Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure ML23242A2292023-11-0707 November 2023 Issuance of Amendment Nos. 315 and 315, Regarding Emergency Procedure Relocation of the Technical Support Center ML23200A2622023-11-0202 November 2023 Issuance of Amendment Nos. 314 and 314, Regarding Technical Specification and Spent Fuel Pool Criticality Change ML23136B1392023-06-29029 June 2023 Issuance of Amendment No. 313 Administrative Changes to Subsequent Renewed Operating Licenses and Technical Specifications ML23072A0892023-05-0101 May 2023 (Amendments 346 & 286), North Anna 1 & 2 (Amnds 294 & 277), Surry 1 & 2 (Amnds 311 & 311), and Summer 1 (Amd 225) - Issuance of Amendments to Revise TSs to Adopt TSTF-554 Revise Reactor Coolant Leakage Requirements ML23100A0652023-04-25025 April 2023 Issuance of Amendment Nos. 310 and 310, Regarding Turbine Building Tornado Classification ML23107A2212023-04-10010 April 2023 Amendment Turbine Building Wind Load Basis Reclassification License Amendment Request - State Consultation No Comment ML23030B8472023-03-10010 March 2023 Issuance of Amendment Nos. 309 and 309, License Amendment Request Regarding a 10-Day Allowed Outage Time for Opposite Unit Auxiliary Feedwater Cross-Connect Capability ML22336A1822022-12-27027 December 2022 Virginia Electric and Power Company Correction of Documentation Error Amendment No. 295 Adopt TSTF-490, Revision 0, and Update Alternative Source Term Analyses ML22250A4672022-09-15015 September 2022 Turbine Building Wind Loading Basis Change Audit Plan ML22193A2952022-08-26026 August 2022 Issuance of Amendment Nos. 308 and 308 License Amendment Request for Removal of the Refueling Water Chemical Addition Tank and Containment Sump, Ph Buffer Change and Safety Evaluation ML22202A0472022-07-25025 July 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action Surry Technical Specification Change Auxiliary Feedwater Allowed Outage Time ML22095A1072022-07-11011 July 2022 Issuance of Amendment Nos. 120, 344, & 284, 293 & 276, & 307 & 307 to Relocate Requirements to the QAPD ML21253A0632021-11-19019 November 2021 Issuance of Amendment Nos. 306 and 306 to Update of the Loss of Coolant Accident Alternate Source Term Dose Analysis ML21188A1742021-10-26026 October 2021 Issuance of Amendment Nos. 305 and 305 Revised Reactor Core Safety Limit to Reflect Topical Report WCAP-177642-P-A, Revision 1 ML21175A1852021-08-20020 August 2021 Issuance of Amendment Nos. 304 and 304 Leak-Before-Break for Pressurizer Surge, Residual Heat Removal, Safety Injection Accumulator, Reactor Coolant System Bypass and Safety Injection Lines ML20091L9822021-05-0404 May 2021 SLR License ML20148M3592020-12-0808 December 2020 Issuance of Amendment Nos. 302 and 302 to Revise Technical Specifications Figure 3.1 1, Surry Units 1 and 2 Reactor Coolant System Heatup Limitations, and Figure 3.1-2, Surry Units 1 and 2 Reactor Coolant System ML20293A1602020-12-0808 December 2020 Issuance of Amendment Nos. 301 and 301 to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML20301A4522020-10-28028 October 2020 Non-Proprietary, Issuance of Amendment Nos. 300 and 300 to Revise Technical Specifications 6.2.C, Core Operating Limits Report ML20309A5912020-10-14014 October 2020 Pre-Submittal Meeting for License Amendment Requests to Implement Batch Framatome 15 X 15 AGORA-5A-I (Agora) Fuel at Surry Power Station Units 1 and 2 (SPS) - Slides ML20085G9642020-05-19019 May 2020 Issuance of Amendments Nos. 298 and 298 to Revise Technical Specifications Table 3.7-1, Reactor Trip Instrument Operating Conditions, for an Addition of 24-Hour Completion Time for an Inoperable Rector Trip Breaker ML20115E2372020-05-0707 May 2020 Issuance of Exigent Amendments Nos. 299 and 299, to Revise TS 6.4.Q, Steam Generator (SG) Program, to Allow a One-Time Deferral of the Inspection of Surry Unit 2 Sg B Spring 2020 Refueling Outage ML20099F8732020-04-17017 April 2020 Audit Proposed License Amendment Request for the Addition of Westinghouse Topical Report WCAP-16996-P-A, Revision 