L-HU-08-014, Planned Initial License Operator Examination Data

From kanterella
Jump to navigation Jump to search
Planned Initial License Operator Examination Data
ML082100126
Person / Time
Site: Monticello, Prairie Island  Xcel Energy icon.png
Issue date: 07/25/2008
From: Weinkam E
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-HU-08-014, RIS-08-016
Download: ML082100126 (1)


Text

Nuclear Management Company 4 14 Nicollet Mall (MP-400)

Minneapolis, MN 55401 July 25, 2008 N

Cornmined to Nuclear Excellence L-H U-08-0 14 RIS 2008-16 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Prairie Island Nuclear Generating Plant Monticello Nuclear Generating Plant Units 1 and 2 Docket No. 50-263 Dockets 50-282 and 50-306 License No. DPR-22 License Nos. DPR-42 and DPR-60 Planned Initial License Operator Examination Data As requested by NRC Regulatory Issue Summary 2008-16, "Preparation and Scheduling of Operator Licensing Examinations", dated June 27, 2008, Nuclear Management Company, LLC (NMC) hereby submits the planned initial licensed operator examination data through 2012 for the Monticello Nuclear Generating Plant and Prairie lsland Nuclear Generating Plant. Enclosed is a corresponding NRC Form 536 for each site which provides the estimated number of applicants to be tested and the proposed primary and alternate dates for the examinations.

This letter makes no new commitments or changes to any existing commitments.

and Emergency Preparedness Nuclear Management Company, LLC Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Prairie lsland Nuclear Generating Plant, USNRC, NRR Resident Inspector, Prairie lsland Nuclear Generating Plant, USNRC Project Manager, Monticello Nuclear Generating Plant, USNRC, NRR Resident Inspector, Monticello Nuclear Generating Plant, USNRC

ENCLOSURE Planned Initial License Operator Examination Data for Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant, Units 1 and 2 Page 1 of 3

NRC FORM 536 (8-2005)

PRINTED ON RECYCLED PAPER NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION (8-2005)

OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 Estimated burden per res onse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments re arding burden estimate to the Records and FOlNPrivacy Services Branch 8 - 5 F53). US.

Nuclear Re ulatory Comm~sslon, Washington, DC 20555-0001, or by Internet e-mail and Regulatory to infoco~~ects@nrc.

Affairs, NE~B-I ov, 0202, and to (31 the 50-01 Desk 31),

Officer, Office Office of Manag,ement of Information and Budget, Washtngton, DC 20503.

If a means used to tmpose an lnformation collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the lnformatlon collection.

I FACILITY Prairie Island Nuclear Generating Plant NRC REGION Ill A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS CY 2009 -

0 0

B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER r

NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSEDDATES PRIMARY DATE ALTERNATE DATE cy 201 2 -

0 0

cy 2010 -

1 0

cy 201 1 -

1 0

CY 2009 -

0 0

0 0

C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY2010 -

7 5

1 0

04/12/2010 03/09/2010 PROPOSED NUMBER ESTIMATED NUMBER OF CANDIDATES CY2011 -

3 3

3 0

11/28/2011 1 2/05/2011 CY2012 -

0 0

0 0

CY 2009

- ~-

CY 2010 MARCH 0

MARCH 0

JUNE 0

DECEMBER 0

SEPTEMBER 0

JUNE 0

DECEMBER 0

SEPTEMBER 6

NRC FORM 536 (8-2005)

PRINTED ON RECYCLED PAPER NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION (8-2005)

OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 Estimated burden per res onse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments re ardjng burden estimate to the Records and FOlAlPrivacy Services Branch (T-5 F53), U.S.

Nuclear Re ulatory Commlsslon, Washlngton, DC 20555-0001, or by Internet e-mail and Regulatory to inYoco~~ect~@nrc.

Affairs, NE~B-10202, ov, and to (3150-OI~I),

the Desk Officer, Office Office of Management of Information and Budget, Washlngton, DC 20503.

If a means used to impose an information collection does not display a currently valid, OMB control number, the NRC may not conduct or sponsor, and a person IS not requlred to respond to, the information collection.

FACILITY Monticello Nuclear Generating Plant NRC REGION Ill A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS cy 201 2 -

0 0

CY 2009 -

1 0

B. INITIAL OPERATOR LICENSE EXAMINATIONS cy 201 0 -

0 0

PROPOSED NUMBER NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSEDDATES PRIMARY DATE ALTERNATE DATE cy 201 1 -

1 0

CY2011 -

8 8

2 0

01/1 7/2011 0 1 /24/20 1 1 CY2012 -

0 0

0 0

CY 2009 -

6 6

1 0

02/23/2009 03/02/2009 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY2010 -

0 0

0 0

PROPOSED NUMBER ESTIMATED NUMBER OF CANDIDATES CY 2009 CY 2011

~ - -----

DECEMBER 0

MARCH 0

DECEMBER 0

MARCH 0

JUNE 0

JUNE 0

SEPTEMBER 18 SEPTEMBER 18