|
---|
Category:INSPECTION REPORT
MONTHYEARIR 05000220/19990061999-09-14014 September 1999 Insp Repts 50-220/99-06 & 50-410/99-06 on 990620-0731.NCVs Noted.Major Areas Inspected:Licensee Operations,Engineering, Maint & Plant Support IR 05000220/19990041999-06-21021 June 1999 Insp Repts 50-220/99-04 & 50-410/99-04 on 990328-0508.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000220/19980151998-12-23023 December 1998 Insp Repts 50-220/98-15 & 50-410/98-15 on 980927-1121.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000220/19980141998-10-26026 October 1998 Insp Repts 50-220/98-14 & 50-410/98-14 on 980816-0926.No Violations Noted.Major Areas Inspected:Reviews of Licensee Activities in Functional Areas of Operations,Engineering, Maint & Plant Support ML20217L9251998-04-28028 April 1998 Insp Repts 50-220/98-08 & 50-410/98-08 on 980406-21. Violations Noted.Major Areas Inspected:Licensee Security Force Capability to Protect Facility Against Radiological Sabotage & Compliance W/Safeguards Program Commitments IR 05000220/19940011994-01-24024 January 1994 Insp Repts 50-220/94-01 & 50-410/94-01 on 940103-07.No Violations Noted.Major Areas Inspected:Mgt Support, Protected Area Barriers,Detection Aids & Assessment Aids, & Protected Area & Isolation Zone Lighting IR 05000220/19930221993-12-22022 December 1993 Insp Repts 50-220/93-22 & 50-410/93-22 on 931004-20.No Violations Noted.Major Areas Inspected:Mov Program Commitments & Enhancments Identified During Team Inspection in June 1992 Were Reviewed for Progress IR 05000220/19930011993-11-12012 November 1993 Insp Repts 50-220/93-01 & 50-410/93-01 on 930919-1030. Violations Noted.Major Areas Inspected:Major Components & Sys for Leakage,Alignment,Lubrication,Cooling Water Supply IR 05000220/19930231993-11-0505 November 1993 Insp Repts 50-220/93-23 & 50-410/93-22 on 931012-14.No Violations Noted.Major Areas Inspected:Mgt Support,Program Plans & Audits,Protected & Vital Area Physical Barriers, Detection & Assessment Aids IR 05000220/19930241993-10-27027 October 1993 Insp Repts 50-220/93-24 & 50-410/93-23 on 931018-22.No Violations Noted.Major Areas Inspected:Exams of Procedures, Representative Records,Interviews W/Personnel & Observations by Inspectors IR 05000220/19930191993-10-18018 October 1993 Insp Rept 50-220/93-19 on 930823-27.No Violations Noted. Major Areas Inspected:Electrical Distribution Sys IR 05000220/19930121993-10-0606 October 1993 Insp Repts 50-220/93-12 & 50-410/93-12 on 930615-18 & 0712-14.No Violations Noted.Major Areas inspected:930615-18 Emergency Preparedness Program & 930713 annual,full- Participation Emergency Preparedness Exercise IR 05000220/19930181993-10-0101 October 1993 Insp Repts 50-220/93-18 & 50-410/93-18 on 930808-0918. Violation Noted.Major Areas Inspected:Plant Operations, Maint & Surveillance Activities,Engineering & Plant Support, W/Regard to Radiological & Chemistry Controls & Security IR 05000220/19930131993-09-21021 September 1993 Insp Repts 50-220/93-13 & 50-410/93-13 on 930802-06.No Violations Noted.Major Areas Inspected:Design Changes & Mods,Installation & Testing of Mods,Interface/Communication, QA & Technical Support,Wrs & LERs IR 05000220/19930151993-09-16016 September 1993 Insp Repts 50-220/93-15 & 50-410/93-15 on 930719-23.No Violations or Deviations Noted.Major Areas Inspected:Offsite Power Supply Sources for Plant & to Review Licensees Corrective Action on Previously Identified Insp Findings IR 05000220/19930161993-08-0404 August 1993 Insp Repts 50-220/93-16 & 50-410/93-16 on 930426-30.No Violations Noted.Major Areas Inspected:Mgt Controls,Audits, Calibration of Effluent & Process Radiation Monitoring Sys, Air Cleaning Sys & Implementation of Previous Programs ML20056C1661993-03-12012 March 1993 Insp Repts 50-220/93-01 & 50-410/93-01 on 930124-0227. Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls,Maintenance,Surveillance,Security & Safety Assessment/Quality Verification Activities IR 05000220/19880301988-11-16016 November 1988 Insp Repts 50-220/88-30 & 50-410/88-29 on 880926-30.No Violations Noted.Major Areas Inspected:Security Plan & Procedures,Mgt Organization,Audits,Records & Repts,Testing & Maint,Barriers,Security Power Supply & Assessment Aids IR 05000220/19880091988-05-19019 May 1988 Insp Repts 50-220/88-09 & 50-410/88-09 on 880307-11 & 0404- 08.Violations Noted.Major Areas Inspected:Inservice Insp Program Re First 10-yr Insp Interval & Augmented Exams Conducted by Licensee,Including Procedures IR 05000220/19870221987-12-0909 December 1987 Insp Rept 50-220/87-22 on 871019-23.No Violations Noted. Major Areas Inspected:Design Change/Mods,Maint & Previously Identified Items IR 05000220/19870151987-09-14014 September 1987 Insp Repts 50-220/87-15 & 50-410/87-24 on 870803-07.No Violations Noted.Major Areas Inspected:Radiochemical Measurements Program,Including Actions on Previous Insp Findings,Chemistry Mgt & Lab QC & Audits IR 05000410/19870051987-03-23023 March 1987 Insp Rept 50-410/87-05 on 870202-05.No Violations Noted. Major Areas Inspected:Msiv Control & Electrical Power Supplies IR 05000410/19870071987-03-10010 March 1987 Insp Rept 50-410/87-07 on 870209-13.No Violations or Deviations Noted.Major Areas Inspected:Electrical/Mechanical Testing,Pms & Repairs During Performance of Surveillance & Maint Activities IR 05000410/19870061987-03-10010 March 1987 Insp Rept 50-410/87-06 on 870210-13.No Violations Noted. Major Areas Inspected:Preoperational Test Results Review, Overall Power Ascension Test Program,Qa/Qc Interfaces, Independent Verifications & Facility Tours IR 05000410/19870031987-03-0606 March 1987 Insp Rept 50-410/87-03 on 870112-28.No Violations Noted. Major Areas Inspected:Licensee Activities Re MSIV Problems IR 05000220/19870021987-02-17017 February 1987 Safety Insp Repts 50-220/87-02 & 50-410/87-04 on 870112-16. No Violations or Deviations Noted.Major Areas Inspected: Radiation Protection Program & Previously Identified Items. Weaknesses in ALARA Area Re Goal Setting & Mgt Noted ML20211A4671987-02-0606 February 1987 Insp Repts 50-220/86-26 & 50-410/86-65 on 861117-870104. Violations Noted:Ineffective Corrective Action for Scram Discharge Vol High Level Trip & Momentary Breach of Reactor Bldg Integrity While in Power Operating Mode ML20212L0421987-01-22022 January 1987 Insp Repts 50-220/86-17 & 50-410/86-61 on 860825-29.No Violations Noted.Major Areas Inspected:Allegations Re Technical Issues.Apparent & Proposed Violations Identified & Will Be Discussed at Enforcement Conference IR 05000410/19860671987-01-0909 January 1987 Insp Rept 50-410/86-67 on 861201-05.No Violations Noted. Major Areas Inspected:Followup of MSIV Problems.Problem Re Seat Spool Packing Identified.No Judgement Could Be Made Re Actions Taken to Correct Ball Scoring Problem IR 05000410/19860681987-01-0606 January 1987 Insp Rept 50-410/86-68 on 861208-12.No Violations Noted. Major Areas Inspected:Preoperational Test Results Review, Overall Power Ascension Test Program,Power Ascension Test Procedure Review & Plant Tours & Meetings IR 05000220/19860271986-12-30030 December 1986 Insp Repts 50-220/86-27 & 50-410/86-66 on 861201-05.No Violations Noted.Majors Areas inspected:organization,self- Indentification/Correction of Deficiencies,Plant Water Chemistry Sys & Sampling/Measurements IR 05000410/19860641986-12-12012 December 1986 Insp Rept 50-410/86-64 on 861117-21.No Violations Noted. Major Areas Inspected:Power Ascension Test Results Evaluation,Power Ascension Test Witnessing,Surveillance Procedure Review & Qa/Qc Interfaces IR 05000410/19860531986-12-11011 