ML041100637

From kanterella
Jump to navigation Jump to search
2004 Monthly Operating Report for Arkansas Nuclear One (Ano), Units 1 and 2
ML041100637
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 04/15/2004
From: James D
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
OCAN040401
Download: ML041100637 (4)


Text

  • r' A MN Entergy Operations, Inc.

Entergy 1448 S.R. 333 Russellville, AR 72802 Tel 501 858 5000 OCAN040401 April 15, 2004 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Monthly Operating Report Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6

Dear Sir of Madam:

Arkansas Nuclear One (ANO), Units 1 and 2 Technical Specifications 5.6.4 and 6.9.1.6, respectively, require the submittal of a Monthly Operating Report. The purpose of this letter is to complete the reporting requirement for March 2004.

There are no new commitments contained in this submittal.

Sincerely, ale E./James Mana er, Licensing DEJ/ LP Atta hment(s) 2,

It OCAN040401 Page 2 cc: Dr. Bruce S. Mallett Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Thomas Alexion Mail Stop 0-7 D1 Washington, DC 20555-0001

OPERATING DATA REPORT DOCKET NO. 50-313 UNIT NAME Arkansas Nuclear IOne - Unit I DATE April 15, 2004 COMPLETED BY Steven L. Coffman TELEPHONE (479) 858-5560 REPORTING PERIOD: March 2004

1. Design Electrical Rating (MWe-Net): 850
2. Maximum Dependable Capacity (MWe-Net): 836 MONTH YR-TO-DATE CUMULATIVE
3. Number of Hours Reactor Was Critical 744.00 2,184.00 202,756.89
4. Number of Hours Generator On-Line 744.00 2,184.00 200,000.72
5. Unit Reserve Shutdown Hours 0.0 0.0 817.5
6. Net Electrical Energy Generated (MWh) 639,443 1,877,426 154,492,058 UNIT SHUTDOWNS Type Method F: Forced Duration of Cause & Corrective Action No.e Date S: Scheduled (Hours) Reason' Shutting Comments Dow n 2 _ _ _ _ _ _ _ _ _ _ _ _

NoneI II

SUMMARY

The Unit operated the entire month near full reactor power.

I 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic TriplScram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

OPERATING DATA REPORT DOCKET NO. 50-368 UNIT NAME Arkansas Nuclear One - Unit 2 DATE April 15, 2004 COMPLETED BY Steven L. Coffman TELEPHONE (479) 858-5560 REPORTING PERIOD: March 2004

1. Design Electrical Rating (MWe-Net): 912
2. Maximum Dependable Capacity (MWe-Net): 858 MONTH YR-TO-DATE CUMULATIVE
3. Number of Hours Reactor Was Critical 744.00 2,124.15 172,180.97
4. Number of Hours Generator On-Line 744.00 2,107.65 169,606.66
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy Generated (MWh) 753,587 2,127,800.0 146,243,786 UNIT SHUTDOWNS Type Method F: Forced Duration of Cause & Corrective No. Date S: Scheduled (Hours) Reason' Shutting Action Down 2 Comments None =

SUMMARY

The Unit operated the entire month near full reactor power.

I 2 Reason: Method:

A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual TriplScram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)