ML021560062
| ML021560062 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 05/21/2002 |
| From: | Higaki V FirstEnergy Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| PY-CEI/NRR-2643L EPI-A6, Rev 10 | |
| Download: ML021560062 (43) | |
Text
FENOC FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant 10 Center Road P.O. Box 97 Perry, Ohio 44081 May 21, 2002 PY-CEIINRR-2643L United States Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Perry Nuclear Power Plant Docket No. 50-440 Submittal of Emergency Plan Implementing Instructions Gentlemen:
Pursuant to 10 CFR 50 Appendix E, enclosed are changes to the Emergency Plan Implementing Instructions (EPIs) for the Perry Nuclear Power Plant. These changes constitute revisions, temporary changes, or reissued pages. Please follow the updating instructions per the attached Controlled Document Instruction Sheet and return the signed Acknowledgment of Receipt form.
If you have questions or require additional information, please contact me at (440) 280-5294.
Very truly yours, A
Vernon
.k igaki, Supervisor Emergency Planning Unit VKH: byr Enclosure cc:
NRR Project Manager NRC Resident Inspector NRC Region III, Incident Response Center w/l attachments
-'ý 46 U
FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant Controlled Document Instruction Sheet Manual: Emergency Plan Implementing Instruction (EPI - A6 I Rev 10, C-5)
Control Number 60 Revision Number 10 Temporary Change No.
5 Remove and Replace Pages Reissue Entire Document
EPI-A6 Page:
Rev.:
PERRY OPERATIONS MANUAL i
10 PNPP CONTROLLED COPY Emergency Plan Implementing Instruction No fM FQ n')
TITLE:
TECHNICAL SUPPORT CENTER ACTIVATION REVISION:
10 EFFECTIVE DATE:
3-20-95 PREPARED:
Joseph D. Anderson 11-15-94
/
Date EFFECTIVE PIC's PiC Type of Effect-ve No.
Change Date 1
Intent 5-29-96 2
Intent 4-21-97 3
Admin 10-9-00 4
Admin 4-4-01 5
Adminin
EPI-A6 Page:
ii Rev.:
10 / C-5 TECHNICAL SUPPORT CENTER ACTIVATION
-Table of Contents Sec.tion Title Page T,. 0,PURPOSE
'1 0
REFERENCES 1
3;'0 DEFINITIONS 3
4.0 RESPOUSIBILIT~ES 3
- 4.
Contiol Room Shift Supervisor,.
3 4.2*
ISC,'Operations Manager
- 3.
3 A14.3 Adm inisjt'rativeA Assistant 4
4.4
-. Radtion Protection Coordinator *
-4 4.5
° Plan Technical., Engineer 4.6 inten'ance Coor'dinator 5
4.:7
.Ope~r~ations Advisor 5..
5 4.-8
. Se.,curity, Coordinator 5
4.9
.e gutory Affains Coprdinatolr.
6 "4.10 hinjdqmation Liaison.
6 4.11
'Deieted 5.0
~
ACT NfS
.6 5.1 Control Room Shift Manager 6
5.2 TSC Operations Manager 7
5.3 Administrative Assistant 12 5.4 Radiation Protection Coordinator.
17 5.5 Plant Technical Engineer 21 5.6 Maintenance Coordinator 23 5.7 Operations Advisor 25 5.8 Security Coordinator 26 5.9 Regulatory Affairs Coordinator 28 5.10 Records 29 6.0 TSC STAFF MOBILIZATION FOR NON-EMERGENCY PLAN EVENTS 30 6.1 TSC Operations.Manager 30 6.2 Administrative Assistant 30 ATTACHMENTS -
TSC Activation Check ist 32 - Alternate TSC Layout 34
EPI-A6 Page:
iii Rev.:
10 SCOPE OF REVISION:
Rev. 10 - 1.
Designates Operations Advisor as interim Operations Manager, and authorizes interim Ops. -Mgr. to assume Emergency Coordinator duties from CR Shift Supervisor.
- 2.
Identifies Plant Technical Engineer as the point of-contact for INPO and other Industry technical support organizations.
- 3.
Revises title of Security Supervisor to S0.SO..
- 4.
Incorporates responsibilities and actions fpor the Regulatory Affairs Coordinator, as an on-call SC 'posi"tion.
- 5.
Clarified actions for coordinating.transfer of Emergency Coordinator duties to the EOF.
- 6.
Restructured Ops. Manager actions.for deci4ring TSC operational.
- 7.
Remove HPN Circuit-oA a Comuunicatoi duty;r avilable HP technician to be assigned lo cirfiibui RPC/RPA if opened.
- 8.
EPI-B1 referenced for 1ln offisiti n6tifidatidh actions.
- 9.
Dose Assessor 'and-Rad. "rot. A staisni7eck' ot"bd actions clarified under Rad. Pbt'.2 Co~ordina*t*r-
- 10. Operating instructions fod thei cNS CXt..R rmot-e headset inserted as Attachment 3.
1.1.
Actions revised to have SecrizrftPCooidinh-aor to direct that access control be-establishe*d onc* the eS& s operational.
- 12.
Deleted reference under Sec1'ri ccýrd'..i6 i-u
- itiple pager message forms; single composite form being implemented.
- 13.
Access Controller actions deleted; covered under SPI-0023.
- 14.
Inserts record capture statement.
. "*. s.D
"., ?. -2.,
i'
>7.L I- *. ~ _
.~
'K ~
t
-t
- 1A A-2 L'
Change History PIC Number:
1 Affected Pages:
ii, 1
13, 1.
2-3, 2
Summary of Change.:
- 1. Addresses the quarantining of plant equipme S...EP-795-19],;
- 2.
Deletes attachment providing instructions c and references Emergency Response Telephone
- 3.
References updated; statements reworded-to S..
.statements directing action; references to propceodu.res/instructions. were deleted.'
- 4.
Responsibility for directing the shifting c transferred to" the TSC Maintenance Coordina
- 5. Discussion on TSC activation/response goal.
Manager.
"6.
TSC Operations Manager "activation" actions minimum TSC staffing to \\declare facility or actionsý ifar-!declaring the TSC operaitional a Emergency.Coordinator duties.
- 7.
TSC Administrative Assistant "'activation" actions, address callout of TSC Communicatc Records Room: clerical-position.
- 8.
Inserts reference to GE BWR Emergency Suppc use of Industry Event Notification-:Form,(rke Technical Engineer..
- 9.
Addresses the*- dispatching.of CEI State. Liaj by the Regulatory Affairs Coordinator.
- 10.
TSC Activation Checklist revised to'addresi comments.
C.
- 11.
Alternate TSC Layout Figure (Attachment 2)
Affairs Coordinator.position.
- 12.
Specifies TSC Radiation Protection Coordin Chemistry activities, including :core 'damage Chemistry Supervisor qfS]T$C 'Dose Assessor.
PIC Number:
2 Affected,*Pages'*..*.
i, ii 12, 1 23, 2 Summary of Change:
- 1.
Addresses the elimination of TSC Access Cor of TSC "accountability" card reader as part issuance of dosimetry by Radiation Protectd
- 2.
Revises Regulatory Affairs Coordinator acti of Ohio and determine the need to dispatch Area Emergency.
- 3.
Clarifies actions performed by the TSC Radj and TSC Operations Advisor which are not re declaration.
[PIFRA No.
96-3766-002]
EPI-A6 Page:
Rev. :
2, 4,
6,
, 15, 16,
, 27, 28, iv 10 7,
8, 9, 9a, 10, 12,
"*18, 19, 20, 21, 22, 32, 33, -35 nt/components.
[PMATS*
n userbf ENS remote headset, Directory for instructions.
address NOTES and "'IF"..
specific sections in other f the TSC HVAC modes tor.
expanded under TSC Cperations revised to:
designate dvational, and separate nd for the transfer of ctions revised to streamline rs, and elimina'te thejTSC rt Program :(SIL No.
324) and INPO) under the TSC Plant sn -at a Sit-e -Area Emergency F text'.cha~ges_ and -user revised to reflect' Regulatory tor responsibility for plant assessment, through the OSC
[EP-96-11]
.1.
I, iv,.
14, 26, v: 2 3,- 4, 6,
9, 11, 27, 28, 29, 32, 33 trol Point, including the use of facility staffing and on Coordinator per HPI-B0003.
ons to discuss with the State a CEI Liaison prior to a Site ation Protection Coordinator quired prior to the Alert
EPI-A6 Page:
v Rev.:
10 Change History (Cont.)
PIC Number:
2
..Summary of Change (Cont.):
- 4.
Inserts statement,..-where, applicable, regarding PAP-0224 FFD requirements for call-ins.
[PIF No.
96-3794]
- 5.
Deleted reference to ANSI-qualified technician as Dose Assessor.".-
- 6.
Reference inserted for Commitment B01028-:.- i:
- 7.
Various sections reworded/organized to clarify instructions.
I:ow-ver, no r.esponsibkýit.ies/actions were created or d~leted'othi-r t h'those
-li-std above.:
PIC Number:
3 Affected 2ages:.-.:; i, iv,ý v,.-2,2,,.4,:-.6I'
.17, 18, 20,
'J
.:*,*:>* 22-,_2 8,,. 2.9 Summary of Change:
-- b t.-.
