Form 4.1-1, Record of Rejected Knowledge and Abilities
ML23012A222
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 08/28/2022
From:
Nuclear Management Co, Xcel Energy
To:
NRC/RGN-III/DORS/OB
Iskierka-Boggs T
Shared Package
ML21188A291 List:
References
Download: ML23012A222 (1)


Text

Form 4.1-1 Record of Rejected Knowledge and Abilities - MNGP 2022-301 Refer to Examination Standard (ES)-4.2, Developing Written Examinations, Section B.3, for deviations from the approved written examination outline.

Tier/Group Randomly Selected K/A Reason for Rejection RO Exam Tier 1 Group 1 Question 8 295019 AK2.21 295019 (APE 19) Knowledge of the relationship between Partial or Complete Loss of Instrument Air and the following systems or components: Recirculation system (CFR: 41.7 / 45.8)

Monticello does not have any Recirculation system interrelationships with instrument air. Recommend reselecting from the following:

CE has selected the following K/A as a replacement:

AK2.14 Plant Air system Tier 2 Group 1 Question 27 203000 A1.09 203000 Ability to predict and/or monitor changes in parameters associated with operation of the RHR/LPCI: Injection Mode, including: Component Cooling water systems.

(CFR: 41.5 / 45.5)

Unable to write valid question that matches CCW to RHR/LPCI injection mode.

CE has selected the following K/A as a replacement:

A1.01 Reactor water level Tier 3 Group 2 Question 66 G2.2.21 Knowledge of pre-and post-maintenance operability requirements (CFR: 41.10 / 43.2)

Unable to develop an operationally valid RO question for the selected K/A. This knowledge would be covered under an SRO only task at Monticello. Recommend reselecting from the following:

CE has selected the following K/A as a replacement:

2.2.22 Knowledge of limiting conditions for operation and safety limits (CFR: 41.5 / 43.2 / 45.2)

SRO Exam Tier 1 Group 1 Question 80 295024 G 2.2.43 (295024) (EPE 1) HIGH DRYWELL PRESSURE (G2.2.43)

EQUIPMENT CONTROL Knowledge of the process used to track inoperable alarms (CFR: 41.10 / 43.5 / 45.13)

Unable to write valid Tier 1 question.

CE has selected the following K/A as a replacement:

2.2.36 Ability to analyze the effect of maintenance activities, such as degraded power sources, on the status of limiting conditions for operation.

Tier 1 Group 2 Question 84 295029 G 2.2.23 (295029) (EPE 6) HIGH SUPPRESSION POOL WATER LEVEL (G2.2.23) EQUIPMENT CONTROL Ability to track technical specification limiting conditions for operation (CFR: 41.10 /

43.2 / 45.13)

TS 3.6.2.2 is the only TS for suppression pool water level. It only has one required 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> action which does not lend itself to plausible distracters. Additionally, knowledge and/or provided references would potentially overlap with question #82 which is already written and is a TS bases question for Low Torus Level.

CE has selected the following K/A as a replacement:

2.4.16 Tier 3 Question 97 G 2.2.36 2.2.36 Ability to analyze the effect of maintenance activities, such as degraded power sources, on the status of limiting conditions for operation. (CFR: 41.10 / 43.2 / 45.13)

Unable to write valid Tier 3 question.

CE has selected the following K/A as a replacement:

2.2.5 Knowledge of the process for making design or operating changes to the facility, such as 10 CFR 50.59, Changes, Tests and Experiments, screening and evaluation processes, administrative processes for temporary modifications, disabling annunciators, or installation of temporary equipment.