|
---|
Category:License-Operator
MONTHYEARML24277A0202024-10-0303 October 2024 Operator Licensing Examination Approval Monticello Nuclear Generating Plant, October 2024 L-MT-24-022, – Preparation and Scheduling of Operator Licensing Examinations2024-07-0909 July 2024 – Preparation and Scheduling of Operator Licensing Examinations ML24082A2452024-03-22022 March 2024 Confirmation of Initial License Examination IR 05000263/20223012022-11-21021 November 2022 NRC Initial License Examination Report 05000263/2022301 ML23011A2512022-11-10010 November 2022 Form 1.3-1 ML23011A3362022-11-10010 November 2022 Form 2.1-1 ML23012A1032022-11-10010 November 2022 Form 2.3-5 ML23012A0982022-11-10010 November 2022 Form 2.3-3 L-MT-22-045, Letter Submitting Post-Exam Package2022-11-0404 November 2022 Letter Submitting Post-Exam Package ML23012A1652022-10-25025 October 2022 As-Administered Operating Test JPMs ML23012A1682022-10-25025 October 2022 As-Administered Written Examination and Answer Key ML23012A1692022-10-25025 October 2022 As-Administered Written Exam Reference Handouts ML23012A1662022-10-25025 October 2022 As-Administered Operating Test Scenarios ML23011A3392022-10-21021 October 2022 Form 5.1-1 ML22271A9162022-10-0303 October 2022 Operator Licensing Examination Approval ML23012A1392022-09-28028 September 2022 Proposed Written Examination ML23012A0122022-09-28028 September 2022 Form 2.3-4 ML23012A1432022-09-28028 September 2022 Form 3.3-1 Proposed Scenario Outlines ML23012A1372022-09-28028 September 2022 Form 3.3-2 Proposed Operating Test Simulator Scenario Guides ML23012A1342022-09-28028 September 2022 Proposed Admin Topics JPMs ML23012A0092022-09-28028 September 2022 Form 2.3-2 ML23012A1362022-09-28028 September 2022 Proposed Sim and Inplant System JPMs ML23012A1922022-08-28028 August 2022 Form 2.3-1 ML23012A2152022-08-28028 August 2022 Form 3.2-1 ML23012A2062022-08-28028 August 2022 Form 3.4-1 ML23012A2162022-08-28028 August 2022 Form 3.2-2 ML23012A2222022-08-28028 August 2022 Form 4.1-1, Record of Rejected Knowledge and Abilities ML23018A1882022-08-28028 August 2022 OP Test Outline Issue Identified ML23012A2182022-08-28028 August 2022 Form 3.3-1 ML23012A2192022-08-28028 August 2022 Form 4.1-BWR and Common ML23012A2102022-07-26026 July 2022 Letter Submitting Monticello Outline Package L-MT-22-023, 75-Day Exam Package2022-07-26026 July 2022 75-Day Exam Package ML21342A3762021-12-13013 December 2021 Confirmation of Initial License Examination ML21215A2172021-08-0303 August 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information L-MT-21-031, Preparation and Scheduling of Operator Licensing Examinations2021-04-20020 April 2021 Preparation and Scheduling of Operator Licensing Examinations ML21110A5762021-04-19019 April 2021 GFE Results, March 2021 ML21020A1002020-11-0303 November 2020 Initial License Exam Form ES-201-1 ML21013A5122020-11-0303 November 2020 Initial License Exam Outline Submittal Letter ML21020A1232020-11-0303 November 2020 Initial License Exam Outline Review Comments ML21019A5732020-11-0303 November 2020 Initial License Exam Administered Scenarios ML21020A1062020-11-0303 November 2020 Initial License Exam Form ES-403-1 ML21013A5422020-11-0303 November 2020 Initial License Exam Forms ES-301-2 ML21019A2202020-11-0303 November 2020 Initial License Exam Proposed Written Exam Key ML21020A1132020-11-0303 November 2020 Initial License Exam Form ES-401-4 ML21020A1202020-11-0303 November 2020 Initial License Exam Forms ES-401-9 ML21013A5412020-11-0303 November 2020 Initial License Exam Forms ES-301-1 ML21013A5432020-11-0303 November 2020 Initial License Exam Forms ES-401-1 and 401-3 ML21020A1172020-11-0303 November 2020 Initial License Exam Forms ES-301-7 ML21013A5072020-11-0303 November 2020 Initial License Exam Forms ES-301-5 ML21019A1752020-11-0303 November 2020 Initial License Exam Form ES-401-6 2024-07-09
