Letter Sequence Approval |
---|
|
|
MONTHYEARML0234701352002-12-10010 December 2002 Tech Spec Pages for Amendments 232 and 232 Surveillance Frequency for the Containment Spray and Recirculation Spray Nozzles Project stage: Other ML0234600862002-12-10010 December 2002 License Amendment 232 and 232, Surveillance Frequency for the Containment Spray and Recirculation Spray Nozzles Project stage: Approval 2002-12-10
[Table View] |
Similar Documents at Surry |
---|
Category:Letter
MONTHYEARML24248A1712024-09-0303 September 2024 Proposed License Amendment Request - Temporary Service Water Supply to the Component Cooling Heat Exchangers IR 05000280/20240052024-08-26026 August 2024 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2024005 and 05000281-2024005), Rev 1 ML24219A2372024-08-23023 August 2024 Issuance of Amendment Nos. 319 and 319, Adoption of TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspection, ML24207A0402024-08-21021 August 2024 Summary of July 17, 2024, Public Meeting - TS 3.7/3.14 AOT for SW Piping Maintenance IR 05000280/20240112024-08-13013 August 2024 Comprehensive Engineering Team Inspection Report 05000280/2024011 and 05000281/2024011 ML24164A0012024-08-12012 August 2024 Proposed Alternative Relief Request V-1 Inservice Testing of Pressure Isolation Valves (EPID l-2023-LLR-0060) IR 05000280/20240022024-08-0101 August 2024 Integrated Inspection Report 05000280/2024002 and 05000281/2024002 05000280/LER-2024-001, Troubleshooting Initiated Unknown Turbine Trip Feature in Control System2024-07-30030 July 2024 Troubleshooting Initiated Unknown Turbine Trip Feature in Control System ML24165A1232024-07-17017 July 2024 Proposed Alternative Relief Request P-1, P-2 Inservice Testing of Residual Heat and Containment Spray Pumps (EPID l-2023-LLR-0058) ML24165A2782024-07-17017 July 2024 Issuance of Amendment Nos. 318 and 318, Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection ML24190A4192024-07-0808 July 2024 Inservice Testing (IST) Program for Pumps and Valves Revised Sixth IST Interval Start Date and Updated Technical Specifications References for Alternative Request V-1 ML24179A2932024-07-0101 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24166A0622024-06-18018 June 2024 – Proposed Alternative Relief Request P-3, P-4 Inservice Testing of Boric Acid, Component Cooling Water Pumps ML24157A0542024-06-13013 June 2024 Audit Summary in Support of License Amendment Request for Proposed Reclassification of Low Head Safety Injection Flow Instrumentation Related to Regulatory Guide 1.97 ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code IR 05000280/20244032024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 ML24141A2512024-05-20020 May 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable - Supplemental Information ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2302024-05-13013 May 2024 Core 1 Cycle 33 Pattern Mdr Revision 0 ML24130A2492024-05-0909 May 2024 Submittal of Information in Support of Surry Power Station Unit 1 Thermal Shield Flexure Replacement Campaign ML24130A2032024-05-0909 May 2024 Proposed License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections Supplemental Information ML24130A1192024-05-0707 May 2024 Inservice Test Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests - Response to Request for Additional Information Regarding Alternative Request V-1 IR 05000280/20240012024-04-30030 April 2024 Integrated Inspection Report 05000280-2024001 and 05000281-2024001 ML24122C6522024-04-30030 April 2024 Annual Radiological Environmental Operating Report ML24142A3852024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report ML24122B3032024-04-29029 April 2024 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change IR 05000280/20244022024-04-29029 April 2024 Security Baseline Inspection Report 05000280/2024402 and 05000281/2024402 ML24115A1952024-04-24024 April 2024 Notification of Surry Power Station Comprehensive Engineering Team Inspection - U.S. NRC Inspection Report 05000280/2024011 and 05000281/2024011 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24108A1812024-04-15015 April 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable Supplemental Information ML24095A2172024-04-12012 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report ML24088A2482024-03-26026 March 2024 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests- Response to Request for Additional Information ML24087A2082024-03-22022 March 2024 Proposed License Amendment Request Addition of Containment Limiting Condition for Operation and Surveillance Requirements ML24078A2642024-03-21021 March 2024 – Regulatory Audit in Support of License Amendment Request to Proposed Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML24087A1522024-03-18018 March 