8)

INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO [TRO] TRIP FUNCTION TRIP SETPOINT 2.2.1.16 OPRM Instrumentation 2.2.1.16.1 3.3.1.1 Sp PBA Amplitude Trip See COLR - TRO 3.2 2.2.1.16.2 3.3.1.1 Np PBA Successive Confirmation Count Trip See COLR - TRO 3.2 2.2.1.16.3 [3.3.9] TOL (F) Period Tolerance 0.10 sec 2.2.1.16.4 [3.3.9] fc Conditioning Filter Cutoff Frequency 1.50 Hz 2.2.1.16.5 [3.3.9] Tmin Oscillation Period Lower Time Limit 1.00 sec 2.2.1.16.6 [3.3.9] Tmax Oscillation Period Upper Time Limit 3.50 sec 2.2.1.16.7 [3.3.9] LPRMmin Minimum LRPMs/Cell Required for 2 Cell Operability 2.2.1.16.8 [3.3.9] S1 Peak Threshold Setpoint/ABA & GRBA 1.20 2.2.1.16.9 [3.3.9] S2 Valley Threshold Setpoint/ABA & GRBA 0.85 2.2.1.16.10 [3.3.9] Smax Amplitude Trip Setpoint/ABA 1.50 2.2.1.16.11 [3.3.9] DR3 Growth Rate Factor Setpoint/GRBA 1.60 2.2.2 Isolation Actuation Instrumentation 2.2.2.1 Primary Containment Isolation 2.2.2.1.1 3.3.6.1 Reactor Vessel Water Level Low, Level 3 > 13.0 inches(a) 2.2.2.1.2 3.3.6.1 Reactor Vessel Water Level Low Low, Level 2 > -38.0 inches(a) 2.2.2.1.3 3.3.6.1 Reactor Vessel Water Level Low Low Low, > -129 inches(a)

Level 1 2.2.2.1.4 3.3.6.1 Drywell Pressure- High < 1.72 psig 2.2.2.1.5 3.3.6.143.3.6] SGTS Exhaust Radiation - High < 23.0 mR/hr 2.2.2.1.6 [3.3.6] Main Steam Line Radiation - High High < 15 x full power background without hydrogen injection (continued)

,a See Figure 2.2-1.

SUSQUEHANNA - UNIT 2 TRM / 2.0-7 EFFECTIVE DATE 03/27/2007

Instrument Trip Setpoint Program PPL Rev. 6 2.2 TABLE 2.2-1 (Page 3 of 8)

INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO

[TRO] TRIP FUNCTION TRIP SETPOINT 2.2.2.2 Secondary Containment Isolation 2.2.2.2.1 3.3.6.2 Reactor Vessel Water Level - Low Low, > -38.0 inches(@)

Level 2 2.2.2.2.2 3.3.6.2 Drywell Pressure - High

  • 1.72 psig 2.2.2.2.3 3.3.6.2 Refuel Floor High Exhaust Duct Radiation -
  • 18 mR/hr High 2.2.2.2.4 3.3.6.2 Railroad Access Shaft Exhaust Duct < 5 mR/hr Radiation - High 2.2.2.2.5 3.3.6.2 Refuel Floor Wall Exhaust Duct Radiation - < 21 mR/hr High 2.2.2.3 Main Steam Line Isolation 2.2.2.3.1 3.3.6.1 Reactor Vessel Water Level - Low Low Low, >-129 inches(a)

Level 1 2.2.2.3.2 3.3.6.1 Main Steam Line Pressure - Low >_861 psig 2.2.2.3.3 3.3.6.1 Main Steam Line Flow - High *<113 psid 2.2.2.3.4 3.3.6.1 Condenser Vacuum - Low > 9.0 inches Hg vacuum 2.2.2.3.5 3.3.6.1 Reactor Building Main Steam Line Tunnel < 1771F Temperature - High 2.2.2.3.6 This Section Not Used 2.2.2.3.7 [3.3.6] Reactor Building Main Steam Line Tunnel 5 99oF A Temperature - High 2-2.2.23.8 [3.3.6] Turbine Building Main Steam Tunnel < 197 0 F Temperature - High 2.2.2.4 Reactor Water Cleanup System Isolation 2.2.2.4.1 3.3.6.1 Reactor Vessel Water Level - Low Low, >--38 inches(a)

Level 2 2.2.2.4.2 3.3.6.1 RWCU A Flow - High *ý 59 gpm 2.2.2.4.3 3.3.6.1 RWCU Flow - High < 462 gpm 2.2.2.4.4 3.3.6.1 RWCU Penetration Area Temperature - High *- 131 IF 2.2.2.4.5 [3.3.6] RWCU Penetration Room Area A *5 691F Temperature - High 2.2.2.4.6 3.3.6.1 RWCU Pump Area Temperature - High *- 147*F 2.2.2.4.7 [3.3.6] RWCU Pump Room Area A Temperature - *691F High 2.2.2.4.8 3.3.6.1 RWCU Heat Exchanger Area Temperature - *1471F High 2.2.2.4.9 [3.3.6] RWCU Heat Exchanger Room Area < 69'F A Temperature - High (continued)

(a) See Figure 2.2-1.

