MONTHYEARML23326A0392024-01-24024 January 2024 Issuance of Amendment No. 281 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24017A1582024-01-17017 January 2024 Submittal of Emergency Plan Revision 50 IR 05000313/20234202024-01-10010 January 2024 Security Baseline Inspection Report 05000313/2023420 and 05000368/2023420 IR 05000313/20234022024-01-0202 January 2024 Security Baseline Inspection Report 05000313/2023402 and 05000368/2023402 ML23354A0022023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment IR 05000313/20234052023-12-12012 December 2023 Security Baseline Inspection Report 05000313/2023405 and 05000368/2023405 ML23341A0832023-12-11011 December 2023 Material Control and Accounting Program Inspection Report 05000313/368/2023404- Cover Letter ML23305A0922023-12-0707 December 2023 Summary of Regulatory Audit Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23275A2072023-11-28028 November 2023 Issuance of Amendment No. 280 Removal of Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML23325A1412023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000313/20230032023-11-21021 November 2023 Revised - ANO Revised Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/ 2023001 ML23243B0452023-11-13013 November 2023 Request for Withholding Information from Public Disclosure ML23313A0962023-11-13013 November 2023 Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023001 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000313/20230112023-10-10010 October 2023 Commercial Grade Dedication Inspection Report 05000313/2023011 and 05000368/2023011 IR 05000313/20230052023-08-21021 August 2023 Updated Inspection Plan for Arkansas Nuclear One, Units 1 and 2 (Report 05000313/2023005 and 05000368/2023005) - Mid Cycle IR 05000313/20243012023-08-14014 August 2023 Notification of NRC Initial Operator Licensing Examination 05000313/2024301 IR 05000313/20230022023-08-11011 August 2023 Integrated Inspection Report 05000313/2023002 and 05000368/2023002 and Notice of Violation ML23209A6022023-08-0909 August 2023 Regulatory Audit Plan in Support of License Amendment Request to Revise Technical Specifications to Adopt Risk- Informed Completion Times IR 05000416/20230022023-08-0808 August 2023 Integrated Inspection Report 05000416/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200050/2023001 ML23208A2132023-08-0303 August 2023 Regulatory Audit Summary Concerning Review of License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23188A1732023-07-12012 July 2023 Request for Withholding Information from Public Disclosure ML23142A2022023-06-29029 June 2023 Issuance of Amendment Nos. 279 and 332 Emergency Plan Staffing Requirements IR 05000313/20234032023-06-28028 June 2023 Security Baseline Inspection Report 05000313/2023403 and 05000368/2023403 ML23178A0892023-06-26026 June 2023 August 2023 Emergency Preparedness Program Inspection-Request for Information ML23166B0902023-06-21021 June 2023 Request for Relief ANO1 ISI 036 Regarding Volumetric Examination Requirements ML23180A1082023-06-20020 June 2023 ANO Unit 1 SAR Amendment 31, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report IR 05000313/20234012023-06-13013 June 2023 Cyber Security Inspection Report 05000313/2023401 and 05000368/2023401 ML23130A2972023-05-17017 May 2023 Notification of Inspection (NRC Inspection Report 05000313/2023003) and Request for Information ML23121A3012023-05-10010 May 2023 Regulatory Audit Plan in Support of License Amendment Request to Revise Technical Specifications to Adopt Risk - Informed Completion Times ML23114A3572023-05-10010 May 2023 Regulatory Audit Summary Concerning Review of Request for Alternative ANO-CISI-002 Regarding Containment Inservice Inspection Frequency ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000313/20230012023-05-0909 May 2023 Integrated Inspection Report 05000313/2023001 and 05000368/2023001 ML23118A3202023-05-0808 May 2023 Notification of Biennial Problem Identification and Resolution Inspection and Request for Information (05000313;05000368/2023010) IR 05000368/20233012023-05-0101 May 2023 NRC Examination Report 05000368/2023301 ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML23108A1362023-04-24024 April 2023 Approval of Request for Half-Nozzle Repair of Reactor Vessel Closure Head Penetration No. 46 ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G 2024-01-24
[Table view] Category:License-Monthly Operating Report
