ML021560062

From kanterella
Jump to navigation Jump to search
Transmittal of Revised Emergency Plan Implementing Instruction (Epi - A6/Rev 10, C-5) for Perry Nuclear Power Plant
ML021560062
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 05/21/2002
From: Higaki V
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PY-CEI/NRR-2643L EPI-A6, Rev 10
Download: ML021560062 (43)


Text

FENOC PerryNuclear Power Plant 10 Center Road P.O. Box 97 FirstEnergyNuclearOperatingCompany Perry,Ohio 44081 May 21, 2002 PY-CEIINRR- 2643L United States Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Perry Nuclear Power Plant Docket No. 50-440 Submittal of Emergency Plan Implementing Instructions Gentlemen:

Pursuant to 10 CFR 50 Appendix E, enclosed are changes to the Emergency Plan Implementing Instructions (EPIs) for the Perry Nuclear Power Plant. These changes constitute revisions, temporary changes, or reissued pages. Please follow the updating instructions per the attached Controlled Document Instruction Sheet and return the signed Acknowledgment of Receipt form.

If you have questions or require additional information, please contact me at (440) 280-5294.

Very truly yours, A

Vernon .k igaki, Supervisor Emergency Planning Unit VKH: byr Enclosure cc: NRR Project Manager NRC Resident Inspector NRC Region III, Incident Response Center w/l attachments

-'ý 46 U

FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant Controlled Document Instruction Sheet Manual: Emergency Plan Implementing Instruction (EPI - A6 I Rev 10, C-5)

Control Number 60 Revision Temporary Number Change No. Remove and Replace Pages 10 5 Reissue Entire Document

EPI-A6 Page: i Rev.: 10 PERRY OPERATIONS MANUAL PNPP CONTROLLED COPY Emergency Plan Implementing Instruction No fM FQ n')

TITLE: TECHNICAL SUPPORT CENTER ACTIVATION REVISION: 10 EFFECTIVE DATE: 3-20-95 PREPARED: Joseph D. Anderson 11-15-94

/ Date EFFECTIVE PIC's PiC Type of Effect-ve No. Change Date 1 Intent 5-29-96 2 Intent 4-21-97 3 Admin 10-9-00 4 Admin 4-4-01 5 Adminin

EPI-A6 Page: ii Rev.: 10 / C-5 TECHNICAL SUPPORT CENTER ACTIVATION

-Table of Contents Sec.tion " Title Page T,. 0,PURPOSE '1 0 REFERENCES 1 3;'0 DEFINITIONS 3 4.0 RESPOUSIBILIT~ES 3

4. . Contiol Room Shift Supervisor,. 3 4.2* ISC ,'Operations Manager 3 3.

' A14.3 Adminisjt'rativeA Assistant . - 4 4.4 -. Radtion Protection Coordinator * , -4 4 .5 ° Plan Technical., Engineer 4.6 inten'ance Coor'dinator - .*" 5 4.:7 . .Ope~r~ations Advisor 5..

5 4.-8 . Se.,curity, Coordinator . 5 4.9 .. gutory

.e Affains Coprdinatolr . 6 "4.10 hinjdqmation Liaison. . 6 4.11 'Deieted 5.0 ~ ACT NfS .;. .6 5.1 Control Room Shift Manager 6 5.2 TSC Operations Manager 7 5.3 Administrative Assistant 12 5.4 Radiation Protection Coordinator. 17 5.5 Plant Technical Engineer 21 5.6 Maintenance Coordinator 23 5.7 Operations Advisor 25 5.8 Security Coordinator 26 5.9 Regulatory Affairs Coordinator 28 5.10 Records 29 6.0 TSC STAFF MOBILIZATION FOR NON-EMERGENCY PLAN EVENTS 30 6.1 TSC Operations .Manager 30 6.2 Administrative Assistant 30 ATTACHMENTS Attachment 1 - TSC Activation Check ist 32 Attachment 2 - Alternate TSC Layout 34

EPI-A6 Page: iii Rev.: 10 SCOPE OF REVISION:

Rev. 10 - 1. Designates Operations Advisor as interim Operations and authorizes interim Ops. -Mgr. to assume Emergency Manager, Coordinator duties from CR Shift Supervisor.

2. Identifies Plant Technical Engineer as the point of-contact INPO and other Industry technical support organizations. for
3. Revises title of Security Supervisor to S0.SO..
4. Incorporates responsibilities and actions fpor the Regulatory Affairs Coordinator, as an on-call SC 'posi"tion.
5. Clarified actions for coordinating .transfer of Emergency Coordinator duties to the EOF. --
6. Restructured Ops. Manager actions .for deci4ring -  :

TSC operational. . -  :

7. Remove HPN Circuit-oA a Comuunicatoi duty;r avilable technician to be assigned lo cirfiibui HP
8. EPI-B1 referenced for 1ln offisiti n6tifidatidh actions. RPC/RPA if opened.
9. Dose Assessor 'and-Rad."rot. A staisni7eck' ot"bd actions clarified under Rad. Pbt'.2
10. Operating instructions fod Co~ordina*t*r-thei cNSrmot-e CXt..R headset inserted as Attachment 3.

1.1. Actions revised to have SecrizrftPCooidinh-aor to access control be- establishe*d onc* theeS& s operational. direct that

12. Deleted reference under Sec1'ri ccýrd'..i6 *itiple i-u message forms; single composite form being implemented. pager
13. Access Controller actions deleted; covered under SPI-0023.
14. Inserts record capture statement. ......

. .: s.D"_ "., ? . -2 ., .. i' >7.L

-t - 1A A-2 L'

I- ~_ .~ 'K ~ t

EPI-A6 Page: iv Rev. : 10 Change History PIC Number: 1 Affected Pages: ii, 1 2, 4, 6, 7, 8, 9, 9a, 10, 12, 13, 1., 15, 16, "*18, 19, 20, 21, 22,

. 2-3, 2 , 27, 28, 32, 33, -35 Summary of Change.:

1. Addresses the quarantining of plant equipme nt/components. [PMATS*

S...EP-795-19] ,; * . .

2. Deletes attachment providing instructions cn userbf ENS remote headset, and references Emergency Response Telephone Directory for instructions.
3. References updated; statements reworded-to address NOTES and "'IF"..

S.. . statements directing action; references to specific sections in other propceodu.res/instructions. were deleted.'

4. Responsibility for directing the shifting cf the TSC HVAC modes transferred to" the TSC Maintenance Coordina tor.
5. Discussion on TSC activation/response goal. expanded under TSC Cperations Manager.

"6. TSC Operations Manager "activation" actions revised to: designate minimum TSC staffing to \declare facility ordvational, and separate actionsý ifar-!declaring the TSC operaitional a nd for the transfer of Emergency .Coordinator duties.

7. TSC Administrative Assistant "'activation" ctions revised to streamline actions, address callout of TSC Communicatc rs, and elimina'te thejTSC Records Room: clerical- position.
8. Inserts reference to GE BWR Emergency Suppc rt Program :(SIL No. 324) and use of Industry Event Notification-:Form ,(rke INPO) under the TSC Plant Technical Engineer. .
9. Addresses the*- dispatching .of CEI State. Liaj sn -at a Sit-e -Area Emergency by the Regulatory Affairs Coordinator.
10. TSC Activation Checklist revised to'addresi Ftext'.cha~ges_ and -user comments. C.
11. Alternate TSC Layout Figure (Attachment 2) revised to reflect' Regulatory Affairs Coordinator .position.
12. Specifies TSC Radiation Protection Coordin tor responsibility for plant Chemistry activities, including :core 'damage assessment, through the OSC Chemistry Supervisor qfS]T$C 'Dose Assessor. [EP-96-11]

.1.

PIC Number: 2 Affected,*Pages'*..*. i, ii iv,. v: 2 3,- 4, 6, 9, 11,

. . .. 12, 1 I, 14, 23, 2 26, 27, 28, 29, 32, 33 Summary of Change:

1. Addresses the elimination of TSC Access Cor trol Point, including the use of TSC "accountability" card reader as part of facility staffing and issuance of dosimetry by Radiation Protectd on Coordinator per HPI-B0003.
2. Revises Regulatory Affairs Coordinator acti ons to discuss with the State of Ohio and determine the need to dispatch a CEI Liaison prior to a Site Area Emergency.
3. Clarifies actions performed by the TSC Radj ation Protection Coordinator and TSC Operations Advisor which are not re quired prior to the Alert declaration. [PIFRA No. 96-3766-002]

EPI-A6 Page: v Rev.: 10 Change History (Cont.)

PIC Number: 2

..Summary of Change (Cont.):

4. Inserts statement,..-where, applicable, regarding PAP-0224 FFD requirements for call-ins. [PIF No. 96-3794]
5. Deleted reference to ANSI-qualified technician as Dose Assessor.".-
6. Reference inserted for Commitment B01028-:.- i:
7. Various sections reworded/organized to clarify instructions. I:ow-ver, no r.esponsibkýit.ies/actions were created or d~leted'othi-r t h'those

-li-std above.: ,...:' -

PIC Number: 3 Affected 2ages:.-.:; i, iv,ý v,.-2,2,,.4,:-.6I' .17, 18, 20,

  • -.. .. "'J.. * *.-  :" .:*,*:>* 22-,_2 8,,. 2.9 . -. ..... ,.