December 1986 Insp Rept 50-410/86-53 on 860922-26.No Violations Noted. Major Areas Inspected:Util Activities Re MSIV Reported Problems & Background History,Including Procurement of New ball-type MSIVs IR 05000220/19860241986-12-0505 December 1986 Insp Rept 50-220/86-24 on 861103-07.No Violations Noted. Major Areas Inspected:Maint Program & Associated Maint Activities IR 05000220/19860221986-12-0404 December 1986 Insp Repts 50-220/86-22 & 50-410/86-58 on 861027-29.No Violations Noted.Major Areas Inspected:Emergency Preparedness & 861029 Emergency Preparedness Exercise ML20214U9041986-12-0202 December 1986 Insp Repts 50-220/86-22 & 50-410/86-54 on 860929-1002.No Violations Noted.One Unresolved Item Identified Re off-hours Dose Assessment Capabilities.Major Areas Inspected: Operational Status of Emergency Preparedness Program IR 05000410/19860601986-11-26026 November 1986 Insp Rept 50-410/86-60 on 861031-1105.No Violations Noted. Major Areas Inspected:Initial Fuel Load Activities,Qa/Qc Interfaces,Independent Verifications & Calculations & Plant Tours & Meetings IR 05000410/19860621986-11-12012 November 1986 Initial OL Review Rept 50-410/86-62.Facility Constructed Per CPPR-112,FSAR & NRC Regulations & Util Ready to Safely Operate Facility IR 05000220/19860131986-10-21021 October 1986 Insp Rept 50-220/86-13 on 860910-19.Violations Identified: Failure to Control Measuring & Test Equipment,Failure to Control safety-related Maint Activities & Failure to Implement Surveillance Procedures IR 05000410/19860441986-09-0202 September 1986 Emergency Preparedness Implementation Appraisal Rept 50-410/86-44 on 860804-06.No Violations Noted.Major Areas Inspected:Open Items from Insp Rept 50-410/86-23 IR 05000220/19860151986-08-19019 August 1986 Insp Rept 50-220/86-15 on 860728-0801.Violation Noted: Failure to Identify Radionuclide Fe-55 & Activity,Quantity & Total Activity on Radwaste Shipping Manifests IR 05000410/19860471986-08-19019 August 1986 Insp Rept 50-410/86-47 on 860804-08.No Violation or Deviation Noted.Major Areas Inspected:Tech Spec Surveillance Testing & Calibr Program,Calibr of safety-related Instruments & Measuring & Testing Equipment Control Program IR 05000410/19860381986-08-0707 August 1986 Insp Rept 50-410/86-38 on 860714-24.No Violation Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings, Preoperational Test Results Evaluation Review & Power Ascension Test Program ML20205A4241986-08-0404 August 1986 Insp Rept 50-410/86-33 on 860630-0711.Deviation Noted: Failure to Review Results of Preliminary Test MD.0100.A03, Standby Diesel Generator Reliability Test IR 05000410/19860231986-07-10010 July 1986 Emergency Preparedness Implementation Appraisal 50-410/86-23 on 860519-22.No Violations Noted.Major Areas Inspected: Emergency Preparedness Program,Including Organization, Administration & Procedures IR 05000410/19860051986-04-0202 April 1986 Insp Rept 50-410/86-05 on 860303-07.No Violations Noted. Major Areas Inspected:Preoperational & Interim Surveillance & Preliminary Test Procedure Review & Qa/Qc Interface W/ Preoperational Test Program IR 05000410/19860071986-03-26026 March 1986 Insp Rept 50-410/86-07 on 860103 & 07 at S&W in Cherry Hill, Nj.Major Areas Inspected:Audit Results & Unresolved Corrective Action Items from Insp Rept 50-410/85-28 for Util Suppl to Engineering Assurance Audit 50 IR 05000220/19850131986-02-11011 February 1986 Enforcement Conference Rept 50-220/85-13 on 860205.Major Areas Discussed:Findings Identified in Insp Rept 50-220/85-13 Re Program of Qualification of Electrical Equipment Per 10CFR50.49 IR 05000410/19850481986-01-24024 January 1986 Preoperational Security Program Insp Rept 50-410/85-48 on 851216-19.No Violation Noted.Major Areas Inspected:Review of Implementing Procedures for Receipt of Snm.Info Partially Withheld (Ref 10CFR2.790) IR 05000410/19850311985-12-31031 December 1985 Errata to Insp Rept 50-410/85-31,consisting of Flow Chart for Large Bore as-built Piping Review,Inadvertently Omitted from Section 3 of 851112 Transmittal 1999-09-14
