ML24339B847
ML24339B847 | |
Person / Time | |
---|---|
Site: | Monticello ![]() |
Issue date: | 10/24/2024 |
From: | NRC/RGN-III/DORS/OB |
To: | Spillum S Northern States Power Company, Minnesota, Xcel Energy |
Bryan Bergeon | |
Shared Package | |
ML22336A034 | List: |
References | |
L-MT-24-039, NUREG 1021 | |
Download: ML24339B847 (1) | |
Similar Documents at Monticello | |
---|---|
Category:Letter
MONTHYEARIR 05000263/20240042025-01-30030 January 2025
[Table view]Integrated Inspection Report 05000263/2024004 ML25006A1522025-01-16016 January 2025 Section 106 Consultation of Monticello SLR-Shakopee ML25006A1502025-01-16016 January 2025 Section 106 Consultation for Monticello SLR-Lower Sioux Indian Community ML25006A1512025-01-16016 January 2025 Section 106 Consultation for Monticello SLR-Mille Lacs Band of Ojibwe ML25010A0722025-01-10010 January 2025 Notification of NRC Baseline Inspection and Request for Information Inspection Report 05000263/2025002 IR 05000263/20244042025-01-0606 January 2025 Material Control and Accounting Program Inspection Report 05000263/2024404 (Public) ML24310A3442024-12-30030 December 2024 Transmittal Letter for Renewed License ML24270A1552024-12-19019 December 2024 Issuance of Amendment No. 213 Revise Technical Specification 5.6.5, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (Ptlr), and Update Neutron Fluence Methodology ML24354A2952024-12-18018 December 2024 ISFSI and Monticello Nuclear Generating Plant - Independent Spent Fuel Storage Installation Decommissioning Funding Plans L-MT-24-045, 2024 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.462024-12-13013 December 2024 2024 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 ML24353A1192024-12-12012 December 2024 Usepa Monticello Re-license Feis Comments (1) IR 05000263/20244022024-12-0606 December 2024 – Security Baseline Inspection Report 05000263/2024402; Independent Spent Fuel Storage Installation Security Inspection Report 07200058/2024401 IR 05000263/20244032024-12-0606 December 2024 – Security Baseline Inspection Report 05000263/2024403 ML24324A0082024-12-0404 December 2024 Letter to Minnesota State Historic Preservation Office Section 106 Consultation Regarding the Monticello Nuclear Generating Plant Subsequent License Renewal Application IR 05000263/20243012024-11-27027 November 2024 NRC Initial License Examination Report 05000263/2024301 L-MT-24-042, Update to the Technical Specifications Bases2024-11-22022 November 2024 Update to the Technical Specifications Bases ML24323A2142024-11-21021 November 2024 – Relief Request RR-017, Inservice Inspection (ISI) Impracticality During the Fifth Ten-Year Interval ML24318C5002024-11-19019 November 2024 Letter to Robert Blanchard Tribal Chairman Bad River Band of Lake Superior Chippewa Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5102024-11-18018 November 2024 Letter to Louis Taylor Chairman Lac Courte Oreilles Band of Lake Superior Chippewa Indians Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5092024-11-18018 November 2024 Letter to Doreen Blaker President Keweenaw Bay Indian Community Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5012024-11-18018 November 2024 Letter to Catherine Chavers Tribal Chairwoman Bois Forte Band Chippewa Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5202024-11-18018 November 2024 Letter to Grant Johnson President Prairie Island Indian Community Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5182024-11-18018 November 2024 Letter to Gena Kakkak Chairwoman Menominee Indian Tribe of Wisconsin Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5222024-11-18018 November 2024 Letter to Darrell Seki Chairman Red Lake Nation Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5282024-11-18018 November 2024 Letter to Jamie Azure Chairman Turtle Mountain Band of Chippewa Indians Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5322024-11-18018 November 2024 Letter to Robert Vanzile Jr Chairman Sokaogon Chippewa Community Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24312A1732024-11-18018 November 2024 Ltr. to Shawn Hafen, Site Vice President, Monticello Nuclear Generating Plant, Re., NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5032024-11-18018 November 2024 Letter to Anthony Reider President Flandreau Santee Sioux Tribe NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5232024-11-18018 November 2024 Letter to Alonzo Denney Chairman Santee Sioux Nation Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5022024-11-18018 November 