ML050820234
| ML050820234 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 03/15/2005 |
| From: | James D Entergy Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| OCAN030503 | |
| Download: ML050820234 (4) | |
Text
- I y
r-
, Lentgy Entergy Operations, Inc.
1448 S.R. 333 Russellville, AR 72802 Tel 501 858 5000 OCAN030503 March 15, 2005 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Monthly Operating Report Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6
Dear Sir or Madam:
Arkansas Nuclear One (ANO), Units 1 and 2 Technical Specifications 5.6.4 and 6.6.4, respectively, require the submittal of a Monthly Operating Report. The purpose of this letter is to complete the reporting requirement for February 2005.
There are no new commitments contained in this submittal.
,-erely, ale James Maner, Licensing DEJ/SLP Attachment(s)
I L-11"
I OCAN030503 Page 2 cc:
Dr. Bruce S. Mallett Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Drew Holland Mail Stop 0-7 D1 Washington, DC 20555-0001 U. S. Nuclear Regulatory Commission Attn: Mr. Thomas Alexion Mail Stop 0-7 D1 Washington, DC 20555-0001
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED TELEPHONE 50-313 Arkansas Nuclear One - Unit I March 15, 2005 BYSteven L. Coffman (479) 858-5560 REPORTING PERIOD:
February 2005
- 1.
Design Electrical Rating (MWe-Net):
850
- 2.
Maximum Dependable Capacity (MWe-Net):
836 MONTH
- 3.
Number of Hours Reactor Was Critical 672.00
- 4.
Number of Hours Generator On-Line 672.00
- 5.
Unit Reserve Shutdown Hours 0.0
- 6.
Net Electrical Energy Generated (MWh) 580,408 YR-TO-DATE 1,416.00 CUMULATIVE 210,061.06 1,416.00 207,279.29 0.0 817.5 1,222,854 160,665,061 UNIT SHUTDOWNS Type Method
-F:-Forced
-Duration of -- -- - Cause & Corrective-Action -
No.
Date S: Scheduled (Hours)
Reason' Shutting Comments Down2 None
SUMMARY
- The Unit operated the entire month at or near full reactor power.
1 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
I Manual 2
Manual Trip/Scram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
OPERATING DATA REPORT DOCKET NO.
50-368 UNIT NAME Arkansas Nuclear DATE March 15, 2005 COMPLETED BY Steven L. Coffman TELEPHONE (479) 858-5560 I One - Unit 2 REPORTING PERIOD:
February 2005
- 1.
Design Electrical Rating (MWe-Net):
912
- 2.
Maximum Dependable Capacity (MWe-Net):
858 MONTH
- 3.
Number of Hours Reactor Was Critical 672.00
- 4.
Number of Hours Generator On-Line 672.00
- 5.
Unit Reserve Shutdown Hours 0.0
- 6.
Net Electrical Energy Generated (MWh) 679,457 YR-TO-DATE 1.416.00 CUMULATIVE 180.094.34 1,416.00 177,497.51 0.0 0.0 1,431,783.0 154.175,328 UNIT SHUTDOWNS Type F: Forced
-S` Scheduled No. - -l -- Date-~
Duration
. (Hours) -
Method of Shutting
- b6DW-n2 -
Cause & Corrective Acti6o Comments 4
4 4
+
4 None
SUMMARY
- The Unit operated the entire month at or near full reactor power.
1 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
I Manual 2
Manual Trip/Scram 3
Automatic TriplScram 4
Continuation 5
Other (Explain)