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000220/19990061999-09-14014 September 1999 Insp Repts 50-220/99-06 & 50-410/99-06 on 990620-0731.NCVs Noted.Major Areas Inspected:Licensee Operations,Engineering, Maint & Plant Support IR 05000220/19990041999-06-21021 June 1999 Insp Repts 50-220/99-04 & 50-410/99-04 on 990328-0508.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000220/19980151998-12-23023 December 1998 Insp Repts 50-220/98-15 & 50-410/98-15 on 980927-1121.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000220/19980141998-10-26026 October 1998 Insp Repts 50-220/98-14 & 50-410/98-14 on 980816-0926.No Violations Noted.Major Areas Inspected:Reviews of Licensee Activities in Functional Areas of Operations,Engineering, Maint & Plant Support ML20217L9251998-04-28028 April 1998 Insp Repts 50-220/98-08 & 50-410/98-08 on 980406-21. Violations Noted.Major Areas Inspected:Licensee Security Force Capability to Protect Facility Against Radiological Sabotage & Compliance W/Safeguards Program Commitments IR 05000220/19940011994-01-24024 January 1994 Insp Repts 50-220/94-01 & 50-410/94-01 on 940103-07.No Violations Noted.Major Areas Inspected:Mgt Support, Protected Area Barriers,Detection Aids & Assessment Aids, & Protected Area & Isolation Zone Lighting IR 05000220/19930221993-12-22022 December 1993 Insp Repts 50-220/93-22 & 50-410/93-22 on 931004-20.No Violations Noted.Major Areas Inspected:Mov Program Commitments & Enhancments Identified During Team Inspection in June 1992 Were Reviewed for Progress IR 05000220/19930011993-11-12012 November 1993 Insp Repts 50-220/93-01 & 50-410/93-01 on 930919-1030. Violations Noted.Major Areas Inspected:Major Components & Sys for Leakage,Alignment,Lubrication,Cooling Water Supply IR 05000220/19930231993-11-0505 November 1993 Insp Repts 50-220/93-23 & 50-410/93-22 on 931012-14.No Violations Noted.Major Areas Inspected:Mgt Support,Program Plans & Audits,Protected & Vital Area Physical Barriers, Detection & Assessment Aids IR 05000220/19930241993-10-27027 October 1993 Insp Repts 50-220/93-24 & 50-410/93-23 on 931018-22.No Violations Noted.Major Areas Inspected:Exams of Procedures, Representative Records,Interviews W/Personnel & Observations by Inspectors IR 05000220/19930191993-10-18018 October 1993 Insp Rept 50-220/93-19 on 930823-27.No Violations Noted. Major Areas Inspected:Electrical Distribution Sys IR 05000220/19930121993-10-0606 October 1993 Insp Repts 50-220/93-12 & 50-410/93-12 on 930615-18 & 0712-14.No Violations Noted.Major Areas inspected:930615-18 Emergency Preparedness Program & 930713 annual,full- Participation Emergency Preparedness Exercise IR 05000220/19930181993-10-0101 October 1993 Insp Repts 50-220/93-18 & 50-410/93-18 on 930808-0918. Violation Noted.Major Areas Inspected:Plant Operations, Maint & Surveillance Activities,Engineering & Plant Support, W/Regard to Radiological & Chemistry Controls & Security IR 05000220/19930131993-09-21021 September 1993 Insp Repts 50-220/93-13 & 50-410/93-13 on 930802-06.No Violations Noted.Major Areas Inspected:Design Changes & Mods,Installation & Testing of Mods,Interface/Communication, QA & Technical Support,Wrs & LERs IR 05000220/19930151993-09-16016 September 1993 Insp Repts 50-220/93-15 & 50-410/93-15 on 930719-23.No Violations or Deviations Noted.Major Areas Inspected:Offsite Power Supply Sources for Plant & to Review Licensees Corrective Action on Previously Identified Insp Findings IR 05000220/19930161993-08-0404 August 1993 Insp Repts 50-220/93-16 & 50-410/93-16 on 930426-30.No Violations Noted.Major Areas Inspected:Mgt Controls,Audits, Calibration of Effluent & Process Radiation Monitoring Sys, Air Cleaning Sys & Implementation of Previous Programs ML20056C1661993-03-12012 March 1993 Insp Repts 50-220/93-01 & 50-410/93-01 on 930124-0227. Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls,Maintenance,Surveillance,Security & Safety Assessment/Quality Verification Activities IR 05000220/19880301988-11-16016 November 1988 Insp Repts 50-220/88-30 & 50-410/88-29 on 880926-30.No Violations Noted.Major Areas Inspected:Security Plan & Procedures,Mgt Organization,Audits,Records & Repts,Testing & Maint,Barriers,Security Power Supply & Assessment Aids IR 05000220/19880091988-05-19019 May 1988 Insp Repts 50-220/88-09 & 50-410/88-09 on 880307-11 & 0404- 08.Violations Noted.Major Areas Inspected:Inservice Insp Program Re First 10-yr Insp Interval & Augmented Exams Conducted by Licensee,Including Procedures IR 05000220/19870221987-12-0909 December 1987 Insp Rept 50-220/87-22 on 871019-23.No Violations Noted. Major Areas Inspected:Design Change/Mods,Maint & Previously Identified Items IR 05000220/19870151987-09-14014 September 1987 Insp Repts 50-220/87-15 & 50-410/87-24 on 870803-07.No Violations Noted.Major Areas Inspected:Radiochemical Measurements Program,Including Actions on Previous Insp Findings,Chemistry Mgt & Lab QC & Audits IR 05000410/19870051987-03-23023 March 1987 Insp Rept 50-410/87-05 on 870202-05.No Violations Noted. Major Areas Inspected:Msiv Control & Electrical Power Supplies IR 05000410/19870071987-03-10010 March 1987 Insp Rept 50-410/87-07 on 870209-13.No Violations or Deviations Noted.Major Areas Inspected:Electrical/Mechanical Testing,Pms & Repairs During Performance of Surveillance & Maint Activities IR 05000410/19870061987-03-10010 March 1987 Insp Rept 50-410/87-06 on 870210-13.No Violations Noted. Major Areas Inspected:Preoperational Test Results Review, Overall Power Ascension Test Program,Qa/Qc Interfaces, Independent Verifications & Facility Tours IR 05000410/19870031987-03-0606 March 1987 Insp Rept 50-410/87-03 on 870112-28.No Violations Noted. Major Areas Inspected:Licensee Activities Re MSIV Problems IR 05000220/19870021987-02-17017 February 1987 Safety Insp Repts 50-220/87-02 & 50-410/87-04 on 870112-16. No Violations or Deviations Noted.Major Areas Inspected: Radiation Protection Program & Previously Identified Items. Weaknesses in ALARA Area Re Goal Setting & Mgt Noted ML20211A4671987-02-0606 February 1987 Insp Repts 50-220/86-26 & 50-410/86-65 on 861117-870104. Violations Noted:Ineffective Corrective Action for Scram Discharge Vol High Level Trip & Momentary Breach of Reactor Bldg Integrity While in Power Operating Mode ML20212L0421987-01-22022 January 1987 Insp Repts 50-220/86-17 & 50-410/86-61 on 860825-29.No Violations Noted.Major Areas Inspected:Allegations Re Technical Issues.Apparent & Proposed Violations Identified & Will Be Discussed at Enforcement Conference IR 05000410/19860671987-01-0909 January 1987 Insp Rept 50-410/86-67 on 861201-05.No Violations Noted. Major Areas Inspected:Followup of MSIV Problems.Problem Re Seat Spool Packing Identified.No Judgement Could Be Made Re Actions Taken to Correct Ball Scoring Problem IR 05000410/19860681987-01-0606 January 1987 Insp Rept 50-410/86-68 on 861208-12.No Violations Noted. Major Areas Inspected:Preoperational Test Results Review, Overall Power Ascension Test Program,Power Ascension Test Procedure Review & Plant Tours & Meetings IR 05000220/19860271986-12-30030 December 1986 Insp Repts 50-220/86-27 & 50-410/86-66 on 861201-05.No Violations Noted.Majors Areas inspected:organization,self- Indentification/Correction of Deficiencies,Plant Water Chemistry Sys & Sampling/Measurements