Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24260A2192024-09-16016 September 2024 Decommissioning Trust Fund Disbursement - Revision to Previous Thirty-Day Written Notification ML24260A1952024-09-16016 September 2024 Response to Request for Additional Information Regarding Proposed Amendment to Support Implementation of Framatome Gaia Fuel ML24248A2272024-09-0404 September 2024 Operator Licensing Examination Approval ML24240A1532024-09-0303 September 2024 Summary of Regulatory Audit Supporting the Review of License Amendment Request for Implementation of Framatome Gaia Fuel IR 05000336/20240052024-08-29029 August 2024 Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Reports 05000336/2024005 and 05000423/2024005 IR 05000336/20240022024-08-13013 August 2024 Integrated Inspection Report 05000336/2024002 and 05000423/2024002 ML24221A2872024-08-0808 August 2024 Independent Spent Fuel Storage Installation (ISFSI) - Submittal of Cask Registration for Spent Fuel Storage IR 05000336/20244412024-08-0606 August 2024 Supplemental Inspection Report 05000336/2024441 and 05000423/2024441 and Follow-Up Assessment Letter (Cover Letter Only) ML24212A0742024-08-0505 August 2024 Request for Withholding Information from Public Disclosure - Millstone Power Station, Unit No. 3, Proposed Alternative Request IR-4-13 to Support Steam Generator Channel Head Drain Modification ML24211A1712024-07-25025 July 2024 Associated Independent Spent Fuels Storage Installation, Revision to Emergency Plan - Report of Change IR 05000336/20244032024-07-22022 July 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000336/2024403 and 05000423/2024403 IR 05000336/20245012024-07-0101 July 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000336/2024501 and 05000423/2024501 ML24180A0932024-06-28028 June 2024 Readiness for Additional Inspection: EA-23-144 IR 05000336/20240102024-06-26026 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000336/2024010 and 05000423/2024010 ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 IR 05000336/20244402024-06-24024 June 2024 Final Significance Determination for Security-Related Greater than Green Finding(S) with Assessment Follow-up; IR 05000336/2024440 and 05000423/2024440 and Notice of Violation(S), NRC Investigation Rpt 1-2024-001 (Cvr Ltr Only) ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24162A0882024-06-10010 June 2024 Control Room Air Conditioning Unit Inoperable Due to Refrigerant Overcharge Resulting in a Condition Prohibited by Technical Specifications ML24165A1292024-06-0505 June 2024 ISFSI, 10 CFR 50.59 Annual Change Report for 2023 Annual Regulatory Commitment Change Report for 2023 ML24128A2772024-06-0404 June 2024 Issuance of Amendment No. 290 to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and Core Operating Limits Report for Use of Framatome Gaia Fuel (EPID L-2023-LLA-0074) (Non-Proprietary) ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24110A0562024-05-21021 May 2024 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2023-LLE-0013) (Letter) ML24109A0032024-05-21021 May 2024 Issuance of Amendment No. 289 to Revise Technical Specifications to Use Framatome Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limit (EPID L-2023-LLA-0065) (Non-Proprietary) ML24141A2432024-05-20020 May 2024 Response to Request for Additional Information Regarding Alloy 600 Aging Management Program Submittal Related to License Renewal Commitment No. 15 ML24141A1502024-05-20020 May 2024 Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24142A0952024-05-20020 May 2024 End of Cycle 22 Steam Generator Tube Inspection Report IR 05000336/20240012024-05-14014 May 2024 Integrated Inspection Report 05000336/2024001 and 05000423/2024001 and Apparent Violation ML24123A2272024-05-0202 May 2024 Pressurizer Power Operated Relief Valve Failed to Stroke Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24123A2042024-05-0202 May 2024 Pre-Decisional Replay to EA-23-144 IR 05000336/20244012024-04-30030 April 2024 Security Baseline Inspection Report 05000336/2024401 and 05000423/2024401 (Cover Letter Only) ML24123A1222024-04-30030 April 2024 Inservice Inspection Program - Owners Activity Report, Refueling Outage 22 ML24116A0452024-04-25025 April 2024 Special Inspection Follow-Up Report 05000336/2024440 and 05000423/2024440 and Preliminary Finding(S) of Greater than Very Low Significance and NRC Investigation Report No. 1-2024-001 (Cover Letter Only) ML24116A1742024-04-24024 April 2024 Annual Radiological Environmental Operating Report ML24114A2662024-04-24024 April 2024 Submittal of 2023 Annual Radioactive Effluent Release Report ML24103A0202024-04-22022 