January 2003 Monthly Operating Report for Arkansas Nuclear One - Units 1 & 2
ML030510268
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 02/14/2003
From: Ashley G
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
OCAN020303
Download: ML030510268 (4)


Text

ny

,- EhteWg Entergy Operations, Inc.

1448S R 333 Russellville, AR 72802 Tel 501 858 5000 0CAN020303 February 14, 2003 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6 Monthly Operating Report

Dear Sir or Madam:

Arkansas Nuclear One (ANO), Units 1 and 2 Technical Specifications 5.6.4 and 6.9.1.6, respectively, require the submittal of a Monthly Operating Report. The purpose of this letter is to complete the reporting requirement for January 2003. Also, in accordance with ANO Unit 2 Technical Specification 6.9.1.5.c and NUREG-0737, Item 11.1.3.3, attached is the 2002 Annual Report of Challenges to Pressurizer Safety Valves.

There are no new commitments contained in this submittal.

Sincerely, Glenn R. Ashley Manager, Licensing GRA/SLP Attachment

0CAN020303 Page 2 cc:

Mr. Ellis W. Merschoff Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. William D. Reckley Washington, DC 20555-0001 U. S. Nuclear Regulatory Commission Attn: Mr. Thomas Alexion Washington, DC 20555-0001

OPERATING DATA REPORT DOCKET NO.

50-1 UNIT NAME Ark DATE Feb COMPLETED BY Ste\\

TELEPHONE (471 REPORTING PERIOD:

~13 ansas Nuclear One - Unit I ruary 15, 2003

/en L. Coff man

9) 858-5560 January 2003 Design Electrical Rating (MWe-Net):

Maximum Dependable Capacity (MWe-Net):

1.
2.
3.
4.
5.

6.

Number of Hours Reactor Was Critical Number of Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWh) 850 836 MONTH YR-TO-DATE CUMULATIVE 744.0 744.0 193,185.6 744.0 744.0 190,509.8 0.0 0.0 817.5 638,732 638,732 146,459,069 UNIT SHUTDOWNS Type Method F: Forced Duration of Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason' Shutting Comments NoneDown 2

None

SUMMARY

The Unit operated the entire month at full power.

2 Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual TriplScram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

I

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD:

50-368 Arkansas Nuclear One - Unit 2 February 15, 2003 Steven L. Coffman (479) 858-5560 January 2003 Design Electrical Rating (MWe-Net):

912 Maximum Dependable Capacity (MWe-Net):

858 Number of Hours Reactor Was Critical Number of Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWh)

MONTH YR-TO-DATE CUMULATIVE 744.0 744.0 162,618.0 744.0 744.0 160,085.5 0.0 0.0 0.0 753,732 753,732.0 136,943,993 UNIT SHUTDOWNS Type Method F: Forced Duration of Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason' Shutting Comments Down 2 None

SUMMARY

The Unit operated the entire month at full power.

Note: There were no challenges to the primary system code safeties nor automatic actuations of the low temperature overpressure protection valves during the year 2002 reporting period.

2 Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

1.
2.
3.
4.
5.

6.

1