0CAN020504, January 2005 Monthly Operating Report for Arkansas Nuclear One - Units 1 and 2

From kanterella
(Redirected from ML050550106)
Jump to navigation Jump to search
January 2005 Monthly Operating Report for Arkansas Nuclear One - Units 1 and 2
ML050550106
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 02/15/2005
From: James D
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
0CAN020504
Download: ML050550106 (4)


Text

-Ee

, Lhtergy Entergy Operations, Inc.

1448 S.R. 333 Russellville, AR 72802 Tel 501 858 5000 OCAN020504 February 15, 2005 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Monthly Operating Report Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6

Dear Sir or Madam:

Arkansas Nuclear One (ANO), Units 1 and 2 Technical Specifications 5.6.4 and 6.6.4, respectively, require the submittal of a Monthly Operating Report. The purpose of this letter is to complete the repirting requimt forJanuary 2005. - - -

There are no new commitments contained in this submittal.

Sncerely,

/DalE.James nager, Licensing DEJ/SLP Attachment(s)

$69Ct4

OCAN020504 Page 2 cc: Dr. Bruce S. Mallett Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Drew Holland Mail Stop 0-7 DI Washington, DC 20555-0001 U. S. Nuclear Regulatory Commission Attn: Mr. Thomas Alexion Mail Stop 0-7 Dl Washington, DC 20555-0001

OPERATING DATA REPORT DOCKET NO. 50-313 UNIT NAME Arkansas Nuclear One - Unit 1 DATE February 15, 2005 COMPLETED BYSteven L. Coffman TELEPHONE (479) 858-5560 REPORTING PERIOD: January 2004

1. Design Electrical Rating (MWe-Net): 850
2. Maximum Dependable Capacity (MWe-Net): 836 MONTH YR-TO-DATE CUMULATIVE
3. Number of Hours Reactor Was Critical 744.00 744.00 209,389.06
4. Number of Hours Generator On-Line 744.00 744.00 206,607.29
5. Unit Reserve Shutdown Hours 0.0 0.0 817.5
6. Net Electrical Energy Generated (MWh) 642,446 642,446 160,084,653 UNIT SHUTDOWNS Type Method of F:- Forced _- Duration._ .- . o Shutting_. -Cause & Corrective Action -

-No. Date S: Scheduled (Hours) Reasons Down 2 Comments None I_ _ _ I I. __ I Il

SUMMARY

The Unit operated the entire month at or near full reactor power.

I 2 Reason: Method:

A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual TriplScram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

4.

OPERATING DATA REPORT DOCKET NO. 50-368 UNIT NAME Arkansas Nuclear One - Unit 2 DATE February 15, 2005 COMPLETED BYSteven L. Coffman TELEPHONE (479) 858-5560 REPORTING PERIOD: January 2004

1. Design Electrical Rating (MWe-Net): 912
2. Maximum Dependable Capacity (MWe.Net): 858 MONTH YR-TO-DATE CUMULATIVE
3. Number of Hours Reactor Was Critical 744.00 744.00 179,422.34
4. Number of Hours Generator On-Line -744.00 744.00 176,825.51
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy Generated (MWh) 752,326 752,326.0 153,495,871 UNIT SHUTDOWNS Type Method F: Forced Duration of Cause & Corrective

- No. Date S: Scheduled (Hours) Reason Shuing - - --- Action.-

I I Down2 Comments None I I

SUMMARY

The Unit operated the entire month at or near full reactor power.

I 2 Reason: Method:

A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic TriplScram D Regulatory Restriction 4 Continuation E Operator Training & License Examinatio n 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)