.. Chang;Lpg 2!fere rnc~es_,~to.- 4PAP-022+ to NOP--LP-lflO02z PIC Ntumber:
4-A*e-cted Pages:
-i;p*,
1,
_2, 3,.4., _-6,- 7, 9a, 10, 11,
`:
-2.1,Z 13, 14, 19, 20, 22, Z5,* :
!286=,
.29, *. 9-32'
-33,f <34-ý 35
- 1.
Deletes Reference to EPI's A3,
-A4 and.A5-wichw*rex-. consolidated into ind superseded by:tPL-A2....,:
J 7
2." Ch4nged refeencfo to.FistEnergy
- 3.
Replaced reference to PAP-0514 with HPI-B0003.
s'--J.
-4.
Rep.a,.e. the. Emergency* Response. InformativnS.System.
(ERýIS) with Integrated Computer System (ICS).
.Z.
- 5.
He e *-rtbhy iso.end,/P-,- were. repl-aced;with Radiatiof 'Protection and RP as appropriate.
CRRA-00-1159-001 with a 1ý/14/00 due date mandates these "FPIC.:Numbe*.:-5
_-j-.a.A.fected Pa~esi:
- iy+/-*. v,..1, 3,
5, 6,
7, 9-,
10, 11,
- -*o*13`22j.
24, 26, 27, 30, 32, 33 Summary of Change:
hangd Qpe2ationj YStaff:position sti*t~le.itto match FENOC titles.
"2,
3 1
or-71 7
J f'
EPI-A6 Page:
Rev.:.
1 10 / C-5 TECHNICAL SUPPORT CENTER ACTIVATION 1.0 PURPOSE This instruction describes the activation and operation of the Technical Support Center (TSC),
and delineates the responsibilities of designated TSC personnel.
The TSC will be activated for an Alert or higher classification, or at the direction of the Shift Manager, serving as Emergency Coordinator.
2.0 REFERENCES
2.1 Source
References:
- 1.
Emergency Plan for PNPP Docket Nos. 50-440, 50-441 2.2 Use
References:
- 1.
Emergency Plan Implementing Instruction Notification System"
- 2.
Health Physics Instruction (HPI) B0003:
Dosimetry"
- 3.
Emergency Plan Implementing Instruction Levels"
- 4.
Emergency Plan Implementing Instruction Actions Based On Event Classification"
- 5.
Emergency Plan Implementing Instruction Action and Guides"
- 6.
Emergency Plan Implementing Instruction Accountability/Site Evacuation" (EPI) Bl:
"Emergency "Processing Of Personnel (EPI) Al:
"Emergency Action (EPI) A2:
(EPI)
BS:
(EPI) B5:
"Emergency "Protective "Personnel
- 7.
Plant Administrative Procedure (PAP) 0103:
"Plant Operations Review Committee"
- 8.
Emergency Plan Implementing Instructior Records"
- 9.
Emergency Response Teleph6ne Directory
- 10.
System Operating Instruction (SOI)
M52:
Ventilation System"
- 11.
Preparedness Support Instruction (PSI)
Plan-Related Communications Equipment I 12.. Phiysical. Security Plan
- 13.
S ytem,0perating Instruction (SOI) 1D19:
Monitoring System"
- 14.
Emergency Plan Implementing Instructioz Su-FTveys..for Emergencies""
- 15.
Emergency Plan Implementing Instructioi Offsite Dose Calculations"
- 16.
Emergency Plan Implementing Instructioi Dose Calculations"
- 17.
Emergency Plan Implementing Instructioi of Core Damage Under Accident Conditlo
- 18.
Emergency zlan-Implementing Instructioi Support Center Activation"
- 19.
Emergency Public Information Organizat:
Manual (EPIOIM)
- 20.
Nuclear Operating. zhinistrative Proce(
for Duty Program"
- 21.
Security Post InstruqQion:(SPI), 0032:
Emergency Response Orgainization.Personi
- 22.
Emergency Plan-Implement.#g, lnstructio0 Operations Facility Activation" 23.
EPI-A6 Page:
2 Rev.:
10 / C-4 (EPI)
B9:
"Emergency "Technical Support Center 0007:
"Reporting Emergency roblems" "Post Accident Radiation (EPI) B3:
"Radiological (EPI) B7a:
"Automated (EPI) B7b:
"Manual Offsite
(.EPI) Bl3:- "Determination is"
(.EPI). A7:
"Operations on.- nstruction Lure (NQP-LP) 1002:
"Fitness
",Notification :of Key S(EPI)
A8":.;:,.,"Emp rgency Plant Administrative Pr-ocedure: (PAP),,1 01:- "Records Management Program"
.A I
EPI-A6 Page:
3 Rev.:
10 / C-5
- 24.
Commitments addressed in this document:
B00626 P00010 P00046 P00051 B01028 P00042 P00047 P00053 L01395 P00045 P00050 P00059 3.0 DEFINITIONS 3.1 Activation/Activate' In regards to any emergency response facilitr,,thL-term AC&IVATION shall refer to that time period from the decision to mobilize or ACTIVATE a Sfacility t'o the de ision- `o dedlaf6 !the fadflity bP.RATIONf-.
3.2 Operational In regards to any emergency response fa"i'1itf*,-fhe term
=O-PETIONAL shall refer to the decision to declare a facility functional and ready to
- Z 2o 4.0 RESPONSIBILITIES
- 4. 1 C6ntrfol Room:Shift ansm! er
- 1.
Direct the prompt activation of the TSC as required by the Emergency Plan, and in Supp6rt a --. he C6oiREf6rcbi mal plant events.
- 2.
Direct the activation of the alternate TSC based on plant conditions.
4.2 TSC Operaiti.o.s
- .iag,
- 1.
Manage the onsite activities of the Emergency Response
"-:Oganiiatio'-&& (ERO)-.. idertti4dirft-16
&f---t'he Emergency Coordinator.
<P00050, P00053>
- 2.
AsSguide "th:-
&itids atd -£ 4spoin'i b
of -the Emergency Coordinator, from the Shift Managek.-;onde l*+/-*S**s oýratiorial, and subsequently transfer these responsibilities to the Emergency,Coordinator in the egenty,*Opeiatibnsý Fdilty2-EGFY Ahezi -it has been declared operational.
<P00051>
J 3
E-r Ensut,+/- iA@TSC is ;maued) an' 4f'erAted Ain accordance with this instruction.
- 4.
Utilize TSC and Operations Support Center (OSC) staff to provide guidance and direction to assist the Control Room personnel in identifying and mitigating the effects of the emergency condition and in the assessment of plant conditions.
- 5.
Coordinate the combined activities of t OSC and all emergency teams and support
-the OSC.'
- 6.
Provide information to the Information and approve"Company press statements fc Alert or more severe.
7".-, 'Authorize emergericy radiation exposure
<HPI-B0003>.
- 8.
Coordinat4the p quantining of equipmer
.caused'by-events resulting in an Emerge
- <EPI -Al>.-.,
4.3 Administrative Assistant 1." Cardinaite-the activation arnd manning c operations Manager...
- 2.
Coordinate TSC Copmunicator and Support augmentation and relief of TSC staff.
3.
Assist TSC staff in "obtainiuig availablE Plant di parhment, and within the Compz declared operational, which may be reqt 4.4 Radiation Protection Coordinator
- 1.
CoordixnaW'.`l17-M4aaition Protection..anc support of eme'-genidy opezations, incluc radiological hazards within the plant.
- 2.
Coordinate' inemý offs ite radiologica and development qof protective action rn
- 3.
Coordinate the issuance of dosimetry ar exposure limit ext3 si oi*s per '<]HPI-BOO(
- 4.
Coordinate the monitoring of area and the TSC, and direct the shifting df TS(
EPI-A6 Page:
4 Rev.:
10 / C-4 heTSC, Control Room, and the personnel dispatched from Liaison stationed in the TSC, r event classified as an limit extensions per t/components resulting in or n"cy Plan clasqsification per f the TSC in support. of the Staff activities, and the resources within the Perry py-prior to the EOF being ired.
Chemistry, activities in Ing assessment of
<P00Q47>
m6nitoring, dose assessment, commendations..
<P00046>
ltheprQcessing of emergency 13.5.
irborne.radiation levels in HVAC modes.
I
EPI-A6 Page:
5 Rev.:
10 / C-5 4.5 Plant Technical Engineer
<P00045>
- 1.
Assess plant-parameters to determine the condition of l.the core, safety related systems, and fission product barriers.
- 2.
Analyze plant conditions and develop guidancp for.protection of the core.
- 3.
Supervise engineering and design activities in support of emergency operations.
- 4.
Provide a liaison between the ERO, Gil.b.ert As.sociates, Xnc., General Electric Company, the Iistitute of Nu~ce~ r Power..pera~ons (INPO),
and"any other contract6r or Industry support organ-izations.
4.6 Maintenance Coordinator
- 1.
Coordinate the dispatching ard tracking of OSCp-e-rs.onnel-, through
- t
-OSd Coordi'at6r, in' siupport of priprorities estoýi.shped by the TSC.