SUSQUEHANNA - UNIT 2 TRM / 2.0-8 EFFECTIVE DATE 12/03/2004

Instrument Trip Setpoint Program PPL Rev. 6 2.2 TABLE 2.2-1 (Page 4 of 8)

INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO

[TRO] TRIP FUNCTION TRIP SETPOINT 2.2.2.5 Reactor Core Isolation Cooling System Isolation 2.2.2.5.1 3.3.6.1 RCIC Steam Line A Pressure - High < 138 inches H 2 0 2.2.2.5.2 3.3.6.1 RCIC Steam Supply Line Pressure - Low _>60 psig 2.2.2.5.3 3.3.6.1 RCIC Turbine Exhaust Diaphragm Pressure s 10.0 psig

- High 2.2.2.5.4 3.3.6.1 RCIC Equipment Room Temperature - High < 1671F 2.2.2.5.5 3.3.6.1 RCIC Pipe Routing Area Temperature- High < 167°F 2.2.2.5.6 3.3.6.1 RCIC Emergency Area Cooler Temperature- < 167°F High 2.2.2.5.7 3.3.6.1 Drywell Pressure - High < 1.72 psig 2.2.2.5.8 [3.3.6] RCIC Equipment Room A Temperature - High _ 891F 2.2.2.5.9 [3.3.6] RCIC Pipe Routing Area A Temperature - < 89OF High 2.2.2.6 High Pressure Coolant Injection System Isolation 2.2.2.6.1 3.3.6.1 HPCI Steam Line AN Pressure - High < 370 inches H 2 0 2.2.2.6.2 3.3.6.1 HPCI Steam Supply Line Pressure - Low > 104 psig 2.2.2.6.3 3.3.6.1 HPCI Turbine Exhaust Diaphragm Pressure - _<10 psig High 2.2.2.6.4 3.3.6.1 HPCI Equipment Room Temperature - High < 167OF 2.2.2.6.5 3.3.6.1 HPCI Emergency Area Cooler Temperature - < 167 0 F High 2.2.2.6.6 3.3.6.1 HPCI Pipe Routing Area Temperature - High < 167 0 F 2.2.2.6.7 3.3.6.1 Drywell Pressure - High < 1.72 psig 2.2.2.6.8 [3.3.6] HPCI Equipment Room A Temperature - High _<89°F 2.2.2.6.9 [3.3.6] HPCI Pipe Routing Area A Temperature - _<89°F High 2.2.2.7 Shutdown Cooling/System Isola tion 2.2.2.7.1 3.3.6.1 Reactor Vessel Water Level - Low, Level 3 > 13.0 inches(a) 2.2.2.7.2 3.3.6.1 Reactor Vessel Steam Dome Pressure - High !5 98 psig 2.2.2.7.3 [3.3.6] RHR Flow - High <25,000 gpm 2.2.3 ECCS Actuation 2.2.3.1 Core Spray System 2.2.3.1.1 3.3.5.1 Reactor Vessel Water Level - Low Low Low, >Ž-129 inches(a)

Level 1 2.2.3.1.2 3.3.5.1 Drywell Pressure - High !5 1.72 psig 2.2.3.1.3 3.3.5.1 Reactor Vessel Steam Dom6 Pressure - Low >-413,:<427 psig injection permissive (continued)

ýa)See Figure 2.2-1.

