Form 5.1-1
ML23011A339
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 10/21/2022
From:
Nuclear Management Co
To:
NRC/RGN-III/DORS/OB
Iskierka-Boggs T
Shared Package
ML21188A293 List:
References
Download: ML23011A339 (1)


Text

Form 5.1-1 Post examination Check Sheet Post examination Check Sheet Facility: MONTICELLO Dates of Examination: 10/16/22 - 10/21/22 Date Activity Description Complete

1. *Received post examination package from facility licensee and verified complete. (ES-4.4) 11/07/2022
2. *Reviewed and incorporated any necessary facility and applicant written examination comments. NRC grading of written examination 11/07/2022 completed. (ES-4.4)
3. *Reviewed and incorporated any necessary facility and applicant operating test comments. NRC grading of operating test completed. 11/14/2022 (ES-3.6)
4. *Completed NRC chief examiner review of operating test and written examination grading. (ES-3.6 and ES-4.4) 11/14/2022
5. Completed licensing official review. 11/17/2022
6. Mailed licenses, preliminary results, and pass letters. 11/17/2022
7. Notified facility licensee of results. 11/17/2022
8. Issued the examination report (refer to Operator Licensing Manual Chapter (OLMC) 510, Operator Licensing Examination Reports). 11/21/2022
9. Returned reference material after final resolution of any informal NRC staff reviews, hearing demands, or both. 11/17/2022
10. Performed examination recordkeeping activities (refer to OLMC 520, Operator Licensing Examination Records and Documentation, and Management Directive 3.53, NRC Records and Document 01/10/2023 Management Program).
  • Activity may not be applicable for a retake examination. If this activity does not apply, place an N/A in the Date Complete column.