2 o]3t~aiin requir~id'tec'hdital sppqrt ffoZOSC activi.i*s
-from TSC staff.
- 3.
Provide the OSC with plant technical, operations, and maintenance zfomaton an
~t~nuus~.
pprise
- e SC! Coord-n~ator of -current
.-infob&_ation, and coibih o crrn plant status and.trani.in
&ýdnditiond.
4.7 Operations Advisor
- 1.
Continuously review eme3qency ronditio~s..aod recommend 3 ~~
- 2.
Serveassthe ft emerfgenyen.
require,,
- 2.
Serve as theSift
ýManager s lf'ison, continuously apprising TSC staff of Control Room operations.and requirements.
Map*paZr :r&
afY of TSC prfor*ites and TSC/OSC activities.
- 4....
Sle~tvss' a
s proesuing activitie pin support of emergency operations.
Ai ttl-ehe ai ion, rotect4qn, oonihator in the development of relea8ý'diration estimates for protective action calculations, prior to the EOF being declared operational.
- 6.
Serve as interim TSC Operations Manager in the event that the arrival of a designated individual is delayed or the TSC Operations Manager becomes incapacitated.
4.8 Security Coordinator
- 1.
Coordinate all onsite security operations with the Supervisor, Nuclear Security Operations (SNSO),
in support of the emergency condition.
- 2.
CoorainatW*the-abcountability of onsit4
" supportoftheOperations Manager.
- 3.
Coordinate.he-access control requiremo Emergency Operations Facility (EOF).:
- 4.
Provide a liaison between tMe Perry P1i local law enforcement agencies.
- 5.
AKsisffin the claisifica.ti6n-orreclas&
related events per <EPI-Al>.
4.9 Regulatory Affairs Coordinator
- 1.
Serve.as a.source of plant and-event ii
,,Liaisons located in, State and localQCol Centers (EOCs) or Emergency Management
- 2.
Coordinate telephone-communications wij colnty-9fficialsi-outside of formal nol accordance with <EPI-BI>.
7
- 3.
Contactýasecond. Regulatory.-Affairs Co EOF, when-notified that representative; being dispatched to the Perry-Plant..:
- 4.
Dispatch.-
_a FirstEnergy.Liaison (s)- to tIl 4.10 Information Liaison
- 1.
Obtaift evu Eeandissem na4E infoi emergency to--h Public 'Information: Re,
-Public Informiation7Center- (JPI)in-a'&
4.11 Deleted 0
5.0 - ACTIONS 4.---'.
- .2.r>'-
5.1 Control Room Shift Manager
- 1.
Direct the activation of the TSC in acc mobilization of TSC staff in support oJ in accordance with <EPI-Al>.
- 2.
Direct and announce the use of the EOF
<EPI-A2>, if plant conditions render tl Service Building not accessible.
EPI-A6 Page:
6 Rev.:
10 / C-5 persQnnel, as necessary, in nts onsite and at the nt and any Federal, State, or
- ification of security tformation for FirstEnergy inty Pmergency Operations Agency (EMA) offices.
h Federal, State, and local ifications performed in crdinator or relocate to the from-the State of Ohio are
ýe-State EOCs when requested mation"* concerning the ponsed"Team (PIRT) or Joint
ýordance with the <EPIOIM>.
.1 ordance with <EPI-A2>, or the a non-Emergency Plan event as an alternate TSC per le 603' elevation of the O
I
EPI-A6 Page:
7 Rev.:
10 / C-5
- 3.
Transfer the non-delegatable Emergency Coordingtor duties to the TSC Operations Manager when the facility is qpp-ational tnd-when he is ready to assume these duties.
For events not classified uhf*er <EPI-Al>,: involVing-the mobilization of TSC staff, the duties and responsibilities of the Emergency Coordinator Will remain fwith the Shift Manager and NOT be transferred to the TSC.
5.2 TSC Operations Manager
5.2.1 Activation
- 1. :Go dir6ý!tli-to Section 6.1-'ifKTSC §taff-is being m6bilized in response t4 M non-Emergencg., Plan!-'eveit; otherwise-continue on I2.
f the-EOF i § o*-b
--us dd'-as the fl t
,r to the otherwise, continue on to Sfep-3.
- . Dirett:the:Admini~t@*.Ivb Agsistant,-Lt6*oo6rdai"ate the
,,* activ~ati*nof-the*TSCi*Osif TSGJAati'ra1&ion-CheckiJst (PNPP No. 7987, Attachment l)T. -".
a,- - -if a qualified-Adtini*tra*#e?*ss4*tdnt-is 7not yet present in the TSC, appoint an interim Administrative Assistant from available personnel.
J Goalfor-rde laring--the,TSC pe
.t1qnal is 60 minutes
--from.the timeofevent-.!classifition:
15 minutes for ERO notifications; 30 minute response time when notified; plus 15 minutes to bring facility to an operational status.
- 4.
Contact the Shift Manager to become apprised of current plant status, transient conditions, and emergency actions underway.
- 5.
Utilize the event checklists contained in <EPI-A2> to obtain an accurate appraisal of emergency actions already performed or underway.
J:.
-'.3
'".*£C O "'
,F
- ..P S
:
6....... Periodical,. assess peron-nel.
Admi~nstrative-Assistant,. to de.
-. taffing exists to declare the' o"0.
Operations Manager o
Administrative Assistý O.
5-Way Communicator o
ENS Communicator or ai Operations Advisor
- o
-Maintenance:Coetdinab oP
.o.........a TanicEngi 0
.Core/Hydraulic (Reacti
.0o ::-.Radiation :Protection I
.Dose Assessor' (on-shi:
- a.
If the arrival of a requiri use your judgment in appoii i.staaff :member to covet that b.. : Direct :;the ',Admlnistrative :;
of qualified personnel for whch-can :be manned. after..J tocAugment-staffinge, o
Electrical Engineer
.o
-echanival Engineer :
o Re*uatoýry.gfairs Co o
Seculi
.it:
Coordinator o
Information Liaison o
Radiation Protection J 0
Communicatore 3o2d)7 PIC-1/VAX/Page 7 of 27 EPI-A6 Page.:
8 Rev.:.. 10 tafgl..
eve1s through th-.
er wn Ffif oug th------
§~___-_
- emneIfollowing mnimm -1A SC operational:
nt signed engineer er r) Engineer o*ordInator t :Chemistry Technician) dnTSC staff member is delayed, ting another available TSC position on an interim basis.
sisstant t6 traik the arrkivl the following TSC positions he.TSC. is declared.operational assistant
°
EPI-A6 Page:
9 Rev.:
10 / C-5
- 7.
When the minimum staffing requirements are met and the TSC is ready to be declared operational, perform.the following steps using., the.:TSC Activation Checklist:
An Interim Operations Manager may declare the TSC opera tional-and accept responsibility for the non-delegatable Emergency Coordinator duties in coordination with TSC staff.
- a.
Use Intra-Facility Public Address System (PA) to:
1,?
o;L "*
(1) Brief TSC/OSC staff on current plant status, event conditions, any.-emergency response efforts underway, and Control Room needs and priorities.
(2)
RemindTSCstaff:'.toJ6g-in fdr accountability purposes using the TSC Hallway card reader.
- b.
Announce over the Plant PA System that "the TSC is
.'OPERATTIONAL, :and,: contiol forOSC activities (if operational) has been transferred to the TSC".
Record t
.mt-ime :TSC declarrd'-OPERATION&A in Logbook.
co,., Inform-the Securit-y.Coordinatbr that the TSC has assumed responsibility for directing SAS to perform further ERO
-In~frm the ShIft _Manager. that.tChdrTSC is now OPERATIONAL, and establish when the following Emergency Coordinator
..'.4utieis:will
-be,_tran.-.
-rtzcrS:
offsite not~if ifi.a.t'.ior s. pEPT!.-Bl offsite protective action recommendations per EPI-B8
- 1)
Notify the TSC administrative Assistant prior to a s sumiLg, q f f$ita t-a tion responsibilities.
f not.ficatoz 1*p~finf (within 30 minutes),
the TSC should defer assurqing offsite notification responsibilit s iit*r"t1e Upcoming notification is
!completed..
- e.
'Aofiný oVe'r-the.'-n r'a-Fa6ility (TSC-OSC)
PA the transfer of Emergency Ciordina'tor.d4ties from the Control Room to the TSC, recoitl t?6'sfer in logbook, and post the transfer of responsib').J:ties on facility status board.
'f..... Rvi-eWandS*-~the TSC Activation Checklist.
EPI-A6 Page:
9a Rev.:
10 / C-4
5.2.2 Operation
- 1.
Perform the actions of the Emergency Coordinator outlined in
<EPI-A2>, concurrently with this instruction, utilizing the associated event checklist to document completion of required actions, until such time as the EOF is operational or the event is terminated.
EPI-A6 Page:
10 Rev.:
10 / C-5
- 2.
Direct OSC operations through the Maintenance Coordinator in support of established priorities.
The Control Room Shift Manager will retain the authority to direct the Fire Brigade, First Aid Team (FAT) and shift personnel.