1 (EPID L-2019-LLA-0243 and EPID L-2019-LLA-0236 ML20058F9662020-03-16016 March 2020 Issuance of Amendment Nos. 297 and 297 to Revise Technical Specifications 3.16, Emergency Power System, to Allow a One Time 14-Day Allowed Outage Time for Replacement of 5-KV Cables Associated with Reserve Station ML19305D2482019-12-31031 December 2019 Issuance of Amendments Adoption of Emergency Action Level Schemes Per NEI 99-01, Rev. 6 ML19028A3842019-06-12012 June 2019 Issuance of Amendment Nos. 295 and 295 to Adopt TSTF-490, Revision 0, and Update Alternative Source Term Analyses (EPID-L-2018-LLA-0068) ML19031B2272019-02-27027 February 2019 Issuance of Amendment Nos. 281, 264, 294, and 294 to Consolidate Emergency Operations Facilities and Associated Emergency Plan Changes ML18261A0992018-10-0505 October 2018 Issuance of Amendments. Request to Revise Technical Specifications Section 3.16 Emergency Power System Regarding a Temporary 21 Day Allowed Outage Time ML18106A0072018-05-0303 May 2018 Issuance of Amendments Regarding Open Phase Protection Per NRC Bulletin 2012 01 (CAC Nos. MF9805, MF9806; EPID L-2017-LLA-0238) ML17326A2252018-02-0909 February 2018 Issuance of Amendments Regarding License Amendment Request to Revise Residual Heat Removal and Component Cooling System Technical Specifications Requirements (CAC Nos. MF9124 and MF9125; EPID L-2017-LLA-0166) ML17170A1832017-07-28028 July 2017 Issuance of Amendments Regarding the Extension of the Emergency Service Water Pump Allowed Outage Time, Surry Power Station, Units 1 and 2 ML17100A2532017-05-31031 May 2017 Issuance of Amendments Regarding Extension of Technical Specification 3.14, Service Water Flow Path Allowed Outage Times and Deletion of Expired Temporary Service Water Jumper Requirements (CAC Nos. MF7746... ML17039A5132017-05-10010 May 2017 Issuance of Amendment Nos. 288 and 288 Regarding Technical Specification Changes to Expand Primary Grade Water Lockout Requirements in TS 3.2.E (CAC Nos. MF7716 and MF7717). 08/10/2017 ML16202A0682016-07-14014 July 2016 Proposed Licensed Amendment Request Emergency Service Water Pump Allowed Outage Time Extension ML16042A1732016-02-29029 February 2016 Issuance of Amendments for Generic Letter 2008-01 (Gas Accumulation) ML15314A0782015-11-0505 November 2015 Virginia Electric and Power Company, Surry Power Station, Units 1 and 2 - Intent to Pursue Second License Renewal ML15245A4822015-10-0707 October 2015 Millstone Power Station, Surry Power Station, and North Anna Power Station - Issuance of Amendments to Revise the Cyber Security Milestone 8 Completion Date in the Renewed Facility Operating Licenses ML15173A1022015-06-26026 June 2015 Issuance of Amendments Regarding Clarification of Reactor Coolant System Heatup and Cooldown Limitation Technical Specification Figures ML15099A6792015-04-28028 April 2015 Issuance of Amendments Regarding Relocation of Augmented Inspection Requirements ML14169A3592014-08-12012 August 2014 Stations, Units 1 and 2, Issuance of Amendments Regarding Addition of an Analytical Methodology to the Core Operating Limits Reports and an Increase to the Surry Minimum Temperature for Criticality ML14148A2352014-07-0303 July 2014 Issuance of Amendment to Extend the Containment Type a and Type C Leak Rate Test Frequency ML14073A4052014-04-24024 April 2014 Issuance of Amendment for the Technical Specifications Changes Related to Snubber Surveillance Requirements ML13186A1972013-09-25025 September 2013 Independent Spent Fuel Storage Installations - Issuance of Amendments for Changes to the Emergency Action Level Revisions ML13018A0862013-01-28028 January 2013 Issuance of License Amendment Request to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection ML12109A2702012-04-17017 April 2012 Issuance of Amendments Regarding Virginia Electric and Power Company License Amendment Request for Permanent Alternate Repair Criteria for Steam Generator Tube Inspection and Repair ML1207303042012-04-17017 April 2012 Issuance of Amendments Regarding Virginia Electric and Power Company License Amendment Request for Permanent Alternate Repair Criteria for Steam Generator Tube Inspection and Repair ML11192A2492011-08-31031 August 2011 Issuance of Amendment Regarding Cyber Security to Dominion Plants ML11194A2902011-07-28028 July 2011 License Amendment, Issuance of Amendments Regarding Administrative Changes to Technical Specifications 3.12 and 6.2 ML11110A1112011-05-31031 May 2011 Issuance of Amendments Regarding Reactor Vessel Heatup and Cooldown Curves for 48 Effective Full-Power Years 2024-01-18
