a SEntergy Entergy Operations, Inc.
1448 S R. 333 Russellville, AR 72802 Tel 501 858 5000 0CAN080203 August 15, 2002 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6 Monthly Operating Report
Dear Sir or Madam:
Arkansas Nuclear One (ANO), Units 1 and 2 Technical Specifications 5.6.4 and 6.9.1.6, respectively, require the submittal of a Monthly Operating Report. The purpose of this letter is to complete the reporting requirement for July 2002.
Sincerely, Glenn R. Ashley Manager, Licensing GRA/SLP Attachment
0CAN080203 Page 2 cc:
Mr. Ellis W. Merschoff Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. William D. Reckley Washington, DC 20555-0001 U. S. Nuclear Regulatory Commission Attn: Mr. Thomas Ale)don Washington, DC 20555-0001
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD:
50-313 Arkansas Nuclear One - Unit I August 15, 2002 Steven L. Coffman (479) 858-5560 July 2002 Design Electrical Rating (MWe-Net):
Maximum Dependable Capacity (MWe-Net):
Number of Hours Reactor Was Critical Number of Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWh) 850 836 MONTH YR-TO-DATE CUMULATIVE 744.0 5,087.0 189,688.4 744.0 5,087.0 187,032.2 0.0 0.0 817.5 622,444 4,351,295 143,603,004 UNIT SHUTDOWNS Type Method F: Forced Duration of Cause & Corrective Action No.
Date 5: Scheduled (Hours)
ReasonI Shutting Comments Down 2
None
SUMMARY
- The unit began the month at full reactor power. On 07/17/2002, a power reduction to -40%
was required by the system dispatcher due to the loss of a major transmission line. The unit returned to full power that same day and operated at full power for the remainder of the month.
2 Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
I Manual 2
Manual Trip/Scram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
- 1.
- 2.
- 3.
- 4.
- 5.
6.
I
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD:
- 1.
- 2.
- 3.
- 4.
- 5.
6.
50-368 Arkansas Nuclear One - Unit 2 August 15, 2002 Steven L. Coffman (479) 858-5560 July 2002 Design Electrical Rating (MWe-Net):
912 Maximum Dependable Capacity (MWe-Net):
858 Number of Hours Reactor Was Critical Number of Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWh)
MONTH YR-TO-DATE CUMULATIVE 744.0 4,585.4 158,218.7 744.0 4,563.4 155,699.9 0.0 0.0 0.0 744,384 4,337,379 132,525,489 UNIT SHUTDOWNS Type Method F: Forced Duration of Cause & Corrective Action No.
Date 5: Scheduled (Hours)
Reamon1 Shutting Comments None
SUMMARY
- The unit began the month at full reactor power. On 7/17/2002, a power reduction to -98.5%
was required by the system dispatcher due to the loss of a major transmission line. The unit returned to full power that same day and operated at full power for the remainder of the month.
2 Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
I Manual 2
Manual Trip/Scram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
I