SUSQUEHANNA - UNIT 2 TRM / 2.0-9 EFFECTIVE DATE 11/15/2004

Instrument Trip Setpoint Program PPL Rev. 6 2.2 TABLE 2.2-1 (Page 5 of 8)

INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO

[TRO] TRIP FUNCTION TRIP SETPOINT 2.2.3.2 LPCI Mode of RHR System 2.2.3.2.1 3.3.5.1 Reactor Vessel Water Level - Low Low Low, >Ž-129 inches(a)

Level 1 2.2.3.2.2 3.3.5.1 Drywell Pressure - High < 1.72 psig 2.2.3.2.3 3.3.5.1 Reactor Vessel Steam Dome Pressure - >413, < 427 psig Low, injection permissive 2.2.3.2.4 3.3.5.1 Reactor Vessel Steam Dome Pressure - > 236 psig, decreasing Low, Recirculation Discharge Valve permissive 2.2.3.3 HPCI System 2.2.3.3.1 3.3.5.1 Reactor Vessel Water Level - Low Low, > -38 inches(a)

Level 2 2.2.3.3.2 3.3.5.1 Drywell Pressure - High < 1.72 psig 2.2.3.3.3 3.3.5.1 Condensate Storage Tank Level - Low > 36.0 inches above tank bottom 2.2.3.3.4 3.3.5.1 Reactor Vessel Water Level - High, Level 8 _ 54 inches 2.2.3.4 Automatic Depressurization System (ADS) 2.2.3.4.1 3.3.5.1 Reactor Vessel Water Level - Low Low Low, >-129 inches Level 1 2.2.3.4.2 3.3.5.1 Drywell Pressure - High < 1.72 psig 2.2.3.4.3 3.3.5.1 ADS Timer < 102 seconds 2.2.3.4.4 3.3.5.1 Core Spray Pump Discharge Pressure - High > 135, < 155 psig 2.2.3.4.5 3.3.5.1 Low Pressure Coolant Injection Pump > 121, < 129 psig Discharge Pressure - High 2.2.3.4.6 3.3.5.1 Reactor Vessel Water Level - Low, Level 3 >_13 inches Confirmatory 2.2.3.4.7 3.3.5.1 ADS Drywell Pressure Bypass Timer < 420 seconds 2.2.3.5 Loss of Power - ECCS Actuation 2.2.3.5.1 4.16kv ESS Bus Undervoltage (Loss of Voltage < 20%)

2.2.3.5.1.1 3.3.8.1 Bus Undervoltage 823.2. f-<856.8 Volts 2.2.3.5.1.2 3.3.8.1 Time delay >0.4, <0.6 seconds (continued)

(a) See Figure 2.2-1.

SUSQUEHANNA - UNIT 2 TRM / 2.0-10 EFFECTIVE DATE 11/15/2004

Instrument Trip Setpoint Program PPL Rev. 6 2.2 TABLE 2.2-1 (Page 6 of 8)

INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO

[TRO] TRIP FUNCTION TRIP SETPOINT 2.2.3.5.2 4.16kV ESS Bus Undervoltage (Degraded Voltage < 65%)

2.2.3.5.2.1 3.3.8.1 Bus Undervoltage > 2641.1, <2748.9 Volts 2.2.3.5.2.2 3.3.8.1 Time delay > 2.7, < 3.3 seconds 2.2.3.5.3 4.16kV ESS Bus Undervoltage (Degraded Voltage, < 93%)

2.2.3.5.3.1 3.3.8.1 Bus Undervoltage _ 3829.3, <3906.7 Volts 2.2.3.5.3.2 3.3.8.1 Time Delay (Non-LOCA) > 4 minute, 30 seconds

_ 5 minute, 30 seconds 2.2.3.5.3.4 3.3.8.1 Time Delay (LOCA) >_9, < 11 seconds 2.2.3.5.4 480V ESS Bus 0B565 Undervoltage (Degraded Voltage, < 65%)

2.2.3.5.4.1 [3.8.5] 480V Basis >308.9, < 315.1 Volts 2.2.3.5.4.2 [3.8.5] Time Delay > 4.5, <55.5 seconds 2.2.3.5.5 480V ESS Bus 0B565 Undervoltage (Degraded Voltage,< 92%)

2.2.3.5.5.1 [3.8.5] 480V Basis > 437T6, < 446.4 Volts 2.2.3.5.5.2 [3.8.5] Time Delay > 9, < 11 seconds 2.2.4 ATWS Alternate Rod Injection and Recirculation Pump Trip 2.2.4.1 3.3.4.2J[3.1.1] Reactor Vessel, Water Level - Low Low, >-38 inches(a)

Level 2 2.2.4.1 3.3.4.2J[3.1.1] Reactor Vessel Steam Dome Pressure - High < 1135 psig 2.2.5 End of Cycle Recirculation Pump Trip 2.2.5.1 3.3.4.1 Turbine Stop Valve-Closure < 5.5% closed 2.2.5.2 3.3.4.1 Turbine Control Valve - Fast Closure > 500 psig 2.2.6 Reactor Core Isolation Cooling System Actuation 2.2.6.1 3.3.5.2 Reactor Vessel Water Level - Low Low, >Ž-38 inches(a)

Level 2 2.2.6.2 3.3.5.2 Reactor Vessel Water Level - High, Level 8

  • 54 inches(a 2.2.6.3 3.3.5.2 Condensate Storage Tank Level - Low >_36.0 inches above tank bottom (continued)

(') See Figure 2.2-1.

