hEntery Entergy Operations, Inc.
1448 S.R. 333 Russellville, AR 72802 Tel 501 858 5000 OCAN01 0502 January 14, 2005 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Monthly Operating Report Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6
Dear Sir or Madam:
Arkansas Nuclear One (ANO), Units 1 and 2 Technical Specifications 5.6.4 and 6.6.4,
__jespectively, require the submittal of a Monthly Operating Report. The purpose of this letter_
is to complete the reporting requirement for December 2004.
There are no new commitments contained in this submittal.
I)
Sincerel!
Dal
.James
/
nager, Licensing
(
tEJ/SLP
.;
.1.1. I I Attachment(s)
"-r. q
OCAN010502 Page 2 cc:
Dr. Bruce S. Mallett Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Drew Holland Mail Stop 0-7 D1 Washington, DC 20555-0001 U. S. Nuclear Regulatory Commission Attn: Mr. Thomas Alexion Mail Stop 0-7 D1 Washington, DC 20555-0001
OPERATING DATA REPORT DOCKET NO.
50-313 UNIT NAME Arkansas Nuclear DATE January 14, 2005 COMPLETED BY Steven L. Coffman TELEPHONE (479) 858-5560 r One - Unit I REPORTING PERIOD:
December 2004 1.
2.
3.
4.
5.
6.
Design Electrical Rating (MWe-Net):
850 Maximum Dependable Capacity (MWe-Net):
836 MONTH YR-TO-DATE CUMULATIVE Number of Hours Reactor Was Critical 744.00 8,072.17 208,645.06 Number of Hours Generator On-Line 744.00 8,046.58 205,863.29 Unit Reserve Shutdown Hours 0.0 0.0 817.5 Net Electrical Energy Generated (MWh) 633,884 6,827,575 159,442,207 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action
-No. -.Date- -S: Scheduled - -(Hours)- -Reason-- -_DownL
_ _Comments.-,
NoneI
SUMMARY
- The Unit began the month at or near full reactor power. On 12/03/04, power was reduced to approximately 40% to allow for the replacement of a Main Feedwater Pump control power supply. The Unit returned to full power on 12/04/04 and operated at or near full reactor power for the remainder of the month.
I 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
1 Manual 2
Manual Trip/Scram 3 Automatic Trip/Scram 4 Continuation 5
Other (Explain)
OPERATING DATA REPORT DOCKET NO.
50-368 UNIT NAME Arkansas Nuclear One - Unit 2 DATE January 14, 2005 COMPLETED BY Steven L. Coffman TELEPHONE (479) 858-5560 REPORTING PERIOD:
December 2004
- 1.
Design Electrical Rating (MWe-Net):
912
- 2.
Maximum Dependable Capacity (MWe-Net):
858 MONTH YR-TO-DATE CUMULATIVE
- 3.
Number of Hours Reactor Was Critical 744.00 8,621.52 178,678.34
- 4.
Number of Hours Generator On-Line 744.00 8,582.50 176,081.51
- 5.
Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 6.
Net Electrical Energy Generated (MWh) 753,462 8,627,559.0 152,743,545 UNIT SHUTDOWNS
SUMMARY
- The Unit operated the entire month at or near full reactor power.
I 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
1 Manual 2
Manual Trip/Scram 3
Automatic Trip/Scram 4
Continuation 5