Letter Sequence Approval |
---|
|
|
MONTHYEARML16206A0012016-08-0404 August 2016 Issuance of Amendment No. 270 to Revise Technical Specification 5.6.3, Fuel Storage Capacity Project stage: Approval 2016-08-04
[Table View] |
|
---|
Category:Letter
MONTHYEARML24030A7522024-01-30030 January 2024 Technical Specification Bases Pages IR 05000336/20234022024-01-30030 January 2024 Security Baseline Inspection Report 05000336/2023402 and 05000423/2023402 (Cover Letter Only) ML23341A0172024-01-12012 January 2024 Issuance of Amendment No. 288 Revision to Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure-Temperature Limitations Figures IR 05000336/20234402024-01-11011 January 2024 Special Inspection Report 05000336/2023440 and 05000423/2023440 (Cover Letter Only) ML24004A1052024-01-0404 January 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000336/2024010 & 05000423/2024010 ML23361A0942023-12-21021 December 2023 Response to Request for Additional Information Regarding Proposed License Amendment Request to Revise Technical Specifications for Reactor Core Safety Limits, Fuel Assemblies and Core Operating Limits Report . ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23361A0312023-12-20020 December 2023 Intent to Pursue Subsequent License Renewal ML23352A0202023-12-18018 December 2023 Senior Reactor and Reactor Operator Initial License Examinations ML23334A2242023-11-30030 November 2023 Request for Exemption from Enhanced Weapons Firearms Background Checks, and Security Event Notifications Implementation ML23324A4222023-11-20020 November 2023 Reactor Vessel Internals Inspections Aging Management Program Submittal Related to License Renewal Commitment 13 ML23324A4302023-11-20020 November 2023 Alloy 600 Aging Management Program Submittal Related to License Renewal Commitment 15 ML23317A2702023-11-13013 November 2023 Core Operating Limits Report, Cycle 23 IR 05000336/20230032023-11-0606 November 2023 Integrated Inspection Report 05000336/2023003 and 05000423/2023003 ML23298A1652023-10-26026 October 2023 Requalification Program Inspection IR 05000336/20234202023-10-0404 October 2023 Security Inspection Report 05000336/2023420 and 05000423/2023420 ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23226A0052023-09-26026 September 2023 Issuance of Amendment No. 287 Supplement to Spent Fuel Pool Criticality Safety Analysis IR 05000245/20230012023-09-19019 September 2023 Safstor Inspection Report 05000245/2023001 IR 05000336/20230102023-09-0808 September 2023 Commercial Grade Dedication Report 05000336/2023010 and 05000423/2023010 IR 05000336/20230052023-08-31031 August 2023 Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Report 05000336/2023005 and 05000423/2023005) ML23248A2132023-08-30030 August 2023 Response to Request for Additional Information Regarding Proposed License Amendment Request to Revise the Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure-Temperature. ML23242A0142023-08-30030 August 2023 Operator Licensing Examination Approval ML23223A0552023-08-18018 August 2023 Request for Withholding Information from Public Disclosure for License Amendment Request to Revise Technical Specifications for Reactor Core Safety Limits, Fuel Assemblies, and COLR Related to Framatome Gaia Fuel ML23223A0482023-08-18018 August 2023 Request for Withholding Information from Public Disclosure for License Amendment Request to Use Framatome Small Break and Realistic Large Break LOCA Evaluation Methodologies for Establishing COLR Limits IR 05000336/20230022023-08-0909 August 2023 Integrated Inspection Report 05000336/2023002 and 05000423/2023002 ML23188A0432023-07-31031 July 2023 Authorization and Safety Evaluation for Alternative Request No. IR-04-11 ML23208A0922023-07-26026 July 2023 Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of Framatome ORFEO-GAIA and OORFE-NMGRID CHF Correlations in the Dominion Energy Vipre-D Computer Code Response ML23188A0202023-07-26026 July 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000336/20234012023-07-17017 July 2023 Material Control and Accounting Program Inspection Report 05000336/2023401 and 05000423/2023401 - (Cover Letter Only) ML23175A0052023-07-12012 July 2023 Alternative Request P-07 for Pump Periodic Verification Testing Program for Containment Recirculation Spray System Pumps