Letter Sequence Other |
---|
EPID:L-2020-LLR-0139, ASME Section XI Inservice Inspection Program Request for NRC Approval of Proposed Alternative S1-I5-ISL-05 and S2-15-ISL-06 (Open) EPID:L-2020-LLR-0140, ASME Section XI Inservice Inspection Program Request for NRC Approval of Proposed Alternative S1-I5-ISL-05 and S2-15-ISL-06 (Open) |
|
MONTHYEARML20296A6802020-10-22022 October 2020 ASME Section XI Inservice Inspection Program Request for NRC Approval of Proposed Alternative S1-I5-ISL-05 and S2-15-ISL-06 Project stage: Request ML20316A0202020-11-10010 November 2020 NRR E-mail Capture - Surry Unit 2 Proposed Alternative S2-I5-ISl-06 Project stage: Other ML20316A0192020-11-10010 November 2020 NRR E-mail Capture - Surry Unit 1 Proposed Alternative S1-I5-ISl-05 Project stage: Other ML21020A1332021-01-13013 January 2021 NRR E-mail Capture - Draft RAIs for Surry'S Request for Proposed Alternative S1-I5-ISl-05 and S2-I5-ISl-06 (ML20296A680) Project stage: Draft RAI ML21020A1322021-01-19019 January 2021 NRR E-mail Capture - RAIs for Surry'S Request for Proposed Alternative S1-I5-ISl-05 and S2-I5-ISl-06 (ML20296A680) Project stage: RAI ML21042B9262021-02-11011 February 2021 ASME Section XI Inservice Inspection Program Request for NRC Approval of Proposed Alternative Requests S1-I5-ISl-05 and S2-I5-ISl-06 - Response to Request for Additional Information Project stage: Response to RAI ML21201A1172021-08-0606 August 2021 Proposed Alternative Requests S1-I5-ISI-05 and S2-I5-ISI-06 to Eliminate Examination of Threads in Reactor Pressure Vessel Flange Project stage: Other 2021-01-13
[Table View] |
Similar Documents at Surry |
---|
Category:Letter
MONTHYEARIR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 IR 05000280/20230102024-01-18018 January 2024 Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 ML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure ML24003A9022024-01-0303 January 2024 Stations, Units 1 and 2, Emergency Plan Revision - Relocation of the Technical Support Center (TSC) - Editorial Correction IR 05000280/20233012023-12-28028 December 2023 NRC Operator License Examination Report 05000280/2023301 and 05000281/2023301 ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23352A3692023-12-18018 December 2023 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change ML23334A2342023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23242A2292023-11-0707 November 2023 Issuance of Amendment Nos. 315 and 315, Regarding Emergency Procedure Relocation of the Technical Support Center ML23200A2622023-11-0202 November 2023 Issuance of Amendment Nos. 314 and 314, Regarding Technical Specification and Spent Fuel Pool Criticality Change IR 05000280/20230032023-10-25025 October 2023 Integrated Inspection Report 05000280/2023003 and 05000281/2023003 ML23286A0372023-10-13013 October 2023 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J ML23285A0922023-10-12012 October 2023 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests ML23277A1172023-10-0303 October 2023 Operator Licensing Examination Approval 05000280/2023301 and 05000281/2023301 ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23256A2672023-09-21021 September 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23244A2352023-09-18018 September 2023 Request to Use a Subsequent Edition of the ASME Code, Section XI ML23230A0012023-09-15015 September 2023 Request to Use a Provision of a Previous Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Non-Destructive Examinations IR 05000280/20220042023-09-0101 September 2023 Reissue - Surry Power Station - Integrated Inspection Report 05000280/2022004 and 05000281/2022004 ML23244A0142023-08-30030 August 2023 Inservice Inspection Owner'S Activity Report IR 05000280/20230052023-08-23023 August 2023 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2023005 and 05000281/2023005) ML23226A1862023-08-10010 