Summary of Change: -- b * - . t.-.

.. Chang;Lpg 2!fere rnc~es_,~to.- 4PAP-022+ to NOP--LP-lflO02z PIC Ntumber: 4- *.-. A*e-cted

_2, Pages: -i;p*, 1, 3,.4., _-6,- 7, 9a, 10, 11,

>:.*--`: , . -2.1,Z 13, 14, 19, 20, 22, Z5,*  : !286=,

.29, *. 9-32' -33,f <34-ý 35

1. Deletes Reference to EPI's A3, -A4 and.A5- wichw*rex-.consolidated into indsuperseded by:tPL-A2....,:J 7 ,

2." Ch4nged refeencfo to.FistEnergy

3. Replaced reference to PAP-0514 with HPI-B0003. s'--J.

-4. Rep.a,.e. the. Emergency* Response. InformativnS.System. (ERýIS) with Integrated Computer System (ICS). - ,

.Z.

5. Hee*-rtbhy iso.end,/P-,- were. repl-aced;with Radiatiof 'Protection and RP as appropriate. CRRA-00-1159-001 with a 1ý/14/00 due date mandates these "FPIC.:Numbe*.:-5 _-j-.a.A.fected Pa~esi: - iy+/-*. v,..1, 3, 5, 6, 7, 9-, 10, 11,

- *:-*o*13`22j. 24, 26, 27, 30, 32, 33 Summary of Change:

. hangd Qpe2ationj YStaff:position sti*t~le.itto match FENOC titles.

"2 , 3 1 or- 71 7 J f'

EPI-A6 Page: 1 Rev.:. 10 / C-5 TECHNICAL SUPPORT CENTER ACTIVATION 1.0 PURPOSE This instruction describes the activation and operation of the Technical Support Center (TSC), and delineates the responsibilities of designated TSC personnel.

The TSC will be activated for an Alert or higher classification, or at the direction of the Shift Manager, serving as Emergency Coordinator.

2.0 REFERENCES

2.1 Source

References:

1. Emergency Plan for PNPP Docket Nos. 50-440, 50-441 2.2 Use

References:

1. Emergency Plan Implementing Instruction (EPI) Bl: "Emergency Notification System"
2. Health Physics Instruction (HPI) B0003: "Processing Of Personnel Dosimetry"
3. Emergency Plan Implementing Instruction (EPI) Al: "Emergency Action Levels"
4. Emergency Plan Implementing Instruction (EPI) A2: "Emergency Actions Based On Event Classification"
5. Emergency Plan Implementing Instruction (EPI) BS: "Protective Action and Guides"
6. Emergency Plan Implementing Instruction (EPI) B5: "Personnel Accountability/Site Evacuation"
7. Plant Administrative Procedure (PAP) 0103: "Plant Operations Review Committee"

EPI-A6 Page: 2 Rev.: 10 / C-4

8. Emergency Plan Implementing Instructior (EPI) B9: "Emergency Records"
9. Emergency Response Teleph6ne Directory
10. System Operating Instruction (SOI) M52: "Technical Support Center Ventilation System"
11. Preparedness Support Instruction (PSI) 0007: "Reporting Emergency Plan-Related Communications Equipment I roblems" 12.. Phiysical. Security Plan
13. S ytem,0perating Instruction (SOI) 1D19: "Post Accident Radiation Monitoring System"
14. Emergency Plan Implementing Instructioz (EPI) B3: "Radiological Su-FTveys..for Emergencies""
15. Emergency Plan Implementing Instructioi (EPI) B7a: "Automated Offsite Dose Calculations"
16. Emergency Plan Implementing Instructioi (EPI) B7b: "Manual Offsite Dose Calculations"
17. Emergency Plan Implementing Instructioi (.EPI) Bl3:- "Determination of Core Damage Under Accident Conditlo is"
18. Emergency zlan- Implementing Instructioi (.EPI). A7: "Operations Support Center Activation" I
19. Emergency Public Information Organizat: on .- nstruction Manual (EPIOIM)
20. Nuclear Operating. zhinistrative Proce( Lure (NQP-LP) 1002: "Fitness for Duty Program"
21. Security Post InstruqQion:(SPI), 0032: ",Notification :of Key Emergency Response Orgainization.Personi
22. Emergency Plan-Implement.#g, lnstructio0 S(EPI) A8": .;:,.,"Emp rgency Operations Facility Activation" .
23. Plant Administrative Pr-ocedure: (PAP),,1 01:- "Records Management Program"

.A

EPI-A6 Page: 3 Rev.: 10 / C-5

24. Commitments addressed in this document:

B00626 P00010 P00046 P00051 B01028 P00042 P00047 P00053 L01395 P00045 P00050 P00059 3.0 DEFINITIONS 3.1 Activation/Activate' In regards to any emergency response facilitr,,thL- term AC&IVATION shall refer to that time period from the decision to mobilize or ACTIVATE a Sfacility t'o the de ision- `o dedlaf6 !the fadflity bP.RATIONf-.

3.2 Operational In regards to any emergency response fa"i'1itf*,-fhe term =O-PETIONAL shall refer to the decision to declare a facility functional and ready to

  • Z . 2o 4.0 RESPONSIBILITIES " "
4. 1 C6ntrfol Room:Shift ansm!er
1. Direct the prompt activation of the TSC as required by the Emergency

- Plan, and in Supp6rt a --. he C6oiREf6rcbi mal plant events.

2. Direct the activation of the alternate TSC based on plant conditions.

4.2 TSC Operaiti.o.s ' *.iag,

1. Manage the onsite activities of the Emergency Response

"-:Oganiiatio'-&& (ERO)-.. idertti4dirft-16 &f---t'he Emergency Coordinator.

<P00050, P00053>

2. AsSguide "th:- &itids atd -£ 4spoin'i b of -the Emergency Coordinator, from the Shift Managek.-;onde l*+/-*S**s oýratiorial, and subsequently transfer these responsibilities to the Emergency,Coordinator in the

-.. egenty,*Opeiatibnsý Fdilty2-EGFY Ahezi -it has been declared operational. <P00051> '.-- ":J 3 E-r Ensut,+/- iA@TSC is ;maued) an' 4f'erAted Ain accordance with this instruction.

4. Utilize TSC and Operations Support Center (OSC) staff to provide guidance and direction to assist the Control Room personnel in identifying and mitigating the effects of the emergency condition and in the assessment of plant conditions.

EPI-A6 Page: 4 Rev.: 10 / C-4

5. Coordinate the combined activities of t heTSC, Control Room, and the OSC and all emergency teams and support personnel dispatched from

-the OSC.'

6. Provide information to the Information Liaison stationed in the TSC, and approve"Company press statements fcr event classified as an Alert or more severe.

7".-, 'Authorize emergericy radiation exposure limit extensions per

<HPI-B0003>.

I

8. Coordinat4thep quantining of equipmer t/components resulting in or

. caused'by-events resulting in an Emerge n"cy Plan clasqsification per

  • <EPI-Al>.-.,

4.3 Administrative Assistant 1." Cardinaite-the activation arnd manning c f the TSC in support. of the operations Manager...

2. Coordinate TSC Copmunicator and Support Staff activities, and the augmentation and relief of TSC staff.
3. Assist TSC staff in "obtainiuig availablE resources within the Perry Plant diparhment, and within the Compz py-prior to the EOF being declared operational, which may be reqt ired.

4.4 Radiation Protection Coordinator

1. CoordixnaW'.`l17-M4aaition Protection ..anc Chemistry, activities in support of eme'-genidy opezations, inclucIng assessment of radiological hazards within the plant. <P00Q47>
2. Coordinate' inemý offs ite radiologica m6nitoring, dose assessment, and development qof protective action rn commendations.. <P00046>
3. Coordinate the issuance of dosimetry ar ltheprQcessing of emergency exposure limit ext3 si oi*s per '<]HPI-BOO( 13.5. *
4. Coordinate the monitoring of area and irborne .radiation levels in the TSC, and direct the shifting df TS( HVAC modes.

EPI-A6 Page: 5 Rev.: 10 / C-5 4.5 Plant Technical Engineer <P00045>

1. Assess plant-parameters to determine the condition of l.the core, safety related systems, and fission product barriers.
2. Analyze plant conditions and develop guidancp for.protection of the core.
3. Supervise engineering and design activities in support of emergency operations.
4. Provide a liaison between the ERO, Gil.b.ert As.sociates, Xnc., General Electric Company, the Iistitute of Nu~ce~ r Power..pera~ons (INPO),

and"any other contract6r or Industry support organ-izations.

4.6 Maintenance Coordinator

1. Coordinate the dispatching ard tracking of OSCp-e-rs.onnel-, through
  • t

-OSd Coordi'at6r, in' siupport of priprorities estoýi.shped by the TSC.