ML23193A8562023-06-28028 June 2023 Submittal of Updates to the Final Safety Analysis Reports ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23153A1732023-06-16016 June 2023 Correction to Amendment Nos. 346 & 286 Millstone, 294 & 277 North Anna, 311 & 311 Surry, and 225 Summer to Revise Technical Specifications to Adopt TSTF-554,Rev Reactor Coolant Leakage Requirement ML23151A0742023-06-12012 June 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report ML23159A2202023-06-0808 June 2023 Associated Independent Spent Fuel Storage Installation Revision to Emergence Plan - Report of Changes IR 07200047/20234012023-06-0808 June 2023 NRC Independent Spent Fuel Storage Installation Security Inspection Report No. 07200047/2023401 2024-01-04
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML23341A0172024-01-12012 January 2024 Issuance of Amendment No. 288 Revision to Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure-Temperature Limitations Figures ML23072A0892023-05-0101 May 2023 (Amendments 346 & 286), North Anna 1 & 2 (Amnds 294 & 277), Surry 1 & 2 (Amnds 311 & 311), and Summer 1 (Amd 225) - Issuance of Amendments to Revise TSs to Adopt TSTF-554 Revise Reactor Coolant Leakage Requirements ML23058A4542023-03-16016 March 2023 Issuance of Amendment Nos. 345 and 285 Regarding Adoption of Technical Specification Task Force-359, Increase Flexibility in Mode Restraints ML23005A1702023-01-17017 January 2023 Correction to Issuance of Amendment No. 283 to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definition ML22095A1072022-07-11011 July 2022 Issuance of Amendment Nos. 120, 344, & 284, 293 & 276, & 307 & 307 to Relocate Requirements to the QAPD ML22041A0102022-03-0101 March 2022 V.C. Summer 1, Issuance of Amendment Nos. 283 (Millstone), 291 and 274 (North Anna), and 221 (Summer) to Revise TSs to Adopt TSTF-569 Revision of Response Time Testing Definition ML22007A1512022-02-16016 February 2022 Issuance of Amendment No. 282 Regarding Shutdown Bank Technical Specification Requirements and Alternate Control Rod Position Monitoring Requirements ML21326A0992022-01-0707 January 2022 Issuance of Amendment No. 281 Regarding Revised Reactor Core Safety Limit to Reflect Topical Report WCAP-177642-P-A, Revision 1 ML21262A0012021-11-0909 November 2021 Issuance of Amendment No. 280 Regarding Measurement Uncertainty Recapture Power Uprate ML21227A0002021-10-0505 October 2021 Issuance of Amendment No. 279 Regarding Addition of Analytical Methodology to the Core Operating Limits Report for a Large Break Loss-of-Coolant Accident ML21222A2302021-09-0909 September 2021 Issuance of Amendment No. 343 Revision to Technical Specifications for Steam Generator Inspection Frequency (L-2020-LLA-0227) ML21043A1622021-03-25025 March 2021 Issuance of Amendment No. 278 Regarding Revision to Battery Surveillance Requirements ML21026A1422021-02-23023 February 2021 Issuance of Amendment No. 342 Revision to Technical Specification Table 3.3-11, Accident Monitoring Instrumentation ML20275A0002020-10-14014 October 2020 Issuance of Amendment No. 277 to Revise Technical Specification 6.8.4.g to Allow a One-Time Deferral of the Steam Generator Inspections ML20237H9952020-09-29029 September 2020 Issuance of Amendment No. 341 Revision to Technical Specification 6.25, Pre-Stressed Concrete Containment Tendon Surveillance Program ML20191A0042020-08-0707 August 2020 Issuance of Amendment No. 340 Revised Technical Specification Limits for Primary and Secondary Coolant Activity ML20161A0002020-07-15015 July 2020 Issuance of Amendment No. 276 Regarding Revision to the Integrated Leak Rate Type a and Type C Test Intervals ML20140A3692020-06-24024 June 2020 Issuance of Amendment No. 339 Extension of Technical Specification 3.8.1.1, A.C. Sources - Operating, Allowed Outage Time ML19340A0252020-01-30030 January 2020 Issuance of Amendment No. 337 Regarding Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structure, Systems, and Components of Nuclear Power Reactors ML19305D2482019-12-31031 December 2019 Issuance of Amendments Adoption of Emergency Action Level Schemes Per NEI 99-01, Rev. 6 ML19150A3672019-05-30030 May 2019 Current Facility Operating License No. DPR-21, Tech Specs, Revised 5/30/2019 ML19126A0002019-05-28028 May 2019 Issuance of Amendment No. 273 Regarding