August 2023 Proposed License Amendment Request - Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML23220A1492023-08-0707 August 2023 Independent Spent Fuel Storage Installation - Submittal of Cask Registrations for Spent Fuel Storage ML23220A1482023-08-0707 August 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Response to Request for Additional Information IR 05000280/20230022023-08-0404 August 2023 Integrated Inspection Report 05000280/2023002 and 05000281/2023002 ML23208A0922023-07-26026 July 2023 Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of Framatome ORFEO-GAIA and OORFE-NMGRID CHF Correlations in the Dominion Energy Vipre-D Computer Code Response ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations ML23198A0322023-07-18018 July 2023 Regulatory Audit Report Regarding Review of License Amendment to Modify Emergency Plan Staff Augmentation Times ML23193A9382023-07-18018 July 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML23173A0602023-07-11011 July 2023 Audit Summary for License Amendment Request Revision of the Emergency Plan to Support Relocation of the Technical Support Center ML23136B1392023-06-29029 June 2023 Issuance of Amendment No. 313 Administrative Changes to Subsequent Renewed Operating Licenses and Technical Specifications ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23152A0432023-06-22022 June 2023 Audit Plan License Amendment Requests to Change Emergency Plan Staff Augmentation Times ML23153A1732023-06-16016 June 2023 Correction to Amendment Nos. 346 & 286 Millstone, 294 & 277 North Anna, 311 & 311 Surry, and 225 Summer to Revise Technical Specifications to Adopt TSTF-554,Rev Reactor Coolant Leakage Requirement ML23163A2352023-06-12012 June 2023 Request to Use a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for the SPS Sixth Inservice Inspection (Isi) Intervals and VCSNS Fifth ISI Interval ML23151A6612023-05-31031 May 2023 ES-2.1-1, Surry 2023-301 Corporate Notification Letter (Revised) ML23167B0072023-05-31031 May 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Supplemental Information - LOCA Dose Calculation Summary ML23117A0952023-05-10010 May 2023 Audit Plan License Amendment Request to Support Relocation of the Technical Support Center ML23130A3742023-05-10010 May 2023 Request to Delay NRC Intial Licensing Examination 2024-02-06
[Table view] Category:Safety Evaluation
MONTHYEARML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23242A2292023-11-0707 November 2023 Issuance of Amendment Nos. 315 and 315, Regarding Emergency Procedure Relocation of the Technical Support Center ML23200A2622023-11-0202 November 2023 Issuance of Amendment Nos. 314 and 314, Regarding Technical Specification and Spent Fuel Pool Criticality Change ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23244A2352023-09-18018 September 2023 Request to Use a Subsequent Edition of the ASME Code, Section XI ML23230A0012023-09-15015 September 2023 Request to Use a Provision of a Previous Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Non-Destructive Examinations ML23136B1392023-06-29029 June 2023 Issuance of Amendment No. 313 Administrative Changes to Subsequent Renewed Operating Licenses and Technical Specifications ML23061A0122023-05-0909 May 2023 Issuance of Amendment Nos. 312 and 312, Regarding Technical Specifications Task Force (TSTF) Traveler 547, Revision 1 ML23072A0892023-05-0101 May 2023 (Amendments 346 & 286), North Anna 1 & 2 (Amnds 294 & 277), Surry 1 & 2 (Amnds 311 & 311), and Summer 1 (Amd 225) - Issuance of Amendments to Revise TSs to Adopt TSTF-554 Revise Reactor Coolant Leakage Requirements ML23100A0652023-04-25025 April 2023 Issuance of Amendment Nos. 310 and 310, Regarding Turbine Building Tornado Classification ML23102A2832023-04-25025 April 2023 ASME OM Code Inservice Testing Program Request for Approval of Alternative