April 2024 Summary of Regulatory Audit in Support of License Amendment Request to Use Framatome Small Break and Realistic Large Break Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limits ML24106A2032024-04-15015 April 2024 2023 Annual Environmental Operating Report ML24088A3302024-04-0404 April 2024 Regulatory Audit Plan in Support of License Amendment Request to Implement Framatome Gaia Fuel ML24093A1022024-04-0101 April 2024 Alternative Request IR-4-13, Proposed Alternative Request to Support Steam Genera Tor Channel Head Drain Modification ML24093A2162024-04-0101 April 2024 Response to Request for Additional Information Regarding License Amendment Request to Use Framatome Small Break and Realistic Large Break Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limits IR 05000336/20240112024-04-0101 April 2024 Comprehensive Engineering Team Inspection - Inspection Report 05000336/2024011 and 05000423/2024011 ML24092A0752024-03-28028 March 2024 3R22 Refueling Outage Inservice Inspection (ISI) Owners Activity Report Extension ML24088A2352024-03-26026 March 2024 Decommissioning Funding Status Report ML24086A4762024-03-22022 March 2024 Application for Technical Specification Change to Extend the Inspection Interval for Reactor Coolant Pump Flywheels Using the Consolidated Line-Item Improvement Process ML24086A4802024-03-22022 March 2024 Alternative Request IR-4-14, Proposed Alternative Request to Defer ASME Code Section XI Inservice Inspection Examination for Pressurizer and Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles ML24051A1922024-03-0808 March 2024 – Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000336/20230062024-02-28028 February 2024 Annual Assessment Letter for Millstone Power Station, Units 2 and 3, (Reports 05000336/2023006 and 05000423/2023006) ML24053A2632024-02-21021 February 2024 Unit 3, and Independent Spent Fuel Storage Installation, Notification Pursuant to 10 CFR 72.212(b)(1) Prior to First Storage of Spent Fuel Under a General License ML24057A0612024-02-19019 February 2024 and Virgil C. Summer Power Nuclear Stations - Nuclear Property Insurance Coverage 2024-09-04
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24128A2772024-06-0404 June 2024 Issuance of Amendment No. 290 to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and Core Operating Limits Report for Use of Framatome Gaia Fuel (EPID L-2023-LLA-0074) (Non-Proprietary) ML24109A0032024-05-21021 May 2024 Issuance of Amendment No. 289 to Revise Technical Specifications to Use Framatome Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limit (EPID L-2023-LLA-0065) (Non-Proprietary) ML23341A0172024-01-12012 January 2024 Issuance of Amendment No. 288 Revision to Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure-Temperature Limitations Figures ML23072A0892023-05-0101 May 2023 (Amendments 346 & 286), North Anna 1 & 2 (Amnds 294 & 277), Surry 1 & 2 (Amnds 311 & 311), and Summer 1 (Amd 225) - Issuance of Amendments to Revise TSs to Adopt TSTF-554 Revise Reactor Coolant Leakage Requirements ML23058A4542023-03-16016 March 2023 Issuance of Amendment Nos. 345 and 285 Regarding Adoption of Technical Specification Task Force-359, Increase Flexibility in Mode Restraints ML23005A1702023-01-17017 January 2023 Correction to Issuance of Amendment No. 283 to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definition ML22095A1072022-07-11011 July 2022 Issuance of Amendment Nos. 120, 344, & 284, 293 & 276, & 307 & 307 to Relocate Requirements to the QAPD ML22041A0102022-03-0101 March 2022 V.C. Summer 1, Issuance of Amendment Nos. 283 (Millstone), 291 and 274 (North Anna), and 221 (Summer) to Revise TSs to Adopt TSTF-569 Revision of Response Time Testing Definition ML22007A1512022-02-16016 February 2022 Issuance of Amendment No. 282 Regarding Shutdown Bank Technical Specification Requirements and Alternate Control Rod Position Monitoring Requirements ML21326A0992022-01-0707 January 2022 Issuance of Amendment No. 281 Regarding Revised Reactor Core Safety Limit to Reflect Topical Report WCAP-177642-P-A, Revision 1 ML21262A0012021-11-0909 November 2021 Issuance of Amendment No. 280 Regarding Measurement Uncertainty Recapture Power Uprate ML21227A0002021-10-0505 October 2021 Issuance of Amendment No. 279 Regarding Addition of Analytical Methodology to the Core Operating Limits Report for a Large Break Loss-of-Coolant Accident ML21222A2302021-09-0909 September 2021 Issuance of Amendment No. 343 Revision to Technical Specifications for Steam Generator Inspection Frequency (L-2020-LLA-0227) ML21043A1622021-03-25025 March 2021 Issuance of Amendment No. 278 Regarding Revision to