2024 Letter to Reggie Wassana Governor Cheyenne and Arapaho Tribes NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5162024-11-18018 November 2024 Letter to James Williams Jr Chairman Lac Vieux Desert Band of Lake Superior Chippewa Indians Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5212024-11-18018 November 2024 Letter to Nicole Boyd Chairwoman Red Cliff Band of Lake Superior Chippewa Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5312024-11-18018 November 2024 Letter to Virgil Wind Chief Executive Mille Lacs Band of Ojibwe Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5292024-11-18018 November 2024 Letter to Kevin Jensvold Tribal Chairman Upper Sioux Community Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5042024-11-18018 November 2024 Letter to Jeffrey Stiffarm President Fort Belknap Indian Community Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5112024-11-18018 November 2024 Letter to John Johnson President Lac Du Flambeau Band of Lake Superior Chippewa Indians Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24312A3512024-11-18018 November 2024 Letter to Amy Spong, Deputy State Historic Preservation Officer, Re., NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5172024-11-18018 November 2024 Letter to Robert Larsen President Lower Sioux Indian Community Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5072024-11-18018 November 2024 Letter Timothy Rhodd Chairman Iowa Tribe of Kansas and Nebraska Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5252024-11-18018 November 2024 Letter to J Garrett Renville Tribal Chairman Sisseton Wahpeton Oyate of the Lake Traversee Re NOA Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5262024-11-18018 November 2024 Letter to Lonna Johnson Street Chairperson Spirit Lake Nation Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5192024-11-18018 November 2024 Letter to Michael Laroque President Minnesota Chippewa Tribe Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5302024-11-18018 November 2024 Letter to Michael Fairbanks Chairman White Earth Nation Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5052024-11-18018 November 2024 Letter to Bruce Savage Tribal Chairperson Found Du Lac Band of Lake Superior Chippewa Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5062024-11-18018 November 2024 Letter to Robert Deschampe Tribal Chair Grand Portage Band of Lake Superior Chippewa Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5152024-11-18018 November 2024 Letter to Faron Jackson Sr Chairman Leech Lake Band of Ojibwe Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24312A3462024-11-18018 November 2024 Letter to Jaime Loichinger Director Office of Federal Agency Programs, Achp NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5242024-11-18018 November 2024 Letter to Cole Miller Chairman Shakopee Mdewakaton Sioux Community Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24312A3202024-11-18018 November 2024 Letter to Durell Cooper Tribal Chairman Apache Tribe of Oklahoma Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5272024-11-18018 November 2024 Letter to Thomas Fowler Chairman St. Croix Chippewa of Wisconsin Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR 2025-01-06 Category:License-Operator MONTHYEARML24339B8462024-12-0404 December 2024
[Table view]Ile Form 5.1-1 Postexamination Check Sheet ML24339B8442024-11-12012 November 2024 Ile Form 1.3-1 Exam Security Agreement ML24339B8452024-11-12012 November 2024 Ile Form 2.1-1 Examination Prep Checklist ML24339B8472024-10-24024 October 2024 Reactor Operator (RO) and Senior Reactor Operator (SRO) Written Examination Post-Examination Comments ML24330A1522024-10-22022 October 2024 Ile Form 3.4-1 Events and Evolutions Checklist - Final ML24277A0202024-10-0303 October 2024 Operator Licensing Examination Approval Monticello Nuclear Generating Plant, October 2024 ML24330A1752024-09-21021 September 2024 Ile Form 2.3-4 Written Exam Quality Checklist ML24330A1732024-09-21021 September 2024 Ile Form 2.3-2 Operating Test Quality Checklist L-MT-24-020, Ile Proposed Exam Submittal Letter2024-07-29029 July 2024 Ile Proposed Exam Submittal Letter L-MT-24-022, – Preparation and Scheduling of Operator Licensing Examinations2024-07-0909 July 2024 – Preparation and Scheduling of Operator Licensing Examinations ML24330A1492024-05-16016 May 2024 Ile Form 2.3-1 Exam Outline Quality Checklist L-MT-24-010, Ile Licensee Outline Submittal Letter2024-05-14014 May 2024 Ile Licensee Outline Submittal