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24277A0202024-10-0303 October 2024 Operator Licensing Examination Approval Monticello Nuclear Generating Plant, October 2024 L-MT-24-022, – Preparation and Scheduling of Operator Licensing Examinations2024-07-0909 July 2024 – Preparation and Scheduling of Operator Licensing Examinations ML24082A2452024-03-22022 March 2024 Confirmation of Initial License Examination IR 05000263/20223012022-11-21021 November 2022 NRC Initial License Examination Report 05000263/2022301 ML23011A2512022-11-10010 November 2022 Form 1.3-1 ML23011A3362022-11-10010 November 2022 Form 2.1-1 ML23012A1032022-11-10010 November 2022 Form 2.3-5 ML23012A0982022-11-10010 November 2022 Form 2.3-3 L-MT-22-045, Letter Submitting Post-Exam Package2022-11-0404 November 2022 Letter Submitting Post-Exam Package ML23012A1692022-10-25025 October 2022 As-Administered Written Exam Reference Handouts ML23012A1662022-10-25025 October 2022 As-Administered Operating Test Scenarios ML23012A1652022-10-25025 October 2022 As-Administered Operating Test JPMs ML23012A1682022-10-25025 October 2022 As-Administered Written Examination and Answer Key ML23011A3392022-10-21021 October 2022 Form 5.1-1 ML22271A9162022-10-0303 October 2022 Operator Licensing Examination Approval ML23012A0092022-09-28028 September 2022 Form 2.3-2 ML23012A1372022-09-28028 September 2022 Form 3.3-2 Proposed Operating Test Simulator Scenario Guides ML23012A1362022-09-28028 September 2022 Proposed Sim and Inplant System JPMs ML23012A1342022-09-28028 September 2022 Proposed Admin Topics JPMs ML23012A1392022-09-28028 September 2022 Proposed Written Examination ML23012A1432022-09-28028 September 2022 Form 3.3-1 Proposed Scenario Outlines ML23012A0122022-09-28028 September 2022 Form 2.3-4 ML23012A2182022-08-28028 August 2022 Form 3.3-1 ML23012A2222022-08-28028 August 2022 Form 4.1-1, Record of Rejected Knowledge and Abilities ML23018A1882022-08-28028 August 2022 OP Test Outline Issue Identified ML23012A2062022-08-28028 August 2022 Form 3.4-1 ML23012A2192022-08-28028 August 2022 Form 4.1-BWR and Common ML23012A2162022-08-28028 August 2022 Form 3.2-2 ML23012A2152022-08-28028 August 2022 Form 3.2-1 ML23012A1922022-08-28028 August 2022 Form 2.3-1 ML23012A2102022-07-26026 July 2022 Letter Submitting Monticello Outline Package L-MT-22-023, 75-Day Exam Package2022-07-26026 July 2022 75-Day Exam Package ML21342A3762021-12-13013 December 2021 Confirmation of Initial License Examination ML21215A2172021-08-0303 August 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information L-MT-21-031, Preparation and Scheduling of Operator Licensing Examinations2021-04-20020 April 2021 Preparation and Scheduling of Operator Licensing Examinations ML21019A5722020-11-0303 November 2020 Initial License Exam Administered JPMs ML21020A1202020-11-0303 November 2020 Initial License Exam Forms ES-401-9 ML21019A5742020-11-0303 November 2020 Initial License Exam Administered Written Exam Key ML21019A1752020-11-0303 November 2020 Initial License Exam Form ES-401-6 ML21013A5412020-11-0303 November 2020 Initial License Exam Forms ES-301-1 ML21020A1232020-11-0303 November 2020 Initial License Exam Outline Review Comments