Battery Surveillance Requirements ML21026A1422021-02-23023 February 2021 Issuance of Amendment No. 342 Revision to Technical Specification Table 3.3-11, Accident Monitoring Instrumentation ML20275A0002020-10-14014 October 2020 Issuance of Amendment No. 277 to Revise Technical Specification 6.8.4.g to Allow a One-Time Deferral of the Steam Generator Inspections ML20237H9952020-09-29029 September 2020 Issuance of Amendment No. 341 Revision to Technical Specification 6.25, Pre-Stressed Concrete Containment Tendon Surveillance Program ML20191A0042020-08-0707 August 2020 Issuance of Amendment No. 340 Revised Technical Specification Limits for Primary and Secondary Coolant Activity ML20161A0002020-07-15015 July 2020 Issuance of Amendment No. 276 Regarding Revision to the Integrated Leak Rate Type a and Type C Test Intervals ML20140A3692020-06-24024 June 2020 Issuance of Amendment No. 339 Extension of Technical Specification 3.8.1.1, A.C. Sources - Operating, Allowed Outage Time ML19340A0252020-01-30030 January 2020 Issuance of Amendment No. 337 Regarding Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structure, Systems, and Components of Nuclear Power Reactors ML19305D2482019-12-31031 December 2019 Issuance of Amendments Adoption of Emergency Action Level Schemes Per NEI 99-01, Rev. 6 ML19150A3672019-05-30030 May 2019 Current Facility Operating License No. DPR-21, Tech Specs, Revised 5/30/2019 ML19126A0002019-05-28028 May 2019 Issuance of Amendment No. 273 Regarding Technical Specification Changes for Spent Fuel Storage and New Fuel Storage ML19042A2772019-03-21021 March 2019 Issuance of Amendment No. 272 Regarding Revision to Technical Specification Action Statement for Loss of Control Building Inlet Ventilation Radiation Monitor Instrumentation Channels ML18246A0072018-09-25025 September 2018 Issuance of Amendment No. 335 Regarding Revision to the Integrated Leak Rate Type a and Type C Test Intervals ML18038B2002018-02-26026 February 2018 Issuance of Amendment Nos. 118, 334, and 271 to Revise Licensee'S Name (CAC Nos. MF9844, MF9845, and MF9848; EPID L-2017-LLA-0245 and EPID L-2017-LLA-0346) ML17025A2182017-01-24024 January 2017 Issuance of Amendment Realistic Large Break Loss-of-Coolant Accident Analysis ML16308A4852016-12-22022 December 2016 Issuance of Amendment No. 331 Revision to Emergency Core Cooling System Technical Specification and Final Safety Analysis Report Ch. 14 to Remove Charging ML16249A0012016-09-30030 September 2016 Issuance of Amendments Small Break Loss of Coolant Accident Reanalysis ML16206A0012016-08-0404 August 2016 Issuance of Amendment No. 270 to Revise Technical Specification 5.6.3, Fuel Storage Capacity ML16193A0012016-07-28028 July 2016 Issuance of Amendments Removal of Severe Line Outage Detection from the Offsite Power System ML16131A7282016-07-28028 July 2016 Issuance of Amendment 268 Adopting Dominion Core Design and Safety Analysis Methods and Addressing the Issues Identified in Three Westinghouse Communication Documents ML16189A0762016-06-29029 June 2016 Supplement to Information Regarding License Amendment Request for Removal of Severe Line Outage Detection from the Offsite Power System ML16003A0082016-06-23023 June 2016 Issuance of Amendment No. 327 Proposed Technical Specification Changes for Spent Fuel Storage ML16068A3122016-03-31031 March 2016 Issuance of Amendment No. 326 to Revise Technical Specifications for Containment Leak Rate Testing ML16011A4002016-01-29029 January 2016 Issuance of Amendments Nos. 325 and 267 to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation ML15288A0042015-11-30030 November 2015 Issuance of Amendment No. 266: Implementation of WCAP-14333 and WCAP-15376, Reactor Trip System and Engineered Safety Feature Actuation System Instrumentation Test Times and Completion Times ML15280A2422015-10-29029 October 2015 Issuance of Amendment No. 324 Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program, Adoption of TSTF-425,Rev 3 ML15245A4822015-10-0707 October 2015 Millstone Power Station, Surry Power Station, and North Anna Power Station - Issuance of Amendments to Revise the Cyber Security Milestone 8 Completion Date in the Renewed Facility Operating Licenses ML15225A0102015-08-28028 August 2015 Issuance of Amendment No. 264 Surveillance Requirement 4.4.4.2, Reactor Coolant System Relief Valves ML15246A1422015-08-27027 August 2015 Connecticut, Inc. Millstone Power Station Unit 3 Supplement to License Amendment Request to Revise Surveillance Requirement 4.4.4.2, Reactor Coolant System Relief Valves ML15225A0082015-08-26026 August 2015 Issuance of Amendment No. 322 Revision to the Final Safety Analysis