Request V-01 Use of Mechanical Agitation Process for Pressure Isolation Valve 1-SI-241 Seat Leakage Testing ML23030B8472023-03-10010 March 2023 Issuance of Amendment Nos. 309 and 309, License Amendment Request Regarding a 10-Day Allowed Outage Time for Opposite Unit Auxiliary Feedwater Cross-Connect Capability ML21320A0072022-09-0707 September 2022 Review of Appendix E to DOM-NAF-2, Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code (EPID L-2021-LLT-0000) (Non-Proprietary) ML22193A2952022-08-26026 August 2022 Issuance of Amendment Nos. 308 and 308 License Amendment Request for Removal of the Refueling Water Chemical Addition Tank and Containment Sump, Ph Buffer Change and Safety Evaluation ML22095A1072022-07-11011 July 2022 Issuance of Amendment Nos. 120, 344, & 284, 293 & 276, & 307 & 307 to Relocate Requirements to the QAPD ML21253A0632021-11-19019 November 2021 Issuance of Amendment Nos. 306 and 306 to Update of the Loss of Coolant Accident Alternate Source Term Dose Analysis ML21188A1742021-10-26026 October 2021 Issuance of Amendment Nos. 305 and 305 Revised Reactor Core Safety Limit to Reflect Topical Report WCAP-177642-P-A, Revision 1 ML21175A1852021-08-20020 August 2021 Issuance of Amendment Nos. 304 and 304 Leak-Before-Break for Pressurizer Surge, Residual Heat Removal, Safety Injection Accumulator, Reactor Coolant System Bypass and Safety Injection Lines ML21201A1172021-08-0606 August 2021 Proposed Alternative Requests S1-I5-ISI-05 and S2-I5-ISI-06 to Eliminate Examination of Threads in Reactor Pressure Vessel Flange ML21075A0452021-03-26026 March 2021 Request to Utilize Code Case N-885 ML20293A1602020-12-0808 December 2020 Issuance of Amendment Nos. 301 and 301 to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML20148M3592020-12-0808 December 2020 Issuance of Amendment Nos. 302 and 302 to Revise Technical Specifications Figure 3.1 1, Surry Units 1 and 2 Reactor Coolant System Heatup Limitations, and Figure 3.1-2, Surry Units 1 and 2 Reactor Coolant System ML20321A2322020-11-20020 November 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20301A4522020-10-28028 October 2020 Non-Proprietary, Issuance of Amendment Nos. 300 and 300 to Revise Technical Specifications 6.2.C, Core Operating Limits Report ML20252A0072020-09-15015 September 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI ML20085G9642020-05-19019 May 2020 Issuance of Amendments Nos. 298 and 298 to Revise Technical Specifications Table 3.7-1, Reactor Trip Instrument Operating Conditions, for an Addition of 24-Hour Completion Time for an Inoperable Rector Trip Breaker ML20115E3522020-05-12012 May 2020 Alternative Request S2-I5-ISI-05 ASME Section XI Inservice Inspection Program Proposed Alternative Request to Use a Mechanical Clamping Device for a One-Inch Main Steam Line Repair ML20115E2372020-05-0707 May 2020 Issuance of Exigent Amendments Nos. 299 and 299, to Revise TS 6.4.Q, Steam Generator (SG) Program, to Allow a One-Time Deferral of the Inspection of Surry Unit 2 Sg B Spring 2020 Refueling Outage ML20058F9662020-03-16016 March 2020 Issuance of Amendment Nos. 297 and 297 to Revise Technical Specifications 3.16, Emergency Power System, to Allow a One Time 14-Day Allowed Outage Time for Replacement of 5-KV Cables Associated with Reserve Station ML19305D2482019-12-31031 December 2019 Issuance of Amendments Adoption of Emergency Action Level Schemes Per NEI 99-01, Rev. 6 ML19028A3842019-06-12012 June 2019 Issuance of Amendment Nos. 295 and 295 to Adopt TSTF-490, Revision 0, and Update Alternative Source Term Analyses (EPID-L-2018-LLA-0068) ML19043A8242019-03-15015 March 2019 Relief Requests Examination Coverage for Pressurizer Nozzle Inner Radius Sections and Certain Stainless Steel Piping Welds (S2-15-LMT-CO1 and S2-15-LMT-P01) ML18331A0602019-02-28028 February 2019 Relief Requests Regarding Examination Coverage