2024 Annual Changes, Tests, and Experiments Report Regulatory Commitment Evaluation Report ML24023A5762024-03-0808 March 2024 Correction to Issuance of Amendment Nos. 315 and 315, Regarding Revised Emergency Plan for Relocation of the Technical Support Center IR 05000280/20230062024-02-28028 February 2024 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2023006 and 05000281/2023006 ML24032A4712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24051A1782024-02-19019 February 2024 Proposed License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML24057A0612024-02-19019 February 2024 and Virgil C. Summer Power Nuclear Stations - Nuclear Property Insurance Coverage IR 05000280/20230042024-02-0909 February 2024 Integrated Inspection Report 05000280/2023004 and 05000281/2023004 IR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 IR 05000280/20230102024-01-18018 January 2024 – Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 ML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure ML24003A9022024-01-0303 January 2024 Emergency Plan Revision - Relocation of the Technical Support Center (TSC) - Editorial Correction IR 05000280/20233012023-12-28028 December 2023 – NRC Operator License Examination Report 05000280/2023301 and 05000281/2023301 ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) 2024-09-03
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24165A2782024-07-17017 July 2024 Issuance of Amendment Nos. 318 and 318, Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection ML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure ML23242A2292023-11-0707 November 2023 Issuance of Amendment Nos. 315 and 315, Regarding Emergency Procedure Relocation of the Technical Support Center ML23200A2622023-11-0202 November 2023 Issuance of Amendment Nos. 314 and 314, Regarding Technical Specification and Spent Fuel Pool Criticality Change ML23136B1392023-06-29029 June 2023 Issuance of Amendment No. 313 Administrative Changes to Subsequent Renewed Operating Licenses and Technical Specifications ML23072A0892023-05-0101 May 2023 (Amendments 346 & 286), North Anna 1 & 2 (Amnds 294 & 277), Surry 1 & 2 (Amnds 311 & 311), and Summer 1 (Amd 225) - Issuance of Amendments to Revise TSs to Adopt TSTF-554 Revise Reactor Coolant Leakage Requirements ML23100A0652023-04-25025 April 2023 Issuance of Amendment Nos. 310 and 310, Regarding Turbine Building Tornado Classification ML23107A2212023-04-10010 April 2023 Amendment Turbine Building Wind Load Basis Reclassification License Amendment Request - State Consultation No Comment ML23030B8472023-03-10010 March 2023 Issuance of Amendment Nos. 309 and 309, License Amendment Request Regarding a 10-Day Allowed Outage Time for Opposite Unit Auxiliary Feedwater Cross-Connect Capability ML22336A1822022-12-27027 December 2022 Virginia Electric and Power Company Correction of Documentation Error Amendment No. 295 Adopt TSTF-490, Revision 0, and Update Alternative Source Term Analyses ML22250A4672022-09-15015 September 2022 Turbine Building Wind Loading Basis Change Audit Plan ML22193A2952022-08-26026 August 2022 Issuance of Amendment Nos. 308 and 308 License Amendment Request for Removal of the Refueling Water Chemical Addition Tank and Containment Sump, Ph Buffer Change and Safety Evaluation ML22202A0472022-07-25025 July 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action Surry Technical Specification Change Auxiliary Feedwater Allowed Outage Time ML22095A1072022-07-11011 July 2022 Issuance of Amendment Nos. 120, 344, & 284, 293 & 276, & 307 & 307 to Relocate Requirements to the QAPD ML21253A0632021-11-19019 November 2021 Issuance of Amendment Nos. 306 and 306 to Update of the Loss of Coolant Accident Alternate Source Term Dose Analysis ML21188A1742021-10-26026 October 2021 Issuance of Amendment Nos. 305 and 305 Revised Reactor Core Safety Limit to Reflect Topical Report WCAP-177642-P-A, Revision 1 ML21175A1852021-08-20020 August 2021 Issuance of Amendment Nos. 304 and 304 Leak-Before-Break for Pressurizer Surge, Residual Heat Removal, Safety Injection Accumulator, Reactor Coolant System Bypass and Safety Injection Lines ML20091L9822021-05-0404 May 2021 SLR License ML20293A1602020-12-0808 December 2020 Issuance of Amendment Nos. 301 and 301 to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML20148M3592020-12-0808 December 2020 Issuance of Amendment Nos. 302 and 302 to Revise Technical Specifications Figure 3.1 1, Surry Units 1 and 2 Reactor Coolant System Heatup Limitations, and Figure 3.1-2, Surry Units 1 and 2 Reactor Coolant System ML20301A4522020-10-28028 October 2020 Non-Proprietary, Issuance of Amendment Nos. 300 and 300 to Revise Technical Specifications 6.2.C, Core Operating Limits Report ML20309A5912020-10-14014 October 2020 Pre-Submittal Meeting for