ML051730462

From kanterella
Jump to navigation Jump to search
May 2005 Monthly Operating Report for Arkansas Nuclear One Units 1 and 2
ML051730462
Person / Time
Site: Arkansas Nuclear  
Issue date: 06/15/2005
From: James D
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
OCAN060503
Download: ML051730462 (4)


Text

,~ Ent-egy Entergy Operations, Inc.

1448 S. R. 333 Russellville, AR 72802 Tel 501 858 5000 OCAN060503 June 15, 2005 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Monthly Operating Report Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6

Dear Sir or Madam:

Arkansas Nuclear One (ANO), Units 1 and 2 Technical Specifications 5.6.4 and 6.6.4, respectively, require the submittal 'of a Monthly Operating Report. The purpose of this letter is to complete the reporting requirement for May 2005.

There are no new commitments contained in this submittal.

,erely le E mes (Acting irector, Nuclear Safety Assurance

JEa

OCAN060503 Page 2 cc:

Dr. Bruce S. Mallett Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Drew Holland Mail Stop 0-7 D1 Washington, DC 20555-0001 U. S. Nuclear Regulatory Commission Attn: Mr. Thomas Alexion Mail Stop 0-7 D1 Washington, DC 20555-0001

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-313 Arkansas Nuclear One - Unit I June 15, 2005 Steven L. Coffman (479) 858-5560 REPORTING PERIOD:

May 2005

1.

Design Electrical Rating (MWe-Net):

2.

Maximum Dependable Capacity (MWe-Net):

850 836 MONTH YR-TO-DATE

3.

Number of Hours Reactor Was Critical 744.00 3,623.00

4.

Number of Hours Generator On-Line 744.00 3,623.00

5.

Unit Reserve Shutdown Hours 0.0 0.0

6.

Net Electrical Energy Generated (MWh) 635,753 3,115,622 CUMULATIVE 212,268.06 209,486.29 817.5 162,557,829 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason' Down2 Comments None

=

SUMMARY

The Unit began the month at, or near, full power. On 05/06/2005, power was reduced to -84% for Main Turbine Governor Valve testing. The Unit returned to full reactor power on 05/07/2005 and remained at, or near full power for the remainder of the month.

1 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual Trip/Scram 3 Automatic Trip/Scram 4

Continuation 5

Other (Explain)

OPERATING DATA REPORT DOCKET NO.

UNIT NAME 50-368 Arkansas Nuclear One - Unit 2 DATE Jun COMPLETED BY Ste, TELEPHONE (471 REPORTING PERIOD:

e 15, 2005 ven L. Coffman

9) 858-5560 May 2005
1.

Design Electrical Rating (MWe-Net):

912

2.

Maximum Dependable Capacity (MWe-Net):

858 MONTH YR-TO-DATE

3.

Number of Hours Reactor Was Critical 744.00 2,852.80

4.

Number of Hours Generator On-Line 744.00 2,829.82

5.

Unit Reserve Shutdown Hours 0.0 0.0

6.

Net Electrical Energy Generated (MWh) 749,906 2,812,496.1 CUMULATIVE 181,531.14 178,911.33 0.0 155,556,041 UNIT SHUTDOWNS Type Method of Cause & Corrective F: Forced Duration Shutting Action No.

Date S: Scheduled (Hours)

Reason' Down 2 Comments None

SUMMARY

The Unit operated the entire month at, or near full reactor power.

1 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual TriplScram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)