IR 05000458/2013202
| ML13179A469 | |
| Person / Time | |
|---|---|
| Site: | River Bend (NPF-047) |
| Issue date: | 08/06/2013 |
| From: | Rachel Johnson NRC/NSIR/DSO/DDSO/SPEB |
| To: | Olson E Entergy Operations |
| Clark J (301) 287-3666 | |
| References | |
| IR-13-202 | |
| Download: ML13179A469 (4) | |
Text
August 6, 2013
SUBJECT:
RIVER BEND STATION - NRC SECURITY INSPECTION REPORT 05000458/2013202
Dear Mr. Olson:
On June 27, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your River Bend Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed via telephone on June 27, 2013, with you and other members of your staff.
NRC inspectors examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
Two NRC-identified findings of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process) were identified during this inspection.
The deficiencies were promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspection was completed.
These findings were determined to involve violations of NRC requirements. However, the NRC is treating the violations as non-cited violations (NCVs) consistent with Section 2.3.2 of the NRC Enforcement Policy.
If you contest the violations or significance of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, U. S.
Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at River Bend Station. One cross-cutting aspect was assigned to these findings. The first finding had a cross-cutting aspect in the area of Human Performance, Decision-Making associated with risk significant decisions H.4(b). The second finding did not have a cross-cutting aspect associated with the finding. If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Director, Office of Nuclear Security and Incident Response; and to the Branch Chief, Security Performance Evaluation Branch, Division of Security Operations, NSIR.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's
"Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, the material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, if security-related information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390 in accordance with CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA/
Robert C. Johnson, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response
Docket No. 50-458 License No. NPF-47
Nonpublic Enclosure: Inspection Report 05000458/2013202 w/Attachments: Supplemental Information
cc w/encl: T. Santy, Security Manager
cc w/o encl:
J. Forbes, CNO
ML13179A469 OFFICE NSIR/DSO/SPEB NSIR/DSO NSIR/DSO/SPEB RIV NSIR/DSO/SPEB NAME J. Clark J. Curry J. Berry M. Haire; J.
Buchanan for C. Johnson DATE 6/28/13 6/28/13 7/11/13 7/9/20/13 8/06/13