1448S R 333 Russellville, AR 72802 Tel 501 858 5000 0CAN020303 February 14, 2003 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6 Monthly Operating Report
Dear Sir or Madam:
Arkansas Nuclear One (ANO), Units 1 and 2 Technical Specifications 5.6.4 and 6.9.1.6, respectively, require the submittal of a Monthly Operating Report. The purpose of this letter is to complete the reporting requirement for January 2003. Also, in accordance with ANO Unit 2 Technical Specification 6.9.1.5.c and NUREG-0737, Item 11.1.3.3, attached is the 2002 Annual Report of Challenges to Pressurizer Safety Valves.
There are no new commitments contained in this submittal.
Sincerely, Glenn R. Ashley Manager, Licensing GRA/SLP Attachment
0CAN020303 Page 2 cc:
Mr. Ellis W. Merschoff Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. William D. Reckley Washington, DC 20555-0001 U. S. Nuclear Regulatory Commission Attn: Mr. Thomas Alexion Washington, DC 20555-0001
OPERATING DATA REPORT DOCKET NO.
50-1 UNIT NAME Ark DATE Feb COMPLETED BY Ste\\
TELEPHONE (471 REPORTING PERIOD:
~13 ansas Nuclear One - Unit I ruary 15, 2003
/en L. Coff man
- 9) 858-5560 January 2003 Design Electrical Rating (MWe-Net):
Maximum Dependable Capacity (MWe-Net):
- 1.
- 2.
- 3.
- 4.
- 5.
6.
Number of Hours Reactor Was Critical Number of Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWh) 850 836 MONTH YR-TO-DATE CUMULATIVE 744.0 744.0 193,185.6 744.0 744.0 190,509.8 0.0 0.0 817.5 638,732 638,732 146,459,069 UNIT SHUTDOWNS Type Method F: Forced Duration of Cause & Corrective Action No.
Date S: Scheduled (Hours)
Reason' Shutting Comments NoneDown 2
None
SUMMARY
- The Unit operated the entire month at full power.
2 Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
I Manual 2
Manual TriplScram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
I
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD:
50-368 Arkansas Nuclear One - Unit 2 February 15, 2003 Steven L. Coffman (479) 858-5560 January 2003 Design Electrical Rating (MWe-Net):
912 Maximum Dependable Capacity (MWe-Net):
858 Number of Hours Reactor Was Critical Number of Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWh)
MONTH YR-TO-DATE CUMULATIVE 744.0 744.0 162,618.0 744.0 744.0 160,085.5 0.0 0.0 0.0 753,732 753,732.0 136,943,993 UNIT SHUTDOWNS Type Method F: Forced Duration of Cause & Corrective Action No.
Date S: Scheduled (Hours)
Reason' Shutting Comments Down 2 None
SUMMARY
- The Unit operated the entire month at full power.
Note: There were no challenges to the primary system code safeties nor automatic actuations of the low temperature overpressure protection valves during the year 2002 reporting period.
2 Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
I Manual 2
Manual Trip/Scram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
- 1.
- 2.
- 3.
- 4.
- 5.
6.
1