for Pressurizer Nozzle Inner Radius Section and Certain Stainless Steel Piping Welds (S1-I5-LMT-C01 and S1-I5-LMT-P01) ML19031B2272019-02-27027 February 2019 Issuance of Amendment Nos. 281, 264, 294, and 294 to Consolidate Emergency Operations Facilities and Associated Emergency Plan Changes ML18318A0622018-12-10010 December 2018 Review of Reactor Vessel Material Surveillance Capsule Withdrawal Schedules (CAC Nos. MG0098 and MG0099; EPID L-2017-LLL-0021) ML18261A0992018-10-0505 October 2018 Issuance of Amendments. Request to Revise Technical Specifications Section 3.16 Emergency Power System Regarding a Temporary 21 Day Allowed Outage Time ML18236A2362018-09-26026 September 2018 Relief from the Requirements of the ASME Code - Proposed Alternatives S1-I5-ISI-04 and S2-I5-ISI-04 ML18225A0202018-08-29029 August 2018 ISFSI; North Anna 1 & 2 Isfsls, and Unit 3; Surry Power 1 & 2, and Isfsls); Dominion Energy Kewaunee, Inc. (Kewaunee Power Station and Isfsi): Request for Threshold Determination Under 10 CFR 50.80 ML18166A3292018-06-29029 June 2018 Revised License Renewal Commitment Pressurizer Surge Line Weld Inspection Frequency ML18106A0072018-05-0303 May 2018 Issuance of Amendments Regarding Open Phase Protection Per NRC Bulletin 2012 01 (CAC Nos. MF9805, MF9806; EPID L-2017-LLA-0238) ML17326A2252018-02-0909 February 2018 Issuance of Amendments Regarding License Amendment Request to Revise Residual Heat Removal and Component Cooling System Technical Specifications Requirements (CAC Nos. MF9124 and MF9125; EPID L-2017-LLA-0166) ML18019A1952018-01-24024 January 2018 Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination (CAC Nos. MF9923, MF9924, MF9925, MF9926, MF9927, and MF9928; EPID L-2017-LLR-0060) ML17303A0682017-12-20020 December 2017 Nonproprietary Relief from the Requirements of the ASME Code (CAC Nos. MF8987 and MF8988; EPID L-2016-LLR-0019) ML17332A0782017-12-12012 December 2017 ISFSI; Millstone and ISFSI; North Anna and ISFSI; Surry and ISFSI - Request for Approval of Revision 24 of the Nuclear Facility Quality Assurance Program Description Topical Report, DOM-QA-1 (CAC Nos. MF9732-MF9739; EPID L-2017-LLQ-0001) ML17242A0142017-10-19019 October 2017 Clarification of Issuance of Amendments Changes to Expand Primary Grade Water Lockout Requirements in Technical Specification 3 2.E ML17170A1832017-07-28028 July 2017 Issuance of Amendments Regarding the Extension of the Emergency Service Water Pump Allowed Outage Time, Surry Power Station, Units 1 and 2 ML17100A2532017-05-31031 May 2017 Issuance of Amendments Regarding Extension of Technical Specification 3.14, Service Water Flow Path Allowed Outage Times and Deletion of Expired Temporary Service Water Jumper Requirements (CAC Nos. MF7746... ML17039A5132017-05-10010 May 2017 Issuance of Amendment Nos. 288 and 288 Regarding Technical Specification Changes to Expand Primary Grade Water Lockout Requirements in TS 3.2.E (CAC Nos. MF7716 and MF7717). 08/10/2017 2024-01-18
[Table view] |
Text
August 6, 2021 Mr. Daniel G. Stoddard Senior Vice President and Chief Nuclear Officer Dominion Nuclear Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
SURRY POWER STATION, UNITS 1 AND 2 - PROPOSED ALTERNATIVE REQUESTS S1-I5-ISI-05 AND S2-I5-ISI-06 TO ELIMINATE EXAMINATION OF THREADS IN REACTOR PRESSURE VESSEL FLANGE (EPID L-2020-LLR-0139 AND L-2020-LLR-0140)
Dear Mr. Stoddard:
By letter dated October 22, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20296A680), and supplemented by letter dated February 11, 2021 (ADAMS Accession No. ML21042B926), Virginia Electric and Power Company (the licensee) submitted a request to the U.S. Nuclear Regulatory Commission (NRC) for the use of proposed alternatives to certain American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (BPV Code),Section XI requirements at the Surry Power Station (Surry), Units 1 and 2.