ML21020A1172020-11-0303 November 2020 Initial License Exam Forms ES-301-7 ML21013A5452020-11-0303 November 2020 Initial License Exam Forms ES-D1 ML21019A5732020-11-0303 November 2020 Initial License Exam Administered Scenarios ML21019A2092020-11-0303 November 2020 Initial License Exam Proposed JPMs ML21020A1132020-11-0303 November 2020 Initial License Exam Form ES-401-4 ML21019A2202020-11-0303 November 2020 Initial License Exam Proposed Written Exam Key ML21013A5422020-11-0303 November 2020 Initial License Exam Forms ES-301-2 ML21013A5122020-11-0303 November 2020 Initial License Exam Outline Submittal Letter ML21020A1022020-11-0303 November 2020 Initial License Exam Security Agreement Forms 2024-07-09
[Table view] |
Text
ES-401 Written Examination Quality Checklist Form ES-401-6 Facility: Monticello Date of Exam: 10/19/20 Exam Level: ROjf SRO _?S Initial Item Description b* c*#
- 1. Questions and answers are technically accurate and applicable to the facility.
Jj a I
§ tY. *<>>;
- 2. a. NRC K/As are referenced for all questions.
- b. Facility learning objectives are referenced as available.
C. Correct answer explanation and distractor analysis provided (ES-401, O.2.g)
- 3. SRO questions are appropriate in accordance with Section D.2.d of ES-401 f?J &t. 001I 13-4 The sampling process was random and systematic. (If more than four RO or two SRO questions were repeated from the last two NRC licensing exams, consult the NRR/NRO OL program office). 4 RO / 2 SRO t)I..
- 5. Question duplication from the licensee screening/audit exam was controlled as indicated below (check the item that applies) and appears appropriate.
_ The audit exam was systematically and randomly developed, or
_ the audit exam was completed before the license exam was started, or
_ the examinations were developed independently, or
()t_
X the licensee certifies that there is no duplication, or
_ other (explain).
6-Bank Modified New 7
- 6. Bank use meets limits (no more than 75% from the bank, at least 10% new, and the rest new or modified); enter the 9/2 actual RO/SRO-only question distribution(s) at right. 49/17 17/6
- 7. Between 38 and 45 questions of the questions on the RO CIA
!Jr* Ci Memory exam and at least 13 questions of the questions on the SRO-only portion of the exam are written at the u
comprehension/analysis level (see ES-401, D.2.c); enter 31/4 44/21 the actual RO/SRO-only question distribution(s) at right.
<# cP1J
- 8. References/handouts provided do not give away answers or aid in the elimination of a
distractors.
- 9. Question content conforms to specific K/A statements in the previously approved examination outline and is appropriate for the tier to which they are assigned; deviations are justified. 6 Cf,VJ
- 10. Question psychometric quality and format meet the guidelines in Appendix B.
/$ ()K cM7
- 11. The exam contains the required number of one-point, multiple-choice items; the total is correct and agrees with the value on the cover sheet. & ()t cYf};
N Date I
- a. Author *mA-,i,J : ;*-' 7/22/zo
- b. Facility Reviewer(*) (J, i t(OU::-(\£(\ .. /Cl.,-- 7/?l/24. .. -
- c. NRC Chief Examiner(#) Charles D. Zoia Digitally signed by Charles D. Zoia s/%J Date: 2020.10.15 06:14:06 -05'00' Patricia J. Pelke Digitally signed by Patricia J. Pelke
- d. NRC Regional Supervisor pjp Date: 2020.10.15 16:41:34 -05'00' Note: . 8/27/20 The facility reviewer's initials or signature are not applicable for NRG-developed examinations.
- Independent NRC reviewer initials items in Column "c"; chief examiner concurrence is required0