2o]3t~aiin requir~id'tec'hdital sppqrt ffoZOSC activi.i*s -from TSC staff.

3. Provide the OSC with plant technical, operations, and maintenance

.-infob&_ation, zfomaton an and ~t~nuus~. pprise *eSC! Coord-n~ator of -current coibih plant status and.trani.in &ýdnditiond. o crrn 4.7 Operations Advisor

1. Continuously review eme3qency ronditio~s ..aod recommend 2.Serveassthe ft emerfgenyen. . 3 ~~ .

require,,

2. Serve as theSift ýManager s lf'ison, continuously apprising TSC staff of Control Room operations .and requirements.

afY :r&

Map*paZr . .

of TSC prfor*ites and TSC/OSC activities.

4. ... Sle~tvss' a s proesuing activitie pin support of emergency operations.

Ai ttl-ehe ai ion, rotect4qn, oonihator in the development of relea8ý'diration estimates for protective action calculations, prior to the EOF being declared operational.

6. Serve as interim TSC Operations Manager in the event that the arrival of a designated individual is delayed or the TSC Operations Manager becomes incapacitated.

4.8 Security Coordinator

1. Coordinate all onsite security operations with the Supervisor, Nuclear Security Operations (SNSO), in support of the emergency condition.

EPI-A6 Page: 6 Rev.: 10 / C-5

2. CoorainatW*the-abcountability of onsit4 persQnnel, as necessary, in "supportoftheOperations Manager.
3. Coordinate.he-access control requiremonts onsite and at the Emergency Operations Facility (EOF).:
4. Provide a liaison between tMe Perry P1i nt and any Federal, State, or local law enforcement agencies.
5. AKsisffin the claisifica.ti6n- orreclas&;ification of security related events per <EPI-Al>.

4.9 Regulatory Affairs Coordinator

1. Serve.as a.source of plant and-event iitformation for FirstEnergy

,,Liaisons located in, State and localQCol inty Pmergency Operations Centers (EOCs) or Emergency Management Agency (EMA) offices.

2. Coordinate telephone-communications wij h Federal, State, and local colnty-9fficialsi-outside of formal nol ifications performed in accordance with <EPI-BI>. 7
3. Contactýasecond. Regulatory.-Affairs Co crdinator or relocate to the EOF, when-notified that representative; from-the State of Ohio are being dispatched to the Perry-Plant..:
4. Dispatch .-

_a FirstEnergy .Liaison (s)- to tIl ýe-State EOCs when requested O 4.10 Information Liaison

1. Obtaift evu Eeandissem na4E infoi mation"* concerning the emergency to--h Public 'Information: Re, ponsed"Team (PIRT) or Joint

-Public Informiation7Center- (JPI)in- a'& ýordance with the <EPIOIM>.

4.11 Deleted 0 . . ..

.1 5.0 - ACTIONS 4.---'.

--  :.2.r>'- -.

5.1 Control Room Shift Manager I

1. Direct the activation of the TSC in acc ordance with <EPI-A2>, or the mobilization of TSC staff in support oJ a non-Emergency Plan event in accordance with <EPI-Al>.
2. Direct and announce the use of the EOF as an alternate TSC per

<EPI-A2>, if plant conditions render tlle 603' elevation of the Service Building not accessible.

EPI-A6 Page: 7 Rev.: 10 / C-5

3. Transfer the non-delegatable Emergency Coordingtor duties to the TSC Operations Manager when the facility is qpp-ational tnd-when he is ready to assume these duties.

For events not classified uhf*er <EPI-Al>,: involVing-the mobilization of TSC staff, the duties and responsibilities of the Emergency Coordinator Will remain fwith the Shift Manager and NOT be transferred to the TSC.

5.2 TSC Operations Manager

5.2.1 Activation

- -"..; 1. :Go dir6ý!tli-to Section 6.1-'ifKTSC §taff-is being m6bilized in

"*  %.-- response t4 M non-Emergencg., Plan!-'eveit; otherwise- continue on

" I2.f the- EOF i § o*-b --us dd'-as the fl t ,r to the otherwise, continue on to Sfep-3.

. Dirett:the:Admini~t@*.Ivb Agsistant,-Lt6*oo6rdai"ate the

,,* activ~ati*nof- the*TSCi*Osif TSGJAati'ra1&ion-CheckiJst (PNPP No. 7987, Attachment l)T. -".

a,- - -if a qualified-Adtini*tra*#e?*ss4*tdnt-is 7not yet present in the TSC, appoint an interim Administrative Assistant from available personnel. J Goalfor-rde laring--the ,TSC pe is 60 minutes

.t1qnal from.the timeofevent-.!classifition:

-- 15 minutes for ERO notifications; 30 minute response time when notified; plus 15 minutes to bring facility to an operational status.

4. Contact the Shift Manager to become apprised of current plant status, transient conditions, and emergency actions underway.
5. Utilize the event checklists contained in <EPI-A2> to obtain an accurate appraisal of emergency actions already performed or underway.

J:. .

-" '* - "> -'.3 - '".

  • £C O "' : ,F *..P S .*.
EPI-A6 Page.: 8 Rev.:.. 10

-.. 6... ....Periodical,. assess peron-nel.

Admi~nstrative-Assistant,. to de.tafgl.. eve1s through th-.

§~___-_

-. taffing exists to declare the' SC operational:

er Ffif wn

emneIfollowing oug th------

mnimm -1A o"0. Operations Manager o Administrative Assistýnt O. 5-Way Communicator o ENS Communicator or aisigned engineer

- - . Operations Advisor

o -Maintenance:Coetdinab oP o.........a

. . TanicEngi er 0 .Core/Hydraulic (Reacti r) Engineer

.0o ::-.Radiation :Protection I o*ordInator

- . . .- .- .Dose Assessor' (on-shi: t :Chemistry Technician)

a. If the arrival of a requiri dnTSC staff member is delayed, . .

use your judgment in appoii ting another available TSC i.staaff :member to covet that position on an interim basis.

b.. : Direct :;the ',Admlnistrative :; sisstant t6 traik the arrkivl of qualified personnel for the following TSC positions

... whch-can

.. :be manned. after..J he .TSC. is declared .operational tocAugment-staffinge, o Electrical Engineer

.o -echanival Engineer :

o

_. Re*uatoýry.gfairs Co o Seculi .it:

Coordinator o Information Liaison o Radiation Protection Jassistant 0 Communicatore 3o2d)7 ° * . . . .. .

PIC-1/VAX/Page 7 of 27

EPI-A6 Page: 9 Rev.: 10 / C-5

7. When the minimum staffing requirements are met and the TSC is ready to be declared operational, perform .the following steps using., the.:TSC Activation Checklist:

An Interim Operations Manager may declare the TSC opera tional- and accept responsibility for the non-delegatable Emergency Coordinator duties in coordination with TSC staff.

a. Use Intra-Facility Public Address System (PA) to:

-.

  • o;L "* 1,?

(1) Brief TSC/OSC staff on current plant status, event conditions, any.-emergency response efforts underway, and Control Room needs and priorities.

(2) RemindTSCstaff:'.toJ6g-in fdr accountability purposes using the TSC Hallway card reader.

b. Announce over the Plant PA System that "the TSC is

.'OPERATTIONAL, :and,: contiol forOSC activities (if operational) has been transferred to the TSC". Record

.mt-ime t :TSC declarrd'-OPERATION&A in Logbook.

co,., Inform-the Securit-y.Coordinatbr that the TSC has assumed responsibility for directing SAS to perform further ERO

... -In~frm the ShIft _Manager. that .tChdrTSC is now OPERATIONAL, and establish

.. when the following Emergency Coordinator

..'.4utieis:will -be,_tran.-. -rtzcrS:

- offsite not~if ifi.a.t'.ior s. pEPT!.-Bl

- offsite protective action recommendations per EPI-B8

1) Notify the TSC administrative Assistant prior to a s sumiLg, q f f$ita t- ation responsibilities.

...' f not.ficatoz 1*p~finf (within 30 minutes), the TSC should defer assurqing offsite notification responsibilit s iit*r"t1e Upcoming notification is

!completed. . ..

e. 'Aofiný oVe'r-the.'-n r'a-Fa6ility (TSC-OSC) PA the transfer of Emergency Ciordina'tor .d4ties from the Control Room to the TSC, recoitl t?6'sfer in logbook, and post the transfer of responsib').J:ties on facility status board.

'f. .... Rvi-eWandS*-~the TSC Activation Checklist.

EPI-A6 Page: 9a Rev.: 10 / C-4

5.2.2 Operation

1. Perform the actions of the Emergency Coordinator outlined in

<EPI-A2>, concurrently with this instruction, utilizing the associated event checklist to document completion of required actions, until such time as the EOF is operational or the event is terminated.

EPI-A6 Page: 10 Rev.: 10 / C-5

2. Direct OSC operations through the Maintenance Coordinator in support of established priorities.

The Control Room Shift Manager will retain the authority to direct the Fire Brigade, First Aid Team (FAT) and shift personnel.