Specifically, pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(z)(1), the licensee requested authorization to eliminate the ASME BPV Code requirement to volumetrically examine the threads in the reactor pressure vessel flange stud holes during the fourth inservice inspection interval on the basis that the alternatives provide an acceptable level of quality and safety.
The NRC staff has reviewed alternative requests S1-I5-ISI-05 and S2-I5-ISI-06 and concludes, as set forth in the enclosed safety evaluation, that Virginia Electric and Power Company has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(z)(1).
Therefore, the NRC staff authorizes the use of alternative request S1-I5-ISI-05 for Surry, Unit 1, fifth Inservice Inspection (ISI) program interval which began December 14, 2013, and ends on October 13, 2023, and S2-I5-ISI-06 for Surry, Unit 2, fifth ISI program interval which began May 10, 2014, and ends on May 9, 2024.
All other ASME BPV Code,Section XI, requirements for which an alternative was not specifically requested and authorized remain applicable, including third party review by the Authorized Nuclear Inservice Inspector.
D. Stoddard If you have any questions, please contact the Project Manager at (301) 415-5897, or via email at Vaughn.Thomas@nrc.gov.
Sincerely, Michael T. Digitally signed by Michael T. Markley Markley Date: 2021.08.06 13:45:32 -04'00' Michael T. Markley, Chief Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-280 and 50-281
Enclosure:
Safety Evaluation cc: Listserv
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION PROPOSED ALTERNATIVE REQUESTS S1-I5-ISI-05 AND S2-I5-ISI-06 TO ELIMINATE EXAMINATION OF THREADS IN REACTOR PRESSURE VESSEL FLANGE VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION, UNIT NOS. 1 AND 2 DOCKET NOS. 50-280 AND 50-281
1.0 INTRODUCTION
By letter dated October 22, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20296A680), and supplemented by letter dated February 11, 2021 (ADAMS Accession Nos. ML21042B926), Virginia Electric and Power Company (the licensee) submitted a request to the U.S. Nuclear Regulatory Commission (NRC) for the use of alternatives to certain American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (BPV Code),Section XI requirements at the Surry Power Station (Surry), Units 1 and 2.
Specifically, pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(z)(1), the licensee requested authorization to eliminate the ASME BPV Code requirement to volumetrically examine the threads in the reactor pressure vessel flange stud holes during the fourth inservice inspection interval on the basis that the alternatives provide an acceptable level of quality and safety.
2.0 REGULATORY EVALUATION
The regulations in 10 CFR 50.55a(z) state, in part, that alternatives to the requirements in paragraphs (b) through (h) of 10 CFR 50.55a may be authorized by the NRC if the licensee demonstrates that: (1) the proposed alternative provides an acceptable level of quality and safety, or (2) compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
The regulations in 10 CFR 50.55a(g)(4) state, in part, that ASME Code Class 1, 2, and 3 components (including supports) must meet the requirements, except the design and access provisions and the preservice examination requirements, set forth in Section XI of the applicable editions and addenda of the ASME Code to the extent practical within the limitations of design, geometry, and materials of construction of the components. The threads in the reactor pressure vessel (RPV) flange are categorized as an ASME Code Class 1 components. Therefore, per 10 CFR 50.55a(g)(4), inservice inspection (ISI) of these threads must be performed in accordance with Section XI of the applicable edition and addenda of the ASME Code.
Enclosure
The applicable ASME Code of record for the fifth 10-year ISI program interval at Surry, Units 1 and 2, is the 2004 Edition of ASME BPV Code,Section XI. The Surry, Unit 1, fifth 10-year ISI program interval is scheduled to end October 13, 2023, and the Surry, Unit 2, fifth 10-year ISI program interval is scheduled to end May 9, 2024.