License Amendment Requests to Implement Batch Framatome 15 X 15 AGORA-5A-I (Agora) Fuel at Surry Power Station Units 1 and 2 (SPS) - Slides ML20085G9642020-05-19019 May 2020 Issuance of Amendments Nos. 298 and 298 to Revise Technical Specifications Table 3.7-1, Reactor Trip Instrument Operating Conditions, for an Addition of 24-Hour Completion Time for an Inoperable Rector Trip Breaker ML20115E2372020-05-0707 May 2020 Issuance of Exigent Amendments Nos. 299 and 299, to Revise TS 6.4.Q, Steam Generator (SG) Program, to Allow a One-Time Deferral of the Inspection of Surry Unit 2 Sg B Spring 2020 Refueling Outage ML20099F8732020-04-17017 April 2020 Audit Proposed License Amendment Request for the Addition of Westinghouse Topical Report WCAP-16996-P-A, Revision 1 (EPID L-2019-LLA-0243 and EPID L-2019-LLA-0236 ML20058F9662020-03-16016 March 2020 Issuance of Amendment Nos. 297 and 297 to Revise Technical Specifications 3.16, Emergency Power System, to Allow a One Time 14-Day Allowed Outage Time for Replacement of 5-KV Cables Associated with Reserve Station ML19305D2482019-12-31031 December 2019 Issuance of Amendments Adoption of Emergency Action Level Schemes Per NEI 99-01, Rev. 6 ML19028A3842019-06-12012 June 2019 Issuance of Amendment Nos. 295 and 295 to Adopt TSTF-490, Revision 0, and Update Alternative Source Term Analyses (EPID-L-2018-LLA-0068) ML19031B2272019-02-27027 February 2019 Issuance of Amendment Nos. 281, 264, 294, and 294 to Consolidate Emergency Operations Facilities and Associated Emergency Plan Changes ML18261A0992018-10-0505 October 2018 Issuance of Amendments. Request to Revise Technical Specifications Section 3.16 Emergency Power System Regarding a Temporary 21 Day Allowed Outage Time ML18106A0072018-05-0303 May 2018 Issuance of Amendments Regarding Open Phase Protection Per NRC Bulletin 2012 01 (CAC Nos. MF9805, MF9806; EPID L-2017-LLA-0238) ML17326A2252018-02-0909 February 2018 Issuance of Amendments Regarding License Amendment Request to Revise Residual Heat Removal and Component Cooling System Technical Specifications Requirements (CAC Nos. MF9124 and MF9125; EPID L-2017-LLA-0166) ML17170A1832017-07-28028 July 2017 Issuance of Amendments Regarding the Extension of the Emergency Service Water Pump Allowed Outage Time, Surry Power Station, Units 1 and 2 ML17100A2532017-05-31031 May 2017 Issuance of Amendments Regarding Extension of Technical Specification 3.14, Service Water Flow Path Allowed Outage Times and Deletion of Expired Temporary Service Water Jumper Requirements (CAC Nos. MF7746... ML17039A5132017-05-10010 May 2017 Issuance of Amendment Nos. 288 and 288 Regarding Technical Specification Changes to Expand Primary Grade Water Lockout Requirements in TS 3.2.E (CAC Nos. MF7716 and MF7717). 08/10/2017 ML16202A0682016-07-14014 July 2016 Proposed Licensed Amendment Request Emergency Service Water Pump Allowed Outage Time Extension ML16042A1732016-02-29029 February 2016 Issuance of Amendments for Generic Letter 2008-01 (Gas Accumulation) ML15314A0782015-11-0505 November 2015 Virginia Electric and Power Company, Surry Power Station, Units 1 and 2 - Intent to Pursue Second License Renewal ML15245A4822015-10-0707 October 2015 Millstone Power Station, Surry Power Station, and North Anna Power Station - Issuance of Amendments to Revise the Cyber Security Milestone 8 Completion Date in the Renewed Facility Operating Licenses ML15173A1022015-06-26026 June 2015 Issuance of Amendments Regarding Clarification of Reactor Coolant System Heatup and Cooldown Limitation Technical Specification Figures ML15099A6792015-04-28028 April 2015 Issuance of Amendments Regarding Relocation of Augmented Inspection Requirements ML14169A3592014-08-12012 August 2014 Stations, Units 1 and 2, Issuance of Amendments Regarding Addition of an Analytical Methodology to the Core Operating Limits Reports and an Increase to the Surry Minimum Temperature for Criticality ML14148A2352014-07-0303 July 2014 Issuance of Amendment to Extend the Containment Type a and Type C Leak Rate Test Frequency ML14073A4052014-04-24024 April 2014 Issuance of Amendment for the Technical Specifications Changes Related to Snubber Surveillance Requirements ML13186A1972013-09-25025 September 2013 Independent Spent Fuel Storage Installations - Issuance of Amendments for Changes to the Emergency Action Level Revisions ML13018A0862013-01-28028 January 2013 Issuance of License Amendment Request to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection ML12109A2702012-04-17017 April 2012 Issuance of Amendments Regarding Virginia Electric and Power Company License Amendment Request for Permanent Alternate Repair Criteria for Steam Generator Tube Inspection and Repair ML1207303042012-04-17017 April 2012 Issuance of Amendments Regarding Virginia Electric and Power Company License Amendment Request for Permanent Alternate Repair Criteria for Steam Generator Tube Inspection and Repair ML11192A2492011-08-31031 August 2011 Issuance of Amendment Regarding Cyber Security to Dominion Plants ML11194A2902011-07-28028 July 2011 License Amendment, Issuance of Amendments Regarding Administrative Changes to Technical Specifications 3.12 and 6.2 2024-07-17
