IR 05000413/1988009
| ML20154R216 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 05/26/1988 |
| From: | Gibson A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| References | |
| NUDOCS 8806070237 | |
| Download: ML20154R216 (1) | |
Text
'
MAY' 261988
-
Duke Power Company ATTN: Mr. H. B. Tucker, Vice President Nuclear Production Department 422 South Church Street Charlotte, NC 28242 Gentlemen:
SUBJECT: NRC INSPECTION REPORT NOS. 50-413/88-09 AND 50-414/88-09 Thank you for your response of April 14, 1988, to our Notice of Violation issued on March 18, 1988, concerning activities conducted at your Catawba facility.
We have evaluated your response and found that it meets the requirements of 10 CFR 2.201; however, we have the following concerns about your discussion of the violation:
Even though you admit the violation, we.do not agree with your assessment that measures were adequate, at the time of the violation, to control eddy current testing of steam generator tubes.
In accordance with your response, only "53 of 57 or 93% of pluggable indications" were properly identified by the first analysis.
The NRC does not consider that proper disposition of 93% of the pluggable tubes indicates adequrte control.
We will examine the implementation of your corrective actions during future inspections.
We appreciate your cooperation in this matter.
Since rely
,
Is Albert F. Gibson, Director Division of Reactor Safety cc:
T. B. Owen, Station Manager Senior Resident Inspector - McGuire bec:
K. N. Jabbour, NRR NRC Resident Inspector DRS, Technical Assistant Document Control Desk State of South Carolina RI RI
-
__
. g-R
,
AGibson bles A//8Crowlfy:ser
'05////88 05/g/88 05/p88 p88
.
AHerdt 05//f/88
'
RII VBro lee 05////88 kb eso607o237 seos26 PDR ADOCK 05000413
)
Z801
-
-
- -.
. _,
-
.-
_