3.0 TECHNICAL EVALUATION
3.1 The Licensees Proposed Alternatives S1-I5-ISI-05 and S2-I5-ISI-06 The licensee submitted alternative S1-I5-ISI-05 and S2-I5-ISI-06 for Surry, Units 1 and 2, respectively. The licensee proposed the use of alternatives to the requirements of the 2004 Edition of ASME BPV Code,Section XI, Examination Category B-G-1, Reactor Vessel Item Number B6.40, which requires volumetric examination of the threads in the RPV flange stud holes. The licensees proposed alternative would eliminate the volumetric examination requirement in accordance with an industry initiative analyzed in Electric Power Research Institute (EPRI) Report 3002007626, "Nondestructive Evaluation: Reactor Pressure Vessel Threads in Flange Examination Requirements," dated March 2016 (ADAMS Accession No. ML16221A068).
3.2 NRC Staff Evaluation The licensees technical basis for the proposed alternatives, S1-I5-ISI-05 and S2-I5-ISI-06, is based on the technical analysis in the EPRI report No. 3002007626. The generic stress analysis and flaw tolerance evaluation which support eliminating the volumetric examination of the RPV threads in flange are contained in Section 6 of the EPRI report. Because the NRC staff has neither reviewed nor approved EPRI report No. 3002007626 for generic use, the NRC staff evaluated the EPRI reports applicability specific to Surry, Units 1 and 2. In a SE for a similar plant-specific alternative request transmitted by letter dated January 26, 2017 (ADAMS Accession No. ML17006A109), the NRC staff determined that the stress and flaw tolerance analyses contained in Section 6 of EPRI report 3002007626 were an acceptable basis for eliminating the ISI of the RPV threads in flange at the Vogtle Electric Generating Plant, Units 1 and 2, and Joseph M. Farley Nuclear Plant, Unit 1. In that plant-specific authorization, the NRC
- stated, The proposed alternative is based on stress analysis and flaw tolerance analysis results documented in an [EPRI] report entitled, "Nondestructive Evaluation: Reactor Pressure Vessel Threads in Flange Examination Requirements" (ADAMS Accession No. ML16221A068). SNC has confirmed that [the Vogtle Electric Generating Plant, Units 1 and 2 (Vogtle)] and [Joseph M. Farley Nuclear Plant, Unit 1 (Farley)] plant-specific parameters (e.g., vessel diameter, number of studs, and inservice inspection findings) are consistent with or bounded by the EPRI report.
The alternative request for Surry, Units 1 and 2, uses the same technical basis as the proposed alternative in the Vogtle and Farley SE dated January 26, 2017. The NRC staff reviewed the configuration of the subject components to determine if the analyses in Section 6 of EPRI report No. 3002007626 applies to the alternatives request for Surry, Units 1 and 2.
The EPRI analysis calculates a bounding preload stress (Ppreload) of 42.3 kilopound per square inch (ksi) at the modeled bolt based on the largest RPV diameter, smallest bolts, and the least number of bolts. The NRC staff reviewed the licensees supplemental information in letter dated
February 11, 2021, which calculated the preload stress based on the applicable parameters.
The NRC staff confirmed that the licensees calculated value of Ppreload equal to 31.6 ksi for Surry, Units 1 and 2, was bounded by the EPRI reports value of 42.3 ksi. Because the licensees Ppreload value is lower than the value of the bounding Ppreload stress in the EPRI report, the NRC staff finds the licensees stress analysis justification acceptable.
