IR 05000424/1986082
| ML20211C412 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 10/15/1986 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML18052B540 | List: |
| References | |
| NUDOCS 8610210354 | |
| Download: ML20211C412 (3) | |
Text
f/N
,
.
OCT 151986 Docket Nos. 50-424, 50-425 License Nos. CPPR-108, CPPR-109 Georgia Power Company
/ ATTN: Mr. J. H.-Miller, Jr.
President P. O. Box 4545 Atlanta, GA 30302 Gentlemen:
SUBJECT: NRC INSPECTION REPORT NOS. 50-424/86-82 AND 50-425/86-40 This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by T. D. Gibbons on August 25-29, 1986.
The inspection included a review of activities authorized for your Vogtle facility.
At the conclusion of the inspection, the findings were discussed with those members of your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observation of activities in progress.
Within the scope of the inspection, no violations or deviations were identified.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosure will be placed'in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely, Virgil L. Brownlee, Chief Reactor Projects Branch 3 Division of Reactor Projects Enclosure:
NRC Inspection Report cc w/ enc 1:
(See page 2)
%k0 kD G
,Sl Tc C[
..
.
.
r
4 Georgia Power Company
OCT I 5198g cc w/ encl:
64. P. O'Reilly, Senior Vice President Nuclear Operations J. E. Conway, Senior Vice President' &
froject Director 7. O. Foster, Vice President, Project
_jupport V. D. Rice, Vice President, Project Engineering N H. Pinson, Vice President, Project Construction g T. Beckham, Vice President &
General Manager - Operations
[V A. Thomas, Vice President, Licensing
- . S. Read, General Manager,
)}uality Assurance C. W. Hayes, Vogtle Quality Assurance Manager M C. Ramsey, Manager -
Readiness Review Af B. Bockhold,. General Manager, Nuclear Operations
V Gucwa, Manager, Nuclear Safety and Licensing
- H. Googe, Project Construction Manager W. D. Groover, Quality Assurance Site Manager -
fonstruction 7. A. Bailey, Project Licensing Manager 4. F. Trowbridge, Esq., Shaw, Pittman, Potts and Trowbridge IWW. Churchill,Esq.,Shaw, Pittman, Potts and Trowbridge f/L. Blake, Jr., Esq., Shaw, Pittman, Potts and Trowbridge v)? E. Joiner, Troutman, Sanders, JockermanandAshmore 4. G. Ledbetter, Commissioner, Department of Human Resources id H. Badger, Office of Planning
@.andBudget Kirkland, III, Counsel, Office of the Consumer's Utility Council
@( C. Teper, Georgians Against Nuclear Energy (cc w/en::1 cont'd - See page 3)
_
'
.
,
t Georgia Power Company
OCT 151986 (cc w/ encl cont'd)
y B. Margulies, Esq., Chairman, Atomic Safety and Licensing Board Panel P.0.H. Paris,AdministrativeJudge
.
Atomic Safety and Licensing Board Panel g A. Linenberger, Jr., Administrative Judge Atomic Safety and Licensing Board
, Panel 15. P. Garde, Citizens Clinic, Director Government Accountability Project
,
bc w/ encl:
. Reis, GS0
'
M. Hill, IE N Miller, NRR g Brach, ED0 M. Sinkule, RII E. Christnot, RII VNRC Resident Inspector Document Control Desk State of Georgia
RII RI -
RI{
fr RII TDGibbons TEConlon ARHerdt MSinkule
OG/
(gyto/86 10//s/86 Io /(/86 10q/86
.
_-
__.
.