Technical Specification Changes for Spent Fuel Storage and New Fuel Storage ML19042A2772019-03-21021 March 2019 Issuance of Amendment No. 272 Regarding Revision to Technical Specification Action Statement for Loss of Control Building Inlet Ventilation Radiation Monitor Instrumentation Channels ML18246A0072018-09-25025 September 2018 Issuance of Amendment No. 335 Regarding Revision to the Integrated Leak Rate Type a and Type C Test Intervals ML18038B2002018-02-26026 February 2018 Issuance of Amendment Nos. 118, 334, and 271 to Revise Licensee'S Name (CAC Nos. MF9844, MF9845, and MF9848; EPID L-2017-LLA-0245 and EPID L-2017-LLA-0346) ML17025A2182017-01-24024 January 2017 Issuance of Amendment Realistic Large Break Loss-of-Coolant Accident Analysis ML16308A4852016-12-22022 December 2016 Issuance of Amendment No. 331 Revision to Emergency Core Cooling System Technical Specification and Final Safety Analysis Report Ch. 14 to Remove Charging ML16249A0012016-09-30030 September 2016 Issuance of Amendments Small Break Loss of Coolant Accident Reanalysis ML16206A0012016-08-0404 August 2016 Issuance of Amendment No. 270 to Revise Technical Specification 5.6.3, Fuel Storage Capacity ML16131A7282016-07-28028 July 2016 Issuance of Amendment 268 Adopting Dominion Core Design and Safety Analysis Methods and Addressing the Issues Identified in Three Westinghouse Communication Documents ML16193A0012016-07-28028 July 2016 Issuance of Amendments Removal of Severe Line Outage Detection from the Offsite Power System ML16189A0762016-06-29029 June 2016 Supplement to Information Regarding License Amendment Request for Removal of Severe Line Outage Detection from the Offsite Power System ML16003A0082016-06-23023 June 2016 Issuance of Amendment No. 327 Proposed Technical Specification Changes for Spent Fuel Storage ML16068A3122016-03-31031 March 2016 Issuance of Amendment No. 326 to Revise Technical Specifications for Containment Leak Rate Testing ML16011A4002016-01-29029 January 2016 Issuance of Amendments Nos. 325 and 267 to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation ML15288A0042015-11-30030 November 2015 Issuance of Amendment No. 266: Implementation of WCAP-14333 and WCAP-15376, Reactor Trip System and Engineered Safety Feature Actuation System Instrumentation Test Times and Completion Times ML15280A2422015-10-29029 October 2015 Issuance of Amendment No. 324 Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program, Adoption of TSTF-425,Rev 3 ML15245A4822015-10-0707 October 2015 Millstone Power Station, Surry Power Station, and North Anna Power Station - Issuance of Amendments to Revise the Cyber Security Milestone 8 Completion Date in the Renewed Facility Operating Licenses ML15225A0102015-08-28028 August 2015 Issuance of Amendment No. 264 Surveillance Requirement 4.4.4.2, Reactor Coolant System Relief Valves ML15246A1422015-08-27027 August 2015 Connecticut, Inc. Millstone Power Station Unit 3 Supplement to License Amendment Request to Revise Surveillance Requirement 4.4.4.2, Reactor Coolant System Relief Valves ML15225A0082015-08-26026 August 2015 Issuance of Amendment No. 322 Revision to the Final Safety Analysis Report - Examination Requirements for ANSI B31.1.0 Piping Welds ML15187A3262015-07-29029 July 2015 Issuance of Amendment No. 321, Adoption of TSTF-426, Revision 5, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6B & 6C ML15187A1862015-07-28028 July 2015 Issuance of Amendment No. 263, Regarding Technical Specification Changes to Auxiliary Feedwater System (MF4692) ML15187A0112015-07-27027 July 2015 Issuance of Amendment No. 262, Refueling Water Storage Tank Allowable Temperatures ML15093A0022015-05-20020 May 2015 Issuance of Amendment No. 320, Delete Technical Specification Index and Make Other Editorial and Administrative Changes ML15098A0342015-05-20020 May 2015 Issuance of Amendment No. 261, Delete Technical Specification Index and Make Other Editorial and Administrative Changes ML15093A4412015-05-18018 May 2015 Issuance of Amendment No. 319, Use of Areva M5 Alloy Clad Fuel Assemblies ML14178A5992014-07-11011 July 2014 Issuance of Amendment Proposed Changes to Technical Specification 3/4 7.5, Ultimate Heat Sink (Tac MF1780) ML14037A4082014-04-18018 April 2014 Issuance of Amendment Revise Technical Specification 3/4.7.11 Ultimate Heat Sink ML14073A0552014-04-0808 April 2014 Issuance of Amendment Calculated Containment Internal Pressure 2024-01-12