- 3.
Ensure the effective direction of the onsite emergency response effort through the establishment, periodic revision, and tracking of TSC priorities.
- a.
Establish OSC and Engineering Task Priorities in conjunction with TSC staff and post on facility status boards; revise periodically based on changing plant condition.
- b.
Direct the quarantining of equipment/components, whose failure resulted in or was caused by events, leading to or associated with the E-Plan classification, and which restoration is not immediately required to support the safe operation or shutdown of the plant.
- 4.
Direct technical and engineering analyses through the Plant Technical Engineer in support of established priorities.
- 5.
Direct radiological aspects of the emergency in-plant and within the site boundary through the Radiation Protection Coordinator.
- 6.
Approve the extension of personnel exposure limits, as recommended by the Radiation Protection Coordinator, per
<HPI-BO003>.
- 7.
Approve and implement onsite protective actions as necessary.
- 8.
Ensure the effective and timely communication of TSC priorities and OSC team status to the Shift Manager, and briefing of TSC staff on Control Room activities by the Operations Advisor.
- 9.
Approve the use of potassium iodide (KI) for plant personnel, and Radiation Monitoring Team (RMT) personnel prior to EOF operation, per <EPI-B8>.
- 10. Ensure the effective and timely implementation of the accountability of onsite personnel through the Security Coordinator per <EPI-B5> at a Site Area Emergency.
- 11. Periodically review established priorities, and brief TSC personnel on the status of the emergency, Control Room emergency actions underway, and the status of OSC and engineering activities.
EPI-A6 Page:
II Rev.:
10 / C-5
- 12.
Provide updates to Federal, State, and local county officials over established telephone links at the request of the Regulatory Affairs Coordinator.
- a.
Do NOT become distracted by calls directly from the NRC or other offsite agencies; refer calls and inquiries to the Regulatory Affairs Coordinator.
- 13.
When informed that the Nuclear Regulatory Commission (NRC)
Regional Site Team has been dispatched to the Perry Plant, perform the following:
- a.
Notify Regulatory Affairs Coordinator, the Shift Manager, and the EOF Emergency Coordinator (if the EOF is operational).
- b.
Direct the activation of the EOF at this time, if the EOF has not yet been activated.
- 14.
Direct the transfer of responsibility for offsite notifications, event re-classification, and for approval of offsite protective action recommendations to EOF once operational and the EOF Emergency Coordinator is ready to accept duties, by performing the following:
- a.
Notify the Administrative Assistant when responsibility for offsite notifications will be transferred to the EOF.
- b.
Notify the Radiation Protection Coordinator when responsibility for offsite dose projection and protective actions will be transferred to the EOF.
- c.
Update facility status board to reflect the transfer of Emergency Coordinator duties to the EOF.
- 15.
Direct the Administrative Assistant to establish a Plant Operations Review Committee (PORC) quorum for an unscheduled meeting per <PAP-0103>,
if deemed necessary to address procedural concerns.
- 16.
Approve Company news statements for events classified at an Alert or higher, prior to the EOF being declared operational.
- 17.
Authorize the Administrative Assistant to develop and initiate a relief rotation for TSC and OSC staff.
If radiation levels resulting from an offsite release restrict the movement of people within the 10-mile EPZ, direct relief personnel to report to a FirstEnergy facility and arrange for transport to the site.
"18. <ire6t -the 'colection of event rec demobilization of the TSC staff u]
5.3 Admninistrative Assistant Activation:
- 1.
Go directly to Section 6.2 if TSC response to a non-Emergency Plan E to Step 2.
2.
Initiate the callout process upon o**nsite, or prior to departurie fron cont~acting a support staff'member cali tree, to obtain a-totql of 3 Staff.
Ensure fitness for duty st
<NOP-LP-1002>.
3'.
Track' the-arrival of T1SC'st affme Chdckli'st, -and briief the TSC Operz
-levels upon his arrival and rautir requiredTSC !staff posit~ions are I
- a.
ff the-activation of the TSC of a site accountability/evac
"'and-Educatioin Center (TEC)_ A.
Seither dismiss the assembled personnel to report 'to the TV
- 4.
If the` EOF is bei'ng usedas the `4']
Alternate TSC Layout (Attachment
- otherwise continue on to Step 5.
- a. Assist arriving TSC staff in equieidnt.-
NOTE:
"TSC 'forms -anid -"thei stored in E-Plarnilc Room.
- b.
In addition to the actions l1 Checklist, perform the folloý
- 1)
Instruct TSC Engineers I Room as a work area and in E-Plan locker.
- 2)
Relocate photo copier (*
TEC to the EOF using th4 keybox.
- 3)
Instruct the On-Call Emi assist in placing the EC isolation, if required.
5.3.1 EPI-A6 Page:
12 Rev.:
10 / C-4 ords per <EPI-B9> and on termination of the event.
staff is being mobilized in vent; otherwise continue on arriving at the TSC when home to the TSC by or communicator to initiate a Communicators and 3 Support atus is determined per
)era on TSC Activation tions Manager on staffing ely there after until rilled.
coincides with the initiation uation, contact the Training dftorium at Ext. 7817 and personnel or direct needed C.
ternateL TSC, refer to the before proceeding; finding workstations and reference materials are cker located in FirstEnergy sted on the TSC Activation ring:
o use TEC 110/111 Conference to install telephones stored
- EROX) from the second floor, door key located in EOF rgency Plan Representative to
ýF HVAC in emergency
EPI-A6 Page:
13 Rev.:
10 / C-5
- 5.
Coordinate the manning and activation of the TSC utilizing the TSC ActiVation Checklist'. :
- a.
Assign Communicators to the following circuits as personnel become available:
("5-way") State and Local County Ringdoiwh.
NRC -Emergency Notification System (ENS) Circuit.
FirstEnergy 800 MHz (RMT)
Radio Link.
'I f suff icilent communicators are "h'o'tavailable within 45 minufes 0'f declarin 'the event to support the TSC operaton6al,?
contact -ihe Shift Manag4er and coordinate
.the transfeir of Contro-l Room C6mmiunicators to the
- b.
Verify that.a TSC engineer has been assigned by the Plant Tec~zcal n.g~neer Lo.h~e NRC' ENS C~rcuit,.
.Q
'-6*
aKht h
- c.
At arx AVert classification or aove, verafy that the Emerg ency Response bala S'ystlem'(ERS'YVIink to the NRC has been initý,ited. by the,TSC.Operations Advisor.
- 1)
If not yet opera'ton-l, acivate ERDS per "dSecrtion 5.7..
A
-Witln
,,i.'hour of the Alert
" de-claration.'"
- d.
Assign s.upport (c~erical) staff i. the following tasks as tybec~dmd via~e tney ~
~
~
Deom av*.a-TSC Operations Manager's' Log S'¶TSCa"ask rziorities/OS* TeI'amStatusboards Plan't,TeQ.nica..
Data*and Plant Radiological Data Statusboards
.s.*.
- e.
Synchronize facility wall cl(
FirstEnergy Office, Haliwayy with I-ntegrated Computer Sysi EPI-A6 Page:
14 Rev.:
10 / C-4 cks in Display Room, nd the Access Control Point em (ICS).
This action shall not delay declaring TSC operational.
-6.,Subftit the';TSC Activation Cheokli:
Manager for review and approval o:
met and equipment checks performe(
Sa.*
If upon completion-of the TS(
designated TSC Operation's-Mai forward the checklist to the
- h.
interim,TSC Operations Ja'nagf 7.,.
Inform the TSC Communicators when responsibility* f6r iaking offsite State of Ohio, and local Counties 5.5:.2 ipt n:
- 1.
Coordinate th1 -drafting,. review/al the initial and follow-up notifici Ohio, and local counties per <EPI
- 2.
- CoDrrdrhat 'tihe drafting,' reviewial peri&ii*
, updiates" and, requests for INPO and American Nuclear Insurer,
- 3.
Conduct tel'6phdne'callouts fora required, or to assist the OSC Co(
addit1on I "pbrsonrel, 'using the.<]
"Directo>11. *1nsrure thed fitness fi per <NOP-LP 1'O02>.-
- t to the TSC Operations kce minimum staffing has been
.Activation Checklist a agerý has not yet arrived, TSC Operations Advisor as
~r.
the! 1SC will assume notification to the-NRC,
ýproval, and transmission of Ltiols to the NRC, State of Bl>.
)ppval, arid transmission of technical assistance to the (ANI) per <EPI-BI>.
1i'tidhal TSC staff if
)rdinator,.in contacting 6teg6,ncy Response Telephone d~uty s~tatus is determined
- i 1
" 'A I
EPI-A6 Page:
Rev.:
15 10
- 4.
When :informed by :*the "5-way= Commuidcator that State represntatives arle responding to the Perry Plant, perform the following:
- a.
Inform the Regulatory Affairs Coordinator.
- b.
Instruct the Information Liaison to notify the PIRT, at Ext. 5044, of the pending-arrival of the State Public Informa~tion.Officer.
- 5.
When informed by the ENS Communicator that the Health Physics
.Network.**(HP.). circuit is to-be opened; inotify the Radiation
- Prq'tect~ion Coordinatpr..
