Inspection/Activity Plan 03/01/2006 - 09/30/2007
ML060610393
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/02/2006
From:
NRC/RGN-II/DRP/RPB4
To:
Shared Package
ML060610387 List:
References
IR-06-001
Download: ML060610393 (2)


Text

Page 1 of 2 Harris 03/02/2006 10:08:08 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PSB1-RP - RP OCCUPATIONAL PRE-INSP VISIT 1 1 IP 7112101 Access Control to Radiologically Significant Areas 03/13/2006 03/15/2006 Baseline Inspections PS2-EP - EP INSP 1 1 IP 7111402 Alert and Notification System Testing 04/03/2006 04/07/2006 Baseline Inspections 1 IP 7111403 Emergency Response Organization Augmentation Testing 04/03/2006 04/07/2006 Baseline Inspections 1 IP 7111404 Emergency Action Level and Emergency Plan Changes 04/03/2006 04/07/2006 Baseline Inspections 1 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 04/03/2006 04/07/2006 Baseline Inspections 1 IP 71151 Performance Indicator Verification 04/03/2006 04/07/2006 Baseline Inspections PSB1-RP - RP OCCUPATIONAL INSP WK1 3 1 IP 7112101 Access Control to Radiologically Significant Areas 04/10/2006 04/14/2006 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 04/10/2006 04/14/2006 Baseline Inspections 1 IP 7112202 Radioactive Material Processing and Transportation 04/10/2006 04/14/2006 Baseline Inspections 1 IP 71151 Performance Indicator Verification 04/10/2006 04/14/2006 Baseline Inspections EB3-ISI - INSERVICE INSPECTION 2 1 IP 2515/150 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA 04/17/2006 04/21/2006 Safety Issues 1 IP 7111108P Inservice Inspection Activities - PWR 04/17/2006 04/21/2006 Baseline Inspections EB3TI150 - 2515/150 : RPV & VHP NOZZLES 2 1 IP 2515/150 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA 04/17/2006 04/21/2006 Safety Issues EB3SGISI - STEAM GENERATOR ISI 3 1 IP 7111108P Inservice Inspection Activities - PWR 04/24/2006 04/28/2006 Baseline Inspections PSB1-RP - RP OCCUPATIONAL INSP WK2 2 1 IP 7112101 Access Control to Radiologically Significant Areas 04/24/2006 04/28/2006 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 04/24/2006 04/28/2006 Baseline Inspections 1 IP 7112202 Radioactive Material Processing and Transportation 04/24/2006 04/28/2006 Baseline Inspections 1 IP 71151 Performance Indicator Verification 04/24/2006 04/28/2006 Baseline Inspections EB3-MR - MR EFFECTIVENESS 2 1 IP 7111112B Maintenance Effectiveness 06/26/2006 06/30/2006 Baseline Inspections EB1-CDB - COMPONENT DESIGN BASES INSPECTION 6 1 IP 7111121 Component Design Bases Inspection 09/18/2006 09/22/2006 Baseline Inspections 1 IP 7111121 Component Design Bases Inspection 10/02/2006 10/06/2006 Baseline Inspections 1 IP 7111121 Component Design Bases Inspection 10/16/2006 10/20/2006 Baseline Inspections 1 IP 7111121 Component Design Bases Inspection 10/30/2006 11/03/2006 Baseline Inspections PSB1-RP - RP PUBLIC PRE - INSP VISIT 1 1 IP 7112101 Access Control to Radiologically Significant Areas 12/18/2006 12/20/2006 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Page 2 of 2 Harris 03/02/2006 10:08:08 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type OL RQ - REQUAL INSPECTION 2 1 IP 7111111B Licensed Operator Requalification Program 03/19/2007 03/23/2007 Baseline Inspections PS2-EP - EP EXERCISE 3 1 IP 7111401 Exercise Evaluation 04/09/2007 04/13/2007 Baseline Inspections 1 IP 7111404 Emergency Action Level and Emergency Plan Changes 04/09/2007 04/13/2007 Baseline Inspections 1 IP 71151 Performance Indicator Verification 04/09/2007 04/13/2007 Baseline Inspections EB3-HS - HEAT SINK 1 1 IP 7111107B Heat Sink Performance 05/14/2007 05/18/2007 Baseline Inspections PSB1-RP - RP PUBLIC PRE-INSP. VISIT 1 1 IP 7112101 Access Control to Radiologically Significant Areas 06/11/2007 06/13/2007 Baseline Inspections OL PREP - INITIAL EXAM PREP 3 1 V23259 HARRIS/JULY 2007 EXAM AT POWER FACILIITES 07/09/2007 07/13/2007 Not Applicable PSB1-RP - RP PUBLIC BASELINE INSP 4 1 IP 7112101 Access Control to Radiologically Significant Areas 07/09/2007 07/13/2007 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 07/09/2007 07/13/2007 Baseline Inspections 1 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 07/09/2007 07/13/2007 Baseline Inspections 1 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 07/09/2007 07/13/2007 Baseline Inspections 1 IP 71151 Performance Indicator Verification 07/09/2007 07/13/2007 Baseline Inspections PSB2 - BASELINE SECURITY INSPECTION 1 1 IP 7113004 Equipment Performance, Testing, and Maintenance 07/09/2007 07/13/2007 Baseline Inspections 1 IP 7113007 Security Training 07/09/2007 07/13/2007 Baseline Inspections OL EXAM - INITIAL EXAM 3 1 V23259 HARRIS/JULY 2007 EXAM AT POWER FACILIITES 07/30/2007 08/10/2007 Not Applicable This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.