FENOC 5501 North State Route 2 FirstEnergy Nuclear Operating Company Oak Harbor, Ohio 43449 Mark B. Bezilla 419-321-7676 Vice President - Nuclear Fax: 419-321-7582 Docket Number 50-346 License Number NPF-3 Serial Number 3085 August 30, 2004 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001
Subject:
Semiannual Fitness-For-Duty Report, January - June 2004 for the Davis-Besse Nuclear Power Station Ladies and Gentlemen:
Pursuant to 10 CFR 26.71(d), "Recordkeeping Requirements," FirstEnergy Nuclear Operating Company (FENOC) submits the semiannual Fitness-For-Duty (FFD) report for the period of January through June 2004 for the Davis-Besse Nuclear Power Station, Unit 1 (DBNPS).
Attachment I provides FENOC's DBNPS FFD Program Performance Data. Attachment 2 provides a summary of management actions taken by FENOC based on positive FFD testing results, presumptive positives, and a list of FFD event reports submitted by FENOC.
Should you have any questions or require additional information, please contact Mr. Robert W. Schrauder, Director - Performance Improvement, at (419) 321-7181.
Sincerely, GMW/s Attachments cc:
Regional Administrator, NRC Region III DB-I NRC/NRR Senior Project Manager DB-1 Senior NRC Resident Inspector Utility Radiological Safety Board
Docket Number 50-346 License Number NPF-3 Serial Number 30S5 Page I of 1 Fitness for Duty Program Performance Data Personnel Subject to 10 CFR 26 FirstEnergy Nuclear Operating Companv Company June 30. 2004 6 Months Ending (419) 321-7181 Phone Davis-Besse Nuclear Power Station Location R. W. Schrauder. Director - Performance Improvement Contact Name Cutoffs: Screen/Confirmation (n/mil)
ADoendix A to 10 CFR 26 Marijuana Cocaine Opiates 100/15 300/150 300/300 Amphetamines Phencyclidine Alcohol (%BAC) 1000/500 25/25 0.04 Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with Unescorted Access 874 0
174 Categories Tested Positive Tested Positive Tested Positive Pre-Access 86 0
0 0
76 0
For Post Accident 0
0 0
0 0
0 Cause Observed Behavior 3
0 0
0 1
1 Random 270 0
0 0
31 0
Follow-up 13 0
0 0
6 0
Other 0
0 0
0 0
0 Total 372 0
0 0
114 1
Breakdown of Confirmed Positive Tests for Specific Substances Mariuana lCocaine Opiates Amphe-Phency-Alcohol Refusal tamiAlcoholineto test Licensee Employees 0
0 0
0 0
0 0
Long-Term Contractors 0
0 0
0 0
0 0
Short-Term Contractors 1
0 0
0 0
0 0
Total 1
0 0
0 0
0 0
Docket Number 50-346 License Number NPF-3 Serial Number 3085 Page 1 of 1 FENOC MANAGEMENT ACTIONS RELATING TO FITNESS-FOR-DUTY FENOC Personnel Contractor Personnel Referred to Employee Assistance Program (EAP)
Management Sanctions 0
0 0
1 FENOC does not perform onsite initial drug screening tests; therefore, there are no unconfirmed positive results on which to base management actions.
FENOC FITNESS-FOR-DUTY REPORTS There were no Fitness-For-Duty reports submitted during this reporting period (January-June 2004).
Docket Number 50-346 License Number NPF-3 Serial Number 3085 Page 1 of 1 COMMITMENT LIST The following list identifies those actions committed to by the Davis-Besse Nuclear Power Station in this document. Any other actions discussed in the submittal represent intended or planned actions by Davis-Besse. They are described only as information and are not regulatory commitments. Please notify the Director - Performance Improvement (419) 321-7181 at Davis-Besse of any questions regarding this document or associated regulatory commitments.
COMMITMENTS DUE DATE None N/A