3. Ensure the effective direction of the onsite emergency response effort through the establishment, periodic revision, and tracking of TSC priorities.
a. Establish OSC and Engineering Task Priorities in conjunction with TSC staff and post on facility status boards; revise periodically based on changing plant condition.
b. Direct the quarantining of equipment/components, whose failure resulted in or was caused by events, leading to or associated with the E-Plan classification, and which restoration is not immediately required to support the safe operation or shutdown of the plant.
4. Direct technical and engineering analyses through the Plant Technical Engineer in support of established priorities.
5. Direct radiological aspects of the emergency in-plant and within the site boundary through the Radiation Protection Coordinator.
6. Approve the extension of personnel exposure limits, as recommended by the Radiation Protection Coordinator, per

<HPI-BO003>.

7. Approve and implement onsite protective actions as necessary.
8. Ensure the effective and timely communication of TSC priorities and OSC team status to the Shift Manager, and briefing of TSC staff on Control Room activities by the Operations Advisor.
9. Approve the use of potassium iodide (KI) for plant personnel, and Radiation Monitoring Team (RMT) personnel prior to EOF operation, per <EPI-B8>.
10. Ensure the effective and timely implementation of the accountability of onsite personnel through the Security Coordinator per <EPI-B5> at a Site Area Emergency.
11. Periodically review established priorities, and brief TSC personnel on the status of the emergency, Control Room emergency actions underway, and the status of OSC and engineering activities.

EPI-A6 Page: II Rev.: 10 / C-5

12. Provide updates to Federal, State, and local county officials over established telephone links at the request of the Regulatory Affairs Coordinator.
a. Do NOT become distracted by calls directly from the NRC or other offsite agencies; refer calls and inquiries to the Regulatory Affairs Coordinator.
13. When informed that the Nuclear Regulatory Commission (NRC)

Regional Site Team has been dispatched to the Perry Plant, perform the following:

a. Notify Regulatory Affairs Coordinator, the Shift Manager, and the EOF Emergency Coordinator (if the EOF is operational).
b. Direct the activation of the EOF at this time, if the EOF has not yet been activated.
14. Direct the transfer of responsibility for offsite notifications, event re-classification, and for approval of offsite protective action recommendations to EOF once operational and the EOF Emergency Coordinator is ready to accept duties, by performing the following:
a. Notify the Administrative Assistant when responsibility for offsite notifications will be transferred to the EOF.
b. Notify the Radiation Protection Coordinator when responsibility for offsite dose projection and protective actions will be transferred to the EOF.
c. Update facility status board to reflect the transfer of Emergency Coordinator duties to the EOF.
15. Direct the Administrative Assistant to establish a Plant Operations Review Committee (PORC) quorum for an unscheduled meeting per <PAP-0103>, if deemed necessary to address procedural concerns.
16. Approve Company news statements for events classified at an Alert or higher, prior to the EOF being declared operational.
17. Authorize the Administrative Assistant to develop and initiate a relief rotation for TSC and OSC staff.

If radiation levels resulting from an offsite release restrict the movement of people within the 10-mile EPZ, direct relief personnel to report to a FirstEnergy facility and arrange for transport to the site.

EPI-A6 Page: 12 Rev.: 10 / C-4 "18. <ire6t -the 'colection of event rec ords per <EPI-B9> and demobilization of the TSC staff u] on termination of the event.

5.3 Admninistrative Assistant

5.3.1 Activation

1. Go directly to Section 6.2 if TSC staff is being mobilized in response to a non-Emergency Plan Event; otherwise continue on to Step 2.
2. Initiate the callout process upon arriving at the TSC when o**nsite, or prior to departurie fron home to the TSC by cont~acting a support staff'member or communicator to initiate a cali tree, to obtain a-totql of 3 Communicators and 3 Support Staff. Ensure fitness for duty st atus is determined per

<NOP-LP-1002>.

3'. Track'the-arrival of T1SC'st affme )era on TSC Activation Chdckli'st, -and briief the TSC Operz tions Manager on staffing

-levels upon his arrival and rautir ely there after until requiredTSC !staff posit~ions are Irilled.

a. ff the- activation of the TSC coincides with the initiation of a site accountability/evac uation, contact the Training

"'and-Educatioin Center (TEC)_ A. dftorium at Ext. 7817 and Seither dismiss the assembled personnel or direct needed personnel to report 'to the TVC.

4. If the` EOF is bei'ng usedas the `4'] ternateL TSC, refer to the Alternate TSC Layout (Attachment
  • before proceeding; otherwise continue on to Step 5.
a. Assist arriving TSC staff in finding workstations and equieidnt.- ..

NOTE: "TSC 'forms -anid -"thei reference materials are stored in E-Plarnilc cker located in FirstEnergy Room.

b. In addition to the actions l1sted on the TSC Activation Checklist, perform the folloýring:
1) Instruct TSC Engineers I o use TEC 110/111 Conference Room as a work area and to install telephones stored in E-Plan locker.
2) Relocate photo copier (* :EROX) from the second floor, TEC to the EOF using th4 door key located in EOF keybox.
3) Instruct the On-Call Emirgency Plan Representative to assist in placing the ECýF HVAC in emergency isolation, if required.

EPI-A6 Page: 13 Rev.: 10 / C-5

5. Coordinate the manning and activation of the TSC utilizing the TSC ActiVation Checklist'. : .
a. Assign Communicators to the following circuits as personnel become available: . . . . .
  • ("5-way") State and Local County Ringdoiwh.
  • NRC -Emergency Notification System (ENS) Circuit.
  • FirstEnergy 800 MHz (RMT) Radio Link.

'I f sufficilent communicators are "h'o'tavailable within

" 45 minufes 0'f declarin 'the event to support the TSC operaton6al,? contact -ihe Shift Manag4er and coordinate

.the transfeir of Contro-l Room C6mmiunicators to the

b. Verify that.a TSC engineer has been assigned by the Plant

"- Tec~zcal n.g~neer Lo.h~e NRC' ENS C~rcuit,.

'-6* .Q aKht h

c. At arx AVert classification or aove, verafy that the Emerg ency Response bala S'ystlem'(ERS'YVIink to the NRC has been initý,ited. by the ,TSC .Operations Advisor.
1) If not yet opera'ton-l, acivate ERDS per "dSecrtion 5.7.. A -Witln ,,i .'hour of the Alert

" de-claration.'" "

d. Assign s.upport (c~erical) staff i. the following tasks as tybec~dmd tney~ av*.a- ~

via~e ~:Deom _*...

  • TSC Operations Manager's' Log S'¶TSCa"ask rziorities/OS* TeI'amStatusboards
  • Plan't ,TeQ.nica.. Data*and Plant Radiological Data Statusboards

'" . " . ;. .s.*. ". ... " . -"  : - " .

EPI-A6 Page: 14 Rev.: 10 / C-4

e. Synchronize facility wall cl( cks in Display Room, FirstEnergy Office, Haliwayy nd the Access Control Point with I-ntegrated Computer Sysi em (ICS).

This action shall not delay declaring TSC operational.

I

-6. ,Subftit the';TSC Activation Cheokli: ;t to the TSC Operations Manager for review and approval o:kce minimum staffing has been met and equipment checks performe(

Sa.* If upon completion-of the TS( .Activation Checklist a designated TSC Operation's- Mai agerý has not yet arrived, forward the checklist to the TSC Operations Advisor as interim

h. ,TSC Operations Ja'nagf ~r.

7.,. Inform the TSC Communicators when the! 1SC will assume responsibility* f6r iaking offsite notification to the-NRC, State of Ohio, and local Counties 5.5:.2 ipt n:

1. Coordinate th1 -drafting,. review/al ýproval, and transmission of the initial and follow-up notificiLtiols to the NRC, State of Ohio, and local counties per <EPI Bl>.
2. *CoDrrdrhat 'tihe drafting,' reviewial )ppval, arid transmission of peri&ii* ,updiates" and, requests for technical assistance to the INPO and American Nuclear Insurer, (ANI) per <EPI-BI>.
3. Conduct tel'6phdne'callouts fora 1i'tidhal TSC staff if required, or to assist the OSC Co( )rdinator,.in contacting

- addit1on I "pbrsonrel, 'using the .<] 6teg6,ncy Response Telephone "Directo>11. *1nsrure thed fitness fi d~uty s~tatus is determined per <NOP-LP 1'O02>.-

! ,*i,, 1 " 'A

EPI-A6 Page: 15 Rev.: 10

4. When :informed by :*the "5-way= Commuidcator that State represntatives arle responding to the Perry Plant, perform the following:
a. Inform the Regulatory Affairs Coordinator.
b. Instruct the Information Liaison to notify the PIRT, at Ext. 5044, of the pending-arrival of the State Public Informa~tion.Officer.
5. When informed by the ENS Communicator that the Health Physics

.Network.**(HP.).circuit is to-be opened; inotify the Radiation

  • - Prq'tect~ion Coordinatpr..
6. When informed* by, th* ENS Cw .muaicator...that the NRC Regional Site Team or Augmented. Inspection Team (AIT) has been Aispatched.

d t-the Perr..Plant, '-notify the -Operations, Manager

" ... IV~ l(~ator Affairs Coordinator. * -

a. Direct the appropriate Communicator to announce-the activation of the EOF over the "5-way"'-,circut if the TSC Operations Manager directs the activation of the EOF in support of the. NRC .- Tm. -

-~~~~ "'r +/- J.. Ir ..

