ML050820234

From kanterella
Jump to navigation Jump to search
February 2005 Monthly Operating Report for Arkansas Nuclear One, Units 1 and 2
ML050820234
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 03/15/2005
From: James D
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
OCAN030503
Download: ML050820234 (4)


Text

- I y

r-

, Lentgy Entergy Operations, Inc.

1448 S.R. 333 Russellville, AR 72802 Tel 501 858 5000 OCAN030503 March 15, 2005 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Monthly Operating Report Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6

Dear Sir or Madam:

Arkansas Nuclear One (ANO), Units 1 and 2 Technical Specifications 5.6.4 and 6.6.4, respectively, require the submittal of a Monthly Operating Report. The purpose of this letter is to complete the reporting requirement for February 2005.

There are no new commitments contained in this submittal.

,-erely, ale James Maner, Licensing DEJ/SLP Attachment(s)

I L-11" 

I OCAN030503 Page 2 cc:

Dr. Bruce S. Mallett Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Drew Holland Mail Stop 0-7 D1 Washington, DC 20555-0001 U. S. Nuclear Regulatory Commission Attn: Mr. Thomas Alexion Mail Stop 0-7 D1 Washington, DC 20555-0001

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED TELEPHONE 50-313 Arkansas Nuclear One - Unit I March 15, 2005 BYSteven L. Coffman (479) 858-5560 REPORTING PERIOD:

February 2005

1.

Design Electrical Rating (MWe-Net):

850

2.

Maximum Dependable Capacity (MWe-Net):

836 MONTH

3.

Number of Hours Reactor Was Critical 672.00

4.

Number of Hours Generator On-Line 672.00

5.

Unit Reserve Shutdown Hours 0.0

6.

Net Electrical Energy Generated (MWh) 580,408 YR-TO-DATE 1,416.00 CUMULATIVE 210,061.06 1,416.00 207,279.29 0.0 817.5 1,222,854 160,665,061 UNIT SHUTDOWNS Type Method

-F:-Forced

-Duration of -- -- - Cause & Corrective-Action -

No.

Date S: Scheduled (Hours)

Reason' Shutting Comments Down2 None

SUMMARY

The Unit operated the entire month at or near full reactor power.

1 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

OPERATING DATA REPORT DOCKET NO.

50-368 UNIT NAME Arkansas Nuclear DATE March 15, 2005 COMPLETED BY Steven L. Coffman TELEPHONE (479) 858-5560 I One - Unit 2 REPORTING PERIOD:

February 2005

1.

Design Electrical Rating (MWe-Net):

912

2.

Maximum Dependable Capacity (MWe-Net):

858 MONTH

3.

Number of Hours Reactor Was Critical 672.00

4.

Number of Hours Generator On-Line 672.00

5.

Unit Reserve Shutdown Hours 0.0

6.

Net Electrical Energy Generated (MWh) 679,457 YR-TO-DATE 1.416.00 CUMULATIVE 180.094.34 1,416.00 177,497.51 0.0 0.0 1,431,783.0 154.175,328 UNIT SHUTDOWNS Type F: Forced

-S` Scheduled No. - -l -- Date-~

Duration

. (Hours) -

Method of Shutting

- b6DW-n2 -

Cause & Corrective Acti6o Comments 4

4 4

+

4 None

SUMMARY

The Unit operated the entire month at or near full reactor power.

1 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual Trip/Scram 3

Automatic TriplScram 4

Continuation 5

Other (Explain)