[Table view] Category:Safety Evaluation
MONTHYEARML24219A2372024-08-23023 August 2024 Issuance of Amendment Nos. 319 and 319, Adoption of TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspection, ML24164A0012024-08-12012 August 2024 Proposed Alternative Relief Request V-1 Inservice Testing of Pressure Isolation Valves (EPID l-2023-LLR-0060) ML24165A1232024-07-17017 July 2024 Proposed Alternative Relief Request P-1, P-2 Inservice Testing of Residual Heat and Containment Spray Pumps (EPID l-2023-LLR-0058) ML24165A2782024-07-17017 July 2024 Issuance of Amendment Nos. 318 and 318, Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection ML24166A0622024-06-18018 June 2024 – Proposed Alternative Relief Request P-3, P-4 Inservice Testing of Boric Acid, Component Cooling Water Pumps ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23242A2292023-11-0707 November 2023 Issuance of Amendment Nos. 315 and 315, Regarding Emergency Procedure Relocation of the Technical Support Center ML23200A2622023-11-0202 November 2023 Issuance of Amendment Nos. 314 and 314, Regarding Technical Specification and Spent Fuel Pool Criticality Change ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23244A2352023-09-18018 September 2023 Request to Use a Subsequent Edition of the ASME Code, Section XI ML23230A0012023-09-15015 September 2023 Request to Use a Provision of a Previous Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Non-Destructive Examinations ML23136B1392023-06-29029 June 2023 Issuance of Amendment No. 313 Administrative Changes to Subsequent Renewed Operating Licenses and Technical Specifications ML23061A0122023-05-0909 May 2023 Issuance of Amendment Nos. 312 and 312, Regarding Technical Specifications Task Force (TSTF) Traveler 547, Revision 1 ML23072A0892023-05-0101 May 2023 (Amendments 346 & 286), North Anna 1 & 2 (Amnds 294 & 277), Surry 1 & 2 (Amnds 311 & 311), and Summer 1 (Amd 225) - Issuance of Amendments to Revise TSs to Adopt TSTF-554 Revise Reactor Coolant Leakage Requirements ML23100A0652023-04-25025 April 2023 Issuance of Amendment Nos. 310 and 310, Regarding Turbine Building Tornado Classification ML23102A2832023-04-25025 April 2023 ASME OM Code Inservice Testing Program Request for Approval of Alternative Request V-01 Use of Mechanical Agitation Process for Pressure Isolation Valve 1-SI-241 Seat Leakage Testing ML23030B8472023-03-10010 March 2023 Issuance of Amendment Nos. 309 and 309, License Amendment Request Regarding a 10-Day Allowed Outage Time for Opposite Unit Auxiliary Feedwater Cross-Connect Capability ML21320A0072022-09-0707 September 2022 Review of Appendix E to DOM-NAF-2, Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code (EPID L-2021-LLT-0000) (Non-Proprietary) ML22193A2952022-08-26026 August 2022 Issuance of Amendment Nos. 308 and 308 License Amendment Request for Removal of the Refueling Water Chemical Addition Tank and Containment Sump, Ph Buffer Change and Safety Evaluation ML22095A1072022-07-11011 July 2022 Issuance of Amendment Nos. 120, 344, & 284, 293 & 276, & 307 & 307 to Relocate Requirements to the QAPD ML21253A0632021-11-19019 November 2021 Issuance of Amendment Nos. 306 and 306 to Update of the Loss of Coolant Accident Alternate Source Term Dose Analysis ML21188A1742021-10-26026 October 2021 Issuance of Amendment Nos. 305 and 305 Revised Reactor Core Safety Limit to Reflect Topical Report WCAP-177642-P-A, Revision 1 ML21175A1852021-08-20020 August 2021 Issuance of Amendment Nos. 304 and 304 Leak-Before-Break for Pressurizer Surge, Residual Heat Removal, Safety Injection Accumulator, Reactor Coolant System Bypass and Safety Injection Lines ML21201A1172021-08-0606 August 2021 Proposed Alternative Requests S1-I5-ISI-05 and S2-I5-ISI-06 to Eliminate Examination of Threads in Reactor Pressure Vessel Flange ML21075A0452021-03-26026 March 2021 Request to Utilize Code Case N-885 ML20293A1602020-12-0808 December 2020 Issuance of Amendment Nos. 301 and 301 to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML20148M3592020-12-0808 December 2020 Issuance of Amendment Nos. 302 and 302 to Revise Technical Specifications Figure 3.1 1, Surry Units 1 and 2 Reactor Coolant System Heatup Limitations, and Figure 3.1-2, Surry Units 1 and 2 Reactor Coolant System ML20321A2322020-11-20020 November 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20301A4522020-10-28028 October 2020 