SUSQUEHANNA - UNIT 2 TRM / 2.0-11 EFFECTIVE DATE 11/15/2004

Instrument Trip Setpoint Program PPL Rev. 6 2.2 TABLE 2.2-1 (Page 7 of 8)

INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO

[TRO] TRIP FUNCTION TRIP SETPOINT 2.2.7 Control Rod Block 2.2.7.1 Rod Block Monitor 2.2.7.1.1 3.3.2 Low Power Range - Upscale See COLR - TRO 3.2 3.3.2 Intermediate Power Range - Upscale See COLR - TRO 3.2 3.3.2 High Power Range - Upscale See COLR - TRO 3.2 2.2.7.1.2 3.3.2 Low Power Range Setpoint See COLR - TRO 3.2 3.3.2 Intermediate Power Range Setpoint See COLR - TRO 3.2 3.3.2 High Power Range Setpoint See COLR - TRO 3.2 2.2.7.2 APRM 2.2.7.2.1 [3.1.3] Simulated Thermal Power-High - Two Loop 0.62 W + 57.7%

Operation 2.2.7.2.2 [3.1.3] Simulated Thermal Power-High - Single 0.62 (W - AW) + 57.7%(c)

Loop Operation 2.2.7.2.3 [3.1.3] Simulated Thermal Power-High Clamp 5 108% of RATED THERMAL POWER 2.2.7.2.4 [3.1.3] Downscale > 5% of RATED THERMAL POWER 2.2.7.2.5 [3.1.3] Neutron Flux - High (Setdown) < 12% of RATED THERMAL POWER 2.2.7.3 Source Range Monitors 2.2.7.3.1 [3.1.3] Upscale < 2E5 cps 2.2.7.3.2 [3.1.3] Downscale > 3.0 cps(b) 2.2.7.4 Intermediate Range Monitors 2.2.7.4.1 [3.1.3] Upscale < 108/125 divisions of full scale 2.2.7.4.2 [3.1.3] Downscale > 5/125 divisions of full scale 2.2.7.5 Scram Discharge Volume 2.2.7.5.1 [3.1.3] Water Level - High < 35.9 gallons 2.2.7.6 Reactor Coolant System Recirculation Flow 2.2.7.6.1 [3.1.3] Upscale 114%

(continued)

(b) With a signal-to-noise ratio > 2, or within the limits of Figure 2.2-2.

(c)For single loop operation, the valve of AW = 8.7.

SUSQUEHANNA - UNIT 2 TRM / 2.0-12 EFFECTIVE DATE 03/27/2007

Instrument Trip Setpoint Program PPL Rev. 6 2.2 TABLE 2.2-1 (Page 8 of 8)

INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO

[TRO] TRIP FUNCTION TRIP SETPOINT 2.2.8 CREOASS 2.2.8.1 3.3.7.1 Main Control Room Outside Air Intake < 5 mR/hr Radiation Monitor 2.2.8.1.1 3.3.7.1 Reactor Vessel Water Level - Low Low, > -38.0 inches(a)

Level 2 2.2.8.1.2 3.3.7.1 Drywell Pressure - High < 1.72 psig 2.2.8.1.3 3.3.7.1 Refuel Floor High Exhaust Duct Radiation - < 18 mR/hr High 2.2.8.1.4 3.3.7.1 Railroad Access Shaft Exhaust Duct < 5 mR/hr Radiation - High 2.2.8.1.5 3.3.7.1 Refuel Floor Wall Exhaust Duct Radiation - < 21 mR/hr High 2.2.9 Feedwater/Main Turbine Trip System Actuation 2.2.9.1 3.3.2.2 Reactor Vessel Level - High < 54.0 inches(a) 2.2.10 MVP Isolation 2.2.10.1 [3.3.11] Main Steam Line Radiation - High High _<15 x full power background without hydrogen injection (3)See Figure 2.2-1 SUSQUEHANNA - UNIT 2 TRM / 2.0-13 EFFECTIVE DATE 11/15/2004

Instrument Trip Setpoint Table PPL Rev. 6 2.2 WATER LEVEL NOMENCLATURE HEIGHT ABOVE VESSEL ZERO READING (IN.)

