Letter Sequence RAI |
---|
|
|
MONTHYEARML0512602392005-04-29029 April 2005 License Amendment Request Regarding Revised Loss of Coolant Accident (LOCA) Analyses-Changes to Accumulator, Refueling Water Storage Rwst), and Administrative Control Technical Specifications Project stage: Request ML0529304312005-10-28028 October 2005 Request for Additional Information Regarding Revised Loss-of-Coolant Accident Analysis, R.E. Ginna Nuclear Power Plant Project stage: RAI ML0534803622005-12-0909 December 2005 R. E. Ginna, Response to Requests for Additional Information Regarding Revised Loss-of-Coolant-Accident Analyses Project stage: Response to RAI ML0611803532006-05-31031 May 2006 License Amendment 96 Regarding Revised Loss-of-Coolant Accident Analyses Project stage: Approval ML0615300162006-05-31031 May 2006 Tech Spec Pages for Amendment 96 Regarding Revised Loss-of-Coolant Accident Analyses Project stage: Other 2005-12-09
[Table View] |
Similar Documents at Ginna |
---|
Category:Letter
MONTHYEARIR 05000244/20243012024-10-22022 October 2024 Initial Operator Licensing Examination Report 05000244/2024301 ML24286A0022024-10-11011 October 2024 Core Operating Limits Report Cycle 45, Revision 0 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing RS-24-092, Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-09-25025 September 2024 Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000244/20245012024-09-24024 September 2024 LLC - Emergency Preparedness Biennial Exercise Inspection Report 05000244/2024501 IR 05000244/20240052024-08-29029 August 2024 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2024005) ML24234A0922024-08-21021 August 2024 Requalification Program Inspection IR 05000244/20240102024-08-19019 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000244/2024010 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000244/20240022024-08-0505 August 2024 LLC - Integrated Inspection Report 05000244/2024002 and Independent Spent Fuel Storage Installation Report 07200067/2024001 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24170A3852024-07-16016 July 2024 R. E. Ginna Nuclear Power Plant - Alternative Associated with Inservice Testing of B Auxiliary Feedwater Pump - PR-03 ML24197A0302024-07-15015 July 2024 LLC - Operator Licensing Examination Approval RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions IR 05000244/20244022024-06-20020 June 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000244/2024402 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24143A0752024-05-22022 May 2024 Re. Ginna Nuclear Power Plant and Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License ISFSI Casks ML24136A1692024-05-14014 May 2024 And Independent Spent Fuel Storage Installation (ISFSI) - 2023 Annual Radioactive Effluent Release Report and 2023 Annual Radiological Environmental Operating Report ML24134A0042024-05-13013 May 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000244/2024010 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000244/20240012024-04-24024 April 2024 LLC - Integrated Inspection Report 05000244/2024001 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24101A0432024-04-10010 April 2024 2024 10 CFR 50.46 Annual Report IR 05000244/20240112024-04-10010 April 2024 LLC - Fire Protection Team Inspection Report 05000244/2024011 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24088A2042024-03-28028 March 2024 R. E. Ginna Nuclear Power Plant - Response to NRC Request for Additional Information Regarding Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump ML24110A0122024-03-28028 March 2024 2023 Report of Individual Monitoring for R.E. Ginna Nuclear Power Plant LLC, License DPR-18 05000244/LER-2023-003-01, Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam2024-03-0707 March 2024 Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam IR 05000244/20230062024-02-28028 February 2024 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC, (Report 05000244/2023006) IR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations 05000244/LER-2023-003, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam Generator Level2023-12-11011 December 2023 Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam Generator Level ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums 05000244/LER-2023-002, Overtemperature Delta Temperature Reactor Protection System and Auxiliary Feedwater System Actuations on Due to 100% Load Rejection Caused by Turbine Overspeed Circuit Card Failure2023-11-0808 November 2023 Overtemperature Delta Temperature Reactor Protection System and Auxiliary Feedwater System Actuations on Due to 100% Load Rejection Caused by Turbine Overspeed Circuit Card Failure. IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) 2024-09-25
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24073A3602024-03-13013 March 2024 Request for Additional Information (RAI) Alternative Request PR-03 Sixth Interval Inservice Testing Program ML23312A1302023-11-0707 November 2023 Final Rci/Rai - Constellation – R. E. Ginna Nuclear Power Plant - Exemption from Security Rule (EPID L-2023-LLE-0029) (Email) ML22160A3962022-06-0909 June 2022 R. E. Ginna Nuclear Power Plant, LLC - Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000244/2022010 ML22271A0772022-05-0606 May 2022 NRR E-mail Capture - Final RAIs 9.1.2021 Constellation Relief Request ML22129A0132022-05-0606 May 2022 NRR E-mail Capture - Draft RAIs for Requests for Alternatives I4R-17, I4R-23, ISI-05-018, I6R-10 ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML21308A5592021-11-0404 November 2021 NRR E-mail Capture - NRC Request for Additional Information for Ginna Biennial EP Exercise Exemption Request ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21189A1602021-07-0808 July 2021 NRR E-mail Capture - Request for Additional Information - Braidwood, Byron, and Ginna - Amendment to Address the Issues in Westinghouse NSALs ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21119A1082021-04-27027 April 2021 Ti 2515/194 Inspection Documentation Request ML21076A5152021-03-17017 March 2021 R. E. Ginna Nuclear Power Plant - RAI Steam Generator LAR to Revise Technical Specifications for Steam Generator Tube Inspection Frequency (EPID L-2020-LLA-0207) (e-mail) ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21029A3302021-01-29029 January 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Fleet Alternative Request to Use ASME Code Case N-885 ML20357A2232020-12-17017 December 2020 Update on Ginna POV - 3504A and 4562 (Email Request for Inspection Information) ML20218A6422020-08-0505 August 2020 R. E. Ginna Nuclear Power Plant - Request for Additional Information (RAI) for LAR to Implement WCAP, TSTF-411, and TSTF-418 ML20153A7042020-06-0101 June 2020 NRR E-mail Capture - Preliminary RAI for Fleet Request to Use Alternative OMN-26 ML19120A3862019-04-30030 April 2019 Request for Additional Information to Revise Emergency Plan Response Organization Staffing and Augmentation ML18228A5242018-08-15015 August 2018 R. E. Ginna Nuclear Power Plant - TSTF 547 Adoption, Request for Additional Information (RAI) EPID L-2018-LLA-0179 ML18102A2372018-04-12012 April 2018 NRR E-mail Capture - Calvert Cliffs, Ginna, and Nine Mile Point - Request for Additional Information Regarding License Amendment Request to Revise Emergency Action Level Schemes (EPID-L-2017-LLA-0237) ML18067A1482018-03-0808 March 2018 Enclosurequest for Additional Information (Letter to P. R. Simpson Request for Additional Information Regarding Exelon Generating Company, Llc'S Decommissioning Funding Plan Update for Independent Spent Fuel Storage Installation) ML17331B1342017-12-12012 December 2017 2, and R.E. Ginna Nuclear Power Plant - Request for Additional Information - Regarding ML17277A2052017-10-0202 October 2017 Email - Ginna: Request for Additional Information (RAI) for NFPA-805 LAR RS-17-026, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal2017-03-10010 March 2017 Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal ML17062A4912017-03-0303 March 2017 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Fleet Alternative to RPV Threads in Flange Examination (CAC Nos. MF8712-MF8729) ML16278A0772016-11-0707 November 2016 Request for Additional Information Regarding: Deletion of E Bar Definition and Revision to Reactor Coolant System Specific Activity Technical Specifications ML16075A1192016-03-17017 March 2016 Request for Additional Information Regarding: Deletion of E Bar Definition and Revision to Reactor Coolant System Specific Activity Technical Specifications ML16077A1082016-03-17017 March 2016 NRR E-mail Capture - (External_Sender) Email Clarification and Supplementation to AMP RAI ML15349B0252016-01-0707 January 2016 Request for Additional Information Regarding Reactor Vessels Internals Program ML15344A3532016-01-0707 January 2016 Request for Additional Information Regarding Risk-Informed Technical Specifications Initiative 5B CAC No. MF6358) ML15100A2112015-04-28028 April 2015 RAI Regarding License Amendment Request to Adopt Technical Specification Task Force Traveler-523 ML14093A6772014-05-0101 May 2014 SONGS - Request for Additional Information Concerning Pre-Emption Authority ML13337A6252013-12-0505 December 2013 Constellation Energy Nuclear Group, R.E. Ginna Nuclear Power Plant, Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instru ML13337A3902013-12-0505 December 2013 Request for Additional Information Regarding Order Approving Direct Transfer of Renewed Facility Operating License and Conforming Amendments ML13304B4182013-11-0101 November 2013 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns ML13261A0612013-09-24024 September 2013 R. E. Ginna Nuclear Power Plant - Request for Additional Information Regarding Amendment to Revise Technical Specification 3.6.5. Containment Air Temperature. ML13261A1142013-09-12012 September 2013 R. E. Ginna Nuclear Power Plant, E-mail Re. NFPA 805 License Amendment Request, Audit RAIs ML13226A3822013-08-29029 August 2013 Request for Additional Information Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) ML13108A0682013-04-23023 April 2013 (Security Related) Request for Additional Information for Review of Security Plan Changes in Revision 5 ML12264A6192012-09-20020 September 2012 RAI for the CRDM Nozzle Examination Relief Request ML12234A5172012-08-21021 August 2012 Physical Security Plan Change Per 10 CFR 50.54(p)(2) ML12228A6182012-08-15015 August 2012 Re_ Ginna-BMI Flaw Evaluation(ME8247) ML12178A1922012-06-25025 June 2012 Gina_ TAC Nos. ME8000 and ME8001-Relief Ginna Relief Request ML12056A0482012-03-12012 March 2012 Enclosure 2 - Recommendation 2.1: Flooding ML12056A0502012-03-12012 March 2012 Enclosure 4 - Recommendation 2.3: Flooding ML12056A0472012-03-12012 March 2012 Enclosure 1 - Recommendation 2.1: Seismic ML12056A0492012-03-12012 March 2012 Enclosure 3 - Recommendation 2.3: Seismic ML12056A0512012-03-12012 March 2012 Enclosure 5 - Recommendation 9.3: Emergency Preparedness 2024-07-12
[Table view] |
Text
October 28, 2005 Mrs. Mary G. Korsnick Vice President R.E. Ginna Nuclear Power Plant R.E. Ginna Nuclear Power Plant, LLC 1503 Lake Road Ontario, NY 14519
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION REGARDING REVISED LOSS-OF-COOLANT ACCIDENT ANALYSES, R.E. GINNA NUCLEAR POWER PLANT (TAC NO. MC6860)
Dear Mrs. Korsnick:
By letter dated April 29, 2005, R.E. Ginna Nuclear Power Plant, LCC (Ginna LLC) submitted an application requesting changes to the Technical Specifications for the Ginna Nuclear Power Plant to reflect the results of revised analyses performed to accommodate expected changes in the nuclear fuel associated with a planned power uprate and to permit the use of Nuclear Regulatory Commission (NRC)-approved methodology for large-break and small-break loss-of-coolant accidents.
The NRC staff has reviewed the information supporting the proposed amendment and has determined that additional information is required in order for the staff to complete its review.
Enclosed is the NRC staffs request for additional information (RAI). This RAI was discussed with the Ginna LLC staff on October 24, 2005, and it was agreed that a response would be provided with 45 days of the date of this letter.