7. Deleted <
8. Obtai 'n availaI?le Perry. RUaz, and.-CojPawzi reources as necessary to si~pp~t. ergenc, 4 respponsqc~itj~

.a;" Ifthe6*O' c -i s' foperational, direct any requests for C re~sorces*t theOFFMana`p~

'-ieir~IIt i &

` "-Cer.ýr,_ . ompa ny1 9Le;.re44ta- te emerg.n An-r ed communications and

  • ýP*.-- : .e.* -Exch fige_,f)a4 Off-Premise EWchafge (OP~i) Crcui`ts e P'D9
10. Initiate repairs to administrative support equipment, i.e.,

FAX, Xerox, CVAX, aperture card reader, etc., by contacting the party(ies) listed in the <Emergency Response Telephone Directory> under "Communications Equipment Operating Guidelines.=

a. If site personnel accountability has been initiated, contact the OSC for available technical repair assistance.

PIC-1/VAX/Page 14 of 27

EPI-A6 Page: 16 Rev.: 10 / C-4 l1" Wheul iirected to convene an unsch( duled PORC meeting, assemble a quorum using a qualified chairm* 6 or designated alternate and qualified members or alternates or site or via a conference call and act as PORC-Secretary in acco: dance with <PAP-0103>.

12. Upon the activation of the EOF, cc ntact the EOF Manager to cdoordinate the transfer of offsit( notification duties, but DO NOT transfer this responsibility ntil.authorized by the TSC Operations Manager.

.a. Dire6ý the TSC Communicators to transfer offsite notification responsibilitie! to the EOF when authorized per <EPI-Bi>.

The TSC will retain respons ibility for maintaining an open ENS line after,.the EOF. is .operational and:

responsibility for offsite Aotifications have transferred.

l

13. Coordinate the relief of TSC and SC personnel at the direction Io*the TSC Operations Manager by* erforming the following:
a. Determine TSC relief-personri. 1,needs for key TSC positions and OSC relief personnel nee( s through the Maintenance e-.Co6bditator, and'submit rosti rs to TSC Operations Manager

ý.i.foi.trerview and appioval.i

b. Have the Radiation Protectioi Coordinator determine

-wfiether7relfef personnel sh6i Id be directed to report to

the -PdrýrPlant site6dr to ai 76ffsite company location.
1) If radiation levels froi an offsite release restrict
  • ;.- md'*i*ent'in the 10-mile

'Z, coordinate with the EOF,

-If otpdrtiozia~l' in'dire' ,ting relief personnel when contacted toriepbrt. to f FirstEnergy facility, such as the Concord Service ,enter (COSC), in arranging

--transpVrtadtion
to- the s. te through the Transportation Officet~a-t*th-- Lak-e !Cou: ty EOC at 953-5480, and in establ-i~hA~kg,'radi ojoic, .1monitoring/dosimetry requirementsi.
c. Direct available Communicato. ,s and support staff to contact required TSC relief ,iersonnel utilizing the

<Emergency Response Telephon ý Directory>. Ensure the fitness for duty status is d !termined per <NOP-LP-1002>.

EPI-A6 Page: 17 Rev. : 10 / C-4

d. Assist the OSC Coordinator in cqntacting required relief "per.sonnel using the OSC Staff Callout Listings available in the OSC. Ensure the fitiess fori'duty status is determined per <NOP-LP-1002>.
e. Keep the Operations Manager informed of the status of staff relief efforts.
14. Upon de*ctivaion oftte TSC peffd the following:
a. -Retdrn TSC HVAC-to normal operatin4 mode.
b. Coordinate the collection of event records per <EPI-B9>.
c. Clean~up 8f~the TSC.
d. -Dismiss fa-Gi1ity-eommunicators--a~nd-support staff.

5.4 Radiation Protýtcoi"noordiratox.

  • ..- . - "-., 3-

5.4.1 Activation

J.

1. At an Alert classifilafc'`6n-or above, perform the following:
a. -.-Direct-,the on-eshift or o1herqualifiqd Chemistry technician to report to the TSC as a Dose Assessor and to

. . * . performnhe following-  :. -.

l)- Verify-.the.oper bilit~y.ef*hgc;omputer-Aided Dose AssessmentPrgrapiCADA-an=ýassociated DEC laser printer per <EPI-B7a>.

_,,,,) +/- Asse*)

S ble two. (2 RMTsin 1 _ OF Decontamination Room "i

,- ,per <EPI-B3>, -and-.brie z-*m-prior to deployment.

<P00059, P00042>

  • ..=.z -.':.*.*.-*:+/-Lc .eri.fy-that,-,he.

Z S@.bop-ne and area radiation

.-.monitors areroperat-ig¢ or are placed in operation

- - - ~ i - -per < S O I-;r l-JP.C j

- .. ea or airborne radiation

%,.- . .r out.ofservice, direct the OSC

.,-r.-- .- , -. oo Supervisor to have periodicahbi.ab.i'ity monitoring of the TSC initiated.

S. . ... 'r' c .; " '.. . ..

EPI-A6 Page: 18 Rev.: 10 / C-4

b. Verify with the OSC that-a mjl Lmum Of four (4) Radiation Protection (RP) technlcians a.e available onsite or are being called in to suppoit in. .pl~nt/OSC RP activities.
2. Call-in, or obtain from the OSC if available, a qualified Radiation Protection Assistant (RP, 0, if additional support is needed to track'and evaluate in-pl Lnt Radiation Protection concerns and OSC activities. Ensu *e the fitness for duty status is determined per <NOP-LP-1 102> for all call-ins.

3.. Request from the Administrative As$istaht. that personnel be assigned, when available', fto the fllbwing positions:

a. RMT COmmunicator
b. RAdiblogical Status Boards (i STSC Display Room) lTheRadiation Protection.?Coordinator is responsible for instructing the statusboard keeper on how and when to u:date-boards,. and for-resolving anyquestions or dis crepancies in data.

i J.

5.4.2 Operation

1. When notifiedby':the: Admin.istrativ A-Assistant to establish an open line on the HPN, assign an av ailable Radiation Protection techniciaw .from-the*OSC to keep th e NRC apprised of significant plant Radiation Protection concern s'and .answer any Radiation Protection related questions regar ding the event. <B00626>
2. Directý thýaiRdiatibn Protection As .ikstabnt to perform the following:
a. .ITterfa* with .the OSC R-P- Sup ervi-s-drsd.to- 1ensure the continuous monitoring bf rAdi 01logqical condition in-plant and onsite.
b. Monitor plant radiological- tI ends on -the Integrated Computer System (ICS); immedi ately notify TSC staff and the OSC RP :S iev+/-sor-of -sigr.ificant changes in radiological dc dit.idns.' L

EPI-A6 Page: 19 Rev.: 10 / C-4

c. Assist the Administrative Assista.it in completing ap1i6cible pporti0ons of the Initial Notification form (PNPP N6.,'7794), Follow-up Notification form (PNPP No. 7795),

and° ndustry Event Notification form (PNPP No. 9596) per

<EPI-BI>.

d." Periodically update or assist Support Staff in updating facility statusboards with current in-plant and site radiological information.

e. --Assist the HPN Communicator in .responding to NRC inquiries

-.... . and-periodic statuis- updates.

3. Recommend the use of protective measures, for plant personnel as needed, including the use of potassium iodide (KI) per

<EPI-B8>, respirators/self-contained breathingapparatus (SCBAs), etc. .. gaprt

  • 4*4

. Direct -the Dose Assessor to coordinate -the. f6llowing:

...a. - Control and deployment of RMTs per <EPI-,B3>. <P00059>

b. Assessment of actual or postulated radiological releases per <EPI-B7a> and <EPI-B7b>.

C. Development of Protective Action Recommendations (PAR) for thte, general publ*jc :per *<P-B8>* .r,.

d,.: ie ecommepdat-p!o of prot-w-ý,ý,.-ae _e,, for RMT personnel

,:[":..*a pg.:*.EP*-B3>.. ......, "* u*.......,*=,**-"

e. Ensure that the Radiological Statusboards are updated with

. doIoe-,tes, ,t or-1yId &i ns-, etc.

5. Review and recommend PARs for the general public to the TSC ape~etios -nager. far, apprQin l,: (V1zr. t-' the EOF assuming
6. Periodically verify radiation levels on both the TSC area and "qtaQ,.

a r*4 aton readings exceed normal levels, direcc h. J2GTMaintenance .Coordinator to have the TSC HVAC system placed in "recirculation" mode; consider recommending the evacuation of any unnecessary TSC support personnel and issuance of high range dosimetry per

<EPI-BlI>' and initiate periodic habitability surveys by Radiation Protection.