The licensee references the linear elastic fracture mechanics evaluation contained in the EPRI report which was performed at various flaw depths in accordance with Article IWB-3600 of Section XI of the ASME Code. This evaluation determined that the allowable applied stress intensity factor (KI) representative for the allowable flaw size in accordance with the ASME Code is 69.6 ksi¥inch (ksi per square root of inch). The EPRI analysis also determined the maximum stress intensity factor (K) at two load conditions: (1) preload only and (2) preload and heat-up/cooldown (stresses due to thermal and internal pressure loads). For the second condition, the EPRI analysis determined a K value of 19.8 ksi¥inch. Therefore, the crack driving force, or KI value, of 19.8 ksi¥inch is lower than the RPV flange fracture toughness, or KIC value, of 69.6 ksi¥inch. Surry, Units 1 and 2, have a larger number of bolts, smaller RPV diameter, and an equal stud size as the bounding case provided in the EPRI analysis. Because these configuration parameters would yield a K value lower than the 19.8 ksi¥inch provided in the EPRI analysis, the NRC staff confirmed that Surry, Units 1 and 2, are bounded by the analysis in the EPRI report for preload and heat-up/cooldown conditions.
The licensees supplemental information in letter dated February 11, 2021, provided an evaluation to show that the most limiting K value at preload only conditions was bounded by the K value of 17.4 ksi¥inch as provided in the EPRI report. The licensee calculated a KIC value based on the equation provided in Appendix A (Subarticle A-4200) of the ASME Code,Section XI, and used the heat-up and cooldown limits in the Surry technical specifications to determine the limiting nil-ductility reference temperature (RTNDT) of 10 degrees Fahrenheit for the RPV flange region at Surry, Units 1 and 2, such that:
KIC = 33.2 + 20.734 exp [0.2(T-RTNDT)] = 89.56 ksi¥inch The ASME Code acceptance criteria for an analytical evaluation of a flaw based on KI is contained in Subarticle IWB-3612 of the ASME Code,Section XI, and is satisfied when KI < KIC / ¥10. Using this criterion and the calculated KIC value, the NRC staff confirmed that the K value of 17.4 ksi¥inch provided in the EPRI report for a preload only condition is less than the licensee calculated allowable KI value of 28.32 ksi¥inch for the same load condition. Therefore, since the crack driving force, or KI value, of 17.4 ksi¥inch is lower than the RPV flange fracture toughness at preload only, or KIC value, at 28.32 ksi¥inch, the NRC staff confirmed that Surry, Units 1 and 2, are bounded by the EPRI report for the preload only condition.
In summary, the NRC staff determined that the stress analysis and flaw tolerance evaluation in EPRI Report No. 3002007626 are bounding for Surry, Units 1 and 2. Based on the above, the NRC staff determined that eliminating the volumetric examinations for Examination Category B-G-1, Item No. B6.40, Threads in Flange, as required by Section XI of the ASME Code, is acceptable for the fifth ISI program interval at Surry, Units 1 and 2.
4.0 CONCLUSION
The NRC staff has reviewed alternative requests S1-I5-ISI-05 and S2-I5-ISI-06 and concludes, as set forth in this safety evaluation, that Virginia Electric and Power Company has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(z)(1). Therefore, the
NRC staff authorizes the use of alternative request S1-I5-ISI-05 for Surry, Unit 1, fifth ISI program interval which began December 14, 2013, and ends on October 13, 2023, and S2-I5-ISI-06 for Surry, Unit 2, fifth ISI program interval which began May 10, 2014, and ends on May 9, 2024.
All other ASME BPV Code,Section XI, requirements for which an alternative was not specifically requested and authorized remain applicable, including third party review by the Authorized Nuclear Inservice Inspector.
Principal Contributor: Isaac Anchondo-Lopez, NRR Date: August 6, 2021
ML21201A117 OFFICE NRR/DORL/LPL2-1/PM NRR/DORL/LPL2-1/PM NRR/DORL/LPL2-1/LAiT NAME SDevlin-Gill VThomas KEntz DATE 07/16/2021 07/20/2021 7/27/2021 OFFICE NRR/DORL/LPL2-1/LA NRR/DNRL/NVIB/BC(A) DORL/LPL2-1/BC NAME KGoldstein DWidrevitz MMarkley DATE 08/02/2021 05/12/2021 08/06/2021 OFFICE DORL/LPL2-1/PM NAME VThomas DATE 08/06/2021