Sincerely,
/RA/
Patrick D. Milano, Sr. Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-244
Enclosure:
RAI cc w/encl: See next page
October 28, 2005 Mrs. Mary G. Korsnick Vice President R.E. Ginna Nuclear Power Plant R.E. Ginna Nuclear Power Plant, LLC 1503 Lake Road Ontario, NY 14519
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION REGARDING REVISED LOSS-OF-COOLANT ACCIDENT ANALYSES, R.E. GINNA NUCLEAR POWER PLANT (TAC NO. MC6860)
Dear Mrs. Korsnick:
By letter dated April 29, 2005, R.E. Ginna Nuclear Power Plant, LCC (Ginna LLC) submitted an application requesting changes to the Technical Specifications for the Ginna Nuclear Power Plant to reflect the results of revised analyses performed to accommodate expected changes in the nuclear fuel associated with a planned power uprate and to permit the use of Nuclear Regulatory Commission (NRC)-approved methodology for large-break and small-break loss-of-coolant accidents.
The NRC staff has reviewed the information supporting the proposed amendment and has determined that additional information is required in order for the staff to complete its review.
Enclosed is the NRC staffs request for additional information (RAI). This RAI was discussed with the Ginna LLC staff on October 24, 2005, and it was agreed that a response would be provided with 45 days of the date of this letter.
Sincerely,
/RA/
Patrick D. Milano, Sr. Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-244
Enclosure:
RAI cc w/encl: See next page DISTRIBUTION:
PUBLIC L. Lund F. Orr J. Trapp, R-I PDI-1 Reading File P. Milano L. Ward OGC R. Laufer Y. Diaz S. Little ACRS J. Nakoski Accession Number: ML052930431 OFFICE PDI-1/PM PDI-1/LA EMCB/SC SRXB/SC PDI-1/SC NAME PMilano SLittle LLund JNakoski RLaufer DATE 10/26/05 10/26/05 06/07/05 10/27/05 10/28/05 OFFICIAL RECORD COPY
R.E. Ginna Nuclear Power Plant cc:
Mr. Michael J. Wallace Office President Wayne County Emergency Operations R.E. Ginna Nuclear Power Plant, LLC Center c/o Constellation Energy 7336 Route 31 750 East Pratt Street Lyons, NY 14489 Baltimore, MD 21202 Ms. Mary Louise Meisenzahl Mr. John M. Heffley Administrator, Monroe County Senior Vice President and Office of Emergency Preparedness Chief Nuclear Officer 1190 Scottsville Road, Suite 200 Constellation Generation Group Rochester, NY 14624 1997 Annapolis Exchange Parkway Suite 500 Mr. Paul Eddy Annapolis, MD 21401 New York State Department of Public Service Kenneth Kolaczyk, Sr. Resident Inspector 3 Empire State Plaza, 10th Floor R.E. Ginna Nuclear Power Plant Albany, NY 12223 U.S. Nuclear Regulatory Commission 1503 Lake Road Ontario, NY 14519 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Peter R. Smith, President New York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY 12203-6399 Carey W. Fleming, Esquire Senior Counsel - Nuclear Generation Constellation Generation Group, LLC 750 East Pratt Street, 17th Floor Baltimore, MD 21202 Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Ms. Thelma Wideman, Director Wayne County Emergency Management
REQUEST FOR ADDITIONAL INFORMATION REGARDING REVISED LOSS-OF-COOLANT ACCIDENT ANALYSES R.E. GINNA NUCLEAR POWER PLANT DOCKET NO. 50-244 By letter dated April 29, 2005 (Agencywide Documents Access and Management System Accession No. ML051260239), R.E. Ginna Nuclear Power Plant, LLC (the licensee) submitted an application to amend the technical specifications (TSs) for the R.E. Ginna Nuclear Power Plant. Specifically, the licensee proposed changes that would reflect the revised analyses performed in support of the planned extended power uprate.
Effects of Post-Loss-of-Coolant Accident (LOCA) Analysis on Containment Sump pH
- 1. In order to complete its evaluation, the Nuclear Regulatory Commission (NRC) staff needs to review the general assumptions and calculations used by the licensee to prove that the containment sump pH will be maintained above seven throughout the duration of the accident.
Describe the procedure utilized for calculating pH of the containment sump water during the 30-day period after a LOCA. If the calculations were performed manually, describe the methodology and provide sample calculations. If a computer code was used, provide the input to the code and the results calculated by it.
