UNITE D S TATE S NUC LEAR RE GULATOR Y C OMMI S SI ON une 5, 2013

SUBJECT:

RIVER BEND STATION - NRC SECURITY INSPECTION REPORT 05000458/2013404

Dear Mr. Olson:

On April 25, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your River Bend Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on April 25, 2013, with Mr. J. Roberts, Director, Nuclear Safety Assurance, and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

Two NRC-identified findings of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process) were identified during this inspection.

The deficiencies were promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspection was completed.

These findings were determined to involve a violation of NRC requirements. However, the NRC is treating these violations as noncited violations (NCVs) consistent with Section 2.3.2.a. of the Enforcement Policy. If you contest any NCV in the enclosed report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspectors at the River Bend Station. Two cross-cutting aspects were assigned to these findings. The first finding had a cross-cutting aspect in the area of human performance associated with risk significant decisions, H.1(a).

The second finding had a cross-cutting aspect in the area of human performance associated with decision making H.1(b).

If you disagree with a crosscutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region IV; and the NRC Resident Inspectors at the River Bend Station.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. If Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Mark S. Haire, Chief Plant Support Branch-1 Division of Reactor Safety Docket Nos.: 50-458 License Nos.: NPF-47 Nonpublic Enclosure:

NRC Inspection Report 05000458/2013404 w/Attachment: Supplemental Information cc: Electronic Distribution for River Bend Station ML13156A471 Cover Letter X Non-Sensitive X Publicly Available MLC x SUNSI Review Sensitive Non-Publicly Available Cover Letter w/Enclosure(s) Non-Sensitive Publicly Available x Keyword: MD 3.4 Non-Public x Sensitive x Non-Publicly Available MLC Category: A.3 SPSI/PSB-1 SPSI/PSB-1 PSI/PSB-1 RI/EB1 C/PBE C/PSB-1 JLarsen JBuchanan MChambers MHaire

/RA/ /RA/ /RA/ /RA/

5/29/13 6/4/13 5/28/13 6/5/13