MONTHYEARML0517304622005-06-15015 June 2005 May 2005 Monthly Operating Report for Arkansas Nuclear One Units 1 and 2 0CAN050505, April 2005 Monthly Operating Report for Arkansas Nuclear One Units 1 & 22005-05-16016 May 2005 April 2005 Monthly Operating Report for Arkansas Nuclear One Units 1 & 2 0CAN040504, March 2005 Monthly Operating Report for Arkansas Nuclear One, Units 1 and 22005-04-15015 April 2005 March 2005 Monthly Operating Report for Arkansas Nuclear One, Units 1 and 2 ML0508202342005-03-15015 March 2005 February 2005 Monthly Operating Report for Arkansas Nuclear One, Units 1 and 2 0CAN020504, January 2005 Monthly Operating Report for Arkansas Nuclear One - Units 1 and 22005-02-15015 February 2005 January 2005 Monthly Operating Report for Arkansas Nuclear One - Units 1 and 2 ML0502501742005-01-14014 January 2005 December 2004 Monthly Operating Report for Arkansas Nuclear One, Units 1 & 2 ML0435501462004-12-15015 December 2004 November 2004 Monthly Operating Report for Arkansas Nuclear One, Units 1 and 2 ML0432804032004-11-15015 November 2004 October 2004 Monthly Operating Report for Arkansas Nuclear One - Units 1 and 2 0CAN100404, September 2004 Monthly Operating Report for Arkansas Nuclear One (Ano), Units 1 and 22004-10-15015 October 2004 September 2004 Monthly Operating Report for Arkansas Nuclear One (Ano), Units 1 and 2 0CAN090405, August 2004 Monthly Operating Report for Arkansas Nuclear One Units 1 and 22004-09-15015 September 2004 August 2004 Monthly Operating Report for Arkansas Nuclear One Units 1 and 2 0CAN080402, July 2004 Monthly Operating Report for Arkansas Nuclear One Units 1 and 22004-08-16016 August 2004 July 2004 Monthly Operating Report for Arkansas Nuclear One Units 1 and 2 ML0421000782004-07-15015 July 2004 June 2004 Monthly Operating Report for Arkansas Nuclear One - Units 1 and 2 0CAN050403, April 2004 Monthly Operating Report for Arkansas Nuclear One, Units 1 and 22004-05-13013 May 2004 April 2004 Monthly Operating Report for Arkansas Nuclear One, Units 1 and 2 ML0411006372004-04-15015 April 2004 2004 Monthly Operating Report for Arkansas Nuclear One (Ano), Units 1 and 2 0CAN030403, February 2004 Monthly Operating Report for Arkansas Units 1 and 22004-03-15015 March 2004 February 2004 Monthly Operating Report for Arkansas Units 1 and 2 0CAN020404, January 2004 Monthly Operating Report for Arkansas Nuclear One (Ano), Units 1 and 22004-02-16016 February 2004 January 2004 Monthly Operating Report for Arkansas Nuclear One (Ano), Units 1 and 2 0CAN010402, December 2003 Monthly Operating Report for Arkansas Nuclear One, Units 1 and 22004-01-15015 January 2004 December 2003 Monthly Operating Report for Arkansas Nuclear One, Units 1 and 2 ML0335102182003-12-15015 December 2003 November 2003 Monthly Operating Report for Arkansas Nuclear One (Ano), Units 1 and 2 0CAN110301, October 2003 Monthly Operating Report for Arkansas Nuclear One, Units 1 & 22003-11-17017 November 2003 October 2003 Monthly Operating Report for Arkansas Nuclear One, Units 1 & 2 0CAN100301, September 2003 Monthly Operating Report for Arkansas Nuclear One, Units 1 & 22003-10-15015 October 2003 September 2003 Monthly Operating Report for Arkansas Nuclear One, Units 1 & 2 0CAN090301, August 2003 Monthly Operating Report for Arkansas Nuclear, Units 1 and 22003-09-15015 September 2003 August 2003 Monthly Operating Report for Arkansas Nuclear, Units 1 and 2 ML0323302512003-08-15015 August 2003 July 2003 Monthly Operating Report for Arkansas Nuclear One 0CAN070303, June 2003 Monthly Operating Report for Arkansas Nuclear One - Units 1 and 22003-07-15015 July 2003 June 2003 Monthly Operating Report for Arkansas Nuclear One - Units 1 and 2 ML0317701562003-06-16016 June 2003 May 2003 Monthly Operating Report for Arkansas Nuclear One - Units 1 & 2 0CAN050301, April 2003 Monthly Operating Report for Arkansas Nuclear One Units 1 & 22003-05-15015 May 2003 April 2003 Monthly Operating Report for Arkansas Nuclear One Units 1 & 2 ML0310702682003-04-15015 April 2003 March 2003 Monthly Operating Report for Arkansas Nuclear One, Units 1 & 2 ML0307803122003-03-14014 March 2003 February 2003 Monthly Operating Report for Arkansas, Units 1 & 2 ML0305102682003-02-14014 February 2003 January 2003 Monthly Operating Report for Arkansas Nuclear One - Units 1 & 2 ML0302301942003-01-15015 January 2003 December 2002 Monthly Operating Report for Arkansas Nuclear One - Units 1 & 2 0CAN120203, November 2002 Monthly Operating Report for Arkansas Nuclear One Units 1 & 22002-12-16016 December 2002 November 2002 Monthly Operating Report for Arkansas Nuclear One Units 1 & 2 0CAN110203, October 2002 Monthly Operating Report for Arkansas Units 1 & 22002-11-14014 November 2002 October 2002 