Best-Estimate Large-Break LOCA (LBLOCA) Analysis
- 1. In order to show that the referenced, generically approved LOCA analysis methodologies apply specifically to Ginna, provide a statement that confirms that Ginna LLC and its vendor have ongoing processes to assure that the ranges and values of the input parameters for the Ginna LOCA analysis conservatively bound the ranges and values of the as-operated plant parameters.
- 2. If the plant-specific analyses are based on the model and/or analyses of any other plant, provide the justification showing that the model or analyses applies to Ginna.
Over-Pressure Protection - Safety Valve Capacity
- 1. In its July 7 application with supporting documentation, descriptions of the provisions to address over-pressure protection were included for Ginna when operating at the uprated power. The NRC staff is reviewing continued sufficiency of the design margin of the safety valve capacity at the uprated power. The information provided in the application only addresses the change to the pressurizer safety valve lift setting and does not address the adequacy of the safety valve capacity. Although Table 5.2-1 in the Ginna Updated Safety Analysis Report does refer to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section III, Nuclear Vessels, 1965, the application does not provide details about analyses that were done Enclosure
at the uprated power to demonstrate the adequate relief capacity and to show that sufficient design quantify margin remains.
Westinghouse Report WCAP-7769, Revision 1, "Topical Report Overpressure Protection for Westinghouse Pressurized Water Reactors," dated June 1972, does provide demonstration of compliance for Ginna with Article NM-7000, Protection Against Overpressure, in Section IIl of the ASME Code. However, WCAP-7769 assumed that Ginna operating at 1518.5 megawatts thermal (MWt).
Provide the analysis results, determined using methods consistent with those in WCAP-7769 (including credit for the second (or later) safety grade trip from the reactor protection system), to show sufficiency margin in the design capacity for the Ginna pressurizer and steam line safety valves, with Ginna operating at the uprated power of 1775 MWt.
Small-Break LOCA (SBLOCA) Analysis
- 1. Provide the full set of transient parameters for the 1.5, 2, and 3-inch break sizes that includes the following:
- core power
- core inlet mass flowrate
- break mass flow rate
- break quality
- pressurizer pressure
- inner vessel or core two-phase level
- clad temperature at peak clad temperature (PCT) location
- steam temperature at hot spot
- heat transfer coefficient at hot spot
- injection mass flow rate vs time (pumped should be separate from accumulator injection)
- condensation rate in cold legs
- void fraction in each core node versus time
- 2. What is the bottom elevation of the suction leg piping and the top elevation of the core?
Also, provide the top elevation of the cold-leg discharge pipe.
- 3. Provide the limiting top peaked axial power shape used in the analysis.
- 4. Provide the head flow curve for the pumped safety injection (SI) system for the severed emergency core cooling injection line. Provide a set of plots for this break (see item 1).
- 5. Breaks larger than 3 inches were not provided. Provide information to demonstrate that breaks as large as 0.5 ft2 are not limiting and, as such, the worst-case break has been identified.
- 6. The 2-inch break shows an interruption in SI flow for about 500 seconds while the 3-inch break shows an interruption of about 600 seconds. For the 3-inch break, the two-phase level in the upper plenum shows very little recession when the SI flow has been
terminated from 2700 to 3300 seconds. Explain and verify the insensitivity of the two-phase level due to the termination of SI flow. Provide an alternate means to verify core uncovery does not occur for all small breaks.
- 7. For larger breaks, the termination of SI flow is expected to have a more significant impact. Identify the impact of SI flow termination on the largest SBLOCA and the limiting LBLOCA.
Post-LOCA Long-Term Cooling
- 1. The long-term cooling analysis and boric acid precipitation analysis are based on a 1975 Westinghouse letter that the NRC staff does not consider acceptable. Submit a new analysis that contains the following considerations for performing the long-term cooling analyses:
- a. The mixing volume must be justified and the void fraction must be taken into account when computing the boric acid concentration.