IR 05000410/19860641986-12-12012 December 1986 Insp Rept 50-410/86-64 on 861117-21.No Violations Noted. Major Areas Inspected:Power Ascension Test Results Evaluation,Power Ascension Test Witnessing,Surveillance Procedure Review & Qa/Qc Interfaces IR 05000410/19860531986-12-11011 December 1986 Insp Rept 50-410/86-53 on 860922-26.No Violations Noted. Major Areas Inspected:Util Activities Re MSIV Reported Problems & Background History,Including Procurement of New ball-type MSIVs IR 05000220/19860241986-12-0505 December 1986 Insp Rept 50-220/86-24 on 861103-07.No Violations Noted. Major Areas Inspected:Maint Program & Associated Maint Activities IR 05000220/19860221986-12-0404 December 1986 Insp Repts 50-220/86-22 & 50-410/86-58 on 861027-29.No Violations Noted.Major Areas Inspected:Emergency Preparedness & 861029 Emergency Preparedness Exercise ML20214U9041986-12-0202 December 1986 Insp Repts 50-220/86-22 & 50-410/86-54 on 860929-1002.No Violations Noted.One Unresolved Item Identified Re off-hours Dose Assessment Capabilities.Major Areas Inspected: Operational Status of Emergency Preparedness Program IR 05000410/19860601986-11-26026 November 1986 Insp Rept 50-410/86-60 on 861031-1105.No Violations Noted. Major Areas Inspected:Initial Fuel Load Activities,Qa/Qc Interfaces,Independent Verifications & Calculations & Plant Tours & Meetings IR 05000410/19860621986-11-12012 November 1986 Initial OL Review Rept 50-410/86-62.Facility Constructed Per CPPR-112,FSAR & NRC Regulations & Util Ready to Safely Operate Facility IR 05000220/19860131986-10-21021 October 1986 Insp Rept 50-220/86-13 on 860910-19.Violations Identified: Failure to Control Measuring & Test Equipment,Failure to Control safety-related Maint Activities & Failure to Implement Surveillance Procedures IR 05000410/19860441986-09-0202 September 1986 Emergency Preparedness Implementation Appraisal Rept 50-410/86-44 on 860804-06.No Violations Noted.Major Areas Inspected:Open Items from Insp Rept 50-410/86-23 IR 05000220/19860151986-08-19019 August 1986 Insp Rept 50-220/86-15 on 860728-0801.Violation Noted: Failure to Identify Radionuclide Fe-55 & Activity,Quantity & Total Activity on Radwaste Shipping Manifests IR 05000410/19860471986-08-19019 August 1986 Insp Rept 50-410/86-47 on 860804-08.No Violation or Deviation Noted.Major Areas Inspected:Tech Spec Surveillance Testing & Calibr Program,Calibr of safety-related Instruments & Measuring & Testing Equipment Control Program IR 05000410/19860381986-08-0707 August 1986 Insp Rept 50-410/86-38 on 860714-24.No Violation Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings, Preoperational Test Results Evaluation Review & Power Ascension Test Program ML20205A4241986-08-0404 August 1986 Insp Rept 50-410/86-33 on 860630-0711.Deviation Noted: Failure to Review Results of Preliminary Test MD.0100.A03, Standby Diesel Generator Reliability Test IR 05000410/19860231986-07-10010 July 1986 Emergency Preparedness Implementation Appraisal 50-410/86-23 on 860519-22.No Violations Noted.Major Areas Inspected: Emergency Preparedness Program,Including Organization, Administration & Procedures IR 05000410/19860051986-04-0202 April 1986 Insp Rept 50-410/86-05 on 860303-07.No Violations Noted. Major Areas Inspected:Preoperational & Interim Surveillance & Preliminary Test Procedure Review & Qa/Qc Interface W/ Preoperational Test Program IR 05000410/19860071986-03-26026 March 1986 Insp Rept 50-410/86-07 on 860103 & 07 at S&W in Cherry Hill, Nj.Major Areas Inspected:Audit Results & Unresolved Corrective Action Items from Insp Rept 50-410/85-28 for Util Suppl to Engineering Assurance Audit 50 IR 05000220/19850131986-02-11011 February 1986 Enforcement Conference Rept 50-220/85-13 on 860205.Major Areas Discussed:Findings Identified in Insp Rept 50-220/85-13 Re Program of Qualification of Electrical Equipment Per 10CFR50.49 IR 05000410/19850481986-01-24024 January 1986 Preoperational Security Program Insp Rept 50-410/85-48 on 851216-19.No Violation Noted.Major Areas Inspected:Review of Implementing Procedures for Receipt of Snm.Info Partially Withheld (Ref 10CFR2.790) IR 05000410/19850311985-12-31031 December 1985 Errata to Insp Rept 50-410/85-31,consisting of Flow Chart for Large Bore as-built Piping Review,Inadvertently Omitted from Section 3 of 851112 Transmittal 1999-09-14