- 6. When informed* by, th* ENS Cw
.muaicator...that the NRC Regional Site Team or Augmented. Inspection Team (AIT) has been d
Aispatched. t-the Perr..Plant, '-notify the -Operations, Manager
... IV~
l(~ator Affairs Coordinator. *
- a.
Direct the appropriate Communicator to announce-the activation of the EOF over the "5-way"'-,circut if the TSC Operations Manager directs the activation of the EOF in support of the. NRC
.- Tm.
- 7.
Deleted <
8.
Obtai 'n availaI?le Perry. RUaz, and. -CojPawzi reources as necessary to si~pp~t.
ergenc, 4 respponsqc~itj~
.a;"
Ifthe6*O' i operational, direct any requests for C c -
f '-i II &
s' `p~
e ir ~ t i ` " -C o m p a n y 1 re~sorces*t theOFFMana er.ýr,_
9Le
- .re44ta-te emerg.n An-r ed communications and
ý P*.
.e.*
-Exch fige_,f)a4 Off-Premise EWchafge (OP~i) Crcui`ts e
P'D9
- 10.
Initiate repairs to administrative support equipment, i.e.,
FAX, Xerox, CVAX, aperture card reader, etc., by contacting the party(ies) listed in the <Emergency Response Telephone Directory> under "Communications Equipment Operating Guidelines.=
- a.
If site personnel accountability has been initiated, contact the OSC for available technical repair assistance.
PIC-1/VAX/Page 14 of 27
-~~~~
J.
"'r Ir
+/-.
l1" Wheul iirected to convene an unsch(
a quorum using a qualified chairm*
qualified members or alternates or and act as PORC-Secretary in acco:
- 12.
Upon the activation of the EOF, cc cdoordinate the transfer of offsit(
NOT transfer this responsibility Operations Manager.
.a.
Dire6ý the TSC Communicators notification responsibilitie!
per <EPI-Bi>.
Coordinate the relief of TSC and Io*
the TSC Operations Manager by*
- a.
Determine TSC relief-personri.
and OSC relief personnel nee(
e-.Co6bditator, and'submit rosti
ý.i.foi.trerview and appioval.i
- b.
Have the Radiation Protectioi
-wfiether7relfef personnel sh6i
- the -PdrýrPlant site6dr to ai
- 1)
If radiation levels froi md'*i*ent'in the 10-mile
-If otpdrtiozia~l' in'dire' contacted toriepbrt. to as the Concord Service
- --transpVrtadtion
- to-the s.
Officet~a-t*th-- Lak-e !Cou:
establ-i~hA~kg,'radi ojoic, requirementsi.
- c.
Direct available Communicato.
contact required TSC relief,
<Emergency Response Telephon fitness for duty status is d
EPI-A6 Page:
Rev.:
16 10 / C-4 duled PORC meeting, assemble 6 or designated alternate and site or via a conference call dance with <PAP-0103>.
ntact the EOF Manager to notification duties, but DO ntil.authorized by the TSC to transfer offsite to the EOF when authorized SC personnel at the direction erforming the following:
1,needs for key TSC positions s through the Maintenance rs to TSC Operations Manager Coordinator determine Id be directed to report to 76ffsite company location.
an offsite release restrict
'Z, coordinate with the EOF,
,ting relief personnel when f FirstEnergy facility, such
,enter (COSC),
in arranging te through the Transportation ty EOC at 953-5480, and in
.1 monitoring/dosimetry
,s and support staff to iersonnel utilizing the
ý Directory>.
Ensure the
!termined per <NOP-LP-1002>.
13.
The TSC will retain respons ibility for maintaining an open ENS line after,.the EOF. is.operational and:
responsibility for offsite Aotifications have transferred.
l
EPI-A6 Page:
Rev. :
17 10 / C-4
- d.
Assist the OSC Coordinator in cqntacting required relief "per.sonnel using the OSC Staff Callout Listings available in the OSC.
Ensure the fitiess fori'duty status is determined per <NOP-LP-1002>.
- e.
Keep the Operations Manager informed of the status of staff relief efforts.
- 14.
Upon de*ctivaion oftte TSC peffd the following:
- a.
-Retdrn TSC HVAC-to normal operatin4 mode.
- b.
Coordinate the collection of event records per <EPI-B9>.
- c.
Clean~up 8f~the TSC.
- d.
-Dismiss fa-Gi1ity-eommunicators--a~nd-support staff.
5.4 Radiation Protýtcoi" noordiratox.
Activation:
3-
J.
- 1.
At an Alert classifilafc'`6n-or above, perform the following:
- a.
-.-Direct-,the on-eshift or o1herqualifiqd Chemistry technician to report to the TSC as a Dose Assessor and to performnhe following- :.
l)-
Verify-.the.oper bilit~y.ef*hgc;omputer-Aided Dose AssessmentPrgrapiCADA-an=ýassociated DEC laser printer per <EPI-B7a>.
_,,,,) +/-
Asse*)
S ble two. (2 RMTsin 1
OF Decontamination Room
,per
<EPI-B3>, -and-.brie z-*m-prior to deployment.
<P00059, P00042>
- ..=.z -.':.*.*.-*:+/-Lc Z.eri.fy-that,-,he.
S@.bop-ne and area radiation
.-.monitors areroperat-ig¢ or are placed in operation
- ~ i
-pe r < S O I-;r l-JP.C j ea or airborne radiation
.r out.ofservice, direct the OSC
.,-r.--
oo Supervisor to have periodicahbi.ab.i'ity monitoring of the TSC initiated.
S..
c
'r' 5.4.1 "i
- b.
Verify with the OSC that-a mjl Protection (RP) technlcians a.
being called in to suppoit in.
- 2.
Call-in, or obtain from the OSC if Radiation Protection Assistant (RP, needed to track'and evaluate in-pl concerns and OSC activities.
Ensu status is determined per <NOP-LP-1 EPI-A6 Page:
Rev.:
18 10 / C-4 Lmum Of four (4) Radiation e available onsite or are
.pl~nt/OSC RP activities.
available, a qualified 0,
if additional support is Lnt Radiation Protection
- e the fitness for duty 102> for all call-ins.
Request from the Administrative As$istaht. that personnel assigned, when available', fto the fllbwing positions:
- a.
RMT COmmunicator
- b.
RAdiblogical Status Boards (i Operation:
- 1.
When notifiedby':the: Admin.istrativ open line on the HPN, assign an av techniciaw.from-the*OSC to keep th plant Radiation Protection concern Protection related questions regar
- 2.
Directý thýaiRdiatibn Protection As following:
- a..ITterfa*
with.the OSC R-P-Sup continuous monitoring bf rAdi and onsite.
b.
Monitor plant radiological-tI Computer System (ICS); immedi the OSC RP :S iev+/-sor-of -sigr.
radiological dc dit.idns.'
L be STSC Display Room)
A-Assistant to establish an ailable Radiation Protection e NRC apprised of significant s'and.answer any Radiation ding the event.
<B00626>
.ikstabnt to perform the ervi-s-drsd.to-1e nsure the 01logqical condition in-plant ends on -the Integrated ately notify TSC staff and ificant changes in 3..
5.4.2 lTheRadiation Protection.?Coordinator is responsible for instructing the statusboard keeper on how and when to u:date-boards,. and for-resolving anyquestions or dis crepancies in data.
i J.
EPI-A6 Page:
19 Rev.:
10 / C-4
- c.
Assist the Administrative Assista.it in completing ap1i6cible pporti0ons of the Initial Notification form (PNPP N6.,'7794),
Follow-up Notification form (PNPP No.
7795),
and° ndustry Event Notification form (PNPP No.
9596) per
<EPI-BI>.
d."
Periodically update or assist Support Staff in updating facility statusboards with current in-plant and site radiological information.
- e.
--Assist the HPN Communicator in.responding to NRC inquiries
. and-periodic statuis-updates.
- 3.
Recommend the use of protective measures, for plant personnel as needed, including the use of potassium iodide (KI) per
<EPI-B8>, respirators/self-contained breathingapparatus (SCBAs),
etc...
gaprt
- 4*4 D irect -the Dose Assessor to coordinate -the. f6llowing:
...a.
- Control and deployment of RMTs per <EPI-,B3>.
<P00059>
- b.
Assessment of actual or postulated radiological releases per <EPI-B7a> and <EPI-B7b>.
C.
Development of Protective Action Recommendations (PAR) for thte, general publ*jc :per *<P-B8>*
.r,.
d,.:
ie ecommepdat-p!o of prot-w-ý,ý,.-ae
_e,, for RMT personnel
,:[" :..*a pg.:*.EP*-B3>..
u*.......,*=,**-"
- e.
Ensure that the Radiological Statusboards are updated with
. doIoe-,tes,
,t or-1yId
&i ns-, etc.
- 5.
Review and recommend PARs for the general public to the TSC ape~etios
-nager. far, apprQin l,: (V1zr. t-' the EOF assuming
- 6.