[Table view] Category:Safety Evaluation
MONTHYEARML23341A0172024-01-12012 January 2024 Issuance of Amendment No. 288 Revision to Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure-Temperature Limitations Figures ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23226A0052023-09-26026 September 2023 Issuance of Amendment No. 287 Supplement to Spent Fuel Pool Criticality Safety Analysis ML23188A0432023-07-31031 July 2023 Authorization and Safety Evaluation for Alternative Request No. IR-04-11 ML23175A0052023-07-12012 July 2023 Alternative Request P-07 for Pump Periodic Verification Testing Program for Containment Recirculation Spray System Pumps ML23072A0892023-05-0101 May 2023 (Amendments 346 & 286), North Anna 1 & 2 (Amnds 294 & 277), Surry 1 & 2 (Amnds 311 & 311), and Summer 1 (Amd 225) - Issuance of Amendments to Revise TSs to Adopt TSTF-554 Revise Reactor Coolant Leakage Requirements ML23058A4542023-03-16016 March 2023 Issuance of Amendment Nos. 345 and 285 Regarding Adoption of Technical Specification Task Force-359, Increase Flexibility in Mode Restraints ML21320A0072022-09-0707 September 2022 Review of Appendix E to DOM-NAF-2, Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code (EPID L-2021-LLT-0000) (Non-Proprietary) ML22201A5082022-07-28028 July 2022 Authorization and Safety Evaluation for Alternative Request No. IR-04-09 ML22095A1072022-07-11011 July 2022 Issuance of Amendment Nos. 120, 344, & 284, 293 & 276, & 307 & 307 to Relocate Requirements to the QAPD ML22039A3392022-03-0303 March 2022 Request for Alternative Frequency to Supplemental Valve Position Verification Testing Requirements in the Fourth 10-year Valve Inservice Testing Program ML22041A0102022-03-0101 March 2022 V.C. Summer 1, Issuance of Amendment Nos. 283 (Millstone), 291 and 274 (North Anna), and 221 (Summer) to Revise TSs to Adopt TSTF-569 Revision of Response Time Testing Definition ML22007A1512022-02-16016 February 2022 Issuance of Amendment No. 282 Regarding Shutdown Bank Technical Specification Requirements and Alternate Control Rod Position Monitoring Requirements ML21326A0992022-01-0707 January 2022 Issuance of Amendment No. 281 Regarding Revised Reactor Core Safety Limit to Reflect Topical Report WCAP-177642-P-A, Revision 1 ML21262A0012021-11-0909 November 2021 Issuance of Amendment No. 280 Regarding Measurement Uncertainty Recapture Power Uprate ML21284A0062021-10-29029 October 2021 Authorization and Safety Evaluation for Alternative Request No. RR-05-04 and IR-4-02 ML21227A0002021-10-0505 October 2021 Issuance of Amendment No. 279 Regarding Addition of Analytical Methodology to the Core Operating Limits Report for a Large Break Loss-of-Coolant Accident ML21222A2302021-09-0909 September 2021 Issuance of Amendment No. 343 Revision to Technical Specifications for Steam Generator Inspection Frequency (L-2020-LLA-0227) ML21174A0202021-08-0202 August 2021 Relief Request for Limited Coverage Examinations Performed in the Fourth 10-Year Inservice Inspection Interval ML21167A3552021-07-16016 July 2021 Authorization and Safety Evaluation for Alternative Request No. RR-05-06 ML21167A2112021-06-30030 June 2021 Relief Request for Limited Coverage Examinations Performed in the Third 10-Year Inservice Inspection Interval (EPID L-2020-LLR-0081 Through L-2020-LLR-0088) ML21075A0452021-03-26026 March 2021 Request to Utilize Code Case N-885 ML21043A1622021-03-25025 March 2021 Issuance of Amendment No. 278 Regarding Revision to Battery Surveillance Requirements ML21026A1422021-02-23023 February 2021 Issuance of Amendment No. 342 Revision to Technical Specification Table 3.3-11, Accident Monitoring Instrumentation ML20312A0022020-12-10010 December 2020 Relief Request for Limited Coverage Examinations Performed in the Third 10-Year Inservice Inspection Interval (EPID L-2020-LLR-0027 Through L-2020-LLR-0032) ML20312A0012020-12-10010 December 2020 Relief Requests for Limited Coverage Examinations Performed in the Fourth 10-Year Inservice Inspection Interval ML20287A4712020-10-20020 October 2020 Proposed Alternative RR-05-05 to the Requirements of the ASME Code Containment Unbonded Post-Tensioning System Inservice Inspection