Report - Examination Requirements for ANSI B31.1.0 Piping Welds ML15187A3262015-07-29029 July 2015 Issuance of Amendment No. 321, Adoption of TSTF-426, Revision 5, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6B & 6C ML15187A1862015-07-28028 July 2015 Issuance of Amendment No. 263, Regarding Technical Specification Changes to Auxiliary Feedwater System (MF4692) ML15187A0112015-07-27027 July 2015 Issuance of Amendment No. 262, Refueling Water Storage Tank Allowable Temperatures ML15093A0022015-05-20020 May 2015 Issuance of Amendment No. 320, Delete Technical Specification Index and Make Other Editorial and Administrative Changes ML15098A0342015-05-20020 May 2015 Issuance of Amendment No. 261, Delete Technical Specification Index and Make Other Editorial and Administrative Changes ML15093A4412015-05-18018 May 2015 Issuance of Amendment No. 319, Use of Areva M5 Alloy Clad Fuel Assemblies ML14178A5992014-07-11011 July 2014 Issuance of Amendment Proposed Changes to Technical Specification 3/4 7.5, Ultimate Heat Sink (Tac MF1780) 2024-06-04
[Table view] Category:Safety Evaluation
MONTHYEARML24128A2772024-06-0404 June 2024 Issuance of Amendment No. 290 to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and Core Operating Limits Report for Use of Framatome Gaia Fuel (EPID L-2023-LLA-0074) (Non-Proprietary) ML24109A0032024-05-21021 May 2024 Issuance of Amendment No. 289 to Revise Technical Specifications to Use Framatome Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limit (EPID L-2023-LLA-0065) (Non-Proprietary) ML23341A0172024-01-12012 January 2024 Issuance of Amendment No. 288 Revision to Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure-Temperature Limitations Figures ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23226A0052023-09-26026 September 2023 Issuance of Amendment No. 287 Supplement to Spent Fuel Pool Criticality Safety Analysis ML23188A0432023-07-31031 July 2023 Authorization and Safety Evaluation for Alternative Request No. IR-04-11 ML23175A0052023-07-12012 July 2023 Alternative Request P-07 for Pump Periodic Verification Testing Program for Containment Recirculation Spray System Pumps ML23072A0892023-05-0101 May 2023 (Amendments 346 & 286), North Anna 1 & 2 (Amnds 294 & 277), Surry 1 & 2 (Amnds 311 & 311), and Summer 1 (Amd 225) - Issuance of Amendments to Revise TSs to Adopt TSTF-554 Revise Reactor Coolant Leakage Requirements ML23058A4542023-03-16016 March 2023 Issuance of Amendment Nos. 345 and 285 Regarding Adoption of Technical Specification Task Force-359, Increase Flexibility in Mode Restraints ML21320A0072022-09-0707 September 2022 Review of Appendix E to DOM-NAF-2, Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code (EPID L-2021-LLT-0000) (Non-Proprietary) ML22201A5082022-07-28028 July 2022 Authorization and Safety Evaluation for Alternative Request No. IR-04-09 ML22095A1072022-07-11011 July 2022 Issuance of Amendment Nos. 120, 344, & 284, 293 & 276, & 307 & 307 to Relocate Requirements to the QAPD ML22039A3392022-03-0303 March 2022 Request for Alternative Frequency to Supplemental Valve Position Verification Testing Requirements in the Fourth 10-year Valve Inservice Testing Program ML22041A0102022-03-0101 March 2022 V.C. Summer 1, Issuance of Amendment Nos. 283 (Millstone), 291 and 274 (North Anna), and 221 (Summer) to Revise TSs to Adopt TSTF-569 Revision of Response Time Testing Definition ML22007A1512022-02-16016 February 2022 Issuance of Amendment No. 282 Regarding Shutdown Bank Technical Specification Requirements and Alternate Control Rod Position Monitoring Requirements ML21326A0992022-01-0707 January 2022 Issuance of Amendment No. 281 Regarding Revised Reactor Core Safety Limit to Reflect Topical Report WCAP-177642-P-A, Revision 1 ML21262A0012021-11-0909 November 2021 Issuance of Amendment No. 280 Regarding Measurement Uncertainty Recapture Power Uprate ML21284A0062021-10-29029 October 2021 Authorization and Safety Evaluation for Alternative Request No. RR-05-04 and IR-4-02 ML21227A0002021-10-0505 October 2021 Issuance of Amendment No. 279 Regarding Addition of Analytical Methodology to the Core Operating Limits Report for a Large Break Loss-of-Coolant Accident ML21222A2302021-09-0909 September 2021 Issuance of Amendment No. 343 Revision to Technical Specifications for Steam Generator Inspection Frequency (L-2020-LLA-0227) ML21174A0202021-08-0202 August 2021 Relief Request for Limited Coverage Examinations Performed in the Fourth 10-Year Inservice Inspection Interval ML21167A3552021-07-16016 July 2021 Authorization and Safety Evaluation for Alternative Request No. RR-05-06 ML21167A2112021-06-30030 June 2021 