[Table view] Category:Meeting Briefing Package/Handouts
MONTHYEARML23338A1522023-12-0707 December 2023 Public Meeting Slides for North Anna and Surry Emergency Plan Augmentation Times License Amendment Request ML23103A3482023-04-14014 April 2023 Annual Assessment Meeting Presentation for North Anna and Surry ML22097A2262022-04-13013 April 2022 Presubmittal Presentation April 13, 2022 One-time TS Change of AOT for Unit 2 AFW Piping Replacement ML22055B1132022-03-0202 March 2022 Technical Support Center (TSC) Relocation Proposed License Amendment Request - NRC Pre-Submittal Meeting, March 2, 2022 ML21134A1632021-05-20020 May 2021 Resolution of Tornado Wind Nonconformances Proposed License Amendment Request NRC Pre-Submittal Meeting - May 20, 2021 ML21127A1362021-05-13013 May 2021 May 13, 2021 NRC Pre-Submittal Meeting - Surry Power Station New Fuel Storage and Spent Fuel Pool Criticality Analysis Proposed License Amendment Request ML21034A5972021-02-10010 February 2021 External Presentation Am Atkinson_Nrc ISG-06 Meeting Dominion Digital IC Project 02102021 ML20307A1772020-11-0404 November 2020 NRC Presentation North Anna Power Station, Units 1 and 2 Subsequent License Renewal Review ML20309A5912020-10-14014 October 2020 Pre-Submittal Meeting for License Amendment Requests to Implement Batch Framatome 15 X 15 AGORA-5A-I (Agora) Fuel at Surry Power Station Units 1 and 2 (SPS) - Slides ML20098B7292020-04-0707 April 2020 Sur 2019 Annual Assessment Meeting Presentation ML20098B6022020-04-0707 April 2020 Annual Assessment Meeting Presentation ML19311C5292019-11-0707 November 2019 Dsies Slides for Nov. 7, 2019 Public Meeting ML19007A2162019-01-0808 January 2019 Subsequent License Renewal Environmental Scoping Meeting, Surry Power Station, Unit Nos. 1 and 2, January 8, 2018 ML18320A2502018-11-20020 November 2018 50.90 License Amendment Request - Dominion Fleet EAL Scheme Changes, November 20, 2018 Public Meeting ML18141A3072018-05-21021 May 2018 18 - SLR Status ML18032A5842018-02-0707 February 2018 SLR Pre-Application 02/07/2018 Meeting - Dominion Energy Slides ML17320A2012017-11-15015 November 2017 Modeling FLEX in Surry Power Station Internal Events and Flooding PRA ML16320A5232016-09-0707 September 2016 Pre-Submittal Meeting with Surry Power Station Regarding Carbon Fiber Reinforced Polymer Alternative Request ML16124A7592016-05-0303 May 2016 April 12, 2016 Summary of Public Meeting - Surry, Units 1 and 2 ML14176A0922014-06-25025 June 2014 6/25/2014, Dominion Public Meeting Presentation for Surry GMRS Profile ML14101A1132014-04-11011 April 2014 Summary of Meeting with Public to Discuss Annual Assessment of Surry Power Station with the Public for the Period of January 1, 2013 - December 31, 2013 ML13151A1022013-05-31031 May 2013 Summary of Public Meeting with Virginia Electric and Power Company, to Discuss Annual Assessment of Surry Power Stationfor the Period of January 1, 2012 December 31, 2012 ML12115A0732012-04-19019 April 2012 RCS Standpipe White Violation Slides ML1110304302011-04-13013 April 2011 Public Meeting/Open House - Handouts ML11228A2312009-08-13013 August 2009 State-of-the-Art Reactor Consequence Analyses (Soarca); Semi-Annual Briefing for Commission Tas ML0912702462009-05-0404 May 2009 NPS Hostile Action Drill - Protective Action Decision Considerations ML0911000832009-04-17017 April 2009 Summary of Meeting with Public/Open House to Discuss NRC Reactor Oversight Process and the Annual Assessment of the Surry Power ML11228A2302009-04-14014 