Requirements ML20275A0002020-10-14014 October 2020 Issuance of Amendment No. 277 to Revise Technical Specification 6.8.4.g to Allow a One-Time Deferral of the Steam Generator Inspections ML20237H9952020-09-29029 September 2020 Issuance of Amendment No. 341 Revision to Technical Specification 6.25, Pre-Stressed Concrete Containment Tendon Surveillance Program ML20252A0072020-09-15015 September 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI ML20191A0042020-08-0707 August 2020 Issuance of Amendment No. 340 Revised Technical Specification Limits for Primary and Secondary Coolant Activity ML20189A2062020-07-16016 July 2020 Relief Request IR-4-03 Concerning Non-Code Methodology to Demonstrate Structural Integrity of Class 3 Moderate-Energy Piping ML20161A0002020-07-15015 July 2020 Issuance of Amendment No. 276 Regarding Revision to the Integrated Leak Rate Type a and Type C Test Intervals ML20140A3692020-06-24024 June 2020 Issuance of Amendment No. 339 Extension of Technical Specification 3.8.1.1, A.C. Sources - Operating, Allowed Outage Time ML20080K5082020-03-24024 March 2020 Alternative Request RR-05-03 for the Fifth 10-Year Inservice Inspection Interval ML19340A0252020-01-30030 January 2020 Issuance of Amendment No. 337 Regarding Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structure, Systems, and Components of Nuclear Power Reactors ML19305D2482019-12-31031 December 2019 Issuance of Amendments Adoption of Emergency Action Level Schemes Per NEI 99-01, Rev. 6 ML19338G3722019-12-18018 December 2019 Alternative Requests RR-05-01 and RR-05-02 for the Fifth 10-Year Inservice Inspection Interval ML19340A0012019-12-18018 December 2019 Proposed Alternative Request IR-4-01 Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography ML19340A0002019-12-13013 December 2019 Relief Request IR-3-39, Proposed Alternative to ASME Code Weld Preheat Requirements ML19126A0002019-05-28028 May 2019 Issuance of Amendment No. 273 Regarding Technical Specification Changes for Spent Fuel Storage and New Fuel Storage ML19098A0342019-04-30030 April 2019 Units 1 and 2; Limerick, Units 1 and 2; Peach Bottom, Units 2 and 3, and Quad Cities, Units 1 and 2 - Revision to Approved Alternative to Use BWR Vessel and Internal Proj Guidelins ML19042A2772019-03-21021 March 2019 Issuance of Amendment No. 272 Regarding Revision to Technical Specification Action Statement for Loss of Control Building Inlet Ventilation Radiation Monitor Instrumentation Channels ML18290A6022018-11-13013 November 2018 Alternative Requests Related to the Fifth and Fourth 10-Year Interval Pump, Valve, and Snubber Inservice Testing Programs, Respectively (EPID L-2018-LLR- 0012 Through EPID L-2018-LLR-0022) ML18275A0122018-10-0404 October 2018 Alternative Request P-06 for the 'C' Charging Pump Test Frequency ML18246A0072018-09-25025 September 2018 Issuance of Amendment No. 335 Regarding Revision to the Integrated Leak Rate Type a and Type C Test Intervals ML18252A0032018-09-17017 September 2018 Alternative Requests RR-04-27 and IR-3-38 for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography ML18225A0202018-08-29029 August 2018 ISFSI; North Anna 1 & 2 Isfsls, and Unit 3; Surry Power 1 & 2, and Isfsls); Dominion Energy Kewaunee, Inc. (Kewaunee Power Station and Isfsi): Request for Threshold Determination Under 10 CFR 50.80 ML18038B2002018-02-26026 February 2018 Issuance of Amendment Nos. 118, 334, and 271 to Revise Licensee'S Name (CAC Nos. MF9844, MF9845, and MF9848; EPID L-2017-LLA-0245 and EPID L-2017-LLA-0346) 2024-01-12
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August4, 2016 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
MILLSTONE POWER STATION, UNIT NO. 3 - ISSUANCE OF AMENDMENT TO REVISE DESIGN FEATURES - FUEL STORAGE TECHNICAL SPECIFICATION 5.6.3, "CAPACITY" (CAC NO. MF6709)
Dear Mr. Heacock:
The U.S. Nuclear Regulatory Commission has issued the enclosed Amendment No. 270 to Renewed Facility Operating License No. NPF-49 for the Millstone Power Station, Unit No. 3 (MPS3). This amendment is in response to your application dated August 31, 2015. The amendment revises the MPS3 Design Features - Fuel Storage Technical Specification 5.6.3, "Capacity," to specify the spent fuel pool storage capacity limit in terms of the total number of fuel assemblies.