Non-Proprietary, Issuance of Amendment Nos. 300 and 300 to Revise Technical Specifications 6.2.C, Core Operating Limits Report ML20252A0072020-09-15015 September 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI ML20085G9642020-05-19019 May 2020 Issuance of Amendments Nos. 298 and 298 to Revise Technical Specifications Table 3.7-1, Reactor Trip Instrument Operating Conditions, for an Addition of 24-Hour Completion Time for an Inoperable Rector Trip Breaker ML20115E3522020-05-12012 May 2020 Alternative Request S2-I5-ISI-05 ASME Section XI Inservice Inspection Program Proposed Alternative Request to Use a Mechanical Clamping Device for a One-Inch Main Steam Line Repair ML20115E2372020-05-0707 May 2020 Issuance of Exigent Amendments Nos. 299 and 299, to Revise TS 6.4.Q, Steam Generator (SG) Program, to Allow a One-Time Deferral of the Inspection of Surry Unit 2 Sg B Spring 2020 Refueling Outage ML20058F9662020-03-16016 March 2020 Issuance of Amendment Nos. 297 and 297 to Revise Technical Specifications 3.16, Emergency Power System, to Allow a One Time 14-Day Allowed Outage Time for Replacement of 5-KV Cables Associated with Reserve Station ML19305D2482019-12-31031 December 2019 Issuance of Amendments Adoption of Emergency Action Level Schemes Per NEI 99-01, Rev. 6 ML19028A3842019-06-12012 June 2019 Issuance of Amendment Nos. 295 and 295 to Adopt TSTF-490, Revision 0, and Update Alternative Source Term Analyses (EPID-L-2018-LLA-0068) ML19043A8242019-03-15015 March 2019 Relief Requests Examination Coverage for Pressurizer Nozzle Inner Radius Sections and Certain Stainless Steel Piping Welds (S2-15-LMT-CO1 and S2-15-LMT-P01) ML18331A0602019-02-28028 February 2019 Relief Requests Regarding Examination Coverage for Pressurizer Nozzle Inner Radius Section and Certain Stainless Steel Piping Welds (S1-I5-LMT-C01 and S1-I5-LMT-P01) ML19031B2272019-02-27027 February 2019 Issuance of Amendment Nos. 281, 264, 294, and 294 to Consolidate Emergency Operations Facilities and Associated Emergency Plan Changes ML18318A0622018-12-10010 December 2018 Review of Reactor Vessel Material Surveillance Capsule Withdrawal Schedules (CAC Nos. MG0098 and MG0099; EPID L-2017-LLL-0021) ML18261A0992018-10-0505 October 2018 Issuance of Amendments. Request to Revise Technical Specifications Section 3.16 Emergency Power System Regarding a Temporary 21 Day Allowed Outage Time ML18236A2362018-09-26026 September 2018 Relief from the Requirements of the ASME Code - Proposed Alternatives S1-I5-ISI-04 and S2-I5-ISI-04 ML18225A0202018-08-29029 August 2018 ISFSI; North Anna 1 & 2 Isfsls, and Unit 3; Surry Power 1 & 2, and Isfsls); Dominion Energy Kewaunee, Inc. (Kewaunee Power Station and Isfsi): Request for Threshold Determination Under 10 CFR 50.80 ML18166A3292018-06-29029 June 2018 Revised License Renewal Commitment Pressurizer Surge Line Weld Inspection Frequency ML18106A0072018-05-0303 May 2018 Issuance of Amendments Regarding Open Phase Protection Per NRC Bulletin 2012 01 (CAC Nos. MF9805, MF9806; EPID L-2017-LLA-0238) ML17326A2252018-02-0909 February 2018 Issuance of Amendments Regarding License Amendment Request to Revise Residual Heat Removal and Component Cooling System Technical Specifications Requirements (CAC Nos. MF9124 and MF9125; EPID L-2017-LLA-0166) ML18019A1952018-01-24024 January 2018 Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination (CAC Nos. MF9923, MF9924, MF9925, MF9926, MF9927, and MF9928; EPID L-2017-LLR-0060) ML17303A0682017-12-20020 December 2017 Nonproprietary Relief from the Requirements of the ASME Code (CAC Nos. MF8987 and MF8988; EPID L-2016-LLR-0019) 2024-08-23
[Table view] |
Text
December 10, 2002 Mr. David A. Christian Senior Vice President - Nuclear Virginia Electric and Power Company 5000 Dominion Blvd.
Glen Allen, Virginia 23060
SUBJECT:
SURRY UNITS 1 AND 2 - SURVEILLANCE FREQUENCY FOR THE CONTAINMENT SPRAY AND RECIRCULATION SPRAY NOZZLES (TAC NOS. MB5114 AND MB5115)
Dear Mr. Christian:
The Commission has issued the enclosed Amendment No. 232 to Facility Operating License No. DPR-32 and Amendment No. 232 to Facility Operating License No.
DPR-37 for the Surry Power Station, Unit Nos. 1 and 2, respectively. The amendments change the Technical Specifications (TS) in response to your application transmitted by letter dated May 14, 2002, as supplemented by letter dated July 22, 2002.
The amendments revise TS Section 4.5 and the associated Bases. The changes revise the surveillance frequency of the containment spray and recirculation spray header nozzles from a periodic surveillance of once every 10 years to a performance-based surveillance following maintenance that could cause nozzle blockage.
A copy of the Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commissions biweekly Federal Register notice.