581.5 +54 566. 5 +39 557. 5 +30 540. 5 +13 489. 5 -38 398. 5 -129

-- NARROW RANGE-d-(8)5--54

-+60-+60""T;+60"- ( 7 )J 3 9 HI ALARM HPCI &(4) 30 LO ALARM REACTO

-- 38 SCRAM CONTRIBUTE (2) INITIATE RCIC, TO ADS HPCI, ARI TRIP RECIRC PUMPS (1) INITIATE RHR, CS START DIESEL CONTRIBUTE TO ADS CLOSE MSIV'S NOTEi SCALE IN INCHES ABOVE VESSEL ZERO FIGURE 2. 2-1 REACTOR VESSEL WATER LEVEL SUSQUEHANNA - UNIT 2 TRMV / 2.0-14 EFFECTIVE DATE 11/15/2004

Instrument Trip Setpoint Table PPL Rev. 6 2.2 Instrument Trip Setpoint Table 2.2 3

2.8 2.6 2.4 2.2 2

1.8 1-1 1.6 1.4 --- Acceptable I-z 1.2 0

1 0f 0.8 0.6 Not Acceptable 0.4 0.2 0

2 6 10 14 18 22 26 30 Signal-to-Noise Ratio Figure 2.2-2 Minimum SRM Trip Setpoint Versus Signal-to-Noise Ratio SUSQUEHANNA - UNIT 2 TRMV 2.0-15 EFFECTIVE DATE 11/15/2005

Control 'Rod Block Instrumentation PPL Rev. 3 3.1.3 3.1 Reactivity Control Systems 3.1.3 Control Rod Block Instrumentation TRO 3.1.3 The control rod block instrumentation for each function in Table 3.1.3-1 shall be OPERABLE.

APPLICABILITY: According to Table 3.1.3-1 ACTIONS


NO TE-Separate condition entry is allowed for each channel CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Enter the Condition referenced Immediately channels inoperable, in Table 3.1.3-1 for the channel.

B. As required by Required B.1 Place at least one inoperable 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from Action A. 1 and channel in the tripped discovery of loss of referenced in condition. trip capability Table 3.1.3-1. AND B.2 Place the inoperable channel in 7 days the tripped condition.

C. As required by Required C.1 Place the inoperable channel in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Action A.1 and the tripped condition.

referenced in Table 3.1.3-1.

D. Required Actions and D.1 Suspend Control Rod Immediately Completion Time of withdrawal.

Conditions B or C not met.

SUSQUEHANNA - UNIT 2 TRM / 3.1-5 EFFECTIVE DATE 8/31/1998

Control Rod Block Instrumentation PPL Rev. 3 3.1.3 TECHNICAL REQUIREMENT SURVEILLANCE


NOTES- -----------------------------

1. Refer to Table 3.1.3-1 to determine which TRSs apply for each Control Rod Block Function.
2. Neutron detectors may be excluded from CHANNEL CALIBRATION.
3. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided at least one other OPERABLE channel in the same trip system is monitoring that parameter.

SURVEILLANCE FREQUENCY TRS 3.1.3.1 Perform CHANNEL CHECK 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> TRS 3.1.3.2 ---------------------- NOTE --------------

For Function 1.a, not required to be performed when entering MODE 2 from MODE 1 until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after entering MODE 2.

Perform CHANNEL FUNCTIONAL TEST 184 days TRS 3.1.3.3 Perform CHANNEL FUNCTIONAL TEST 7 days TRS 3.1.3.4 Perform CHANNEL FUNCTIONAL TEST 92 days TRS 3.1.3.5 Perform CHANNEL CALIBRATION 184 days TRS 3.1.3.6 ---------------------- NOTE --------------

Neutron Detectors are excluded.

Perform CHANNEL CALIBRATION 24 months TRS 3.1.3.7 Perform LOGIC SYSTEM FUNCTIONAL TEST 24 months SUSQUEHANNA - UNIT 2 TRM / 3.1-6 EFFECTIVE DATE 03/27/2007

Control Rod Block Instrumentation PPL Rev. 3 3.1.3 TABLE 3.1.3-1 (Page 1 of 2)

CONTROL ROD BLOCK INSTRUMENTATION CONDITIONS APPLICABLE REFERENCED MODES OR OTHER FROM SPECIFIED REQUIRED REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS CHANNELS ACTION A. 1 REQUIREMENTS VALUE

1. APRM
a. Neutron Flux - High 2, 5(a) 3 B TRS 3.1.3.2 < 14% RTP (Setdown) TRS 3.1.3.6
b. Simulated Thermal 1 3 B TRS 3.1.3.2 0.62 W +

