IR 05000416/1979027
| ML19260B003 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 11/21/1979 |
| From: | Kellogg P, Wagner A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML19260B001 | List: |
| References | |
| 50-416-79-27, NUDOCS 7912060260 | |
| Download: ML19260B003 (3) | |
Text
{{#Wiki_filter:.
o,, UNITED STATES ! ' NUCLEAR REGULATORY CCMMISSION e o $ E
REGION II
o, ' '# 101 MARIETTA ST N.W., SUITE 3100 % * * *V ATLANTA, GEORGIA 30303
Report No. 50-416/79-27 Licensee: Mississippi Power and Light Company Jackson, Mississippi Facility: Grand Gulf Locket No. CPPR-118 Inspection at Jackson Mi 's -ppi and Port Gibson, Mississippi Inspector: / // // [g y A. G. Wa ' 'c f Datd Sig'ned / Accompanying Personnei: R. C. Lewis, Chief, RONS Branch J ello , Chief, RPS #3, RONS Branch Approved by: // 7
es P. J Kelfogh..SectionAief. RONS Branch Date Signed SUMMARY [[ - Inspection on October 3-4, 1979 Areas Inspected This routine, announced second corporate management meeting was held to advise the licensee concerning the NRC's inspection and enforcement organization and inspection program for the Grand Gulf Nuclear Facility, Unit 1, during preoper-ational and startup testing. The role of the resident inspector was also dis-cussed. A tour of the facility was conducted subsequent to the meeting. The inspection involved 23 inspector hours by 3 NRC inspectors.
Results Of the areas inspected, no apparent items of noncompliance or deviations were identified.
- 1520 Doy 19"
. e DETAILS 1.
Persons Contacted Licensee Employees Mississippi Power and Light Company T. M. Johnson, Project Management E. W. Chumley, Project Administrator H. Starling, Director Purchasing and Stores L. Nail, Manager Production Engineering J. E. Reaves, Quality Systems Coordinator (QA) W. E. Edge, Quality Program and Audits Coordinator (QA) J. C. Fuller, Quality Assurance S. F. Tanner, Quality Assurance T. E. Reaves, Jr., Manager of Quality Assurance H. L. Stampley, Vice President, Prcduction & Engineering J. P. McGaughy, Jr., Director of Power Production C. K. McCoy, Site Manager / Plant Manager R. B. McGehee, Wise Carter / Lawyer J. D. Richardson, Manager of Licensing M. I. Aneshansley, Operations Superintendent C. R. Hutchinson, Support Services Superintendent H. D. Morgan, Construction Supv/GGNS D. L. Hunt, Plant Quality Supervisor R. Skinner, Startup Supervisor C. H. Deutcher, M. Supt.
Other Organizations Bechtel Construction Company J. W. Yelverton, Lead QA Engineer R. L. Scott, Project Quality Assurance Manager R. A. Boone, Assistant Construction Test Organization Supervisor 2.
Licensee Action on Previous Inspection Finding Not inspected.
3.
Unresolved Item No new unresolved items were identified during this inspection.
4.
Management Meeting As part of the NRC's routine inspection program, a management meeting was held at the Mississippi Power and Light Company Corporate Offices on October 3, 1979, at the request of the Region II Office.
ihe purpose of . 1520 07u
,
. the meeting was to discuss with the licensee the NRC organization, I & E mission, and the inspection program to be conducted prior to and following issuance of an operating license. The role of the resident inspector was also discussed.
The licensee responded with questions during the meeting and expressed their intent of continued cooperation with the NRC.
, 5.
Tour of the Facility Subsequent to the meeting, a tour of the facility was conducted on October 4, 1979, to familiarize the inspectors with the facility and construction progress.
. 15:20 071 }}