Periodically verify radiation levels on both the TSC area and "qtaQ,.
a r*4 aton readings exceed normal levels, direc c
- h. J2GTMaintenance.Coordinator to have the TSC HVAC system placed in "recirculation" mode; consider recommending the evacuation of any unnecessary TSC support personnel and issuance of high range dosimetry per
<EPI-BlI>' and initiate periodic habitability surveys by Radiation Protection.
- b.
If either monitor becomes out
, Radiation Protection Sup'ervi,*
habitability monitoring.
- 7.
Coordinate plant Chemistry activit of core damage per <EPI-BI3>, thrc Supervisor or Dose Assessor.
- 8.
If the TSC was activated at an Um section5'.4.1.1 to mobilize requ*2 to an Alert classification or aboi
- 9.
Upon'the _declaration of a Site ArE following:
- a.
Dispatch -a Radi~atiIn Protect Access Contact Point (PACP) accountability and, if warrai
-Operations Manager-th.:use o0 assembly/dec.ntaminati6n cenrt
`b.
Verif:ra minithium bf seven (7]
".i Techticians and two'.(2) Chemn in support of in-plant/OSC aW conduct additional callouts
<NOP-LP-1002>, to meet this,(
- c.
Direct the Dose Assessor to r
<EPI-B3>,, and to brief EOF p(
Ai.*">Te"actiýtie
,s::i'
<PO04.':
- d.
Ens~ue dosimetry is issued.t(
";EO.F*
stff pek <HPI-B3>5
- e.
Pis aldP
'ýTl
,R ""
dhr iiiah, W1 asslst In radiological monit(
- 10.,Onfie
.)
If kup 1
,0OF is.a&tiv.al of onsiti EF,d -dspatch Asht4,..er'ice Cente.
the EOF isir.4gi~na1, perfc
- a.
When authorizdby the., TSC.Oj i"
esponisibilityý.
A, dosie-assei and for control 'the MTs I EPI-A6 Page:
Rev.:
20 10 / C-4 of service, direct the OSC or to initiate periodic TSC ies, including the estimation ugh the OSC Chemistry sual Event, perform
ýed staff when event escalates re.
a Eniergency, perform the
[on technician to the Primary n support of personnel
- ted, recommend to the TSC
'dffSite ers per <EPI-B5>.
Radiation Protection stry Technicians are onsite Itivities.
Direct the OSC to is necessary per
- ommitment.
Lobilize a third RMT per
ýrqonýel on dose assessment
ýring of facility.
red.injieu, of or in support an RP iTechnician to the (ASSC),
irm the following:
- erations Manager, turnover of
ýsment activities per <EPI-B8>
er <EPI-B3>.
I
EPI-A6 Page:
Rev.:
21 10
- b.
..Request the Offsite Radiation Advisor (ORA) to open the EOF HPN line and handle NRC revests for dose assessment information.
Responsibility for relaying information on site and in-plant health physics concerns will remain in the MSC..
- c.
At your discretion, relocate the Dose Assessor to the EOF to assist in offsite-dose assessment activities.
- d.
Continue to track protective actions being recommended by P~iry, and-Im~plemented.of fsite.
- e. *Ino.rz-.th4 09RA of radiochemistry.and radiological survey
..SUtsj or,aidipated plant oper4tions which may affect 4e dm"s jecti60i.
- 11.
Provide instructions po.C.qntrol Rqom, 4.. SC, TSC and t.46 'dollectionan, d,peo.essieng of- =osimetry as part 5enief dirfaciEi ie d...
ea...,...
5.5 Pl~ant -V~cbiImia nier EOF staff on of staff 5.5.1 Activation-.
I. Deterifnei3f 4'core /Hk0kuiu'c.
giF er Electrical Engineer, and MechaniCiltEngineer nave arrived yet.
NOTE:
leerC~faxd M..neers have a response time goal of *60 miiznu-es; therefore, declaration of the TSC as operationa; Ihoul4 not be delayed pending i"-
ihe aýr V
-Of tese
- Ing, ieers.
- 2.
Assign.the first available enineer to monitor the NRC ENS C*uit 6U1diieft-indii"I to!'Oerfofm the following:
NOTE:Ik Operait1*.
itrý*6l&i 'are listed in the <Emergency Response Telephone Directory> under *Communications
- Equipment Op~e~iegýGuidelines.
- a.
Inform the NRdofa'fiificant changes in the operational 66t abnormal trends in plant data.
- b.
Record NRC questions and requests on a Communications Record Sheet (PNPP No. 6284) per <EPI-BI>.
- c.
Keep the Regulatory Affairs Coordinator apprised of NRC activities.
Page 18 of 27 I
C-1, 2
.3... Contactadditiona engineering st emergency event.
Ensure the fitn.
d.etermined for call-ins per <NOP-:
- a.
Contact the on-shift Shift E:
relief shift SE and/or the t:
working hours to support TSC Appoint engineering staff members the following duties.:-.
Lead Engineer to coordinate.i activities and to bief TSC:*
Room on event status and pw
- b.
ICS Operator/Plant Technical
- 5.
Update the Plant Technical-Data S.r the Administrative Assistant that assigned to maintain this board w]
- a...,,Ift'e.ICS is inoperable or disp'ýtch &axiava3la-le, 'ioimun:
to the Control' Rorm 'to "i.nitii over,*he.StaOusboard,Ringdom
- 6.
Contact the Control Room STA to V(
Ringdown Circuit is plugged in an(
7..
Initiate amnd track.engineering aci emrgency event,pasd 'onpriorit+/-i
- 8.
Brief the,jSq ager which are underwa-,.
required,. a available to. respond. ;tQ.z.the. emerg(
Operation:
- 1.
Deleted
- 2.
Maintain contact with STA~foran.ý and current or postulated 'Control
- 3.
Direct the actions of plant.techni personnel to analyze plant c6ndit!
status in support of the ControlJ, priorities established by TSC Ope3 EPI-A6 Page:'
22 Rev.:
10 / C-5 ff.members based on the ss for duty status is
,P-1O02>.
gineer (SE) to locate the
'aining Shift SE during normal operation.
as they become available, to nd, track engineering ngineers in plant FirstEnergy
.t conditions.
Data Statusboard Coordinator.
at-ýboards, and request from a support staff member be en available.
Occess. to data limited,
ýcator-.or TSC/OSC staff member Lte 'and maintain an open line
ý,Circuit.
rify.,-that the TSC-STA
'operational.
ivities i-n support of the
- s. once-established.
n,,engineering activities
.well as engineering support ncy event.'
ssessment of plant conditions Room,. actions.
-al. and engineering design ons" and system/equipment oom shift staff and based on ations Manager.
Th"Plaant; Technical Enginee'r is +/-esp6-sible for instructing the statusboard keeper on how and when to update this board, and for resolving any queztions,or discrepancies in data.
5.5.2
EPI-A6 Page:
Rev.:
23 10
- 4.
Track TSC engineering activities and revise,assignments as ne4deid to meet u ent TSC priorities,.
- 5.
Assign available engineering support. to assist in briefing osC teams and in providing in-plant engineering support to OSC team members.
- 6.
Act as -a liaison between the ERO and INPO, General Electric (SIL No. 324,
- BWR Emergency Support Program.), and other contractors c'dr Indus*ry support organizations on technical and design matters.
<B01028>-
Sa.
-Request for INPO tdchnical or 64dipment/expertise location
'assistfance should be made through the Administrative
--"'Assistant using ar Indudtiy Event Notification form (PNPP No. 9596) per <EPI-Bi>.
- 7.
Ensure that the Plant Technical Data Statusboard is updated periodIcally andt data, i.e., system~stat~is,' interpreted when required..
- 8.
Periodically AppriseA yy._TSC _ta fzeberP. of plant technical and engineering desi n activities underway and recommendations develp-ed.,--
.5.61 -.
Activation:t..
~~\\staff i6 iidga i
i a.-
paJ1int an OSC tooidind*adr om -supervisors available in the OSC, if the arrival of A designated OSC Coordinator is 2.. Initially update the OSC Team Statusboard and request from the
.Admiifst~ative ksh t-a,.u-jport member be assigned to
-1WtWWW thi:s b-b fi.i*in tfie 'OW CreV Status Ringdown.
The iaintLena6ce _Codroi&6tr i s reSiOnsible for instructing
-the -"btAtus bord ke0pi&6, "ihw and when-to update this board, and for resolving any questions or discrepancies in data.
- 3.
Apprise key TSC staff on the status of the OSC, including
- curret -aki ptojeateFstaf-ing levels and activities presently undarwa*-'r -I
- -ý--
- 42 Notify thei TSC. operations Manager: when ready to assume control
~'. -6f thee OSC If"o'ithe Control Room.
-a E
r,- D4' Page 20 of 27 I
C-1, 2
Operation:
- 1.
Notify the OSC Coordinator when c(
assumed, and request that TSC Opei the Plant PA the transfer of OSC
- 2.
Ensure that the Operations Foremai Operators (POs) are relocated to I
"-<EPI-A7>.
i* 3.
EPI-A6 Page:
Rev.:
24 10 / C-5 ntrol of OSC activities is ations Manager announces over ctivities to the TSC.
and the Plant he OSd when operational per Control of the on-shift POs remairs with the Control Room.
