July 2002 Monthly Operating Report for Arkansas Nuclear One
ML022320679
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 08/15/2002
From: Ashley G
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML022320679 (4)


Text

a SEntergy Entergy Operations, Inc.

1448 S R. 333 Russellville, AR 72802 Tel 501 858 5000 0CAN080203 August 15, 2002 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6 Monthly Operating Report

Dear Sir or Madam:

Arkansas Nuclear One (ANO), Units 1 and 2 Technical Specifications 5.6.4 and 6.9.1.6, respectively, require the submittal of a Monthly Operating Report. The purpose of this letter is to complete the reporting requirement for July 2002.

Sincerely, Glenn R. Ashley Manager, Licensing GRA/SLP Attachment

0CAN080203 Page 2 cc:

Mr. Ellis W. Merschoff Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. William D. Reckley Washington, DC 20555-0001 U. S. Nuclear Regulatory Commission Attn: Mr. Thomas Ale)don Washington, DC 20555-0001

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD:

50-313 Arkansas Nuclear One - Unit I August 15, 2002 Steven L. Coffman (479) 858-5560 July 2002 Design Electrical Rating (MWe-Net):

Maximum Dependable Capacity (MWe-Net):

Number of Hours Reactor Was Critical Number of Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWh) 850 836 MONTH YR-TO-DATE CUMULATIVE 744.0 5,087.0 189,688.4 744.0 5,087.0 187,032.2 0.0 0.0 817.5 622,444 4,351,295 143,603,004 UNIT SHUTDOWNS Type Method F: Forced Duration of Cause & Corrective Action No.

Date 5: Scheduled (Hours)

ReasonI Shutting Comments Down 2

None

SUMMARY

The unit began the month at full reactor power. On 07/17/2002, a power reduction to -40%

was required by the system dispatcher due to the loss of a major transmission line. The unit returned to full power that same day and operated at full power for the remainder of the month.

2 Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

1.
2.
3.
4.
5.

6.

I

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD:

1.
2.
3.
4.
5.

6.

50-368 Arkansas Nuclear One - Unit 2 August 15, 2002 Steven L. Coffman (479) 858-5560 July 2002 Design Electrical Rating (MWe-Net):

912 Maximum Dependable Capacity (MWe-Net):

858 Number of Hours Reactor Was Critical Number of Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWh)

MONTH YR-TO-DATE CUMULATIVE 744.0 4,585.4 158,218.7 744.0 4,563.4 155,699.9 0.0 0.0 0.0 744,384 4,337,379 132,525,489 UNIT SHUTDOWNS Type Method F: Forced Duration of Cause & Corrective Action No.

Date 5: Scheduled (Hours)

Reamon1 Shutting Comments None

SUMMARY

The unit began the month at full reactor power. On 7/17/2002, a power reduction to -98.5%

was required by the system dispatcher due to the loss of a major transmission line. The unit returned to full power that same day and operated at full power for the remainder of the month.

2 Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

I