Sincerely,
/RA/
Chris Gratton, Senior Project Manager, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-280 and 50-281
Enclosures:
- 1. Amendment No. 232 to DPR-32
- 2. Amendment No. 232 to DPR-37
- 3. Safety Evaluation cc w/encls: See next page
Mr. David A. Christian Senior Vice President - Nuclear Virginia Electric and Power Company 5000 Dominion Blvd.
Glen Allen, Virginia 23060
SUBJECT:
SURRY UNITS 1 AND 2 - SURVEILLANCE FREQUENCY FOR THE CONTAINMENT SPRAY AND RECIRCULATION SPRAY NOZZLES (TAC NOS. MB5114 AND MB5115)
Dear Mr. Christian:
The Commission has issued the enclosed Amendment No. 232 to Facility Operating License No. DPR-32 and Amendment No. 232 to Facility Operating License No.
DPR-37 for the Surry Power Station, Unit Nos. 1 and 2, respectively. The amendments change the Technical Specifications (TS) in response to your application transmitted by letter dated May 14, 2002, as supplemented by letter dated July 22, 2002.
The amendments revise TS Section 4.5 and the associated Bases. The changes revise the surveillance frequency of the containment spray and recirculation spray header nozzles from a periodic surveillance of once every 10 years to a performance-based surveillance following maintenance that could cause nozzle blockage.
A copy of the Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commissions biweekly Federal Register notice.
Sincerely,
/RA/
Chris Gratton, Senior Project Manager, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-280 and 50-281
Enclosures:
- 1. Amendment No. 232 to DPR-32
- 2. Amendment No. 232 to DPR-37
- 3. Safety Evaluation cc w/encls: See next page Distribution:
See next page ADAMS ACCESSION NO.: ML023460086 OFFICE PDII-1/PM PDII-1/PM PDII-2/LA OGC PDII-1/SC NAME GEdison CGratton EDunnington RHoefling HBerkow for JNakoski DATE 11/27/02 12/27/02 11/27/02 12 /04/02 12/10/02 OFFICIAL RECORD COPY
DATED: December 10, 2002 AMENDMENT NO. 232 TO FACILITY OPERATING LICENSE NO. DPR SURRY UNIT 1 AMENDMENT NO. 232 TO FACILITY OPERATING LICENSE NO. DPR SURRY UNIT 2 PUBLIC PDII-1 R/F HBerkow JNakoski GEdison CGratton EDunnington OGC ACRS GHill (4 copies)
RLobel KLandis, RII SWeerakkody OTabatabai
Mr. David A. Christian Surry Power Station Virginia Electric and Power Company cc:
Mr. Donald P. Irwin, Esq. Office of the Attorney General Hunton and Williams Commonwealth of Virginia Riverfront Plaza, East Tower 900 East Main Street 951 E. Byrd Street Richmond, Virginia 23219 Richmond, Virginia 23219 Mr. Stephen P. Sarver, Acting Director Mr. Richard H. Blount, II Nuclear Licensing & Operations Support Site Vice President Innsbrook Technical Center Surry Power Station Virginia Electric and Power Company Virginia Electric and Power Company 5000 Dominion Blvd.
5570 Hog Island Road Glen Allen, Virginia 23060-6711 Surry, Virginia 23883-0315 Mr. David A. Heacock Senior Resident Inspector Site Vice President Surry Power Station North Anna Power Station U. S. Nuclear Regulatory Commission Virginia Electric and Power Company 5850 Hog Island Road P. O. Box 402 Surry, Virginia 23883 Mineral, Virginia 23117-0402 Chairman Mr. William R. Matthews Board of Supervisors of Surry County Vice President - Nuclear Operations Surry County Courthouse Virginia Electric and Power Company Surry, Virginia 23683 Innsbrook Technical Center 5000 Dominion Boulevard Dr. W. T. Lough Glen Allen, Virginia 23060-6711 Virginia State Corporation Commission Division of Energy Regulation P. O. Box 1197 Richmond, Virginia 23209 Robert B. Strobe, M.D., M.P.H.