Dizect.the. dispatching of emergen y.teams and support personnel from the OSC through the OSC Coor inator-per <EPI-A7> in support of the Control Room and based on the priorities estadblished by the TSC Operations. Manager.
All plant personnel available on' ite, i.e.,
- Security, Safety/Fire Protection technician s, etc., should be assembled and utilized if necessery to support OSC
.ctfivjtie-until the OSC staff iE properly augmented.
U'"
/.
- 4.
Establish the briefing requiremeni
'for eadh OSC team direacted to be
- 5.
Requ6st a'ssisfanc'e from the Plant briefing OSC teams and for in-,plai needed:
- 6.
Continuously apprise th~e OSC.Coorc and emergeqy, act*ins underway, ii activities-and TSC,es.ablished pr:
- 7.
Ensure that t*e OSC Team Statusbo*
key TSC staf*.,re periodijcally in4 activities.
- 8.
Direct OSC Coordinator to request dispatch a PO to realign the TSC I request of the Admini.strative Ass:
Coordinator.
- 9.
AssIst the AdministraIA'eAsslstai rotation for OSC staff personnel i
- 10.
Direct the.deactivation "ofdthe OS(
TSC Operation Manager wher OSC-dei
.s, as outlined in <EPI-A7>,
Lispatched.
Technical Engineer in Lt engineering support when Linator of plant conditions
ýcluding Control Room
,orities.
rd is kept current and that onrmedof.the status of OSC that the-Operati.ons.Foreman
[VAC per <SOI-M52> at the
,stant or Radiation Protection
ýt in developing a relief rhen needed.
,ýwhen ordered and notify the
ýctivation is complete.
5.6.2 I
EPI-A6 Page:
Rev. :
25 10 / C-4 5.7 Operations Advisor 5.7.1
- 2.
Contact the C6n-trrýRbom s
"to b4eome apprised of their p'e.~s~e o
,tbc-6eprsdo hi
- activte,
- i. plant s ySrtm'4qupm'-s-tat*u~s, and applicable emergency procedures/instructions entered.
3... '.
of' p*tata' dot, f*'ICS and the initial updating of the Plant Technical Data Statusbsoard.
4.-'Act-as iriim Oper*t1i.&1s M*
i'kg*
r-96tion 5.2, if the
-Q arrival of,:a qualified TSC OperatiA ns-anager!is delayed or if the TS Oper'ations 1arig9g4emjr 'b ipaired, to allow the TSC to be declared operational in support of the Control Room.
Apprise -t ýai-a6cpeiaebnsa
-u jpon atriVal of Control Room and plant emergency activities presently underway.
C tinuously~re~i*W a dr+/-e the criteria: set forth in
<EPI-Al> with current or projected plant and emergency
.conditions; recommend rqclassification of the emergency event "a' Operati n
- 5ýs -required.
. L.
I 3LS :
- 2.
Monitor Control Room actions and operations to ensure compliane'witl appr ved dperating procedures and instructions Activation:
- i.
At an Alert classification or above, activate ERDS with NRC per the following:
<L01395>
- a. "1fer to the Emergency Response Data System Users Manual "next to the ERDS terminal located in the TSC FirstEnergy Room and EOF Display Room.
"b.
Press tlie RETURN key.
- c.
When *the--computer prompts for "Usernayfte, enter -ERDS and
-,press RETURN' ky.
- d.
.When the-computer prompts.for Passwordf--,; nter NRCERDS and press RETURN key.
- e.
Eiter 0*t'on ',-and press REZTURN -key.
If ERDS Q'an not be activated due.t computer/modem "problems, notify the NRC over E*N Circuit, document failure in log-, -and contaet--Computer Support Unit (CSU).
- 3.
Serve as a liaison to the Shift Mi
- a.
Briefing TSC staff of"Cdntro' underway or being considered,
- b.
Apprising Control Room staff and the statu's of TSC engineo activities.
- c.
Advising the TSC Operations with the operation of the rei
-d.
Assisting in the:-rsoJlution reldcationof th4 Opqerti 4 ns in the effective utiliZation
- 4.
If -the-TSC was activated at an nl 5.7.
to activate the El event-e'scalates ta an
- Alet class:
- 5.
Assist the Radiation Protection Cc in..
nthe forlationof*release duri
- "act&Tons t6 thd Plant Peprations A(
operational.
- 6.
- -Assfslt-hi-*n ýthe t-ra~nsfer of plant Qo adtionm to -the EOF.
- 7.
ASislzthe Shift Mtnager in c-ood actiift*ie":in coordinating in sup]
5.8 Secur.i ty Coordinator.
5.8.1 Activation
- 1.
Become apprised of Security.;activ:
SNSO on current plant operations wel*' as "any -an-oral iadiologicai o~nsite.
- 2.
Brief the TSC. Ope;itaons -Manager.
on-g.oing Sitse. Proteqtlon, -response.
- 3.
If the TSC is being activated con(
Emergency declaration, verify thai TSC use the TSC Hallwyw*5card-.readc accountability purposes*.j.*
- 4.
If the EOF is being used as the a:
security officer be dispatched to restrict access to FirstEnergy eml EPI-A6 Page:
26 Rev.:
10 / C-5 inager by:
Room'activities, operations and needs..
of TSC established priorities ring and-OSC team status and fahager on matters dealing Lctor and support systems.
ýf any problems regarding the Fore-man and POs to the OSC or of thd POs.
sual.ivent, perform DS bfOadcast. to the NRC when
.fication t 'above.
ýordinator and Dose Assessor
ýtions tor offsite protective Ivisor, when the EOF is ierations information and nating ort 0of*
Radwaste processing the emergency event.
t-ios.underway and update the nd emergency activities, as conditions in-plant or ndTSC,-staff on recent and urrent. with a Site Area personnel responding to the r.to Iog-in f or.,
ternate TSC, request that a establish access control and loyees.
S.
C '
I
EPI-A6 Page:
27 Rev.:
10 / C-5 5.8.2 Operation:
- 1.
Monitor on-going security, First Aid Team (FAT),
and Safety activities, and provide support to the SNSO in support of the Physical Security Plan.
NOTE:
Only Channels Z and 5 can be,monitored by radio unit
.at Security Coordinator',s desk.
- 2.
_Apprise the SNSO of the emergency actions underway and abnormal Sradiologfcal c6niditionsrin-plant or onsite.
- 3.
Direct the SNSO to have all securityofficers-report to the OSC
, w'heno-perational.jriQr to(, entering the Ra iologically Restricted:Area'.-R)..
- 4.
Immediately notify T]SC..staff 9f an.actual,opr potential fire or fr5st al., incilent. ard cordinate wait-h tM.padiation oator t:o,niure
- p.
"ompt
-ntry and support of plant-and offsite responders entering the RRA.
c IC'.
).
J A.'
,Provide a liaison bletween the Perryant
- nd offsite law
,enforcement agencies* concerping o9nsi,e
.ce*1urty actions
- underway and requests -for assistance.
, 1...:
- 6.
Upon declaration of-a Site Arq4.Emargenrcy
, the direction "of the Operatiouis Manager, perf6rm- *the., toJioning:
a.._ Commen.ce-per;sonnel cco-untabi i"y
.cpiyns per <EPI-B5>,
and verify that TSC_ staff _bas 4:g e*-!n using the TSC Hallway card reader.
Within 30 minutes of initiating accountability, the Control Room Shift Manager must be n6t-ified of the number of people unaccounted for and search and rescue
- b.
Ensure a Pager Messages form, (PNPP No.
91:00) is promptly drafted and approved by the TSC Operations Manager; the
'.-: <dle~ted *-f
-~a*
~ed;to Seconidary Alarm Station.-(SAS)A;*-n-- ind.-Eý
'4rer :activated per <SPI-0032>.
ýc-
£
_ -i6elet-ed:> -
P
- 7. :.upbrrXEOF-act-i.-
or i*-"4ie SNSO to dispatca a Security Officer(s) to the onsit-d;...OF-*-or BF-ckup EOF (at:the Ashtabula Service Center) to control facility access.
- 8.
Deleted 5.9 Recsulatorv Affairs Coordinator Activation:
I.
Become apprised of plant condition
§s4aff. du~ing activatiep.
EPI-A6 Page:
Rev.:
28 10 / C-4 and event status from TSC i2.
,.Contact the,: State: EOC to.ýdetermine the.flo-1lowing:
- a.
Status of the State of Ohio's
- site.:.. If the State makes a d Perry Plant site, perform the Section:.5.9:.2.4,.
- b.
Need to dispatch a FirstEnerg prior to a Site Area Emergenc 5.9.2
- c.
Discuss event status and prob worsen.
- 3.
.-.Cortt.-an-E.MA, representati-ve. or
- the EOCs-in Ashtabula, Geauga and event status and prognosis, and tc fobr:.-Iurtll-ex..-
que st i ons.~.
NOTE:
Offsite planners from Ex are contacted at an Alex respective counties' cal as a liaison between the ERO.
- 4.
Apprise:the TSC.Operations Man-agei county responsezto thee.vent.--,..
Operationalr
- 1.
