ML061530016

From kanterella
Jump to navigation Jump to search

Tech Spec Pages for Amendment 96 Regarding Revised Loss-of-Coolant Accident Analyses
ML061530016
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/31/2006
From:
Plant Licensing Branch III-2
To:
References
TAC MC6860
Download: ML061530016 (9)


Text

(b) Pursuant to the Act and 10 CFR Part 70, to possess and use four (4) mixed oxide fuel assemblies in accordance with the RG&E's application dated December.14, 1979 (transmitted by letter dated December 20, 1979), as supplemented February 20, 1980 and March 5, 1980; (3) Pursuant to the Act and 10 CFR Parts 30, 40, and 70 to receive, possess, and use at any time any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) Pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; and is subject to all applicable provisions of the Act and rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified below:

(1) Maximum Power Level Ginna LLC is authorized to operate the facility at steady-state power levels up to a maximum of 1520 megawatts (thermal).

(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 96, are hereby incorporated in the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications.

(3) Fire Protection (a) The licensee shall implement and maintain in effect all fire protection features described in the licensee's submittals referenced in and as approved or modified by the NRC's Fire Protection Safety Evaluation (SE) dated February 14, 1979 and Amendment No. 96

Accumulators 3.5.1 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.1 Accumulators LCO 3.5.1 Two ECCS accumulators shall be OPERABLE.

APPLICABILITY: MODES 1 and 2, MODE 3 with pressurizer pressure > 1600 psig.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One accumulator A.1 Restore boron 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable due to boron concentration to within concentration not within limits.

limits.

B. One accumulator B.1 Restore accumulator to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> inoperable for reasons OPERABLE status.

other than Condition A.

C. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A or B AND not met.

C.2 Reduce pressurizer 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> pressure to < 1600 psig.

D. Two accumulators D.1 Enter LCO 3.0.3. Immediately inoperable.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.1.1 Verify each accumulator motor operated isolation 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> valve is fully open.

SR 3.5.1.2 Verify borated water volume in each accumulator is 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> I >1090 cubic feet (24%) and < 1140 cubic feet (83%).

R.E. Ginna Nuclear Power Plant 3.5.1-1 Amendment 96

Accumulators 3.5.1 SURVEILLANCE FREQUENCY SR 3.5.1.3 Verify nitrogen cover pressure in each accumulator is 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />

> 700 psig and < 790 psig.

SR 3.5.1.4 Verify boron concentration in each accumulator is 31 days on a I Ž2550 ppm and < 3050ppm. STAGGEREDTEST BASIS SR 3.5.1.5 Verify power is removed from each accumulator 31 days motor operated isolation valve operator when pressurizer pressure is > 1600 psig.

R.E. Ginna Nuclear Power Plant 3.5.1-2 Amendment 96

RWST 3.5.4 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.4 Refueling Water Storage Tank (RWST)

LCO 3.5.4 The RWST shall be OPERABLE.

APPLICABILITY: MODES 1,2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. RWST boron A.1 Restore RWST to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> concentration not within OPERABLE status.

limits.

B. RWST water volume not B.1 Restore RWST to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> within limits. OPERABLE status.

C. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion lime not met. AND C.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.4.1 Verify RWST borated water volume is > 300,000 7 days gallons (88%).

SR 3.5.4.2 Verify RWST boron concentration is;> 2750 ppm and 7 days I < 3050 ppm.

R.E. Ginna Nuclear Power Plant 3.5.4-1 Amendment 96

Reporting Requirements 5.6 5.0 ADMINISTRATIVE CONTROLS 5.6 Reporting Requirements The following reports shall be submitted in accordance with 10 CFR 50.4.

5.6.1 Deleted 5.6.2 Annual Radiological Environmental Operating Report The Annual Radiological Environmental Operating Report covering the operation of the plant during the previous calendar year shall be submitted by May 15 of each year. The report shall include summaries, interpretations, and analyses of trends of the results of the radiological environmental monitoring activities for the reporting period. The material provided shall be consistent with the objectives outlined in the Offsite Dose Calculation Manual (ODCM), and in 10 CFR 50, Appendix i, Sections IV.B.2, IV.B.3, and IV.C.

The Annual Radiological Environmental Operating Report shall include the results of analyses of all radiological environmental samples and of all environmental radiation measurements taken during the period pursuant to the locations specified in the table and figures in the ODCM, as well as summarized and tabulated results of these analyses and measurements in the format of the table in the Radiological Assessment Branch Technical Position, Revision 1, November 1979. In the event that some individual results are not available for inclusion with the report, the report shall be submitted noting and explaining the reasons for the missing results. The missing data shall be submitted in a supplementary report as soon as possible.

5.6.3 Radioactive Effluent Release Report The Radioactive Effluent Release Report covering the operation of the plant shall be submitted in accordance with 10 CFR 50.36a. The report shall include a summary of the quantities of radioactive liquid and gaseous effluents and solid waste released from the plant. The material provided shall be consistent with the objectives outlined in the ODCM and in conformance with 10 CFR 50.36a and 10 CFR 50, Appendix I, Section IV.B.1.