- b. Since the mixing volume is a variable quantity that increases with time, the boric acid concentration just prior to the switch to simultaneous injection should reflect the variable size of the mixing region set by the pressure drop in the loop. The fluid static balance between the downcomer and inner vessel region (i.e. lower plenum, core, and upper plenum regions of the vessel) can then be performed taking into account the loop pressure drop at a given steaming rate to compute the mixture volume in the core and eventually the upper plenum regions. The concentration in the resulting mixing volume just prior to expansion into the upper plenum (which will cause a sudden decrease in concentration due to the large area change in the upper plenum) must be shown to remain below the precipitation limit.
- c. The precipitation limit must be justified, especially if containment pressures greater than 14.7 psia are assumed or additives are contained in the sump water.
- d. The decay heat multiplier, as required by Appendix K to 10 CFR 50.46, must employ a multiplier of 1.2 for all times. 10 CFR 50.46(b)(5) states that "decay heat shall be removed for an extended period of time required by the long lived radioactivity remaining in the core." Subsection (I)(A)(4), "Fission Product Decay," of Appendix K states that "The heat generation from radioactive decay of fission products shall be assumed to be equal to 1.2 times the values for infinite operating time ..."
- 2. Small breaks were not addressed. The boric acid concentration for the limiting SBLOCA needs to be evaluated. Provide a summary of the results to show that the boric acid concentration is not sufficient to cause precipitation should the operators inadvertently depressurize the reactor coolant system (RCS) in a rapid manner.
- 3. Provide information to show that for the largest break that does not actuate upper plenum injection (UPI) (where a cooldown is required) that there is sufficient time to
perform this function given an appropriate precipitation time based on consideration of the four items in item 1 above.
- 4. What is the temperature of the SI water entering the core at the time of SI re-initiation at 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />?
- 5. Once UPI initiates, at what time following an LBLOCA would the core steaming rate be insufficient to entrain the hot-side injection?
- 6. What are the guidelines for depressurizing the RCS below 140 psia? Describe the emergency operating procedure (EOP) requirements to accomplish this? Is there a time constraint for initiating a cooldown? Does the cooldown consider a failure of the steam generator atmospheric dump valves (ADVs)?
- 7. If the RCS refills early during the cooldown for very small breaks and hot water is trapped in the pressurizer with a saturation temperature above the entry temperature to start residual heat removal (RHR), how is the pressurizer eventually cooled to initiate RHR? Explain the method to reduce RCS pressure under these conditions. Can cooldown be accomplished before the condensate storage tank supply is exhausted?
- 8. What precipitation limit is used for LBLOCAs and intermediate-break LOCAs? Explain whether debris in the sump water affects this limit and the time variation in boric acid concentration.
- 9. For intermediate breaks that produce RCS pressures above the UPI shut-off head, the SI pumps are secured if the need to switch to recirculation should occur. Explain the procedure for assuring RHR can be actuated if the steam generators (SGs) have to be cooled down, especially with the loss of offsite power and failure of one of the ADVs.
What is the timing for cooldown of the SGs to assure RHR will be operating when the switch to recirculation is made?
- 10. Following LBLOCAs, borated water is entrained in the steam exiting the core, which can enter the SG tubes. Since the secondary side is at high temperatures, the borated water can be boiled-off leaving behind the boric acid. What happens to the boric acid in the SGs? Can boric acid build-up sufficiently to increase the loop resistance and depress the two-phase level in the core?
- 11. Following a SBLOCA, the RCS can boil for an extended period of time. While the boric acid will remain in solution at the high temperatures, the sudden need to depressurize the RCS rapidly could cause an inadvertent precipitation. Explain what guidelines or EOP directives are available to the operators to assure this does not happen.
- 12. Explain how the EOPs guide the operators to assure them that they can refill the RCS for all small breaks and re-establish natural circulation to flush the boric acid from the vessel.
- 13. What is the size of the bottom mounted instrument tubes? Are failed instrument tubes in the bottom of the head part of the design basis? If so, was a failed tube analyzed at
extended power uprate conditions? Also, is operator action required to assure the core remains below 2200 EF with one tube assumed failed?
- 14. Explain the impact of the refilling of the loop seals (for breaks on the side of the cold leg) on the mixing volume and boric acid concentration.