A copy of the related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice.
Sincerely, Richard V. Guzman, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-423
Enclosures:
- 1. Amendment No. 270 to NPF-49
- 2. Safety Evaluation cc w/encls: Distribution via Listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 DOMINION NUCLEAR CONNECTICUT, INC.
DOCKET NO. 50-423 MILLSTONE POWER STATION, UNIT NO. 3 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 270 Renewed License No. NPF-49
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Dominion Nuclear Connecticut, Inc. dated August 31, 2015, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
Enclosure 1
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-49 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A, revised through Amendment No. 270 and the Environmental Protection Plan contained in Appendix 8, both of which are attached hereto are hereby incorporated into the license. DNC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3. This license amendment is effective as of the date of issuance, and shall be implemented within 60 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Travis L. Tate, Chief Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the License and Technical Specifications Date of Issuance: August 4, 201 6
ATTACHMENT TO LICENSE AMENDMENT NO. 270 MILLSTONE POWER STATION. UNIT NO. 3 RENEWED FACILITY OPERATING LICENSE NO. NPF-49 DOCKET NO. 50-423 Replace the following page of the Renewed Facility Operating License with the attached revised page. The revised page is identified by amendment number and contains a marginal line indicating the area of change.
REMOVE INSERT Replace the following page of the Appendix A Technical Specifications with the attached revised page. The revised page is identified by amendment number and contains a marginal line indicating the area of change.
REMOVE INSERT 5-6a 5-6a
(2) Technical Specifications The Technical Specifications contained in Appendix A, revised through Amendment No. 270 and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto are hereby incorporated into the license. DNC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
(3) DNC shall not take any action that would cause Dominion Resources, Inc.
(ORI) or its parent companies to void, cancel, or diminish DNC's Commitment to have sufficient funds available to fund an extended plant shutdown as represented in the application for approval of the transfer of the licenses for MPS Unit No. 3.
(4) Immediately after the transfer of interests in MPS Unit No. 3 to DNC, the amount in the decommissioning trust fund for MPS Unit No. 3 must, with respect to the interest in MPS Unit No. 3, that DNC would then hold, be at a level no less than the formula amount under 10 CFR 50. 75.
(5) The decommissioning trust agreement for MPS Unit No. 3 at the time the transfer of the unit to DNC is effected and thereafter is subject to the following:
(a) The decommissioning trust agreement must be in a form acceptable to the NRC.
(b) With respect to the decommissioning trust fund, investments in the securities or other obligations of Dominion Resources, Inc. or its affiliates or subsidiaries, successors, or assigns are prohibited.
Except for investments tied to market indexes or other non-nuclear-sector mutual funds, investments in any entity owning one or more nuclear power plants are prohibited.
(c) The decommissioning trust agreement for MPS Unit No. 3 must provide that no disbursements or payments from the trust, other than for ordinary administrative expenses, shall be made by the trustee until the trustee has first given the Director of the Office of Nuclear Reactor Regulation 30 days prior written notice of payment. The decommissioning trust agreement shall further contain a provision that no disbursements or payments from the trust shall be made if the trustee receives prior written notice of objection from the NRC.
(d) The decommissioning trust agreement must provide that the agreement cannot be amended in any material respect without 30 days prior written notification to the Director of the Office of Nuclear Reactor Regulation.
