IR 05000458/2013201

From kanterella
Jump to navigation Jump to search
IR 05000458-13-201; 01/28/2013 - 01/31/2013; River Bend Station, Unit 1; Target Set Inspection (Cover Letter)
ML13067A196
Person / Time
Site: River Bend Entergy icon.png
Issue date: 03/14/2013
From: West G
Division of Security Operations
To: Olson E
Entergy Operations
Michael Maley (301) 415-2919
Shared Package
ML13067A183 List:
References
IR-13-201
Download: ML13067A196 (3)


Text

March 14, 2013

Mr. Eric Olson, Vice President Entergy Operations, Inc. River Bend Station 5485 U.S. Highway 61N St. Francisville, LA 70775

SUBJECT: RIVER BEND STATION, UNIT 1 - NRC SECURITY INSPECTION REPORT 05000458/2013201

Dear Mr. Olson:

On January 31, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at the River Bend Station, Unit 1. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on January 31, 2013, with you and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings were identified. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's PARS, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entireresponse "Security-Related Information - Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,/RA/

Garmon West, Jr., Chief Security Training and Support Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket No. 50-458 License No. NPF-47

Enclosure:

Inspection Report 05000458/2013201

w/Attachments:

Supplemental Information