Relief Request for Limited Coverage Examinations Performed in the Third 10-Year Inservice Inspection Interval (EPID L-2020-LLR-0081 Through L-2020-LLR-0088) ML21075A0452021-03-26026 March 2021 Request to Utilize Code Case N-885 ML21043A1622021-03-25025 March 2021 Issuance of Amendment No. 278 Regarding Revision to Battery Surveillance Requirements ML21026A1422021-02-23023 February 2021 Issuance of Amendment No. 342 Revision to Technical Specification Table 3.3-11, Accident Monitoring Instrumentation ML20312A0022020-12-10010 December 2020 Relief Request for Limited Coverage Examinations Performed in the Third 10-Year Inservice Inspection Interval (EPID L-2020-LLR-0027 Through L-2020-LLR-0032) ML20312A0012020-12-10010 December 2020 Relief Requests for Limited Coverage Examinations Performed in the Fourth 10-Year Inservice Inspection Interval ML20287A4712020-10-20020 October 2020 Proposed Alternative RR-05-05 to the Requirements of the ASME Code Containment Unbonded Post-Tensioning System Inservice Inspection Requirements ML20275A0002020-10-14014 October 2020 Issuance of Amendment No. 277 to Revise Technical Specification 6.8.4.g to Allow a One-Time Deferral of the Steam Generator Inspections ML20237H9952020-09-29029 September 2020 Issuance of Amendment No. 341 Revision to Technical Specification 6.25, Pre-Stressed Concrete Containment Tendon Surveillance Program ML20252A0072020-09-15015 September 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI ML20191A0042020-08-0707 August 2020 Issuance of Amendment No. 340 Revised Technical Specification Limits for Primary and Secondary Coolant Activity ML20189A2062020-07-16016 July 2020 Relief Request IR-4-03 Concerning Non-Code Methodology to Demonstrate Structural Integrity of Class 3 Moderate-Energy Piping ML20161A0002020-07-15015 July 2020 Issuance of Amendment No. 276 Regarding Revision to the Integrated Leak Rate Type a and Type C Test Intervals ML20140A3692020-06-24024 June 2020 Issuance of Amendment No. 339 Extension of Technical Specification 3.8.1.1, A.C. Sources - Operating, Allowed Outage Time ML20080K5082020-03-24024 March 2020 Alternative Request RR-05-03 for the Fifth 10-Year Inservice Inspection Interval ML19340A0252020-01-30030 January 2020 Issuance of Amendment No. 337 Regarding Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structure, Systems, and Components of Nuclear Power Reactors ML19305D2482019-12-31031 December 2019 Issuance of Amendments Adoption of Emergency Action Level Schemes Per NEI 99-01, Rev. 6 ML19340A0012019-12-18018 December 2019 Proposed Alternative Request IR-4-01 Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography ML19338G3722019-12-18018 December 2019 Alternative Requests RR-05-01 and RR-05-02 for the Fifth 10-Year Inservice Inspection Interval ML19340A0002019-12-13013 December 2019 Relief Request IR-3-39, Proposed Alternative to ASME Code Weld Preheat Requirements ML19126A0002019-05-28028 May 2019 Issuance of Amendment No. 273 Regarding Technical Specification Changes for Spent Fuel Storage and New Fuel Storage ML19098A0342019-04-30030 April 2019 Units 1 and 2; Limerick, Units 1 and 2; Peach Bottom, Units 2 and 3, and Quad Cities, Units 1 and 2 - Revision to Approved Alternative to Use BWR Vessel and Internal Proj Guidelins ML19042A2772019-03-21021 March 2019 Issuance of Amendment No. 272 Regarding Revision to Technical Specification Action Statement for Loss of Control Building Inlet Ventilation Radiation Monitor Instrumentation Channels ML18290A6022018-11-13013 November 2018 Alternative Requests Related to the Fifth and Fourth 10-Year Interval Pump, Valve, and Snubber Inservice Testing Programs, Respectively (EPID L-2018-LLR- 0012 Through EPID L-2018-LLR-0022) ML18275A0122018-10-0404 October 2018 Alternative Request P-06 for the 'C' Charging Pump Test Frequency ML18246A0072018-09-25025 September 2018 Issuance of Amendment No. 335 Regarding Revision to the Integrated Leak Rate Type a and Type C Test Intervals ML18252A0032018-09-17017 September 2018 Alternative Requests RR-04-27 and IR-3-38 for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography 2024-06-04
[Table view] |
Text
June 29, 2004 Mr. David A. Christian Senior Vice President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
MILLSTONE POWER STATION, UNIT 1 - ISSUANCE OF AMENDMENT RE:
SPENT FUEL POOL STORAGE (TAC NO. MC0853)
Dear Mr. Christian:
The Commission) has issued the enclosed Amendment No. 113 to Facility Operating License No. DPR-21 for the Millstone Power Station, Unit 1. The amendment consists of changes to the Technical Specifications in response to your application dated September 18, 2003.