Renewed License No. NPF-49 Amendment No. 270
DESIGN FEATURES CAPACITY 5.6.3 The spent fuel storage pool contains 350 Region 1 storage locations, 673 Region 2 storage locations and 756 Region 3 storage locations, for a total of 1779 fuel storage locations. An additional Region 2 rack with 81 storage locations may be placed in the spent fuel pool, if needed. With this additional rack installed, the Region 2 storage capacity is 754 storage locations. The total storage capacity of the spent fuel pool is limited to no more than 1860 fuel assemblies.
5.7 DELETED MILLSTONE- UNIT 3 5-6a Amendment No.39,ii.0,-1.89,212, 270
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 270 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-49 DOMINION NUCLEAR CONNECTICUT, INC.
DOCKET NO. 50-423 MILLSTONE POWER STATION, UNIT NO. 3
1.0 INTRODUCTION
By application dated August 31, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15246A118), Dominion Nuclear Connecticut, Inc. (DNC, the licensee), submitted a license amendment request (LAR) regarding the Millstone Power Station, Unit No. 3 (MPS3). The proposed amendment would revise the MPS3 Design Features - Fuel Storage Technical Specification (TS) 5.6.3, "Capacity," to specify the spent fuel pool (SFP) storage capacity limit in terms of the total number of fuel assemblies.
2.0 REGULATORY EVALUATION
As required by Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Section 50.92(a),
in determining whether an amendment to a license will be issued to the applicant, the Commission will be guided by the considerations which govern the issuance of initial licenses to the extent applicable and appropriate. To issue an operating license, the Commission must make the findings in 10 CFR 50.57, which include findings that the facility will operate in conformity with the application as amended, the provisions of the Atomic Energy Act of 1954, as amended (Act), and the rules and regulations of the Commission; and there is reasonable assurance (i) that the activities authorized by the operating license can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's.
The U.S. Nuclear Regulatory Commission's (NRC's) regulatory requirements related to the content of the TSs are contained in 10 CFR 50.36, "Technical specifications." Per 10 CFR 50.36(b), each license authorizing operation of a utilization facility will include technical specifications, which will be derived from the analyses and evaluation included in the safety analysis report, and amendments thereto, submitted pursuant to 10 CFR 50.34 "Contents of applications; technical information". The Commission may include such additional technical specifications as the Commission finds appropriate. Per 10 CFR 50.36(c)(4), TSs will include items in the category of "design features." The regulation in 10 CFR 50.36(c)(4), states that "design features to be included are those features of the facility such as materials of Enclosure 2
construction and geometric arrangements, which, if altered or modified, would have a significant effect on safety and are not covered in the categories of safety limits, limiting safety system settings, limiting conditions for operation, and surveillance requirements.
Under 10 CFR 50.90, whenever a holder of an operating license desires to amend the license, application for an amendment must be filed with the Commission fully describing the changes desired, and following as far as applicable, the form prescribed for original applications.
Pursuant to 10 CFR 50.36(a)(1 ), each applicant for a license authorizing operation of a utilization facility shall include in the application proposed TSs in accordance with the requirements of 10 CFR 50.36. Accordingly, the licensee provided proposed changes to its TS covering the fuel storage design features.
The NRC staff also considered the following guidance document during this review:
NUREG-1431, "Standard Technical Specifications [STS], Westinghouse Plants: Specification,"
Volume 1, Revision 4 (ADAMS Accession No. ML12100A222). As described in the Commission's Final Policy Statement on Technical Specifications Improvements for Nuclear Power Reactors, 58 Fed. Reg. 39, 132, 39, 136 (July 22, 1993), "improved STS have been developed and will be maintained for each [nuclear steam supply system] owners group. The Commission encourages licensees to use the improved STS as a basis for plant[-]specific Technical Specifications." NUREG-1431 includes TS 4.3 "Fuel Storage" providing TS 4.3.1 "Criticality," 4.3.2 "Drainage," and 4.3.3 "Capacity." Model TS 4.3.3 states: "The spent fuel storage pool is designed and shall be maintained with a storage capacity limited to no more than [1737] fuel assemblies" (square brackets in original).
2.1 Background The MPS3 Final Safety Analysis Report, Section 9.1, "Fuel Storage and Handling," Revision 27, details the MPS3 SFP design. The SFP is an L-shaped structure located in the fuel building and is designed to accommodate fuel racks that store both new and spent fuel assemblies. The spent fuel storage racks, located under water in the SFP, are designed to maintain the stored fuel assemblies in a safe, coolable geometry.
