ML043550146

From kanterella
Jump to navigation Jump to search
November 2004 Monthly Operating Report for Arkansas Nuclear One, Units 1 and 2
ML043550146
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 12/15/2004
From: James D
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
OCAN120404
Download: ML043550146 (4)


Text

- Entergy Entergy Operations, Inc.

1448 S. R. 333 Russellville, AR 72802 Tel 501 858 5000 OCAN 120404 December 15, 2004 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Monthly Operating Report Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6

Dear Sir of Madam:

Arkansas Nuclear One (ANO), Units 1 and 2 Technical Specifications 5.6.4 and 6.6.4, respectively, require the submittal of a Monthly Operating Report. The purpose of this letter is to complete the reporting requirement for November 2004.

There are no new commitments contained in this submittal.

/"

rely, ale E.

es Manag

, Licensing DEJ/ LP Attachment(s)

OCAN1 20404 Page 2 cc:

Dr. Bruce S. Mallett Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Drew Holland Mail Stop 0-7 D1 Washington, DC 20555-0001 U. S. Nuclear Regulatory Commission Attn: Mr. Thomas Alexion Mail Stop 0-7 D1 Washington, DC 20555-0001

OPERATING DATA REPORT DOCKET NO.

50-313 UNIT NAME Arkansas Nuclear I DATE December 15,2004 COMPLETED BY Steven L. Coffman TELEPHONE (479) 858-5560 One - Unit I REPORTING PERIOD:

November 2004

1.

Design Electrical Rating (MWe-Net):

850

2.

Maximum Dependable Capacity (MWe-Net):

836 MONTH YR-TO-DATE CUMULATIVE

3.

Number of Hours Reactor Was Critical 720.00 7,328.17 207,901.06

4.

Number of Hours Generator On-Line 720.00 7,302.58 205,119.29

5.

Unit Reserve Shutdown Hours 0.0 0.0 817.5

6.

Net Electrical Energy Generated (MWh) 619,340 6,193,691 158,808,323 UNIT SHUTDOWNS Type Method Cause & Corrective F: Forced Duration of Action No.

Date S: Scheduled (Hours)

Reason' Shutting Comments Donn=

None IIII

SUMMARY

The Unit operated the entire month at or near full reactor power.

I 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

1 Manual 2

Manual TriplScram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

OPERATING DATA REPORT DOCKET NO.

50-368 UNIT NAME Arkansas Nuclear 4 DATE December 15, 2004 COMPLETED BY Steven L. Coffman TELEPHONE (479) 858-5560 One - Unit 2 REPORTING PERIOD:

November 2004 1.

2.

3.

4.

5.

6.

Design Electrical Rating (MWe-Net):

Maximum Dependable Capacity (MWe-Net):

912 858 MONTH YR-TO-DATE CUMULATIVE Number of Hours Reactor Was Critical 720.00 7,877.52 177,934.34 Number of Hours Generator On-Line 720.00 7,838.50 175,337.51 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 728,237 7,874,097.0 151,990,083 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective No.

Date S: Scheduled (Hours)

Reason' Down2 Action I

I_

I I

Comments None

SUMMARY

The Unit operated the entire month at or near full reactor power.

I 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

. Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)