Power - High TRS 3.1.3.6 5 9 . 7 %(b)

c. Downscale 1 3 B TRS 3.1.3.2 > 3% RTP TRS 3.1.3.6
d. Inop 1,2 3 B TRS 3.1.3.2 NA 5(a) 3 B TRS 3.1.3.2 NA
2. Source Range Monitors
a. Detector not full in 2(c) 3 B TRS 3.1.3.3 NA TRS 3.1.3.7 5j) 2 B TRS 3.1.3.3 NA TRS 3.1.3.7
b. Upscale 2(d) 3 B TRS 3.1.3.3 < 3.3E5 cps TRS 3.1.3.6 TRS 3.1.3.7
50) 2 B TRS 3.1.3.3 _ 3.3E5 cps TRS 3.1.3.6 TRS 3.1.3.7
c. Inop 2 (d) 3 B TRS 3.1.3.3 NA TRS 3.1.3.7
50) 2 B TRS 3.1.3.3 NA TRS 3.1.3.7 (continued)

(a) When performing Shutdown Margin Demonstration per Technical Specification 3.10.8.

(b) 0.62 (W - AW) + 59.7% when reset for single loop operation per LCO 3.4.1, "Recirculation Loops Operating." For single loop operation, the value of AW = 8.7.

(c) When not automatically bypassed with SRM counts > 100 cps or the IRM channels on range 3 or higher.

(d When not automatically bypassed with IRM channels on range 8 or higher.

0) With any control rod withdrawn from a core cell containing one or more fuel assemblies.

SUSQUEHANNA - UNIT 2 TRM / 3.1-7 EFFECTIVE DATE 03/27/2007

Control Rod Block Instrumentation PPL Rev. 3 3.1.3 TABLE 3.1.3-1 (Page 2 of 2)

CONTROL ROD BLOCK INSTRUMENTATION CONDITIONS APPLICABLE REFERENCED REFROM MODES OR OTHER SPECIFIED REQUIRED REQUIRED SURVEILLANCE ALLOWABL FUNCTION CONDITIONS CHANNELS ACTION A.1 REQUIREMENTS VALUE

d. Downscale 2(e) 3 B TRS 3.1.3.3 > 1.8 ýpsM TRS 3.1.3.6 TRS 3.1.3.7 5(') U) 2 B TRS 3.1.3.3 >_1.8 cps(U TRS 3.1.3.6 TRS 3.1.3.7
3. Intermediate Range Monitors
a. Detector 2, 5 G) 6 B TRS 3.1.3.3 NA not full in TRS 3.1.3.7
b. Neutron 6 B TRS 3.1.3.1 < 110/125 Flux - High TRS 3.1.3.3 divisions of TRS 3.1.3.5 full scale TRS 3.1.3.7 C. Inop 2, 5 U) 6 B TRS 3.1.3.3 NA TRS 3.1.3.7
d. Downscale 2(g) 5 0) 6 B TRS 3.1.3.1 3/125 TRS 3.1.3.3 divisions of TRS 3.1.3.5 full scale TRS 3.1.3.7
4. Scram Discharge 1, 2, 5 (h) 2 C TRS 3.1.3.4 < 36.5 gallons Volume Water TRS 3.1.3.6 Level-High
5. Reactor Coolant System Recirculation Flow
a. Upscale 1 3 C TRS 3.1.3.2 _<117/125 TRS 3.1.3.6 divisions of full scale (e)

When not automatically bypassed with IRMs on range 3 or higher.

(0) With a signal-to-noise ratio >_2, or within the limits of TS Figure 3.3.1.2-1.

(g) When not automatically bypassed with IRM channels on range 1.

(h)

When more than one control rod is withdrawn. Not applicable to control rods removed per Technical Specification 3.10.5 or 3.10.6.

0)i Not required when eight or fewer fuel assemblies (adjacent to the SRMs) are in the core.

Ii) With any control rod withdrawn from a core cell containing one or more fuel assemblies.

SUSQUEHANNA - UNIT 2 TRM / 3.1-8 EFFECTIVE DATE 03/27/2007

OPRM Instrumentation PPL Rev. 2 3.3.9 3.3 Instrumentation 3.3.9 OPRM Instrumentation Configuration TRO 3.3.9 Oscillation Power Range Monitor (OPRM) supporting setpoints and settings shall be within the specified limits.