The amendment revises Technical Specification 4.2, "Fuel Storage," to eliminate all credit for Boraflex as a neutron absorber, reduce the number of fuel assemblies allowed to be stored in the spent fuel pool (SFP), change the required SFP keff, and eliminate design features requirements on new fuel storage.
A copy of our related Safety Evaluation is enclosed. The Notice of Issuance will be included in the Commissions next biweekly Federal Register notice.
Sincerely,
/RA/
Alan B. Wang, Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-245
Enclosures:
- 1. Amendment No. 113 to DPR-21
- 2. Safety Evaluation cc w/encls: See next page
June 29, 2004 Mr. David A. Christian Senior Vice President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
MILLSTONE POWER STATION, UNIT 1 - ISSUANCE OF AMENDMENT RE:
SPENT FUEL POOL STORAGE (TAC NO. MC0853)
Dear Mr. Christian:
The Commission) has issued the enclosed Amendment No. 113 to Facility Operating License No. DPR-21 for the Millstone Power Station, Unit 1. The amendment consists of changes to the Technical Specifications in response to your application dated September 18, 2003.
The amendment revises Technical Specification 4.2, "Fuel Storage," to eliminate all credit for Boraflex as a neutron absorber, reduce the number of fuel assemblies allowed to be stored in the spent fuel pool (SFP), change the required SFP keff, and eliminate design features requirements on new fuel storage.
A copy of our related Safety Evaluation is enclosed. The Notice of Issuance will be included in the Commissions next biweekly Federal Register notice.
Sincerely,
/RA/
Alan B. Wang, Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-245 DISTRIBUTION PUBLIC
Enclosures:
- 1. Amendment No. 113 to DPR-21 PDIV-2 Reading
- 2. Safety Evaluation RidsNrrDlpm (HBerkow)
RidsNrrPMAWang cc w/encls: See next page RidsNrrLAEPeyton RidsOgcRp GHill (2)
TBoyce
- SE Input RidsAcrsAcnwMailCenter RidsRgn1MailCenter (DScrenci/JDurr/TJackson)
TS Pages: ML041880212 Nrr-100 ACCESSION NO.: ML041840482 Nrr-058 Pkg No.: ML041890397 OFFICE PDIV-2/PM PDIV-2/LA SRXB* OGC PDIV-2/SC NAME AWang EPeyton FAkstulewicz CMarco SDembek DATE 6/18/04 6/18/04 6/15/04 6-25-04 6/28/04 DOCUMENT NAME: C:\ORPCheckout\FileNET\ML041840482.wpd OFFICIAL RECORD COPY
DOMINION NUCLEAR CONNECTICUT, INC.
DOCKET NO. 50-245 MILLSTONE POWER STATION, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 113 License No. DPR-21
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Dominion Nuclear Connecticut, Inc.
(the licensee) dated September 18, 2003, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will be decommissioned in conformity with the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment; and paragraph 2.C.(2) of Facility Operating License No. DPR-21 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 113, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3. The license amendment is effective as of its date of issuance and shall be implemented within 60 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Stephen Dembek, Chief, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: June 29, 2004
ATTACHMENT TO LICENSE AMENDMENT NO. 113 FACILITY OPERATING LICENSE NO. DPR-21 DOCKET NO. 50-245 Replace the following pages of Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
REMOVE INSERT 4.0-1 4.0-1
--- 4.0-2
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 113 TO FACILITY OPERATING LICENSE NO. DPR-21 DOMINION NUCLEAR CONNECTICUT, INC.
MILLSTONE POWER STATION, UNIT 1 DOCKET NO. 50-245
1.0 INTRODUCTION
By letter dated September 18, 2003, Dominion Nuclear Connecticut, Inc. (the licensee) requested changes to the Technical Specifications (TSs) for the Millstone Power Station, Unit 1 (MP1). The amendment proposes to revise Technical Specification 4.2, "Fuel Storage."
Specifically, the proposed changes would eliminate all credit for Boraflex as a neutron absorber, reduce the number of fuel assemblies allowed to be stored in the spent fuel pool (SFP), change the required SFP keff, and eliminate design features requirements on new fuel storage.
2.0 REGULATORY EVALUATION
The staff finds that the licensee in Section 5.2 of its submittal identified the applicable regulatory requirements. The regulatory requirements for which the staff based its acceptance are:
Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Appendix A, "General Design Criteria (GDC) for Nuclear Power Plants," provides a list of the minimum design requirements for nuclear power plants. According to GDC 62, "Prevention of criticality in fuel storage and handling," the licensee must prevent criticality in the fuel handling and storage system by physical systems or processes.