At the Site Area Emergency declari Liaison using the <Emergency Respc
-dispath:-to the StatteEOC if-,not-..
response to Perry Plant
.cision to respond to the actions outlined in
, Lia~ison to the State EOC V declaration.
ibility for the event to xstEanergy County Liaisons at Lake-_Counties to clarify the identify a point of contact
.rgency Planning Unit (EPU) t level, as part of their lout process, and.will. serve county EOC and the Perry of.'cunrent NRC, State and tion, :contact. a. FirstEnergy
ýnse Telephone Directory> and
ýet.performed1.
-Ensure fitness for duty status is determined per <NOP-LP-1002>.
- 2.
Provide an interface with the TSC Circuit-and FirstEnetgy-*State-:and.
to NRC, State and local county ini NOTE:
The Executive Discussiol and local counties shal.
TSC.
Engineer manning County:-,Li-iaons, uiries.
the ENS in response Line (EDL) with the State NOT be established in the 5.9.1 i
_r z
EPI-A6 Page:
29 Rev.:
10 / C-4
- 3.
Resolve any concerns regarding communications to offsite governmn&t agencies, including any -requests'for the establishment of additional telephone links not already described in the EPIs.
- 4.
Upon being notified that the State is dispatching representatives to the Perry Plant site, perform the following:
- a.
Update the TSC Operationfs Manaqetr-&and--recommend either the activation of the EOF or the co-location of the State e-representatives-t,;-the?*TSC based on-the-.event status "and prognosis.
- b.
Contact and di4atch-a second'TRegulatory Affairs "o Coozdinator.tothe EO.F to.nx f 2the3:State representatives upon their arrival via'-Ohi' Nationa1VGuard helicopter.
Ensure the fitness for duty status is determined per
- c.
Brief the second Regulatory Affairs Coordinator upon "his/her arrial.ons-ite.
- 5.
Document communications with offsite officials or FirstEnergy 0, *,o;-.
Sta~te/C~in:ty."tOC Liaisbns In., -our" Thgbook* iousing a Co-mmunications Rec2qxd 'Sheet (*2UP
-o",
6214.).p-r <EPI-B9>.
- 6.
Once the EOF is activated-snd de1ared~o.ratinal, relocate to the EOF and continue to coordinate the interface with offsite S..46rnr agincia pgeh ee pef A
-5jcO eRecords 5.10.1 Records Handling 0,,
- 1.~ r,:
T~
ards
~~g.erated by.
- emer~gen*" Dýsponse personnel will be collected and maintaiined-sbfy Emeaer y..-.Plariing Unit (EPU) pursuant to <EPI-B9>.
The Emergency Records Package will be transferred to Records Management pursuarit.-to '<PAP-1701>..
.-.The f
.w0hng.."records,ari @jfea~tedd by'this 'document:
Quality Assurance Records Acb!*.latioitChykls",:.*NaPNo 7987Rcr Non-Quality Records S....
...'i
.. :,No ne. - ? '! Z.. i
EPI-A6 Page:
Rev. :
30 10 / C-5 "S6`0 TSC STAFF MOBILIZATION FOR NON-EMERGENCY PLiN EVENTS Under no circumstances shall the Control R, transfer, or the Operations Manager accept Emergency Coordinator duties unless the ev,
<EPI-Al>.
.4-om Shift Manager responsibility for the
!nt is classified per i1 Upon arrival, contact the Control Room Shift Manager to become apprised of event/plant conditions and required support.
Establish and track task priorities using facility status boards.
Brief TSC staff upon their arrival of *vent/plant condition and direct facility activities in support 4f established priorities.
Direct the Administrative Assistant to of TSC staff based on the event.
coordinate the augmentation No minimum staffing or completion of TSC Activation Checklist is required for staff mobilization ourside the Emergency Plan.
6.1.5 6.1.6 6.2 Admiz 6.2.1 6.2.2 6.2.3 6.2.4 Direct the Operations Advisor to monitc into the Emergency Plan based on changJ recommend classification of an event p(
Manager if warranted.
Upon the Shift Manager's classificatioi per <EPI-Al>, go directly to Section 5.
Activation Checklist to augment staff Emergency Coordinator duties.
nistrative Assistant Do NOT initiate the TSC Activation Che(
Plan event is classified per <EPI-Al>.
Instruct TSC Communicator NOT to test I State/County Ringdown.
Track the arrival of TSC staff and perJ Operations Manager of staffing levels.
Initiate callouts for additional TSC si TSC Operations Manager and on-call TSC communicators.
ýr <EPI-Al> for possible entry
,ng plant conditions, and
,r <EPI-Al> to the Shift of an Emergency Plan event 2.1 and utilize the TSC nd coordinate the transfer of klist unless an Emergency he NRC ENS Circuit or "5-Way" odically notify the TSC
.pport at the direction of the responders, using available 6.1 TSC Operations Manager 6.1.1 6.1.2 6.1.3 6.1.4
EPI-A6 Page:
Rev.:
Assign support staff as. they become available to TSC status boards and then'Records..Room.
When notified by the TSC Operations Manager that the Emergency Plan I has been entered, go to Section 5.3.1 and use the TSC Activation Checklist to ensure minimum staffing and testing of equipment.
31 10 U
"L
,i' 6.2.5 6.2.6
-Rev.:
10.t'Atachment 1
8Sheet 1 of 2 TSC ACTIVATIONCHE (TO BE COMPLETED BYTHE ADMINISTRI PNPP NO*. 7987 Rev. 3113/02 ý,
A. EQ TSC rooms are unlo'ked [NOTE: Master key located in keybo<
B. Verify TSC manning levels:
Minimum TSC Staffinc-Iequ rements:,.,
o TSC Operations Mhnager....
[I Operations Advisor 0J Maintenance Coordinator El Plant Technical Engineer.
EJ CorelHydrat'lic (Reracfor) Engineer O Radiation Protection Coordinator O Dose Assessor (shift Chemistry Tech.)
o Administrative.Assistant.
ol "5-Way" Communicator I ';
NOTE: Control Room communicator can be relocated to TSC to support facility activation or qualified I&C technicians used from OSC.
El ENS Communicator or assigned engineer TEASST ITwE ASSISTrANT)
EPI-A6 outside TS9 Records Room.]
C. IF TSC ACTIVATION AND PERSONNEL ACCOUNTABILITY ARE SIMULTANEOUSLY, call Ext 7817 or request that a Security Offio member be dispatched to the GETAuditoriuim to assess available1 to report to the TSC'and notify"Secudty at'PACP.
D. Test the following circuits:
[I Intra-Facility (TSC-OSC).PA, El Turn up Plant PA ceiling speakers in TSC rooms & hallway E. El Verify that the Operations Advisor has activated the ERDS tram performed, initiate transmission at this time per EPI-A6 Section BEING PERFORMED I r.or available TSC/OSC staff nanpoWer. Direct needed personnel mission to the NRC. If not yet
- .7.1.1.
I EPI-A6 EPI-A6 Page:
32 / C-5I
EPI-A6 Rev.,:
10 Sheet 2 of 2 Page:
33 /C-5 TS~ ACTIVATION CHECKLIST (TO 'BE COMPLETED BY RTHE TSC OPERATIONS MANAGER)
PNPP No. 7987 Rev. 3113/02 EPI-Ae
- 1. Dl When the minimum staffing requirements are met and the TSC is ready to be declared OPERATIONAL, biidf TSC staff on current plant conditions, emergericy actions runderway, Control Room needs, and TSC priorities.
- 2. 5 Announce over the Plant PAr Systemthat Uthe TSC is OPERATIONAL, and control for OSC activities (if operational) has been.tranSferred.to the TSC". Record time TSG*'elaýed OPERATIONAL in logbook.
3 El Inform the Security Coordinator that the. TSC has assumed responsibility.fpr directing SAS to perform further ERO notifications.
- 4. L] Inform -the Shift Manager thiatithe TSC is now OPERATIONAL, and establiA-Wfven "-ef6ilowing Emergency Coordinator duties wilt be transferred to the TSC:
e evnt classificat!o pe
~P-1..
offsite nof*
cations, per EPi-3.
offste protective action'recommendations per EPI-B8.
E] Notify the TSC Administrative Assistant prior to assuming offsite notification responsibilities.
-~.
- 5. Announce pver the Intra-Facili-ty s-oSc
),PA e.the tran-rsfer of E*eprgency Coordin*tor duties from the Conitrol Room to the TSC, record transferin l6gbook, ;and post the'tr*.nsferafiresponsibilities on facility status board:
El Event Classification E] Offsite Notifications El Offsite Protective Action Recommendations
.,Zu 0.-*,-.*
t Time
- *. *a*-
- AA
EZPI-i 2101
Page,:,
35 / C-4 -LAST PERRY NUCLEAR POWER PIANT ALTERNATE TECHNICAL SUPPORT CENTER TRAINING CENTER (TEC)
FIRST FLQOOF.
LAYOUT Assessor 71 Supplies'.
.
l
7 7
CONFERENCE ROOM (TEC 110/111)
Engineering Staff -
2/01 EPI-A6 Rev.:
10 Attachment Sheet 2 of.2,.