APPLICABILITY: Thermal POWER Ž_25% RTP ACTIONS


NOTE -------

1. Separate Condition entry is allowed for each channel

. . . . .. . . . . .. . .. . . .. .. . .. . . . .. . .. . . .. . .. . . .. . . . . .. . .. . . . . . .. . . . . . . .. . .. .. .. . . .. 7 . .. ... . . .. . .. . . .. . . . . . . . . . .. . . . . . . . . . .. . .. .. . . . . . . .

CONDITION REQUIRED ACTION COMPLETION TIME A. OPRM Setpoints and A.1 Enter the condition referenced in Immediately Settings not in accordance Table 3.3.9-1 for the parameter with Table 3.3.9-1 B. As required by Required B.1 Declare affected OPRM channel Immediately Action A.1 and referenced inoperable.

in Table 3.3.9.1 C. As required by Required C.1 Restore the OPRM Setpoints and 120 days Action A. 1 and referenced Settings to within the specified in Table 3.3.9-1 limits.

OR C.2 Declare affected OPRM channel Immediately inoperable.

D. Alternate method to detect D.1 Initiate monitoring to detect entry Immediately and suppress thermal into Conditions E, F, and/or G.

hydraulic instability oscillations required by LCO 3.3.1.1 Required Action 1.1 (continued)

SUSQUEHANNA - UNIT 2 TRM / 3.3-21 EFFECTIVE DATE 03/27/2007

OPRM Instrumentation PPL Rev. 2 3.3.9 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME E. -------- NOTE -----------

Only applicable as required by Required Action D.1 Total core flow as a E.1 Place reactor mode switch in Immediately function of THERMAL the shutdown position.

POWER within Region I of the Power Flow map as specified in the COLR.

OR Total core flow as a function of THERMAL POWER within Region II of the Power Flow map as specified in the COLR and less than 50% of required LPRM upscale alarms OPERABLE NOTE -----------

F. - - -------

Only applicable as required by Required Action D.1 and when in Region 11of the Power Flow map as specified in the COLR.

F.1 Place the reactor mode switch Immediately Two or more APRM readings oscillating with in the shutdown position.

one or more oscillating

Ž10% of RTP peak-to-peak OR (continued)

SUSQUEHANNA - UNIT 2 TRM / 3.3-21 a EFFECTIVE DATE 11/15/2004

OPRM Instrumentation PPL Rev. 2 3.3.9 CONDITION REQUIRED ACTION COMPLETION TIME F. (continued)

Two or more LPRM upscale alarms activating and deactivating with a period Ž_1 second and _<5 seconds.

OR Sustained LPRM 2 oscillations >10 W/cm peak-to-peak with a period

Ž1 second and *5 seconds.

G. - -------- NOTE ----------

Only applicable as required by Required Action D.1.

Total core flow as a G.1 Initiate action to restore total core Immediately function of THERMAL flow as a function of THERMAL POWER is within Region II POWER outside of Region II.

of the Power Flow map as specified in the COLR.

H. Less than 50% of the H.1 Post sign on the reactor control 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> required LPRM Upscale panel that less than 50% of the Alarms are OPERABLE LPRM Upscale Alarms are I_ OPERABLE.

SUSQUEHANNA - UNIT 2 TRM / 3.3-21 b EFFECTIVE DATE 03/27/2007

OPRM Instrumentation PPL Rev. 2 3.3.9 TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY TRS 3.3.9.1 --------------- NO TE ----------------------------

Only required to be met when an alternate method to detect and suppress thermal hydraulic instability oscillations is required by LCO 3.3.1.1 Required Action 1.1.

Verify total core flow as a function of THERMAL 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> POWER is outside of Region I and II of the Power Flow map as specified in the COLR.

TRS 3.3.9.2 Perform CHANNEL CALIBRATION on the LPRM 24 months Upscale alarm 24 months TRS 3.3.9.3 Verify OPRM parameter setpoints and settings are within limits SUSQUEHANNA - UNIT 2 TRM / 3.3-21 c EFFECTIVE DATE 03/27/2007

OPRM Instrumentation PPL Rev. 2 3.3.9 Table 3.3.9-1 OPRM SETPOINTS AND SETTINGS CONDITIONS REFERENCE