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000220/19990061999-09-14014 September 1999 Insp Repts 50-220/99-06 & 50-410/99-06 on 990620-0731.NCVs Noted.Major Areas Inspected:Licensee Operations,Engineering, Maint & Plant Support IR 05000220/19990041999-06-21021 June 1999 Insp Repts 50-220/99-04 & 50-410/99-04 on 990328-0508.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000220/19980151998-12-23023 December 1998 Insp Repts 50-220/98-15 & 50-410/98-15 on 980927-1121.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000220/19980141998-10-26026 October 1998 Insp Repts 50-220/98-14 & 50-410/98-14 on 980816-0926.No Violations Noted.Major Areas Inspected:Reviews of Licensee Activities in Functional Areas of Operations,Engineering, Maint & Plant Support ML20217L9251998-04-28028 April 1998 Insp Repts 50-220/98-08 & 50-410/98-08 on 980406-21. Violations Noted.Major Areas Inspected:Licensee Security Force Capability to Protect Facility Against Radiological Sabotage & Compliance W/Safeguards Program Commitments IR 05000220/19940011994-01-24024 January 1994 Insp Repts 50-220/94-01 & 50-410/94-01 on 940103-07.No Violations Noted.Major Areas Inspected:Mgt Support, Protected Area Barriers,Detection Aids & Assessment Aids, & Protected Area & Isolation Zone Lighting IR 05000220/19930221993-12-22022 December 1993 Insp Repts 50-220/93-22 & 50-410/93-22 on 931004-20.No Violations Noted.Major Areas Inspected:Mov Program Commitments & Enhancments Identified During Team Inspection in June 1992 Were Reviewed for Progress IR 05000220/19930011993-11-12012 November 1993 Insp Repts 50-220/93-01 & 50-410/93-01 on 930919-1030. Violations Noted.Major Areas Inspected:Major Components & Sys for Leakage,Alignment,Lubrication,Cooling Water Supply IR 05000220/19930231993-11-0505 November 1993 Insp Repts 50-220/93-23 & 50-410/93-22 on 931012-14.No Violations Noted.Major Areas Inspected:Mgt Support,Program Plans & Audits,Protected & Vital Area Physical Barriers, Detection & Assessment Aids IR 05000220/19930241993-10-27027 October 1993 Insp Repts 50-220/93-24 & 50-410/93-23 on 931018-22.No Violations Noted.Major Areas Inspected:Exams of Procedures, Representative Records,Interviews W/Personnel & Observations by Inspectors IR 05000220/19930191993-10-18018 October 1993 Insp Rept 50-220/93-19 on 930823-27.No Violations Noted. Major Areas Inspected:Electrical Distribution Sys IR 05000220/19930121993-10-0606 October 1993 Insp Repts 50-220/93-12 & 50-410/93-12 on 930615-18 & 0712-14.No Violations Noted.Major Areas inspected:930615-18 Emergency Preparedness Program & 930713 annual,full- Participation Emergency Preparedness Exercise IR 05000220/19930181993-10-0101 October 1993 Insp Repts 50-220/93-18 & 50-410/93-18 on 930808-0918. Violation Noted.Major Areas Inspected:Plant Operations, Maint & Surveillance Activities,Engineering & Plant Support, W/Regard to Radiological & Chemistry Controls & Security IR 05000220/19930131993-09-21021 September 1993 Insp Repts 50-220/93-13 & 50-410/93-13 on 930802-06.No Violations Noted.Major Areas Inspected:Design Changes & Mods,Installation & Testing of Mods,Interface/Communication, QA & Technical Support,Wrs & LERs IR 05000220/19930151993-09-16016 September 1993 Insp