State Health Commissioner Office of the Commissioner Virginia Department of Health P.O. Box 2448 Richmond, Virginia 23218
VIRGINIA ELECTRIC AND POWER COMPANY DOCKET NO. 50-280 SURRY POWER STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 232 License No. DPR-32
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Virginia Electric and Power Company (the licensee) dated May 14, 2002, as supplemented by letter dated July 22, 2002, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of Facility Operating License No. DPR-32 is hereby amended to read as follows:
(B) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 232 , are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 30 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA by HBerkow for/
John A. Nakoski, Chief, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: December 10, 2002
VIRGINIA ELECTRIC AND POWER COMPANY DOCKET NO. 50-281 SURRY POWER STATION, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 232 License No. DPR-37
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Virginia Electric and Power Company (the licensee) dated May 14, 2002, as supplemented by letter dated July 22, 2002, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of Facility Operating License No. DPR-37 is hereby amended to read as follows:
(B) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 232 , are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 30 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA by HBerkow for/
John A. Nakoski, Chief, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: December 10, 2002
ATTACHMENT TO LICENSE AMENDMENT NO. 232 TO FACILITY OPERATING LICENSE NO. DPR-32 LICENSE AMENDMENT NO. 232 TO FACILITY OPERATING LICENSE NO. DPR-37 DOCKET NOS. 50-280 AND 50-281 Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove Pages Insert Pages TS 4.5-1 TS 4.5-1 TS 4.5-2 TS 4.5-2 TS 4.5-4 TS 4.5-4
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 232 TO FACILITY OPERATING LICENSE NO. DPR-32 AND AMENDMENT NO. 232 TO FACILITY OPERATING LICENSE NO. DPR-37 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION, UNIT NOS. 1 AND 2 DOCKET NOS. 50-280 AND 50-281
1.0 INTRODUCTION
By letter dated May 14, 2002, Virginia Electric and Power Company (the licensee) proposed revising the Technical Specifications (TS) for the Surry Power Station, Units 1 and 2 (SPS1&2).
The licensees proposed amendment revises Surveillance Requirement (SR) 4.5.A.3 and SR 4.5.B.3 for the containment spray (CS) system nozzles and recirculation spray (RS) system nozzles, respectively. Currently, SRs 4.5.A.3 and 4.5.B.3 require periodic verification that the CS and RS spray nozzles are free of blockage. This verification is required to be performed once every 10 years to ensure that the CS and RS systems will operate as designed when needed. The verification tests are performed by an air or smoke flow test to verify that the spray nozzles are not obstructed. The proposed change would modify the surveillance frequency to those conditions following maintenance that could result in nozzle blockage.
Routine maintenance activities with foreign material exclusion (FME) controls will not require performance of this surveillance. Only unanticipated circumstances will require performance of the surveillance (such as loss of foreign material control when working within the spray ring risers and headers). Spray system maintenance procedures establish FME controls and post-maintenance inspection when the spray system maintenance requires opening the system.
In response to the staffs request, the licensee provided additional information in a July 22, 2002, letter. This supplemental letter contained clarifying information only and did not change the initial no significant hazards consideration determination or expand the scope of the initial application.
2.0 BACKGROUND
The containment depressurization system is used to return the containment atmosphere to subatmospheric pressure after a loss-of-coolant accident (LOCA) by removing heat from the containment atmosphere and the containment structure. The containment depressurization system consists of two subsystems: (1) the CS subsystem, and (2) the RS subsystem. The CS subsystem transfers heat from the containment atmosphere to the CS, which is collected in the containment sump. The RS subsystem transfers heat, via the RS coolers, from the water collected on the containment floor and from the containment atmosphere to the service water (SW) system.
The containment depressurization system consists of two separate but parallel CS subsystems, each of 100-percent capacity, and four separate but parallel RS subsystems, each of approximately 50-percent capacity.
The licensees May 14, 2002, letter stated that a smoke or air flow test has been performed five times on Unit 1 and four times on Unit 2. Except for some dried-out tape that blocked flow through three nozzles on the Unit 1 RS header during a 1983 test, the results of each test demonstrated unobstructed flow through each nozzle. After removal of the tape, all spray nozzles tested satisfactorily. Even with the three blocked nozzles, the spray system had sufficient redundancy so that the spray system remained operable. The tests confirmed that the systems were free from construction debris and also free from obstructions following startup and operation of the units.
The licensee provided the following justification for the requested revision: (1) the air flow tests impact fuel movement in containment, (2) the SR presents a personnel safety risk for the individuals required to access the top of containment to check the air flow through the nozzles, (3) performance of the SR is expensive, and (4) operating experience has demonstrated that nozzle blockage is predominantly associated with maintenance activities. The licensee is, therefore, proposing to change the surveillance frequency to those conditions following maintenance that could result in nozzle blockage. The licensee is also proposing that the verification could consist of a visual inspection of the nozzles in lieu of an air or smoke test.
3.0 EVALUATION Each CS subsystem consists of two separate spray ring headers located in the containment dome and one common spray ring header located outside the crane wall. Each train is rated at 100-percent capacity. The CS ring headers have a total of 234 nozzles. The piping is fabricated of stainless steel and the spray nozzles are also stainless steel.
The CS pump discharge motor-operated valves (MOVs) and weighted check valves are maintained closed during normal operation to provide containment isolation. Each CS supply line to the containment contains a weight-loaded check valve to prevent air inleakage to the containment when it is at subatmospheric pressure. One-quarter-inch drain lines located downstream of the check valves inside containment will drain the CS manifolds should any water enter the manifolds during periodic testing. In addition, each train of CS has a 4-inch line downstream of the isolation valves that supplies water to the suction of the RS pumps for increased net positive suction head. The 4-inch line would also serve to prevent any water collection in the supply headers. Containment sump inleakage is monitored and recorded in the control room during plant operation, which provides another method to identify any leak-by of the CS and RS MOVs.