10 CFR Section 50.68, "Criticality accident requirements," provides the NRC regulatory requirements for maintaining subcritical conditions in SFPs: "If no credit for soluble boron is taken, the k-effective of the spent fuel storage racks loaded with fuel of the maximum fuel assembly reactivity must not exceed 0.95, at a 95 percent probability, 95 percent confidence level, if flooded with unborated water. If credit is taken for soluble boron, the k-effective of the spent fuel storage racks loaded with fuel of the maximum fuel assembly reactivity must not exceed 0.95, at a 95 percent probability, 95 percent confidence level, if flooded with borated water, and the k-effective must remain below 1.0 (subcritical), at a 95 percent probability, 95 percent confidence level, if flooded with unborated water." The licensees amendment proposed to increase the SFP required keff from 0.90 to 0.95, as discussed in Section 2.2 of this safety evaluation (SE).
The NRC has also defined acceptable methodologies for performing SFP criticality analyses in the following documents:
NUREG-0800, Standard Review Plan (SRP), Section 9.1.2, "Spent Fuel Storage," Draft Revision 4
Proposed Revision 2 to Regulatory Guide (RG) 1.13, "Spent Fuel Storage Facility Design Basis"
Memorandum from L. Kopp (NRC) to T. Collins (NRC), "Guidance on the Regulatory Requirements for Criticality Analysis of Fuel Storage at Light-Water Reactor Power Plants" The staff used the guidance contained in these documents as part of its review.
3.0 TECHNICAL EVALUATION
3.1 Background The following describes the proposed changes:
- 1. The licensee will delete TS 4.2.1 pertaining to new fuel storage.
- 2. In TS 4.2.2, the licensee will increase the required keff limit from 0.90 to 0.95, add the phrase "and with no fuel allowed in the storage locations shown in Figure 4.1," and add Figure 4.1.
- 3. In TS 4.2.3, the licensee will change the maximum number of fuel assemblies allowed to be stored in the SFP from 3229 to 2959.
The staff has reviewed the licensees regulatory and technical analyses in support of its proposed license amendment which are described in Sections 4.0 and 5.0 of the licensees submittal against the regulatory criteria described in Section 2.0 of this SE. The basis for the staffs acceptance and a description of the review it performed is located in Section 3.2 of this SE. The detailed evaluation below will support the conclusion that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
3.2 Technical Evaluation The MP1 SFP controls reactivity with two types of storage rack materials: boron carbide B4C plates and Boraflex. The licensee must demonstrate that subcriticality is maintained within the SFP at all times. The licensee submitted a criticality analysis with their proposed license amendment in order to fulfill this requirement (Attachments 3 and 4 to their September 18, 2003, submittal). The analysis demonstrates that for the spent fuel storage cells that currently use Boraflex for reactivity control, if fuel is limited to a 3-out-of-4 fuel storage configuration, keff of the racks will be maintained at < 0.95, on a 95/95 basis, without credit for any Boraflex. The 3-out-of-4 fuel storage configuration would require the reduction of 270 specific fuel storage locations. The licensees analysis conservatively assumes that all fuel in the SFP is at the most reactive condition possible, using the most reactive fuel design and at the most reactive normal
operating temperature. The analysis also considers abnormal and accident conditions. The licensee states that the revised criticality analysis for the Boraflex storage racks does not affect the other storage racks in the SFP.
In order to withdraw Boraflex credit, the licensee has requested increasing the allowable SFP keff limit from 0.90 to 0.95. The use of 0.95 as the SFP keff limit is an NRC accepted standard, as documented in the SRP (Section 9.1.2) and RG 1.13.
The NRC staff has reviewed the criticality analysis that accompanies the licensees request.
The licensee used KENO Va from the SCALE-4.4 code package to perform the necessary calculations on the 3-out-of-4 fuel loading pattern. This included benchmarking input files, and analyzing the results to determine trends in independent variable bias. The licensee then determined an upper subcritical limit for the SFP from those resulting trends.
The licensee also modeled potential biases and accident scenarios to determine the maximum keff possible for the SFP. After establishing a baseline keff for the 3-out-of-4 fuel storage configuration, the licensee developed independent bias models concerning channel swelling, pitch tolerance, stainless steel thickening tolerance, and eccentric assembly positioning. The licensee additionally modeled three single-accident SFP scenarios: heating of the SFP to boiling; a dropped fuel assembly on top of or next to the SFP rack; and a worst-case single assembly misload. Of these three cases, the misload yielded the highest keff. Combining the accidental misload keff with the net bias delta-K (calculated by way of root mean square from the considered biases) and a 3 sigma value created the licensees maximum determined keff. The licensee compared the max keff to the calculated upper subcritical limit, determined the max keff to be the lower number, and therefore stated that the new SFP configuration will maintain subcriticality without credit for Boraflex. The NRC staff has reviewed all the steps that the licensee has taken to perform this criticality analysis, and finds them acceptable. Additionally, the staff determined the licensee properly applied double contingency considerations in their analysis.