EPI-A6 Page: 20 Rev.: 10 / C-4

b. If either monitor becomes out of service, direct the OSC Radiation Protection Sup'ervi,*or to initiate periodic TSC habitability monitoring.
7. Coordinate plant Chemistry activit ies, including the estimation of core damage per <EPI-BI3>, thrc ugh the OSC Chemistry Supervisor or Dose Assessor.
8. If the TSC was activated at an Um sual Event, perform section5'.4.1.1 to mobilize requ*2 ýed staff when event escalates to an Alert classification or aboi re.
9. Upon'the _declaration of a Site ArEa Eniergency, perform the I

following:

a. Dispatch -a Radi~atiIn Protect [on technician to the Primary Access Contact Point (PACP) n support of personnel accountability and, if warrai ted, recommend to the TSC

-Operations Manager- th.:use o0 'dffSite assembly/dec.ntaminati6n cenrt ers per <EPI-B5>.

`b. Verif:ra minithium bf seven (7]

Radiation Protection

".i Techticians and two'.(2) Chemn stry Technicians are onsite in support of in-plant/OSC aWItivities. Direct the OSC to conduct additional callouts is necessary per

<NOP-LP-1002>, to meet this ,( :ommitment.

c. Direct the Dose Assessor to r Lobilize a third RMT per

<EPI-B3>,, and to brief EOF p( ýrqonýel on dose assessment Ai .*">Te"actiýtie ,s::i'

. <PO04.':

d. Ens~ue dosimetry is issued .t(* TSC, Control Room, OSC, and

";EO.F*

stff pek <HPI-B3>5

e. Pis ,aldP'ýTl ,R"" dhr iiiah, W1jen available, to the EOF to asslst In radiological monit( ýring of facility.

.) If kup,0OF 1 is .a&tiv.al red.injieu, of or in support of onsiti EF,d -dspatch an RP iTechnician to the Asht4,..er'ice Cente. (ASSC),

10. ,Onfie the EOF isir.4gi~na1, perfcirm the following:
a. When authorizdby i" ! esponisibilityý. A, the., TSC .Oj dosie- assei
  • erations Manager, turnover of

ýsment activities per <EPI-B8>

and for control 'the MTs I er <EPI-B3>.

EPI-A6 Page: 21 Rev.: 10

b. ..Request the Offsite Radiation Advisor (ORA) to open the EOF HPN line and handle NRC revests for dose assessment information.
  • Responsibility for relaying information on site and in-plant health physics concerns will remain in the MSC..
c. At your discretion, relocate the Dose Assessor to the EOF to assist in offsite-dose assessment activities.
d. Continue to track protective actions being recommended by
  • -
  • P~iry, and-Im~plemented .offsite.

e.*Ino.rz-.th4 09RA of radiochemistry .and radiological survey

..SUtsj or ,aidipatedplant oper4tions which may affect 4e dm"s - jecti60i.

11. Provide instructions po .C.qntrol Rqom, ..4 SC, TSC and EOF staff on t.46 'dollectionan,d,peo.essieng of- =osimetry as part of staff I 5enief dirfaciEi ie d... ea... ,...

5.5 Pl~ant -V~cbiImia nier - .-

5.5.1 Activation-.

I. Deterifnei3f 4'core /Hk0kuiu'c. giFer Electrical Engineer, and MechaniCiltEngineer nave arrived yet.

NOTE: leerC~faxd M..neers have a response time goal of *60 miiznu-es; therefore, declaration of the TSC as operationa; Ihoul4 not be delayed pending i"-aýr V ihe -Of tese Ing, ieers.

2. Assign .the first available enineer to monitor the NRC ENS

- . C*uit 6U1diieft-indii"I to!'Oerfofm the following:

NOTE:Ik Operait1*. itrý*6l&i 'are listed in the <Emergency Response Telephone Directory> under *Communications

  • Equipment Op~e~iegýGuidelines.

. . a. Inform the NRdofa'fiificant changes in the operational 66t abnormal trends in plant data.

b. Record NRC questions and requests on a Communications Record Sheet (PNPP No. 6284) per <EPI-BI>.
c. Keep the Regulatory Affairs Coordinator apprised of NRC activities.

C-1, 2 Page 18 of 27

EPI-A6 Page:' 22 Rev.: 10 / C-5

.. .3...Contactadditiona engineering st ff.members based on the emergency event. Ensure the fitn. ss for duty status is d.etermined for call-ins per <NOP-: ,P-1O02>.

a. Contact the on-shift Shift E:gineer (SE) to locate the relief shift SE and/or the t: 'aining Shift SE during normal working hours to support TSC operation.
  • .* Appoint engineering staff members as they become available, to the following duties.:-.

.. Lead Engineer to coordinate.i nd, track engineering activities and to bief TSC:* ngineers in plant FirstEnergy Room on event status and pw .t conditions.

b. ICS Operator/Plant Technical Data Statusboard Coordinator.
5. Update the Plant Technical-Data S.r at-ýboards, and request from the Administrative Assistant that a support staff member be assigned to maintain this board w] en available.

Th"Plaant; Technical Enginee'r is +/-esp6-sible for instructing the statusboard keeper on how and when to update this board, and for resolving any queztions,or discrepancies in data . _ _ .... .... _::

a. .. ,,Ift'e.ICS is inoperable or Occess. to data limited, disp'ýtch &axiava3la-le, 'ioimun:ýcator-.or TSC/OSC staff member to the Control' Rorm 'to "i.nitiiLte 'and maintain an open line over,*he.StaOusboard,Ringdom ý,Circuit.
6. Contact the Control Room STA to V( rify.,-that the TSC-STA Ringdown Circuit is plugged in an( 'operational.

7.. Initiate amnd track.engineering aci ivities i-n support of the emrgency event ,pasd 'onpriorit+/-i s. once-established.

8. Brief the ,jSq ager n,,engineering activities which are underwa-,. required,. a .well as engineering support available to. respond. ;tQ.z.the. emerg( ncy event.'

5.5.2 Operation

1. Deleted
2. Maintain contact with STA~foran.ý ssessment of plant conditions and current or postulated 'Control Room,. actions.
3. Direct the actions of plant.techni -al. and engineering design personnel to analyze plant c6ndit! ons" and system/equipment status in support of the ControlJ, oom shift staff and based on priorities established by TSC Ope3 ations Manager.

EPI-A6 Page: 23 Rev.: 10

4. Track TSC engineering activities and revise ,assignments as ne4deid to meet u ent TSC priorities ,.
5. Assign available engineering support. to assist in briefing osC teams and in providing in-plant engineering support to OSC team members.
6. Act as -aliaison between the ERO and INPO, General Electric (SIL No. 324, *BWR Emergency Support Program.), and other contractors c'dr Indus*ry support organizations on technical and design matters. <B01028>-

Sa. -Request for INPO tdchnical or 64dipment/expertise location I

'assistfance should be made through the Administrative

--"'Assistant using ar Indudtiy Event Notification form (PNPP No. 9596) per <EPI-Bi>.

7. Ensure that the Plant Technical Data Statusboard is updated periodIcally andt data, i.e., system~stat~is,' interpreted when required..

. 8. Periodically AppriseA yy._TSC _ta fzeberP. of plant technical and engineering desi n activities underway and recommendations develp-ed.,-- .- .. .

.5.61 -. Activation:t.. .. ..

1. tdef4 69 _to'ii-o t6te-666"ife 'apprised of current OSC

~~\staff i6 iidga i i a.- paJ1int an OSC tooidind*adr om -supervisors available in the OSC, if the arrival of A designated OSC Coordinator is 2.. Initially update the OSC Team Statusboard and request from the

. dmiifst~ative A ksht-a, .u-jport member be assigned to

-1WtWWW thi:s b-b fi.i*in tfie 'OW CreV Status Ringdown.

The iaintLena6ce _Codroi&6tr i s reSiOnsible for instructing

-the-"btAtus bord ke0pi&6, "ihw and when-to update this board, and for resolving any questions or discrepancies in data.

3. Apprise key TSC staff on the status of the OSC, including

- curret -aki ptojeateFstaf-ing levels and activities presently undarwa*-'r -I ." - -ý-- " "

- 42 Notify thei TSC. operations Manager: when ready to assume control

~'. -6f thee OSC If"o'ithe Control Room.

-a E r,- D4' -

C-1, 2 Page 20 of 27

EPI-A6 Page: 24 Rev.: 10 / C-5

5.6.2 Operation

1. Notify the OSC Coordinator when c(ntrol of OSC activities is assumed, and request that TSC Opei ations Manager announces over the Plant PA the transfer of OSC ctivities to the TSC.
2. Ensure that the Operations Foremai and the Plant Operators (POs) are relocated to I he OSd when operational per

"-<EPI-A7>.

Control of the on-shift POs remairs with the Control Room.