Letter ML24330A1502024-05-14014 May 2024 Ile Form 3.4-1 Events and Evolutions Checklist - Draft ML24082A2452024-03-22022 March 2024 Confirmation of Initial License Examination IR 05000263/20223012022-11-21021 November 2022 NRC Initial License Examination Report 05000263/2022301 ML23012A1032022-11-10010 November 2022 Form 2.3-5 ML23011A2512022-11-10010 November 2022 Form 1.3-1 ML23012A0982022-11-10010 November 2022 Form 2.3-3 ML23011A3362022-11-10010 November 2022 Form 2.1-1 L-MT-22-045, Letter Submitting Post-Exam Package2022-11-0404 November 2022 Letter Submitting Post-Exam Package ML23012A1652022-10-25025 October 2022 As-Administered Operating Test JPMs ML23012A1662022-10-25025 October 2022 As-Administered Operating Test Scenarios ML23012A1682022-10-25025 October 2022 As-Administered Written Examination and Answer Key ML23012A1692022-10-25025 October 2022 As-Administered Written Exam Reference Handouts ML23011A3392022-10-21021 October 2022 Form 5.1-1 ML22271A9162022-10-0303 October 2022 Operator Licensing Examination Approval ML23012A1432022-09-28028 September 2022 Form 3.3-1 Proposed Scenario Outlines ML23012A1362022-09-28028 September 2022 Proposed Sim and Inplant System JPMs ML23012A1372022-09-28028 September 2022 Form 3.3-2 Proposed Operating Test Simulator Scenario Guides ML23012A0092022-09-28028 September 2022 Form 2.3-2 ML23012A0122022-09-28028 September 2022 Form 2.3-4 ML23012A1392022-09-28028 September 2022 Proposed Written Examination ML23012A1342022-09-28028 September 2022 Proposed Admin Topics JPMs ML23012A2182022-08-28028 August 2022 Form 3.3-1 ML23012A2062022-08-28028 August 2022 Form 3.4-1 ML23012A2192022-08-28028 August 2022 Form 4.1-BWR and Common ML23012A2152022-08-28028 August 2022 Form 3.2-1 ML23018A1882022-08-28028 August 2022 OP Test Outline Issue Identified ML23012A1922022-08-28028 August 2022 Form 2.3-1 ML23012A2162022-08-28028 August 2022 Form 3.2-2 ML23012A2222022-08-28028 August 2022 Form 4.1-1, Record of Rejected Knowledge and Abilities ML23012A2102022-07-26026 July 2022 Letter Submitting Monticello Outline Package L-MT-22-023, 75-Day Exam Package2022-07-26026 July 2022 75-Day Exam Package ML21342A3762021-12-13013 December 2021 Confirmation of Initial License Examination ML21215A2172021-08-0303 August 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information L-MT-21-031, Preparation and Scheduling of Operator Licensing Examinations2021-04-20020 April 2021 Preparation and Scheduling of Operator Licensing Examinations ML21110A5762021-04-19019 April 2021 GFE Results, March 2021 ML21020A1002020-11-0303 November 2020 Initial License Exam Form ES-201-1 ML21020A1022020-11-0303 November 2020 Initial License Exam Security Agreement Forms ML21019A4332020-11-0303 November 2020 Initial License Exam Proposed Exam Submittal Letter 2024-09-21 Category:Part 55 Examination Related Material MONTHYEARML24339B8462024-12-0404 December 2024
[Table view]Ile Form 5.1-1 Postexamination Check Sheet ML24339B8452024-11-12012 November 2024 Ile Form 2.1-1 Examination Prep Checklist ML24339B8442024-11-12012 November 2024 Ile Form 1.3-1 Exam Security Agreement ML24339B8472024-10-24024 October 2024 Reactor Operator (RO) and Senior Reactor Operator (SRO) Written Examination Post-Examination Comments ML24330A1522024-10-22022 October 2024 Ile Form 3.4-1 Events and Evolutions Checklist - Final ML24277A0202024-10-0303 October 2024 Operator Licensing Examination Approval Monticello Nuclear Generating Plant, October 2024 ML24330A1752024-09-21021 September 2024 Ile Form 2.3-4 Written Exam Quality Checklist ML24330A1732024-09-21021 September 2024 Ile Form 2.3-2 Operating Test Quality Checklist L-MT-24-020, Ile Proposed Exam Submittal Letter2024-07-29029 July 2024 Ile Proposed Exam Submittal Letter L-MT-24-022, – Preparation and Scheduling of Operator Licensing Examinations2024-07-0909 July 2024 – Preparation and Scheduling of Operator Licensing Examinations ML24330A1492024-05-16016 May 2024 Ile Form 2.3-1 Exam Outline Quality Checklist ML24330A1502024-05-14014 May 2024 Ile Form 3.4-1 Events and Evolutions Checklist - Draft L-MT-24-010, Ile Licensee Outline Submittal Letter2024-05-14014 May 2024 Ile Licensee Outline Submittal Letter ML24082A2452024-03-22022 March 2024 Confirmation of Initial License Examination IR 05000263/20223012022-11-21021 November 2022 NRC Initial License Examination Report 05000263/2022301 ML23012A0982022-11-10010 November 2022 Form 2.3-3 ML23012A1032022-11-10010 November 2022 Form 2.3-5 ML23011A3362022-11-10010 November 2022 Form 