Inspection / Activity Plan 09/01/2005 - 03/31/2007
ML052420552
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 08/25/2005
From: Ernstes M
NRC/RGN-II/DRP/RPB1
To: Gordon Peterson
Duke Energy Corp
Shared Package
ML052420544 List:
References
Download: ML052420552 (2)


Text

Page 1 of 2 McGuire 08/29/2005 16:39:56 Inspection / Activity Plan Report 22 09/01/2005 - 03/31/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type MTNTI160 - 2515/160 U-1: PZR PENETRATION NOZZLES 1 1 IP 2515/160 Pzr Pene Nozzles & Stm Space Piping Connections in U.S. PWRs [NRC Bulletin 2004-01] 09/28/2005 09/30/2005 Safety Issues EB3-ISI - U1 INSERVICE INSPECTION 1 1 IP 7111108P Inservice Inspection Activities - PWR 10/03/2005 10/07/2005 Baseline Inspections EB1SSDPC - SSDPC PRE-INSPECTION VISIT 1 1, 2 IP 7111121 Safety System Design and Performance Capability 02/20/2006 02/24/2006 Baseline Inspections EB1SSDPC - SAFETY SYSTEM DESIGN & PERF. CAPABILITY 6 1, 2 IP 7111121 Safety System Design and Performance Capability 03/20/2006 03/24/2006 Baseline Inspections 1, 2 IP 7111121 Safety System Design and Performance Capability 04/03/2006 04/07/2006 Baseline Inspections 1, 2 IP 7111121 Safety System Design and Performance Capability 04/17/2006 04/21/2006 Baseline Inspections OL RQ - REQUAL INSPECTION 2 1, 2 IP 7111111B Licensed Operator Requalification Program 05/15/2006 05/19/2006 Baseline Inspections PS1-RP - RP PREINSPECTION VISIT/ ISFSI 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 08/28/2006 08/30/2006 Baseline Inspections PS1-RP - RP BASELINE OCCUPATIONAL WK1 3 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 09/18/2006 09/22/2006 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 09/18/2006 09/22/2006 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 09/18/2006 09/22/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 09/18/2006 09/22/2006 Baseline Inspections EB3-ISI - U2 INSERVICE INSPECTION 1 2 IP 7111108P Inservice Inspection Activities - PWR 09/25/2006 09/29/2006 Baseline Inspections EB3SGISI - U2 STEAM GENERATOR ISI 1 2 IP 7111108P Inservice Inspection Activities - PWR 10/02/2006 10/06/2006 Baseline Inspections PS1-RP - RP BASELINE OCCUPATIONAL WK2 2 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 10/02/2006 10/06/2006 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 10/02/2006 10/06/2006 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 10/02/2006 10/06/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 10/02/2006 10/06/2006 Baseline Inspections PS2-EP - EP INSP 1 1, 2 IP 7111402 Alert and Notification System Testing 10/23/2006 10/27/2006 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 10/23/2006 10/27/2006 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 10/23/2006 10/27/2006 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 10/23/2006 10/27/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 10/23/2006 10/27/2006 Baseline Inspections This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.

Page 2 of 2 McGuire 08/29/2005 16:39:56 Inspection / Activity Plan Report 22 09/01/2005 - 03/31/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB2-TFP - FIRE PROTECTION-TRIENNIAL PRE INSP VISIT 7 1, 2 IP 7111105T Fire Protection [Triennial] 10/31/2006 11/02/2006 Baseline Inspections EB2-TFP - FIRE PROTECTION-TRIENNIAL 4 1, 2 IP 7111105T Fire Protection [Triennial] 11/27/2006 12/01/2006 Baseline Inspections 1, 2 IP 7111105T Fire Protection [Triennial] 12/11/2006 12/15/2006 Baseline Inspections PI&R - PI&R 4 1, 2 IP 71152B Identification and Resolution of Problems 01/22/2007 01/26/2007 Baseline Inspections 1, 2 IP 71152B Identification and Resolution of Problems 02/05/2007 02/09/2007 Baseline Inspections EB1-MODS - MODIFICATIONS-10CFR50.59 3 1, 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 02/12/2007 02/16/2007 Baseline Inspections 1, 2 IP 7111117B Permanent Plant Modifications 02/12/2007 02/16/2007 Baseline Inspections OL PREP - INITIAL EXAM PREP 2 1 V23235 MCGUIRE/EXAMS AT POWER FACILITIES 02/26/2007 03/02/2007 Not Applicable OL EXAM - INITIAL EXAM 3 1 V23235 MCGUIRE/EXAMS AT POWER FACILITIES 03/19/2007 03/23/2007 Not Applicable This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.