Ile Form 2.1-1 Examination Prep Checklist
ML24339B845
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 11/12/2024
From:
NRC/RGN-III/DORS/OB
To:
Northern States Power Co, Xcel Energy
Bryan Bergeon
Shared Package
ML22336A034 List:
References
Download: ML24339B845 (1)


Text

Form 2.1-1 Examination Preparation Checklist Facility: Monticello Date of Examination: October 14-23, 2024 Developed by: Written:

Facility NRC

//

Operating:

Facility NRC Days from Exam Target Date*

Task Description CEs Initials

-240 02/17/24

1. Examination administration date confirmed (A.1-5). For NRC-prepared examinations, arrangements are made for the facility licensee to submit reference materials (B.4, C.4.g and F).

BAB 12/14/23

-210 03/18/24

2. NRC examiners and facility licensee contact assigned (B.1 and C.1-3).

BAB 12/14/23

-210 03/18/24

3. Facility licensee contact briefed on examination security and other requirements (D.4).

As applicable, the facility licensee contact submits to the NRC any prescreened K/As for elimination from the written examination outline, with a description of the facility licensees prescreening process (ES-4.1 A.1.a and ES-4.1 B.2).

BAB 12/14/23

-210 N/A

4. Reference material due for NRC-prepared examinations (F).

N/A

-210 03/18/24

5. Examination kick-off call held (C.4). The NRC sends the corporate notification letter (A.5).

BAB 3/21/24

-195 04/02/24

6. Written examination outline developed by the NRC and sent to the facility licensee contact (must be on the examination security agreement) (B.2, ES-4.1 A.1.b and ES-4.1 A.2.a).

BAB 12/14/23

-150 05/17/24

7. Operating test outlines and checklists due: Forms 1.3-1, 2.3-1, 3.2-1, 3.2-2, 3.3-1, and 3.4-1, as applicable (B.6). Facility licensee provides a draft operating test administration schedule to the NRC (B.18).

BAB 5/14/24

-136 05/31/24

8. Operating test outlines reviewed by the NRC and feedback provided to the facility licensee (ES-2.3).

BAB 5/16/24

-100 N/A

9. NRC-prepared examinations approved by the NRC supervisor and forwarded for facility licensee review (ES-2.3).

N/A

-75 07/31/24

10. Proposed examinations (written, JPMs, and scenarios, as applicable) and outline forms; quality checklists and supporting documentation (including Forms 2.3-2 and 2.3-4 and any Form 2.3-1, 1.3-1, and 3.4-1 updates); and reference materials due.

BAB 07/29/24

-60 08/15/24

11. Preliminary waiver/excusal requests due (ES-2.2 E.1).

BAB 08/2/7/24

-50 08/25/24

12. Written examination and operating test reviews completed (ES-2.3). The NRC supervisors authorization to proceed with the facility review granted (ES-2.3 D).

BAB 08/26/24

-50 08/25/24

13. Examination review results discussed between the NRC and the facility licensee (B.14).

BAB 08/26/24

-35 09/09/24

14. Examination preparatory week conducted by the NRC and the facility licensee (I).

BAB 09/08/24

-30 09/14/24

15. Preliminary license applications, including any waiver/excusal requests, due (ES-2-2 C.1).

BAB 09/16/24

-14 09/30/24

16. Final license applications, including any waiver/excusal requests, due and Form 2.2-1 prepared (ES-2.2 C and E).

BAB 10/01/24

-7 10/07/24

17. Written examinations and operating tests approved by the NRC supervisor (C.9)

BAB 09/24/24

-7 10/07/24

18. Facility licensee management feedback on the examination requested by the NRC supervisor (C.10).

BAB 10/02/24

-7 10/07/24

19. Final applications reviewed; 10% of applications audited to confirm qualifications/eligibility (ES-2.2 G); and examination approval letter (Letter 2.3-1) and waiver/excusal letters sent.

BAB 10/7/24

-7 10/07/24

20. Written examination administration guidelines reviewed with the facility licensee (D.14).

BAB 09/18/24

-7 10/07/24

21. Approved scenarios and job performance measures distributed to NRC examiners (D.12).

BAB 09/26/24

  • Target dates are based on facility licensee-prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted in coordination with the facility licensee.