Entergy Operations, Inc.

-~ Entkagy 1448 S.R 333 Russeliville, AR 72802 Tel 501858 5000 OCAN070303 July 15, 2003 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Arkansas Nuclear One - Units I and 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6 Monthly Operating Report

Dear Sir or Madam:

Arkansas Nuclear One (ANO), Units 1 and 2 Technical Specifications 5.6.4 and 6.9.1.6, respectively, require the submittal of a Monthly Operating Report The purpose of this letter is to complete the reporting requirement for June 2003.

There are no new commitments contained in this submittal.

Sincerely, Glenn R. Ashley Manager, Licensing GRANSLP Attachment D---, .

OCAN070303 Page 2 cc: Mr. Ellis W. Merschoff Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. John L. Minns Washington, DC 20555-0001 U. S. Nuclear Regulatory Commission Attn: Mr. Thomas Alexion Washington, DC 20555-0001

OPERATING DATA REPORT DOCKET NO. 50-313 UNIT NAME Arkansas Nuclear One - Unit 1 DATE July 15, 2003 COMPLETED BY Steven L. Coffman TELEPHONE (479) 858-5560 REPORTING PERIOD: June 2003

1. Design Electrical Rating MWe-Net): 850
2. Maximum Dependable Capacity (MWe-Net): 836 MONTH YR-TO-DATE CUMULATIVE
3. Number of Hours Reactor Was Critical 720.0 4,343.0 196,784.6
4. Number of Hours Generator On-Line 720.0 4,343.0 194,108.8 S. Unit Reserve Shutdown Hours 0.0 0.0 817.5
6. Net Electrical Energy Generated (MWh) 611,199 3,701,000 149,521,337 UNIT SHUTDOWNS Type Method F: Forced Duration of Cause & Corrective Action No. Date S: Scheduled (Hours) Reason' Shuttin Comments None____ Down 2 None IIIIII

SUMMARY

The Unit operated the entire month at full power.

I 2 Reason: Method:

A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual TriplScram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination S Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

4 ., I OPERATING DATA REPORT DOCKET NO. 50-368 UNIT NAME Arkansas Nuclear One - Unit 2 DATE July 15, 2003 COMPLETED BY Steven L. Coffman TELEPHONE (479) 858-5560 REPORTING PERIOD: June 2003

1. Design Electrical Rating (MWe-Net): 912
2. Maximum Dependable Capacity (MWe-Net): 858 MONTH YR-TO-DATE CUMULATIVE
3. Number of Hours Reactor Was Critical 720.0 4,343.0 166,217.0
4. Number of Hours Generator On-Line 720.0 4,343.0 163,684.5
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy Generated (MWh) 722,680 4,382,617.0 140,572,878 UNIT SHUTDOWNS Type Method F: Forced Duration of Cause & Corrective Action No. Date S: Scheduled (Hours) Reason Shutting Comments

_ __ _ _ _ _ _ _ _ __ __ _ _ __ __ _ _ _ _ _ _ _ _ _ _D o w n2 _ _ _ _ _ _ _ _ _ _ _ _

N one I _ I__ _ _ _ _ I__ _ _ I__ _ _ I__ _ _ I__ _ _ _ _ _ _ _ _ I__

SUMMARY

The Unit operated the entire month at full power.

I 2 Reason: Method:

A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual TriplScram C Refueling 3 Automatic TriplScram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 6 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)