April 2009 State-of-the-Art Reactor Consequence Analyses; Semi-Annual Briefing for Commission Technical Assistants ML11228A2292008-12-17017 December 2008 Soarca Seismic Issue; Briefing for the Commissioners' Technical Assistants ML11228A2282008-09-10010 September 2008 State-of-the-Art Reactor Consequence Analyses (Soarca); Semi-Annual Briefing for Commission Technical Assistants ML11228A2272008-06-0202 June 2008 State-of-the-Art Reactor Consequence Analyses; Briefing for Commission Technical Assistants ML0730400332007-11-0101 November 2007 Public Meeting Slides for Meeting with Dominion Nuclear ML0613902012006-05-17017 May 2006 Att. 6, FAQ 60.3 ML0529005282005-09-27027 September 2005 Meeting Summary, Use of Nuhoms Fuel Storage System Under General License at Surry - 10CFR50.68 Implications ML0525604472005-08-17017 August 2005 B&W Owners Group Reactor Vessel Working Group Summary of the Plans of the B&Wog Reactor Vessel Integrity Program ML0521403292005-03-0909 March 2005 RIC 2005 Presentation - A3 - Donald G. Harrison - 50.69 ML0331604212003-11-21021 November 2003 Meeting Handouts for 9/24/03 Public Meeting Re. Discussion of Planned Consolidation of Quality Assurance Programs ML0327206212003-09-24024 September 2003 Examiner - Vendor Matrix with Phone Number ML0327206112003-09-22022 September 2003 Exam Process ML0309805972003-04-0303 April 2003 Annual Assessment Meeting for Surry Power Station. NRC Presentation Slides ML0224702742002-08-29029 August 2002 NRC Staff'S Handout for 08/08/2002 Meeting with Dominion VEPCO (Enclosure 1), Dominion Vepco'S Graphs on Total Number of Flow Accelerated Corrosion Events (Enclosure 2) ML0231102312002-08-21021 August 2002 Attachment 2 - 11/06/02 Memo to C.L. Miller Frm. M.J. Ross-Lee Summary of the August 21, 2002, Meeting Between the Nuclear Regulatory Commission Staff and Dominion Virginia Power ML0215103002002-05-29029 May 2002 May 29, 2002, Slides from Public Meeting: Preliminary Results of Environmental Review, Surry Units 1 and 2 ML0213404582002-05-16016 May 2002 Training Managers Conference Handouts ML0205303982002-01-0808 January 2002 Attachment to the 01/08/2002 Mtg with NEI, Southern Nuclear Operating Company (Snc), Florida Power and Light Company (Fpl), Virginia Electric and Power Company (Vepco), Duke Energy Corporation (Duke), and Exelon Generation Company (Exelon) 2023-04-14
[Table view] Category:Slides and Viewgraphs
MONTHYEARML23338A1522023-12-0707 December 2023 Public Meeting Slides for North Anna and Surry Emergency Plan Augmentation Times License Amendment Request ML23103A3482023-04-14014 April 2023 Annual Assessment Meeting Presentation for North Anna and Surry ML22097A2262022-04-13013 April 2022 Presubmittal Presentation April 13, 2022 One-time TS Change of AOT for Unit 2 AFW Piping Replacement ML22091A0902022-04-0101 April 2022 Combined 2021 Assessment Meeting Slides ML22055B1132022-03-0202 March 2022 Technical Support Center (TSC) Relocation Proposed License Amendment Request - NRC Pre-Submittal Meeting, March 2, 2022 ML21134A1632021-05-20020 May 2021 Resolution of Tornado Wind Nonconformances Proposed License Amendment Request NRC Pre-Submittal Meeting - May 20, 2021 ML21127A1362021-05-13013 May 2021 May 13, 2021 NRC Pre-Submittal Meeting - Surry Power Station New Fuel Storage and Spent Fuel Pool Criticality Analysis Proposed License Amendment Request ML21034A5972021-02-10010 February 2021 External Presentation Am Atkinson_Nrc ISG-06 Meeting Dominion Digital IC Project 02102021 ML20307A1772020-11-0404 November 2020 NRC Presentation North Anna Power Station, Units 1 and 2 Subsequent License Renewal Review ML20309A5912020-10-14014 October 2020 Pre-Submittal Meeting for License Amendment Requests to Implement Batch Framatome 15 X 15 AGORA-5A-I (Agora) Fuel at Surry Power Station Units 1 and 2 (SPS) - Slides ML20098B6022020-04-0707 April 2020 Annual Assessment Meeting Presentation ML20098B7292020-04-0707 April 2020 Sur 2019 Annual Assessment Meeting Presentation ML19311C5292019-11-0707 November 2019 Dsies