The RS subsystem is composed of two trains; each train includes an inside RS subsystem and an outside RS subsystem. Each subsystem is considered to be at 50 percent capacity, and consists of one RS pump, one RS spray heat exchanger and one 180E coverage spray header with stainless steel nozzles. The heat exchanger tubes are titanium.
Strainers are provided in the suction of the CS pumps. Three layers of screening are provided in the suction of the RS pumps. The strainers and the screen mesh are small enough to prevent any material that could plug the nozzles from passing through. Test spray nozzles are installed inside the refueling water storage tank for routine surveillance testing of the CS pumps. This provides an indication of possible blockage.
The NRC staff examined the performance history of the spray systems at SPS and failure mechanisms of spray nozzles revealed by past performance at SPS as well as at other plants, and the effectiveness of the air or smoke flow test with respect to those failure mechanisms.
Based on these examinations, the NRC staff concluded that the impact of the proposed changes on the system reliability is negligible.
In addition to the flow tests, the licensee is proposing inspection as an alternate method of verifying the absence of blockage following maintenance that could cause nozzle blockage.
The experience at another pressurized-water reactor (PWR) indicates that a thorough visual inspection of the piping is capable of finding debris in the spray headers that may not be found through the air or smoke blockage test. Therefore, the NRC staff considers inspection, if done thoroughly, is an acceptable alternative to the air or smoke flow test.
Performance History at SPS In addition to the testing history discussed in the Background section of this Safety Evaluation, the licensee also did a thorough job of flushing the CS and RS subsystems prior to initial operation. No significant debris was found. Although work has been done on the CS and RS systems since that time that involved opening the system, subsequent testing has shown acceptable testing results.
The licensees May 14, 2002, letter states that a review of the maintenance and modification history since the last flow blockage test indicates a limited number of work orders and modifications have been performed on CS and RS MOV isolation valves or the system piping.
The modifications associated with the valves were for operator adjustment and would not have affected system cleanliness. The maintenance activities included: repositioning the spectacle flange and elbows for RS testing activities, repair and adjustment of weighted discharge check valves, installing blanks on CS piping to support MOV leak testing, and RS heat exchanger inspections. Cleanliness control practices, including post-work inspections, were used and documented in the work orders to ensure system cleanliness requirements were maintained.
Industry experience and failure mechanisms Review of industry experience using the NRCs Sequence Coding and Search System for Licensee Event Reports indicates that spray systems of similar design are highly reliable (i.e.,
not susceptible to plugging). The NRC staff reviewed industry experience and found that, with a few exceptions, once tested after construction, CS nozzles have not been subject to blockage. There have been some exceptions. In the case of one PWR, a chemical added to the inner surface of a spray system pipe to eliminate a corrosion problem detached and the loose material blocked some spray nozzles. Spray piping in PWRs, and in particular at SPS, is corrosion-resistant; therefore, this failure mechanism is not applicable to SPS. The licensee for another PWR found debris, identified as construction debris, in the spray nozzle headers. The fraction of blockage was not significant and the sprays remained functional. The debris was found by visual observation, not by an air flow test. Another plant had corrosion in the spray piping due to water in the spray system and piping that was not stainless steel.
Other problems have been identified in CS and fire protection systems in which water leakage resulted in corrosion that resulted in some, but not complete, blockage. As described above, the SPS design effectively precludes this condition. The spray ring headers are maintained dry and are made of corrosion-resistant stainless steel and, therefore, formation of significant corrosion products is precluded.
Introduction of foreign material exterior to the headers is unlikely due to their location at the top of the containment. Since maintenance that could introduce foreign material is the most likely cause for obstruction, testing or inspection following such maintenance would suffice to verify the systems capability to perform its safety function. These reasons make the potential for nozzle obstruction very low and, therefore, the 10-year test frequency is unnecessary. Verifying that the nozzles are not obstructed following maintenance that could introduce foreign materials internal to the spray ring headers is a more appropriate frequency. This verification would consist of an inspection of the nozzles, or an air or smoke flow test.
Based on its review of the plant-specific and industry performance history as described above, the NRC staff concludes that the design of the SPS containment depressurization system (CS and RS), combined with the licensees Post Maintenance Testing Program to address nozzle blockage when performing maintenance on the system, will minimize the potential for nozzle blockage. The NRC staff, therefore, concludes that the licensees proposed TS change, which modifies the frequency of verifying the CS and RS nozzles are unobstructed from once every 10 years to conditions following maintenance that could result in nozzle blockage, is acceptable.
4.0 STATE CONSULTATION
In accordance with the Commissions regulations, the Virginia State official was notified of the proposed issuance of the amendments. The State official had no comment.
5.0 ENVIRONMENTAL CONSIDERATION
These amendments change a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20 and change surveillance requirements. The NRC staff has determined that the amendments involve no significant increase in the amounts and no significant change in the types of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that these amendments involve no significant hazards consideration, and there has been no public comment on such finding (67 FR 42831). Accordingly, these amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of these amendments.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of these amendments will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: R. Lobel Date: December 10, 2002