I i*3. Dizect.the. dispatching of emergen y.teams and support personnel from the OSC through the OSC Coor inator-per <EPI-A7> in support of the Control Room and based on the priorities estadblished by the TSC Operations. Manager.

All plant personnel available on' ite, i.e., Security, Safety/Fire Protection technician s, etc., should be assembled and utilized if necessery to support OSC

.ctfivjtie-U'"

/. " :.

  • until the OSC staff iE properly augmented.
4. Establish the briefing requiremeni .s, as outlined in <EPI-A7>,

'for eadh OSC team direacted to be Lispatched.

5. Requ6st a'ssisfanc'e from the Plant Technical Engineer in briefing OSC teams and for in-,plai Lt engineering support when needed: -.
6. Continuously apprise th~e OSC .CoorcLinator of plant conditions and emergeqy, act*ins underway, iiýcluding Control Room activities- and TSC ,es.ablished pr: ,orities.
7. Ensure that t*e OSC Team Statusbo*

rd is kept current and that key TSC staf* .,re periodijcally in4 onrmedof.the status of OSC activities.

8. Direct OSC Coordinator to request that the-Operati.ons.Foreman dispatch a PO to realign the TSC I[VAC per <SOI-M52> at the request of the Admini.strative Ass: ,stant or Radiation Protection Coordinator.
9. AssIst the AdministraIA'eAsslstai ýt in developing a relief rotation for OSC staff personnel i rhen needed.
10. Direct the.deactivation "ofdthe OS( ,ýwhen ordered and notify the TSC Operation Manager wher OSC-deiýctivation is complete.

EPI-A6 Page: 25 Rev. : 10 / C-4 5.7 Operations Advisor

5.7.1 Activation

i. At an Alert classification or above, activate ERDS with NRC per the following: <L01395>
a. "1fer to the Emergency Response Data System Users Manual "next to the ERDS terminal located in the TSC FirstEnergy Room and EOF Display Room.

"b. Press tlie RETURN key.

c. When *the--computer prompts for "Usernayfte, enter -ERDS and

-,press RETURN' ky.  :

d. .When the-computer prompts .for Passwordf--,; nter NRCERDS and press RETURN key.
e. Eiter 0*t'on ',-and press REZTURN -key.

-- If ERDS Q'an not be activated due .t computer/modem "problems, notify the NRC over E*N Circuit, document failure in log-, -and contaet--Computer Support Unit (CSU).

2. Contact the C6n-trrýRbom p'e.~s~e s "too b4eome apprised of their

,tbc-6eprsdo hi activte, i. plant s ySrtm'4qupm'-s-tat*u~s, and applicable emergency procedures/instructions entered.

3... '. .-. - of' p*tata' dot, f*'ICS and the initial updating of the Plant Technical Data Statusbsoard.

4.-'Act-as iriim Oper*t1i.&1s M* i'kg* r-96tion

..- 5.2, if the

-Q arrival of,:a qualified TSC OperatiAns-anager!is delayed or if the TS Oper'ations 1arig9g4emjr 'b ipaired, to allow the TSC to be declared operational in support of the Control Room.

Apprise -týai- a6cpeiaebnsa

-ujpon atriVal of Control Room and plant emergency activities presently underway.

",'.: : C tinuously~re~i*W a dr+/-e the criteria: set forth in

<EPI-Al> with current or projected plant and emergency

.conditions; recommend rqclassification of the emergency event

"*- "a' Operati n ;5ýs -required.

. . L. -I 3LS- :

2. Monitor Control Room actions and operations to ensure compliane'witl appr ved dperating procedures and instructions

S.. C' EPI-A6 Page: 26 Rev.: 10 / C-5

3. Serve as a liaison to the Shift Miinager by:

I

a. Briefing TSC staff of"Cdntro' Room'activities, operations underway or being considered, and needs..
b. Apprising Control Room staff of TSC established priorities and the statu's of TSC engineo ring and-OSC team status and activities.
c. Advising the TSC Operations fahager on matters dealing with the operation of the rei Lctor and support systems.

-d. Assisting in the:-rsoJlution ýf any problems regarding the reldcationof th4 Opqerti 4 ns Fore-man and POs to the OSC or in the effective utiliZation of thd POs.

4. If -the-TSC was activated at an nl sual .ivent, perform 5.7. to activate the El DS bfOadcast. to the NRC when event- e'scalates ta an :Alet class: .fication t 'above.
5. Assist the Radiation Protection Cc ýordinator and Dose Assessor nthe in. . forlationof*release duri ýtions tor offsite protective

- "act&Tons t6 thd Plant Peprations A( Ivisor, when the EOF is operational.

6.  :-Assfslt-hi-*n ýthe t-ra~nsfer of plant Qoierations information and adtionm to -the EOF. .
7. ASislzthe Shift Mtnager in c-ood nating Radwaste processing actiift*ie":in coordinating in sup] ort 0of* the emergency event.

5.8 Secur.i ty Coordinator .

5.8.1 Activation

1. Become apprised of Security.;activ:

t-ios.underway and update the SNSO on current plant operations nd emergency activities, as wel*' as "any-an-oral iadiologicai conditions in-plant or o~nsite.

2. Brief the TSC. Ope;itaons -Manager. ndTSC,-staff on recent and on-g.oing Sitse. Proteqtlon, -response.
3. If the TSC is being activated con( urrent. with a Site Area Emergency declaration, verify thai personnel responding to the TSC use the TSC Hallwyw*5card-.readc r.to Iog-in f or.,

accountability purposes*.j.* *;

4. If the EOF is being used as the a:ternate TSC, request that a security officer be dispatched to establish access control and restrict access to FirstEnergy eml loyees.

EPI-A6 Page: 27 Rev.: 10 / C-5

5.8.2 Operation

1. Monitor on-going security, First Aid Team (FAT), and Safety activities, and provide support to the SNSO in support of the Physical Security Plan.

NOTE: Only Channels Z and 5 can be,monitored by radio unit

.at Security Coordinator',s desk.

2. _Apprise the SNSO of the emergency actions underway and abnormal c6niditionsrin-plant Sradiologfcal or onsite.
3. Direct the SNSO to have all securityofficers-report to the OSC

, w'heno-perational .jriQr to(, entering the Ra iologically Restricted:Area'.-R).. .. " -,

4. Immediately notify T]SC..staff 9f an.actual ,opr potential fire or fr5st al., incilent. ard cordinate wait-h tM.padiation oator t:o ,niure"ompt p. -ntry and support of plant-and offsite responders entering the RRA.

"

  • c
  • IC'. ,. *" * ). . . J ' *A.'

. ,Provide a liaison bletween the Perryant *nd offsite law

,enforcement agencies* concerping o9nsi ,e .ce*1urty actions

- underway and requests -for assistance. , 1...:

6. Upon declaration of- a Site Arq4 .Emargenrcy , the direction "of the Operatiouis Manager, perf6rm-*the., toJioning:

a.._ Commen.ce- per;sonnel cco-untabi i"y .cpiynsper <EPI-B5>,

and verify that TSC_ staff _bas 4:g e*-!n using the TSC Hallway card reader.

Within 30 minutes of initiating accountability, the Control Room Shift Manager must be n6t-ified of the number of people unaccounted for and search and rescue

b. Ensure a Pager Messages form, (PNPP No. 91:00) is promptly drafted and approved by the TSC Operations Manager; the
-; '.-: <dle~ted *-f -~a* ~ed;to Seconidary Alarm Station .-(SAS)A;*-n-- ind .-Eý '4rer :activated per <SPI-0032>.

ýc-

£ _-i6elet-ed:> - P

7. :.upbrrXEOF-act-i.- or i*-"4ie SNSO to dispatca a Security Officer(s) to the onsit-d;...OF-*-or BF-ckup EOF (at:the Ashtabula Service Center) to control facility access.

EPI-A6 Page: 28 Rev.: 10 / C-4

8. Deleted 5.9 Recsulatorv Affairs Coordinator

5.9.1 Activation

i I. Become apprised of plant condition and event status from TSC

§s4aff. du~ing activatiep. _r z '

i2. ,.Contact the,: State: EOC to.ýdetermine the.flo-1lowing:

a. Status of the State of Ohio's response to Perry Plant

- - site.:.. If the State makes a d .cision to respond to the

. Perry Plant site, perform the actions outlined in Section:.5.9:.2.4,.

b. Need to dispatch a FirstEnerg , Lia~ison to the State EOC prior to a Site Area Emergenc V declaration.
c. Discuss event status and prob ibility for the event to worsen.
3. .-. Cortt.-an-E.MA, representati-ve. or
  • xstEanergy County Liaisons at the EOCs- in Ashtabula, Geauga and Lake-_Counties to clarify the event status and prognosis, and tc identify a point of contact que st ions.~.

fobr:.-Iurtll-ex..-

NOTE: Offsite planners from Ex .rgency Planning Unit (EPU) are contacted at an Alex t level, as part of their respective counties' cal lout process, and .will. serve as a liaison between the county EOC and the Perry ERO.