2.1-1 ML23011A2512022-11-10010 November 2022 Form 1.3-1 L-MT-22-045, Letter Submitting Post-Exam Package2022-11-0404 November 2022 Letter Submitting Post-Exam Package ML23012A1662022-10-25025 October 2022 As-Administered Operating Test Scenarios ML23012A1682022-10-25025 October 2022 As-Administered Written Examination and Answer Key ML23012A1652022-10-25025 October 2022 As-Administered Operating Test JPMs ML23012A1692022-10-25025 October 2022 As-Administered Written Exam Reference Handouts ML23011A3392022-10-21021 October 2022 Form 5.1-1 ML22271A9162022-10-0303 October 2022 Operator Licensing Examination Approval ML23012A1342022-09-28028 September 2022 Proposed Admin Topics JPMs ML23012A0122022-09-28028 September 2022 Form 2.3-4 ML23012A0092022-09-28028 September 2022 Form 2.3-2 ML23012A1432022-09-28028 September 2022 Form 3.3-1 Proposed Scenario Outlines ML23012A1392022-09-28028 September 2022 Proposed Written Examination ML23012A1372022-09-28028 September 2022 Form 3.3-2 Proposed Operating Test Simulator Scenario Guides ML23012A1362022-09-28028 September 2022 Proposed Sim and Inplant System JPMs ML23012A2222022-08-28028 August 2022 Form 4.1-1, Record of Rejected Knowledge and Abilities ML23012A2182022-08-28028 August 2022 Form 3.3-1 ML23018A1882022-08-28028 August 2022 OP Test Outline Issue Identified ML23012A2062022-08-28028 August 2022 Form 3.4-1 ML23012A2152022-08-28028 August 2022 Form 3.2-1 ML23012A2192022-08-28028 August 2022 Form 4.1-BWR and Common ML23012A2162022-08-28028 August 2022 Form 3.2-2 ML23012A1922022-08-28028 August 2022 Form 2.3-1 L-MT-22-023, 75-Day Exam Package2022-07-26026 July 2022 75-Day Exam Package ML23012A2102022-07-26026 July 2022 Letter Submitting Monticello Outline Package ML21342A3762021-12-13013 December 2021 Confirmation of Initial License Examination ML21215A2172021-08-0303 August 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information L-MT-21-031, Preparation and Scheduling of Operator Licensing Examinations2021-04-20020 April 2021 Preparation and Scheduling of Operator Licensing Examinations ML21019A1752020-11-0303 November 2020 Initial License Exam Form ES-401-6 ML21019A2092020-11-0303 November 2020 Initial License Exam Proposed JPMs ML21020A1132020-11-0303 November 2020 Initial License Exam Form ES-401-4 ML21019A5742020-11-0303 November 2020 Initial License Exam Administered Written Exam Key 2024-09-21 |
Text
Xcel Energy October 24, 2024 Regional Administrator, Region Ill U.S. Nuclear Regulatory Commission 2056 Westings Avenue, Suite 400 Naperville, IL 60563-2657 Monticello Nuclear Generating Plant Docket No. 50-263 Renewed Facility Operating License DPR22 2807 West County Road 75 Monticello, MN 55362 L-MT-24-039 NUREG 1021 2024 Reactor Operator (RO) and Senior Reactor Operator (SRO) Written Examination Post-Examination Comments Reference 1: NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 12 Pursuant to the requirements of Reference 1, Section ES-5.1, "Issuing Operator Licenses and Post Examination Activities," the Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy (hereafter "NSPM"), is providing the NRC with the required post-examination documentation.
The post-examination documentation was developed as a result of the completion of the NSPM grading and reviews of the Reactor Operator and Senior Reactor Operator License written examinations completed on October 22, 2024 at the Monticello Nuclear Generating Plant.
NSPM submits the following information as enclosures: pre-graded answer sheets, post-graded answer sheets, applicant coversheets, electronic key sheet, applicant exam profile reports, exam item analysis, post-examination applicant comments, and written examination seating chart.
NSPM acknowledges the facility retained the original graded written examinations. Scans are being provided to the NRC's Chief Examiner of the originals plus clean copies, and graded copies of each applicant's answer sheet. In addition to the master written examinations and answer keys, questions asked by the applicants, and the answers given to the applicant during the written examination have been provided. There were zero post-examination comments by the candidates for the written examination.
Form ES-1.3-1, "Examination Security Agreement", is not fully completed at this time. NSPM will submit the completed original form ES-1.3-1, "Examination Security Agreement," in accordance with NUREG 1021, Section ES-4.4 & ES-5.1.
If there are any questions, please contact Mr. Roman Becker at 763-350-3785.