Slides for Nov. 7, 2019 Public Meeting ML19296D7862019-11-0606 November 2019 Dseis Slides for November 7, 2019 Public Meeting ML19248C7352019-09-0909 September 2019 CFR 50.69 License Amendment Request Pre-Submittal Meeting with NRC - September 9, 2019 ML19007A2162019-01-0808 January 2019 Subsequent License Renewal Environmental Scoping Meeting, Surry Power Station, Unit Nos. 1 and 2, January 8, 2018 ML18141A3072018-05-21021 May 2018 18 - SLR Status ML18102A5692018-04-17017 April 2018 Dominion'S Presentation on Surry'S SLRA Safety Meeting-Final (for April 17, 2018) ML18086A7742018-02-21021 February 2018 LOR Program Biennial Inspection 71111.11B Exam Overlap Issues ML18032A5842018-02-0707 February 2018 SLR Pre-Application 02/07/2018 Meeting - Dominion Energy Slides ML17320A2012017-11-15015 November 2017 Modeling FLEX in Surry Power Station Internal Events and Flooding PRA ML16124A7592016-05-0303 May 2016 April 12, 2016 Summary of Public Meeting - Surry, Units 1 and 2 ML14176A0922014-06-25025 June 2014 6/25/2014, Dominion Public Meeting Presentation for Surry GMRS Profile ML13151A1022013-05-31031 May 2013 Summary of Public Meeting with Virginia Electric and Power Company, to Discuss Annual Assessment of Surry Power Stationfor the Period of January 1, 2012 December 31, 2012 ML12129A2532012-05-0808 May 2012 EOC Poster Boards 2011 ML12115A0732012-04-19019 April 2012 RCS Standpipe White Violation Slides ML1110304092011-04-13013 April 2011 Annual Assessment Meeting Summary Slides ML1011005472010-04-20020 April 2010 NRC Strategic Plan Posters ML11228A2312009-08-13013 August 2009 State-of-the-Art Reactor Consequence Analyses (Soarca); Semi-Annual Briefing for Commission Tas ML0912702462009-05-0404 May 2009 NPS Hostile Action Drill - Protective Action Decision Considerations ML11228A2302009-04-14014 April 2009 State-of-the-Art Reactor Consequence Analyses; Semi-Annual Briefing for Commission Technical Assistants ML11228A2292008-12-17017 December 2008 Soarca Seismic Issue; Briefing for the Commissioners' Technical Assistants ML12024A3792008-11-0505 November 2008 Soarca Comparison to NUREG-1150, Res/Dra ML11228A2282008-09-10010 September 2008 State-of-the-Art Reactor Consequence Analyses (Soarca); Semi-Annual Briefing for Commission Technical Assistants ML0822614842008-08-13013 August 2008 Keys to Surry Power Station'S NRC Exam ML11228A2272008-06-0202 June 2008 State-of-the-Art Reactor Consequence Analyses; Briefing for Commission Technical Assistants ML0811301672008-04-15015 April 2008 Annual Assessment Meeting Slides - Reactor Oversight Program - Cy 2007 ML0730400332007-11-0101 November 2007 Public Meeting Slides for Meeting with Dominion Nuclear ML0634704322006-12-0606 December 2006 December 6, 2006, Surry Public Meeting Regarding Chilled Water Piping ML0611100852006-04-19019 April 2006 NRC Cy 2005 Annual Assessment Meeting, Surry Power Station ML0529005282005-09-27027 September 2005 Meeting Summary, Use of Nuhoms Fuel Storage System Under General License at Surry - 10CFR50.68 Implications ML0525604472005-08-17017 August 2005 B&W Owners Group Reactor Vessel Working Group Summary of the Plans of the B&Wog Reactor Vessel Integrity Program ML0509704632005-03-30030 March 2005 Presentation Slides for Surry 03/30/2005 NRC Cy 2004 Regulatory Performance Meeting ML0510302122005-03-30030 March 2005 NRC Cy 2004 Annual Assessment Meeting, Surry Plant, 03/30/2005 ML0521403292005-03-0909 March 2005 RIC 2005 Presentation - A3 - Donald G. Harrison - 50.69 ML0421800892004-08-0404 August 2004 VIPRE-D Topical Report DOM-NAF-2 Meeting with NRC ML0410401122004-04-0808 April 2004 Annual Assessment Meeting with NRC Re Reactor Oversight Program - Cy 2004 ML0410401342004-04-0101 April 2004 Regulatory Conference NRC Triennial Fire Protection Inspection Findings, Surry Power Station, Units 1 and 2 ML0402307032004-01-14014 January 2004 Summary of Meeting to Discuss Surry Power Station Performance Improvements (Slides) ML0403502122003-08-13013 August 2003 DRS Open Items Status 2023-04-14
[Table view] |