2.2 Proposed Technical Specification Changes On November 28, 2000, the NRC issued License Amendment No. 189 (ADAMS Accession No. ML003744387) approving an increase of spent fuel storage capacity for Region 2 of the SFP storage locations. The NRC approved the fuel storage racks in Region 2 to be increased by 81, from 673 to 754 racks. As a result MPS3's Design Features - Fuel Storage TS 5.6.3, "Capacity" currently states:
The spent fuel storage pool contains 350 Region 1 storage locations, 673 Region 2 storage locations and 756 Region 3 storage locations, for a total of 1779 total available fuel storage locations. An additional Region 2 rack with 81 storage locations may be placed in the spent fuel pool, if needed. With this additional rack installed, the Region 2 storage capacity is 754 storage locations, for a total of 1860 total available fuel storage locations.
The licensee's proposed change would state (deletions have strikethroughs and additions are balded):
The spent fuel storage pool contains 350 Region 1 storage locations, 673 Region 2 storage locations and 756 Region 3 storage locations, for a total of 1779 tetal--
available fuel storage locations. An additional Region 2 rack with 81 storage locations may be placed in the spent fuel pool, if needed. With this additional rack installed, the Region 2 storage capacity is 754 storage locations, f.or a total of 1860 total available fuel storage locations. The total storage capacity of the spent fuel pool is limited to no more than 1860 fuel assemblies.
3.0 TECHNICAL EVALUATION
In its LAR dated August 31, 2015, the licensee stated, in part:
Currently, TS 5.6.3 describes the total fuel assembly storage capacity in terms of the total "available" fuel storage locations. The number of "available" fuel storage locations is subject to change. Fuel storage availability in the three regions of the MPS3 SFP is affected when individual storage cells are unusable due to physical obstructions or removed from service because the storage cell does not meet its design basis.
The proposed change to TS 5.6.3 is consistent with the design configuration of the MPS3 SFP. MPS3 design and accident analyses are based on a total SFP storage capacity limit (i.e., 1860 fuel assemblies) ... The proposed change to TS 5.6.3 only revises the description of the MPS3 SFP storage capacity. The number of SFP storage locations and the maximum number of fuel assemblies allowed to be stored in the MPS3 spent fuel pool remain unchanged.
The NRC staff reviewed the licensee's application against the regulation and guidance discussed in Section 2.0 of this safety evaluation. The licensee stated in its application dated August 31, 2015, that although the additional racks were approved for implementation, they have yet to be physically installed in the SFP. The licensee's proposed change to TS 5.6.3 would remove the words "total available" and specify a storage capacity limit of 1860 fuel assemblies.
Per 10 CFR 50.36(c)(4) design features are features "if altered or modified, would have a significant effect on safety." In this case, the design feature is the upper limit on total available fuel storage locations. Both before and after the amendment, the upper limit is unchanged.
However, due to the unusable individual storage locations described by the licensee, the actual number of storage locations at any given time is less than, or equal to, the upper limit. The staff had previously analyzed, and found appropriate, an upper limit of 1860 total available fuel storage locations. The change to the TS continues to reflect this upper limit. Because there is no "significant effect on safety" associated with using fewer than the upper limit of fuel storage locations, there is no need to specify a lower limit in the design features category of TS.
Further, NUREG-1431 STS 4.3.3 "Capacity" does not include a lower limit, but only states an upper limit. The licensee's proposed change similarly includes only an upper limit. In this way, the proposed change is consistent with the STS.
Therefore, the NRC staff concludes that the proposed TS changes are acceptable.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Connecticut State official was notified on July 25, 2016, of the proposed issuance of the amendment. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendment changes a requirement with respect to the installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding published in the Federal Register (FR) on November 24, 2015 (80 FR 73235). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner; (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations; and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: K. West Date: August 4, 2016
ML16206A001 *SE memo dated OFFICE NRR/DORL/LPLl-1 /PM NRR/DORL/LPLl-1 /LA DSS/STSB/BC*
NAME RGuzman KGoldstein (PBlechman for) AKlein DATE 7/25/16 7/29/16 7/18/16 OFFICE OGC DORL/LPLl-1 /BC DORL/LPLl-1 /PM NAME DRoth TTate RGuzman DATE 8/4/16 8/4/16 8/4/16