September 11, 2003 MEMORANDUM TO: Davis-Besse Nuclear Power Station IMC 0350 Panel FROM: John A. Grobe, Chairman, Davis-Besse Oversight Panel /RA/

SUBJECT:

MINUTES OF INTERNAL MEETING OF THE DAVIS-BESSE OVERSIGHT PANEL The implementation of the IMC 0350 process for the Davis-Besse Nuclear Power Station was announced on April 29, 2002. An internal panel meeting was held on May 20, 2003. Attached for your information are the minutes from the internal meeting of the Davis-Besse Oversight Panel and the Open Action Items List.

Attachment:

As stated cc w/att: H. Nieh, OEDO J. Dyer, RIII J. Caldwell, RIII R. Gardner, DRS B. Clayton, EICS G. Wright, DRP DB0350

MEMORANDUM TO: Davis-Besse Nuclear Power Station IMC 0350 Panel FROM: John A. Grobe, Chairman, Davis-Besse Oversight Panel

SUBJECT:

MINUTES OF INTERNAL MEETING OF THE DAVIS-BESSE OVERSIGHT PANEL The implementation of the IMC 0350 process for the Davis-Besse Nuclear Power Station was announced on April 29, 2002. An internal panel meeting was held on May 20, 2003. Attached for your information are the minutes from the internal meeting of the Davis-Besse Oversight Panel and the Open Action Items List.

Attachment:

As stated cc w/att: J. Dyer, RIII J. Caldwell, RIII R. Gardner, DRS B. Clayton, EICS G. Wright, DRP DB0350 DOCUMENT NAME: C:\ORPCheckout\FileNET\ML032650317.wpd To receive a copy of this document, indicate in the box:"C" = Copy without enclosure "E"= Copy with enclosure"N"= No copy OFFICE RIII RIII RIII RIII NAME DPassehl/klg /RA DPassehl CLipa JGrobe for/MPhillips DATE 09/05/03 09/05/03 09/05/03 09/11/03 OFFICIAL RECORD COPY

MEETING MINUTES: Internal IMC 0350 Oversight Panel Meeting Davis-Besse Nuclear Power Station DATE: May 20, 2003 TIME: 1:00 p.m. Central ATTENDEES:

J. Grobe M. Phillips D. Simpkins D. Passehl W. Ruland J. Hopkins T. Mendiola J. Jacobson R. Gardner D. Hills M. Farber S. Burton C. Lipa P. Lougheed N. Shah Agenda Items:

1. Discuss Integrated Leak Rate Test (ILRT) Inspection Results M. Farber and P. Lougheed discussed the results of the ILRT inspection. The test went well, and the results were very satisfactory. Ten valves still need local leak rate testing, including the purge inlet and exhaust valves, which wont be done until late (as long as people are in containment, these valves need to be open).
2. Discuss Programs Phase II Inspection Results J. Jacobson, S. Burton, and N. Shah discussed the results of the Programs Phase II inspection. The team did not do a thorough independent review of the licensees programs, but did assess the licensees review of each program and how the program issues were identified and corrected. The team concluded that as written, all programs were workable if implemented. The team discussed licensee findings to address the In-Service Inspection (ISI) and Modifications programs. Based on the discussion, the panel and team agreed to close restart checklist items 3.f and 3.g and RAM item E-26 in this report. The Boric Acid program inspection results was then discussed.

Davis-Besse staff had addressed all concerns identified from the Programs I inspection, but it now relies on the Quality Assurance and Corrective Action programs to work for the Boric Acid program to be effective. The panel agreed that it needed to decide on how to address URI-07 and URI-08 prior to closing this (3.d) checklist item. The panel was briefed on the review of the Operating Experience program. The team and panel were satisfied with the enhancements made to the program. However, the Operating Experience program checklist item (3.b) will remain open while a related allegation is resolved. The panel was briefed on the Reactor Coolant System Leakage monitoring program. Based on that review, the panel agreed to close restart checklist item 3.e. The panel also agreed to keep checklist item 3.a open pending the results of the Corrective Action Team Inspection (CATI). The panel felt that a separate discussion was needed to discuss the exit plan for the Programs II inspection, given that some items would be kept open, and others closed in this report.

