ML042100078
| ML042100078 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 07/15/2004 |
| From: | James D Entergy Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| OCAN070403 | |
| Download: ML042100078 (4) | |
Text
Entergy Entergy Operations, Inc.
1448 S. R. 333 Russeliville, AR 72802 Tel 501 858 5000 OCAN070403 July 15, 2004 U.S. Nuclear Regulatory Commission AItn: Document Control Desk Washington, DC 20555-0001
Subject:
Monthly Operating Report Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6
Dear Sir or Madam:
Arkansas Nuclear One (ANO), Units 1 and 2 Technical Specifications 5.6.4 and 6.9.1.6, respectively, require the submittal of a Monthly Operating Report. The purpose of this letter is to complete the reporting requirement for June 2004.
There are no new commitments contained in this submittal.
- incerely,
/ Dal
. James 6
Msager, Licensing DEJ/SLP Attachment(s)
I OCAN070403 Page 2 cc:
Dr. Bruce S. Mallett Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Drew Holland Mail Stop 0-7 DI Washington, DC 20555-0001 U. S. Nuclear Regulatory Commission Attn: Mr. Thomas Alexion Mail Stop 0-7 Dl Washington, DC 20555-0001
b OPERATING DATA REPORT DOCKET NO.
50-313 UNIT NAME Arkansas Nuclear DATE July 15, 2004 COMPLETED BY Steven L. Coffman TELEPHONE (479) 858-5560 One - Unit 1 REPORTING PERIOD:
June 2004
- 1.
Design Electrical Rating (MWe-Net):
850
- 2.
Maximum Dependable Capacity (MWe-Net):
836 MONTH
- 3.
Number of Hours Reactor Was Critical 531.85
- 4.
Number of Hours Generator On-Line 524.30
- 5.
Unit Reserve Shutdown Hours 0.0
- 6.
Net Electrical Energy Generated (MWh) 489,260 YR-TO-DATE CUMULATIVE 3,655.17 204,228.06 3,629.58 201,446.29 0.0 817.5 1
3,120,479 155,735,111 UNIT SHUTDOWNS Type Method F: Forced Duration of Cause & Corrective Action No.
Date S: Scheduled (Hours)
Reason' Shutting Comments I_
__I_
_D ow n 2 2004-02 040611 S
195.70 B
I Shutdown to repair a Main LP Turbine diaphragm gasket leak
SUMMARY
- The Unit began the month near full power. On 06/1112004, the Unit executed a planned maintenance shutdown to repair a Main Low Pressure Turbine diaphragm gasket leak. The Unit was tied back to the grid on 06/20/2004, and achieved full power that same day. The Unit operated at or near full power for the remainder of the month.
I 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G Operational Error (Explain)
H Other (Explain)
Method:
I Manual 2 Manual TriplScram 3
Automatic TriplScram 4 Continuation 5 Other (Explain)
- 6 OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED TELEPHONE 50-368 Arkansas Nuclear One - Unit 2 July 15, 2004 BY Steven L. Coffman (479) 858-5560 REPORTING PERIOD:
June 2004
- 1.
Design Electrical Rating (MWe-Net):
912
- 2.
Maximum Dependable Capacity (MWe-Net):
858 MONTH YR-TO-DATE CUMULATIVE
- 3.
Number of Hours Reactor Was Critical 720.00 4,307.15 174,363.97
- 4.
Number of Hours Generator On-Line 720.00 4,290.65 171,789.66
- 5.
Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 6.
Net Electrical Energy Generated (MWh) 722,637 4,326,964.0 148,442,950 UNIT SHUTDOWNS Type Method F: Forced Duration of Cause & Corrective No.
Date S: Scheduled (Hours)
Reason' Shutting Action l
Down2 Comments N o n e
SUMMARY
- The Unit operated the entire month at or near full reactor power.
I 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
I Manual 2
Manual TriplScram 3 Automatic TriplScram 4
Continuation 6
Other (Explain)