TS Figure 4.1 has been added to the TSs to prohibit fuel storage in 270 specific locations to maintain SFP subcriticality without credit for Boraflex. This loading pattern was assumed in the revised SFP criticality analysis as discussed above and is therefore acceptable. TS 4.2.3 will be revised to change the maximum number of fuel assemblies allowed to be stored in the SFP from 3229 to 2959. This reduction of 270 fuel storage locations, the new 3-out-of-4 fuel storage configuration, is needed to maintain the SFP keff limit at < 0.95. In addition, lowering the number of allowed fuel storage locations will not impact any other storage rack or heat load analyses. The NRC staff has reviewed this request and finds that decreasing the maximum number of fuel assemblies, as described in TS Figure 4.1, stored in the SFP will maintain the SFP keff limit at < 0.95 in the SFP assuming no credit for Boraflex.
The licensee requested a deletion of TS 4.2.1, which pertains to the keff of new fuel storage facilities. The NRC staff recognizes that MP1 has ceased power operation and will no longer receive new fuel; therefore deleting TS 4.2.1 does not increase the potential for criticality in the SFP.
3.3 Conclusion The NRC staff reviewed the proposed TS changes addressing fuel storage requirements.
These changes included elimination of all credit for Boraflex as a neutron absorber, reduction of the maximum number of fuel assemblies allowed in the SFP, increasing the required SFP keff limit to <0.95, and elimination of new fuel storage requirements. The staff finds that these TS changes meet the requirements of GDC 62 and 10 CFR 50.68, and are therefore acceptable.
4.0 STATE CONSULTATION
In accordance with the Commissions regulations, the Connecticut State official was notified of the proposed issuance of the amendment. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and here has been no public comment on such finding (68 FR 68659). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: M. Langschwager Date: June 29, 2004
Millstone Power Station Unit 1 cc:
Lillian M. Cuoco, Esquire Citizens Regulatory Commission Senior Counsel ATTN: Ms. Susan Perry Luxton Dominion Resources Services, Inc. 180 Great Neck Road Rope Ferry Road Waterford, CT 06385 Waterford, CT 06385 Deborah Katz, President Edward L. Wilds, Jr., Ph.D. Citizens Awareness Network Director, Division of Radiation P.O. Box 83 Department of Environmental Protection Shelburne Falls, MA 03170 79 Elm Street Hartford, CT 06106-5127 Mr. John Buckingham Department of Public Utility Control Mr. Allan Johanson, Assistant Director Electric Unit Office of Policy and Management 10 Liberty Square Policy Development & Planning Division New Britain, CT 06051 450 Capitol Avenue - MS# 52ERN P.O. Box 341441 Nancy Burton, Esquire Hartford, CT 06134-1441 147 Cross Highway Redding Ridge, CT 06876 Regional Administrator, Region I U.S. Nuclear Regulatory Commission Mr. W. R. Matthews 475 Allendale Road Senior Vice President - Nuclear Operations King of Prussia, PA 19406 Dominion Nuclear Connecticut, Inc.
Rope Ferry Road First Selectmen Waterford, CT 06385 Town of Waterford 15 Rope Ferry Road Mr. P. J. Parulis Waterford, CT 06385 Manager - Nuclear Oversight Dominion Nuclear Connecticut, Inc.
Attorney Nicholas J. Scobbo, Jr. Rope Ferry Road Ferriter, Scobbo, & Rodophele, PC Waterford, CT 06385 125 High Street Boston, MA 02110 Mr. S. E. Scace Assistant to the Site Vice President Ernest C. Hadley, Esquire Dominion Nuclear Connecticut, Inc.
1040 B Main Street Rope Ferry Road P.O. Box 549 Waterford, CT 06385 West Wareham, MA 02576 Mr. J. Alan Price Mr. Evan W. Woollacott, Co-Chair Site Vice President - Millstone Nuclear Energy Advisory Council Dominion Nuclear Connecticut, Inc.
128 Terrys Plain Road Rope Ferry Road Simsbury, CT 06070 Waterford, CT 06385
Millstone Power Station Unit 1 cc:
Mr. G. D. Hicks, Director Nuclear Station Safety and Licensing Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385 Mr. A. J. Jordan, Jr.
Director - Nuclear Engineering Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385 Mr. S. P. Sarver, Director Nuclear Station Operations & Maintenance Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385 Mr. Chris L. Funderburk Director, Nuclear Licensing and Operations Support Dominion Resources Services, Inc.
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Mr. David W. Dodson Licensing Supervisor Dominion Nuclear Connecticut , Inc.
Rope Ferry Road Waterford, Connecticut 06385