.D FROM OPRM REQUIRED PARAMETER DESCRIPTION ACTION A. 1 VALUE

1. TOL(E) Period Tolerance B > 0.10 and

< 0.30 sec

2. fc Conditioning Filter Cutoff Frequency B 1.5 Hz
3. Tmin Oscillation Period Lower Time Limit B > 1.0 and
  • 1.2 sec
4. Tmax Oscillation Period Upper Time Limit B 3.5 sec
5. LPRMmin Minimum LRPMs/Cell Required for Cell B _2 Operability
6. $1 Peak Threshold Setpoint/ABA & GRBA C _ 1.10 and
  • 1.20
7. S2 Valley Threshold Setpoint/ABA & GRBA C > 0.85 and
  • 0.95
8. Smax Amplitude Trip Setpoint/ABA C > 1.30 and
  • 1.50
9. DR3 Growth Rate Factor Setpoint/GRBA C >1.30 and
  • 1.60 SUSQUEHANNA - UNIT 2 TRM / 3.3-21 d EFFECTIVE DATE 03/27/2007

Shutdown Margin Test RPS Instrumentation PPL Rev. 1 3.10.2 3.10 Miscellaneous 3.10.2 Shutdown Margin Test RPS Instrumentation TRO 3.10.2 The Shutdown Margin Test RPS instrumentation for each Function in Table 3.10.2-1 shall be OPERABLE with "shorting links" removed.

APPLICABILITY: MODE 5, During shutdown margin demonstrations per LCO 3.1.1 ACTIONS


NOTES ----------------------------

Separate Condition entry is allowed for each channel.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Enter the Condition Immediately channels inoperable referenced in Table 3.10.2-1 for the channel B. As required by Required B.1 Suspend all operations Immediately Action A.1 and referenced involving CORE in Table 3.10.2-1 ALTERATIONS and initiate actions to insert all insertable control rods C. As required by Required CA1 Restore RPS trip capability 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Action A.1 and referenced in Table 3.10.2-1 C.2 Place channel in trip 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> D. Required Action and D.1 Suspend all operations Immediately associated Completion involving CORE Times of Condition C not ALTERATIONS and initiate met actions to insert all insertable OR control rods Requirements of the TRO otherwise not met SUSQUEHANNA - UNIT 2 3;,10-4 EFFECTIVE DATE 8/30/98

Shutdown Margin Test RPS Instrumentation PPL Rev. 1 3.10.2 TECHNICAL REQUIREMENT SURVEILLANCE


NOTES -------------------------------------------- ----

1. Refer to Table 3.10.2-1 to determine which TRSs apply for each TRM RPS Instrumentation function.
2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the trip function is maintained.

SURVEILLANCE FREQUENCY TRS 3.10.2.1 Verify SRM is OPERABLE per LCO 3.3.1.2 "Source 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Range Monitor (SRM) Instrumentation" TRS 3.10.2.2 Verify that the RPS circuitry "shorting links" have 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> been removed TRS 3.10.2.3 Perform CHANNEL FUNCTIONAL TEST 7 days TRS 3.10.2.4 Perform LOGIC SYSTEM FUNCTIONAL TEST with 184 days "shorting links" removed TRS 3.10.2.5 Perform CHANNEL CALIBRATION 24 months TRS 3.10.2.6 Perform LOGIC SYSTEM FUNCTIONAL TEST 24 months SUSQUEHANNA - UNIT 2 TRM / 3.10-5 EFFECTIVE DATE 03/27/2007

TRM Reactor Protection System (RPS) Instrumentation PPL Rev. 1 3.10.2 TABLE 3.10.2-1 TRM RPS INSTRUMENTATION CONDITIONS REFERENCED REQUIRED FROM CHANNELS PER REQUIRED SURVEILLANCE FUNCTION TRIP SYSTEM ACTION A.1 REQUIREMENTS ALLOWABLE VALUE

1. Source Range Monitor (a) B TRS 3.10.2.1 < 3.3E5 CPS TRS 3.10.2.2 TRS 3.10.2.3 TRS 3.10.2.4 TRS 3.10.2.5
2. Intermediate Range Monitor
a. Neutron Flux-High 6 C TRS 3.10.2.2 (b)

TRS 3.10.2.4

b. Inop 6 C TRS 3.10.2.2 N/A TRS 3.10.2.4 1
3. Average Power Range Monitori )
a. Neutron Flux-High (b) C TRS 3.10.2.2 (b)

(Setdown) TRS 3.10.2.6

b. Inop (b) C TRS 3.10.2.2 N/A TRS 3.10.2.6
c. 2-Out-of-4 Voter (b) C TRS 3.10.2.2 N/A TRS 3.10.2.6 (1) APRM not required for Mode 5 as per LCO 3.3.1.1, but is required for other conditions during shutdown margin demonstrations required per LCO 3.1.1 (a) As specified in LCO 3.3.1.2 (b) As specified in LCO 3.3.1.1 SUSQUEHANNA - UNIT 2 TRM / 3.1-0-6 EFFECTIVE DATE 03/27/2007