5.6.4 Deleted R.E. Ginna Nuclear Power Plant 5.6-1 Amendment 96

Reporting Requirements 5.6 5.6.5 CORE OPERATING LIMITS REPORT (COLR)

The following administrative requirements apply to the COLR:

a. Core operating limits shall be established prior to each reload cycle, or prior to any remaining portion of a reload cycle, and shall be documented in the COLR for the following:

2.1, "Safety Limits (SLs);

LCO 3.1.1, "SHUTDOWN MARGIN (SDM)";

LCO 3.1.3, "MODERATOR TEMPERATURE COEFFICIENT (MTC)";

LCO 3.1.5, "Shutdown Bank Insertion Limit";

LCO 3.1.6. "Control Bank Insertion Limits";

LCO 3.2.1. "Heat Flux Hot Channel Factor (Fo(Z))";

LCO 3.2.2, "Nuclear Enthalpy Rise Hot Channel Factor (FNAH)";

LCO 3.2.3. "AXIAL FLUX DIFFERENCE (AFD)";

LCO 3.3.1, "Reactor Protection System (RPS) Instrumentation";

LCO 3.4.1, "RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits"; and LCO 3.9.1. "Boron Concentration."

b. The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents:
1. WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.

(Methodology for 2.1, LCO 3.1.1, LCO 3.1.3, LCO 3.1.5, LCO 3.1.6, LCO 3.2.1, LCO 3.2.2, LCO 3.2.3, and LCO 3.9.1.)

2. WCAP-16009-P-A, "Realistic Large-Break LOCA Evaluation Methodology Using the Automated Statistical Treatment of Uncertainty (ASTRUM)," January 2005.
3. WCAP-1 0216-P-A, Rev. 1A, "Relaxation of Constant Axial Offset Control / FQ Surveillance Technical Specification,"

February 1994.

(Methodology for LCO 3.2.1 and LCO 3.2.3.)

R.E. Ginna Nuclear Power Plant 5.6-2 Amendment 96

Reporting Requirements 5.6

4. WCAP-12610-P-A, "VANTAGE + Fuel Assembly Reference Core Report," April 1995.

(Methodology for LCO 3.2.1.)

5. WCAP 11397-P-A, "Revised Thermal Design Procedure,"

April 1989.

(Methodology for LCO 3.4.1 when using RTDP.)

6. WCAP-1 0054-P-A and WCAP-1 0081 -A, 'Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code," August 1985.

(Methodology for LCO 3.2.1.)

7. WCAP-1 0054-P-A, Addendum 2, Revision 1, "Addendum to the Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code: Safety Injection Into the Broken Loop and COSI Condensation Model," July 1997.

(Methodology for LCO 3.2.1)

8. WCAP-11145-P-A, "Westinghouse Small Break LOCA ECCS Evaluation Model Generic Study With the NOTRUMP Code,"

October 1986.

(Methodology for LCO 3.2.1)

9. WCAP-10079-P-A, "NOTRUMP - A Nodal Transient Small Break and General Network Code," August 1985.

(Methodology for LCO 3.2.1)

10. WCAP-8745, "Design Basis for the Thermal Overpower Delta T and Thermal Overtemperature Delta T Trip Functions,"

March 1977.

(Methodology for LCO 3.3.1.)

11. WCAP-14710-P-A, "l-D Heat Conduction Model for Annular Fuel Pellets," May, 1998.

(Methodology for LCO 3.2.1)

c. The core operating limits shall be determined such that all applicable limits (e.g., fuel thermal mechanical limits, core thermal hydraulic limits, Emergency Core Cooling Systems (ECCS) limits, nuclear limits such as SDM, transient analysis limits, and accident analysis limits) of the safety analysis are met.
d. The COLR, including any midcycle revisions or supplements, shall be provided upon issuance for each reload cycle to the NRC.

R.E. Ginna Nuclear Power Plant 5.6-3 Amendment 96

Reporting Requirements 5.6 5.6.6 Reactor Coolant System (RCS) PRESSURE AND TEMPERATURE LIMITS REPORT (PTLR)

The following administrative requirements apply to the PTLR:

a. RCS pressure and temperature limits for heatup, cooldown, criticality, and hydrostatic testing as well as heatup and cooldown rates shall be established and documented in the PTLR for the following:

LCO 3.4.3, "RCS Pressure and Temperature (P/T) Limits"

b. The power operated relief valve lift settings required to support the Low Temperature Overpressure Protection (LTOP) System, and the LTOP enable temperature shall be established and documented in the PTLR for the following:

LCO 3.4.6, "RCS Loops - MODE 4";

LCO 3.4.7, "RCS Loops - MODE 5. Loops Filled";

LCO 3.4.10, "Pressurizer Safety Valves"; and LCO 3.4.12, "LTOP System."

c. The analytical methods used to determine the RCS pressure and temperature and LTOP limits shall be those previously reviewed and approved by the NRC in NRC letter, "R.E. Ginna - Acceptance for Referencing of Pressure Temperature Limits Report, Revision 2 (TAC No. M96529)," dated November 28, 1997. Specifically, the methodology is described in the following documents:
1. Letter from R.C. Mecredy, Rochester Gas and Electric Corporation (RG&E), to Document Control Desk, NRC, Attention: Guy S. Vissing, "Application for Facility Operating License, Revision to Reactor Coolant System (RCS)

Pressure and Temperature Limits Report (PTLR)

Administrative Controls Requirements," Attachment VI, September 29, 1997, as supplemented by letter from R.C.

Mecredy, RG&E, to Guy S. Vissing, NRC, "Corrections to Proposed Low Temperature Overpressure Protection System Technical Specification," October 8, 1997.

2. WCAP-14040-NP-A, "Methodology used to Develop Cold Overpressure Mitigating System Setpoints and RCS Heatup and Cooldown Limit Curves," Sections 1 and 2, January, 1996.

R.E. Ginna Nuclear Power Plant 5.6-4 Amendment 96

Reporting Requirements 5.6

d. The PTLR shall be provided to the NRC upon issuance for each reactor vessel fluence period and for revisions or supplement thereto.

R.E. Ginna Nuclear Power Plant 5.6-5 Amendment 96