IR 05000413/1988011

From kanterella
Jump to navigation Jump to search
Partially Withheld Insp Repts 50-413/88-11 & 50-414/88-11 on 880216-18 (Ref 10CFR2.790(d) & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Procedures,Records & Operations for Control & Accountability of SNM
ML19302D357
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 03/01/1988
From: Mcalpine E, Seymour D, Todd G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19302D356 List:
References
50-413-88-11, 50-414-88-11, NUDOCS 8803290269
Download: ML19302D357 (1)


Text

& AftRIAL TRWMITTto HERrwnH CONT AINS 2.M swggggggy UNITED sTAf ts

.

>* * E C 4'o, NUCLE AR REGULATORY COMMIS$lO;J

'

I RE GloN 11

f*

%j

.

,f 101 MARitTT A sTRE ET.N.W.

r ATL ANT A, GE oRGt A 30323

\\+..../

,

.

Report Nos.:

50-413/E8-11 and 50-414/88-11 Licensee:

Duke Power Con:pany 422 South Church Street Charlotte, NC 28242

.

Docket Nos.:

50-413 and 50-414 License Nos.:

NPF-35 and NPF-52 Facility Name:

Ca wba 1 and 2

/

Inspection Condue >d:

Februa ry 16-18, 1988 J'

9E Inspectors:

4 ---,

~Date Signed

-

G o @, SQe,'" ( Audit 4r 3Hw L4 d L

'

.$~eymour,Cnemicabf2gineer Da'Le Signed

.

Approved by:

[h#b 3[IN?

E. J. McATpine, Chief,\\ Mat' rial Control and Date Signed e

Accountability Section, Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards SUMMARY Scope: This routine, unannounced inspection entailed the review of procedures, records, and operations for the control, and accountability of special nuclear material.

Results:

In the areas inspected, violations or deviations were not identified.

9903290269 890303 ADOCK0500g3 ey. n,

m.m 7 7,gy,,,,, n,,p gq PLH

.. m,0,,...,,,,

a

.