3. Discuss Management and Human Performance Phase III Inspection The panel agreed to put this discussion on hold pending W. Ruland determining what criteria had been used at Millstone to conclude its safety conscious work environment problems had been solved sufficiently to allow restart. Mr. Ruland will determine when to next put this item on the agenda.
4. Discuss Action Items The Panel discussed the list of open action items. No items were added or closed.
5. Discuss Restart Action Matrix Items The Panel determined that given the length of time taken for the inspection debriefs and the amount of time needed to go over the RAM list, the RAM items would be postponed to the next panel meeting.
6. Discuss Allegation Status M. Phillips stated that there was a new allegation that had four concerns. John Jacobson would be requested to address the Operating Experience portion of the allegation for closure. There were no requests for extensions by the licensee to address allegations referred to them for evaluation.
7. Discuss High Pressure Injection Pump Modification Inspection Needs D. Hills stated that he did not feel he was ready to scope out what would be needed to address this inspection until we had a better handle on exactly what the licensee was going to be doing. This item was placed on hold pending the meeting that was to be held with the licensee in Headquarters to discuss the pump modification scope and associated activities.
8. Discuss Items for Licensee Weekly Calls The Panel discussed several items for the licensee weekly calls. Since J. Grobe would not be available for the call, W. Ruland agreed to call M. Phillips before the call to discuss the call agenda.

DAVIS-BESSE OVERSIGHT PANEL OPEN ACTION ITEM LIST Item Action Item (Date Assigned to Comments Number generated) 24a Discuss making Panel Discuss by June 30, after safety information related to significance assessment complete; HQ/licensee calls publicly 6/27 - Invite Bateman to panel mtg.

available To discuss what else is needed to closeout the CAL (i.e. quarantine plan); 7/2 - NRR not yet ready to discuss; 7/16 - See if procedures have changed on CAL closeout -

does JD need to send letter?; 7/18

- Discussed - is there an applicable regional procedure?; 8/6 -

Discussed. Need to determine the final approach on the core removed from the head and the final approach on the head before the quarantine can be lifted; 8/22 -

Revisit action item after letter sent to licensee confirming plans with old vessel head (head may be onsite longer than originally anticipated); 8/29 - Memo to be sent to Region, with a letter to go out next week; 10/01- Discussed.

1) Conduct NRC staff survey-due 10/7 2)Memo to NRR - due 10/11
3) Region to issue letter; 11/07-Letter required from NRR on head quarantine status; 11/19 - Letter in draft; 01/03 - A. Mendiola to look at phone conference writeups on quarantine decision making to determine if they can be released to the public; 01/07 - discussed; 01/21 - discussed; 01/31- A.

Mendiolas action; 02/11 -

Completion of Licensee Phase 3 sampling plan required; 02/21 -

17.5 Rem to cut samples, Less samples may be required; 04/03 -

Completion of Phase 3 sampling plan scheduled for late April -

discuss again then; 04/08 - Revisit in June 2003

DAVIS-BESSE OVERSIGHT PANEL OPEN ACTION ITEM LIST Item Action Item (Date Assigned to Comments Number generated) 54a Review TSP amendment D. Pickett 7/9 - Discussed. Will wait for and advise the panel on response from licensee; 7/16 -

the need for a TIA on Discussed - added action item 54b; Davis-Besse (7/2) 8/6 - Sent to the licensee on 7/22 and a response is due by 8/22; 8/22 - Discussed - need to check if response has been received; 8/27

- Received response - DRS is reviewing - will fax to NRR for 54b; 8/29 - Discussed, DRS report of response to be issued to panel prior to item 54b; 10/1-Discussed.

DRS coordinating with NRR 11/07-Discussed - On hold for draft with specific information; 12/10 - B.

Dean believed B. Bateman thought a calculation for sufficient volume of TSP was completed to technical specification value. However questions whether the calculation was to technical specification or actual TSP level remain; 01/03 -

Item under NRR review.

Calculation completion expected on Jan 17. Allegation issue in RIII domain; 01/07 - Allegation Item #3 under NRR Review for Resolution; 01/21 - Item #3 is under Region III control for final letter, holding for NRR input; 02/11 - Writeup for NRR input provided 4 answers, going back to reviewer to ensure specific tasking is clear to answer allegation concerns. Action item 54c created; 02/21 - Allegation at 242 day mark. Effective expression of due date required; 04/03 -

Messrs. Beckner, Grobe, Ruland,

& Mendiola to discuss; 04/08 - J.

Hopkins to set up call for 4/11/03

DAVIS-BESSE OVERSIGHT PANEL OPEN ACTION ITEM LIST Item Action Item (Date Assigned to Comments Number generated) 73 Send feedback form on Lipa 8/6 - Generate feedback after IMC 0350 procedure to Mendiola panel meetings reduced to once IIPB (8/6) per week; 8/29 - Discussed - no change; 10/1 - Discussed; 11/7 -

D Passehl sent email to C Carpenter and D Coe indicating that we would be able to perform a review of the draft IMC 0350 during the first quarter of 2003; 12/3- discussed; 01/03 - 2 parts, short part- C. Lipa with P. Harris, long part- B. Dean; 01/07 - 2nd larger response will require meeting between all parties; 01/21

- Communications with P. Harris; 01/31-Meeting with P. Harris on Feb 4; 02/11 - Many concerns identified by the panel for inclusion; 02/21 - July 1 due date for larger input.

