ML032390731

From kanterella
Jump to navigation Jump to search
Inspection/Activity Plan
ML032390731
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 08/27/2003
From:
Division Reactor Projects I
To:
Shared Package
ML032390691 List:
References
Download: ML032390731 (1)


Text

Page 1 of 1 McGuire 08/27/2003 14:30:38 Inspection / Activity Plan Report 22 09/01/2003 - 09/30/2004 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB2-MR - MAINTENANCE RULE 2 1, 2 IP 7111112B Maintenance Effectiveness 09/08/2003 09/12/2003 Baseline Inspections EB2-ISI - INSERVICE INSPECTION-U2 2 2 IP 7111108P Inservice Inspection Activities - PWR 09/15/2003 09/19/2003 Baseline Inspections OL EXAM - INITIAL EXAM 1 1 V23224 MCGUIRE/RETAKE EXAMS AT POWER FACILITIES 10/21/2003 10/24/2003 Not Applicable EB1SSDPC - SSDPC PRE-INSPECTION VISIT 2 1, 2 IP 7111121 Safety System Design and Performance Capability 01/05/2004 01/09/2004 Baseline Inspections EB1SSDPC - SAFETY SYS DESIGN & PERF. CAPABILITIES 5 1, 2 IP 7111121 Safety System Design and Performance Capability 01/26/2004 01/30/2004 Baseline Inspections 1, 2 IP 7111121 Safety System Design and Performance Capability 02/09/2004 02/13/2004 Baseline Inspections EB2-ISI - INSERVICE INSPECTION-U1 1 1 IP 7111108P Inservice Inspection Activities - PWR 03/08/2004 03/12/2004 Baseline Inspections PS-RP - RADIATION PROTECTION 3 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 03/08/2004 03/12/2004 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 03/08/2004 03/12/2004 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 03/08/2004 03/12/2004 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 03/08/2004 03/12/2004 Baseline Inspections PS-RP - RADIATION PROTECTION 2 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 03/22/2004 03/26/2004 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 03/22/2004 03/26/2004 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 03/22/2004 03/26/2004 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 03/22/2004 03/26/2004 Baseline Inspections OL RQ - REQUAL INSPECTION 2 1, 2 IP 7111111B Licensed Operator Requalification 05/24/2004 05/28/2004 Baseline Inspections OL EP - EP INSPECTION 1 1, 2 IP 7111402 Alert and Notification System Testing 07/12/2004 07/16/2004 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 07/12/2004 07/16/2004 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 07/12/2004 07/16/2004 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 07/12/2004 07/16/2004 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 07/12/2004 07/16/2004 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.