Monthly Operating Report for Arkansas Units 1 & 2 0CAN010020, September 2002 Monthly Operating Report for Arkansas Nuclear One Units 1 & 22002-10-15015 October 2002 September 2002 Monthly Operating Report for Arkansas Nuclear One Units 1 & 2 0CAN009020, August 2002 Monthly Operating Report for Arkansas One Units 1 & 22002-09-16016 September 2002 August 2002 Monthly Operating Report for Arkansas One Units 1 & 2 ML0223206792002-08-15015 August 2002 July 2002 Monthly Operating Report for Arkansas Nuclear One 0CAN070202, June 2002 Monthly Operating Report for Arkansas Units 1 & 22002-07-15015 July 2002 June 2002 Monthly Operating Report for Arkansas Units 1 & 2 0CAN060205, May 2002 Monthly Operating Report for Arkansas Units 1 & 22002-06-12012 June 2002 May 2002 Monthly Operating Report for Arkansas Units 1 & 2 0CAN050205, April 2002 Monthly Operating Report for Arkansas Nuclear One - Units 1 and 22002-05-15015 May 2002 April 2002 Monthly Operating Report for Arkansas Nuclear One - Units 1 and 2 0CAN040202, March 2002 Monthly Operating Report for Arkansas Nuclear One - Units 1 & 22002-04-15015 April 2002 March 2002 Monthly Operating Report for Arkansas Nuclear One - Units 1 & 2 0CAN030201, February 2002 Monthly Operating Report for Arkansas Nuclear One, Units 1 & 22002-03-15015 March 2002 February 2002 Monthly Operating Report for Arkansas Nuclear One, Units 1 & 2 0CAN020201, January 2002 Monthly Operating Report for Arkansas Units 1 & 22002-02-15015 February 2002 January 2002 Monthly Operating Report for Arkansas Units 1 & 2 0CAN010201, December 2001 Monthly Operating Report for Arkansas Nuclear One, Units 1 and 22002-01-15015 January 2002 December 2001 Monthly Operating Report for Arkansas Nuclear One, Units 1 and 2 2005-06-15
[Table view] |
Text
- Entergy Entergy Operations, Inc.
1448 S.R.333 Russellville, AR 72802 Tel 501 858 5000 OCAN 120404 December 15, 2004 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Monthly Operating Report Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6
Dear Sir of Madam:
Arkansas Nuclear One (ANO), Units 1 and 2 Technical Specifications 5.6.4 and 6.6.4, respectively, require the submittal of a Monthly Operating Report. The purpose of this letter is to complete the reporting requirement for November 2004.
There are no new commitments contained in this submittal.
/" rely, ale E. es Manag , Licensing DEJ/ LP Attachment(s)
OCAN1 20404 Page 2 cc: Dr. Bruce S. Mallett Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Drew Holland Mail Stop 0-7 D1 Washington, DC 20555-0001 U. S. Nuclear Regulatory Commission Attn: Mr. Thomas Alexion Mail Stop 0-7 D1 Washington, DC 20555-0001
OPERATING DATA REPORT DOCKET NO. 50-313 UNIT NAME Arkansas Nuclear IOne - Unit I DATE December 15,2004 COMPLETED BY Steven L. Coffman TELEPHONE .
(479) 858-5560 REPORTING PERIOD: November 2004
- 1. Design Electrical Rating (MWe-Net): 850
- 2. Maximum Dependable Capacity (MWe-Net): 836 MONTH YR-TO-DATE CUMULATIVE
- 3. Number of Hours Reactor Was Critical 720.00 7,328.17 207,901.06
- 4. Number of Hours Generator On-Line 720.00 7,302.58 205,119.29
- 5. Unit Reserve Shutdown Hours 0.0 0.0 817.5
- 6. Net Electrical Energy Generated (MWh) 619,340 6,193,691 158,808,323 UNIT SHUTDOWNS Type Method Cause & Corrective F: Forced Duration of Action No. Date S: Scheduled (Hours) Reason' Shutting Comments Donn=
None IIII
SUMMARY
- The Unit operated the entire month at or near full reactor power.
I 2 Reason: Method:
A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual TriplScram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)
F Administration G Operational Error (Explain)
H Other (Explain)
OPERATING DATA REPORT DOCKET NO. 50-368 UNIT NAME Arkansas Nuclear 4One - Unit 2 DATE December 15, 2004 COMPLETED BY Steven L. Coffman TELEPHONE (479) 858-5560 REPORTING PERIOD: November 2004
- 1. Design Electrical Rating (MWe-Net): 912
- 2. Maximum Dependable Capacity (MWe-Net): 858 MONTH YR-TO-DATE CUMULATIVE
- 3. Number of Hours Reactor Was Critical 720.00 7,877.52 177,934.34
- 4. Number of Hours Generator On-Line 720.00 7,838.50 175,337.51
- 5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 6. Net Electrical Energy Generated (MWh) 728,237 7,874,097.0 151,990,083 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective No. Date S: Scheduled (Hours) Reason' Down 2 Action I I_ I I Comments None
SUMMARY
- The Unit operated the entire month at or near full reactor power.
I 2 Reason: Method:
A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)
F Administration G . Operational Error (Explain)
H Other (Explain)