97 Bulletins 2002-01 and NRR 11/07 - Discussed, further 2002-02 response and research and discussion required; acceptance (9/5) 01/07 - RAI response expected Mid February; 01/31- On track; 02/11 - New Orders will supercede BL2002-01 and BL2002-02 responses with the exception of the BL2002-01 Boric Acid Corrosion program information request; 02/21 - Licensee RAI response delayed. Both Order and BL2002-01 Boric Acid Corrosion program responses to be tracked as RAM items; 04/08 - Discussed, leave open pending NRR review 126 Review Davis- Strasma Besse/Vessel Head 02/11 - Checked, but revisiting Degradation web site item; 02/21 - Web site being content for ease of use by reassessed.

the public. (11/07) 138 Evaluate the effectiveness A. Mendiola, 01/31 - Ongoing; 02/21 - New EDO of the Comm Plan (01/07) C. Lipa Comm Plan for Crisis Update, A.

Mendiola to review for inclusion.

DAVIS-BESSE OVERSIGHT PANEL OPEN ACTION ITEM LIST Item Action Item (Date Assigned to Comments Number generated) 145 Prepare a special D. Passehl 02/21 - date to be determined inspection plan for the restart readiness team inspection. (01/09) 147 Generate a list of items to D. Passehl 01/31 - working; consider after restart as 02/11 - Include dates and well as transition back to deadlines to Manual Chapter 0350 the normal 0350 when restart inspections planner terminating the 0350 Panel. The items should include plans to augment inspection of corrective actions, inservice inspection, and safety culture monitoring.

(01/09) 156 Read Generic Safety J. Hopkins 01/21 - Determine status of GSI-Issue-191, "Assessment of 191; 02/21 - Check GL98-04 Debris Accumulation on response on coatings. Draft GL PWR Sump Pump and Draft Reg Guide needs review Performance" (01/09) for DB relevance; 02/24 - Request Response Review and Program Implementation to GL98-04; 03/04

- activity to be reassigned to Reactor Engineer who will close sump LER; 04/08, D. Hills to discuss with K. Coyne and A.

Dunlop work assignments 174 Review 2/4 transcript for R. Lickus Mr. Witts recommendations (2/18) 178 Determine the type of C. Lipa backlog assessment that will be performed and by whom. Two attributes need to be considered: (1) the capability of the licensee to manage the backlog in an operating environment; and (2) the impact of the backlog on equipment reliability.

(03/04)

DAVIS-BESSE OVERSIGHT PANEL OPEN ACTION ITEM LIST Item Action Item (Date Assigned to Comments Number generated) 186 Add Dennis Kucinich to A. Saso the standard distribution list on documents for Davis-Besse. Then remove Dennis Kucinich from distribution 90 days after the NRC reply to his 10 CFR 2.206 Petition is signed out. (04/22) 187 Arrange for Fire Protection R.Gardner Inspection to evaluate the licensees safe shutdown design calculations in the context of electrical and thermo-hydraulic design to support closure of Restart Checklist Item 5.b, "Systems Readiness for Restart." (04/29) 188 Arrange for Radiation K.Riemer Protection Inspection to evaluate management stability in the Radiation Protection organization.

An inspection plan is to be drafted and presented to the Panel for approval, including applicable Restart Action Matrix items, for an inspection to be conducted in the July 2003 time frame. (04/29) 189 Investigate how the NRC B.Ruland handled communication of potential inspection issues and findings during in-progress inspection work at Millstone in regards to their organization and human performance problems. (05/16)

DAVIS-BESSE OVERSIGHT PANEL OPEN ACTION ITEM LIST Item Action Item (Date Assigned to Comments Number generated) 190 Discuss with T. Kozak C.Lipa removing Davis-Besse from the Operational Management Information Report (OMI). (05/16) 191 Prepare Questions and C.Lipa/

Answers (Qs and As) once A.Mendiola the GT 221 letter to Rep.

Kucinich is issued to ensure consistent communications regarding how the NRC articulates issues to the public.

(05/16) 192 Draft an update to the D. Passehl March 31, 2003, inspection schedule letter.

(05/16)