4. Apprise:the TSC.Operations Man-agei of.'cunrent NRC, State and county responsezto thee.vent.--,..

5.9.2 Operationalr  :  :. - .

1. At the Site Area Emergency declari tion, :contact. a. FirstEnergy Liaison using the <Emergency Respc ýnse Telephone Directory> and

-dispath:-to the StatteEOC if-,not-.. ýet .performed1. -Ensure fitness for duty status is determined per <NOP-LP-1002>.

2. Provide an interface with the TSC Engineer manning the ENS Circuit- and FirstEnetgy-*State-:and. County:-,Li-iaons, in response to NRC, State and local county ini uiries.

NOTE: The Executive Discussiol Line (EDL) with the State and local counties shal. NOT be established in the TSC.

EPI-A6 Page: 29 Rev.: 10 / C-4

3. Resolve any concerns regarding communications to offsite governmn&t agencies, including any -requests'for the establishment of additional telephone links not already described in the EPIs.
4. Upon being notified that the State is dispatching representatives to the Perry Plant site, perform the following:
a. Update the TSC Operationfs Manaqetr-&and--recommend either the activation of the EOF or the co-location of the State e-representatives- t,;-the?*TSC based on-the-.event status "and prognosis.
b. Contact and di4atch-a second'TRegulatory Affairs

- "o Coozdinator .tothe EO.F to .nx f 2the3:State representatives upon their arrival via'-Ohi' Nationa1VGuard helicopter.

Ensure the fitness for duty status is determined per

c. Brief the second Regulatory Affairs Coordinator upon "his/her arrial.ons-ite.
5. Document communications with offsite officials or FirstEnergy 0, * ,o;-. Sta~te/C~in:ty."tOC Liaisbns In., -our"Thgbook* iousing a Co-mmunications Rec2qxd 'Sheet (*2UP 6214.)-o",

.p-r <EPI-B9>.

6. Once the EOF is activated-snd de1ared~o.ratinal, relocate to the EOF and continue to coordinate the interface with offsite S..46rnr agincia ee pgeh pef A

-5jcO eRecords 5.10.1 Records Handling 0,,

  • 1.~ r,: T~ ards ~~g.erated by.;emer~gen*" Dýsponse personnel will be collected and maintaiined-sbfy Emeaer y..-.Plariing Unit (EPU) pursuant to <EPI-B9>. The Emergency Records Package will be transferred to Records Management pursuarit.-to '<PAP-1701>..

.- .The f .w0hng .."records ,ari @jfea~tedd by'this 'document:

Quality Assurance Records Acb!*.latioitChykls",:.*NaPNo 7987Rcr Non-Quality Records S...

". .. .'i .. :,No ne . - ? '! Z .. i _-;. :: . ,.

EPI-A6 Page: 30 Rev. : 10 / C-5 "S6`0 TSC STAFF MOBILIZATION FOR NON-EMERGENCY PLiN EVENTS

.4-6.1 TSC Operations Manager Under no circumstances shall the Control R, om Shift Manager transfer, or the Operations Manager accept responsibility for the Emergency Coordinator duties unless the ev, !nt is classified per

<EPI-Al>.

i1 6.1.1 Upon arrival, contact the Control Room Shift Manager to become apprised of event/plant conditions and required support.

6.1.2 Establish and track task priorities using facility status boards.

6.1.3 Brief TSC staff upon their arrival of *vent/plant condition and direct facility activities in support 4f established priorities.

6.1.4 Direct the Administrative Assistant to coordinate the augmentation of TSC staff based on the event.

No minimum staffing or completion of TSC Activation Checklist is required for staff mobilization ourside the Emergency Plan.

6.1.5 Direct the Operations Advisor to monitcýr <EPI-Al> for possible entry into the Emergency Plan based on changJ ,ng plant conditions, and recommend classification of an event p(,r <EPI-Al> to the Shift Manager if warranted.

6.1.6 Upon the Shift Manager's classificatioi of an Emergency Plan event per <EPI-Al>, go directly to Section 5. 2.1 and utilize the TSC Activation Checklist to augment staff nd coordinate the transfer of Emergency Coordinator duties.

6.2 Admiznistrative Assistant 6.2.1 Do NOT initiate the TSC Activation Che( klist unless an Emergency Plan event is classified per <EPI-Al>.

6.2.2 Instruct TSC Communicator NOT to test Ihe NRC ENS Circuit or "5-Way" State/County Ringdown.

6.2.3 Track the arrival of TSC staff and perJ odically notify the TSC Operations Manager of staffing levels.

6.2.4 Initiate callouts for additional TSC si.pport at the direction of the TSC Operations Manager and on-call TSC responders, using available communicators.

EPI-A6 Page: 31 Rev.: 10 6.2.5 Assign support staff as. they become available to TSC status boards and then'Records..Room.

6.2.6 When notified by the TSC Operations Manager that the Emergency has been entered, go to Section 5.3.1 and use the TSC ActivationPlan I Checklist to ensure minimum staffing and testing of equipment.

.................... U "L

. "..*...*.* ,i' .. ,.. -

EPI-A6 -Rev.: 10 .t'Atachment 1 8Sheet 1 of 2 Page: 32 / C-5I TSC ACTIVATIONCHE TEASST (TO BE COMPLETED BYTHE ADMINISTRI ITwE ASSISTrANT)

PNPP NO*. 7987 Rev. 3113/02 ý, . . EPI-A6 EPI-A6 A. EQ TSC rooms are unlo'ked B. Verify TSC manning levels:

Minimum TSC Staffinc-Iequ rements:,.,

[NOTE: Master key located in keybo< outside TS9 Records Room.]

I o TSC Operations Mhnager ....

[I Operations Advisor 0J Maintenance Coordinator El Plant Technical Engineer.

EJ CorelHydrat'lic (Reracfor) Engineer O Radiation Protection Coordinator O Dose Assessor (shift Chemistry Tech.)

o Administrative.Assistant.I';

olNOTE:

"5-Way" Communicator Control Room communicator can be relocated to TSC to support facility activation or qualified I&C technicians used from OSC.

El ENS Communicator or assigned engineer I

C. IF TSC ACTIVATION AND PERSONNEL ACCOUNTABILITY ARE BEING PERFORMED SIMULTANEOUSLY, call Ext 7817 or request that a Security Offio r.or available TSC/OSC staff member be dispatched to the GETAuditoriuim to assess available1 nanpoWer. Direct needed personnel to report to the TSC'and notify"Secudty at'PACP.

D. Test the following circuits:

[I Intra-Facility (TSC-OSC).PA, El Turn up Plant PA ceiling speakers in TSC rooms & hallway E. El Verify that the Operations Advisor has activated the ERDS tram mission to the NRC. If not yet performed, initiate transmission at this time per EPI-A6 Section ;.7.1.1.

EPI-A6 Rev.,: 10 Attachment 1 Sheet 2 of 2 Page: 33 /C-5 TS~ ACTIVATION CHECKLIST (TO 'BE COMPLETED BY RTHE TSC OPERATIONS MANAGER)

PNPP No. 7987 Rev. 3113/02 EPI-Ae

1. Dl When the minimum staffing requirements are met and the TSC is ready to be declared OPERATIONAL, biidf TSC staff on current plant conditions, emergericy actions runderway, Control Room needs, and TSC priorities.
2. 5 Announce over the Plant PArSystemthat Uthe TSC is OPERATIONAL, and control for OSC activities (if operational) has been.tranSferred.to the TSC". Record time TSG*'elaýed OPERATIONAL in logbook.

3 El Inform the Security Coordinator that the. TSC has assumed responsibility.fpr directing SAS to perform further ERO notifications.

4. L] Inform -the Shift Manager thiatithe TSC is now OPERATIONAL, and establiA-Wfven "-ef6ilowing Emergency Coordinator duties wilt be transferred to the TSC:

e evnt

-, classificat!o pe ~P- 1..

offsite nof*cations, per EPi-3.

- offste protective action'recommendations per EPI-B8.

E] Notify the TSC Administrative Assistant prior to assuming offsite notification responsibilities.

, ' ".. -~. .. . . . '*! ,.:'  :

5. Announce pver the Intra-Facili-ty s-oSc ),PA e.the tran-rsfer of E*eprgency Coordin*tor duties from the Conitrol Room to the TSC, record transferin l6gbook, ;and post the'tr*.nsferafiresponsibilities on facility status board:

El Event Classification E] Offsite Notifications El Offsite Protective Action Recommendations

.,Zu 0.-*,-.*

tTime

  • *. *a*- * *AA

EZPI-i -.

2101

EPI-A6 Rev.: 10 Attachment . Sheet 2 of.2,. Page,:, 35 / C-4 -LAST PERRY NUCLEAR POWER PIANT ALTERNATE TECHNICAL SUPPORT CENTER LAYOUT TRAINING CENTER (TEC)

FIRST FLQOOF.

Assessor 71 Supplies'.

CONFERENCE ROOM (TEC 110/111)

Engineering Staff - 2/01 7

l 7