Repts 50-220/93-15 & 50-410/93-15 on 930719-23.No Violations or Deviations Noted.Major Areas Inspected:Offsite Power Supply Sources for Plant & to Review Licensees Corrective Action on Previously Identified Insp Findings IR 05000220/19930161993-08-0404 August 1993 Insp Repts 50-220/93-16 & 50-410/93-16 on 930426-30.No Violations Noted.Major Areas Inspected:Mgt Controls,Audits, Calibration of Effluent & Process Radiation Monitoring Sys, Air Cleaning Sys & Implementation of Previous Programs ML20056C1661993-03-12012 March 1993 Insp Repts 50-220/93-01 & 50-410/93-01 on 930124-0227. Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls,Maintenance,Surveillance,Security & Safety Assessment/Quality Verification Activities IR 05000220/19880301988-11-16016 November 1988 Insp Repts 50-220/88-30 & 50-410/88-29 on 880926-30.No Violations Noted.Major Areas Inspected:Security Plan & Procedures,Mgt Organization,Audits,Records & Repts,Testing & Maint,Barriers,Security Power Supply & Assessment Aids IR 05000220/19880091988-05-19019 May 1988 Insp Repts 50-220/88-09 & 50-410/88-09 on 880307-11 & 0404- 08.Violations Noted.Major Areas Inspected:Inservice Insp Program Re First 10-yr Insp Interval & Augmented Exams Conducted by Licensee,Including Procedures IR 05000220/19870221987-12-0909 December 1987 Insp Rept 50-220/87-22 on 871019-23.No Violations Noted. Major Areas Inspected:Design Change/Mods,Maint & Previously Identified Items IR 05000220/19870151987-09-14014 September 1987 Insp Repts 50-220/87-15 & 50-410/87-24 on 870803-07.No Violations Noted.Major Areas Inspected:Radiochemical Measurements Program,Including Actions on Previous Insp Findings,Chemistry Mgt & Lab QC & Audits IR 05000410/19870051987-03-23023 March 1987 Insp Rept 50-410/87-05 on 870202-05.No Violations Noted. Major Areas Inspected:Msiv Control & Electrical Power Supplies IR 05000410/19870071987-03-10010 March 1987 Insp Rept 50-410/87-07 on 870209-13.No Violations or Deviations Noted.Major Areas Inspected:Electrical/Mechanical Testing,Pms & Repairs During Performance of Surveillance & Maint Activities IR 05000410/19870061987-03-10010 March 1987 Insp Rept 50-410/87-06 on 870210-13.No Violations Noted. Major Areas Inspected:Preoperational Test Results Review, Overall Power Ascension Test Program,Qa/Qc Interfaces, Independent Verifications & Facility Tours IR 05000410/19870031987-03-0606 March 1987 Insp Rept 50-410/87-03 on 870112-28.No Violations Noted. Major Areas Inspected:Licensee Activities Re MSIV Problems IR 05000220/19870021987-02-17017 February 1987 Safety Insp Repts 50-220/87-02 & 50-410/87-04 on 870112-16. No Violations or Deviations Noted.Major Areas Inspected: Radiation Protection Program & Previously Identified Items. Weaknesses in ALARA Area Re Goal Setting & Mgt Noted ML20211A4671987-02-0606 February 1987 Insp Repts 50-220/86-26 & 50-410/86-65 on 861117-870104. Violations Noted:Ineffective Corrective Action for Scram Discharge Vol High Level Trip & Momentary Breach of Reactor Bldg Integrity While in Power Operating Mode ML20212L0421987-01-22022 January 1987 Insp Repts 50-220/86-17 & 50-410/86-61 on 860825-29.No Violations Noted.Major Areas Inspected:Allegations Re Technical Issues.Apparent & Proposed Violations Identified & Will Be Discussed at Enforcement Conference IR 05000410/19860671987-01-0909 January 1987 Insp Rept 50-410/86-67 on 861201-05.No Violations Noted. Major Areas Inspected:Followup of MSIV Problems.Problem Re Seat Spool Packing Identified.No Judgement Could Be Made Re Actions Taken to Correct Ball Scoring Problem IR 05000410/19860681987-01-0606 January 1987 Insp Rept 50-410/86-68 on 861208-12.No Violations Noted. Major Areas Inspected:Preoperational Test Results Review, Overall Power Ascension Test Program,Power Ascension Test Procedure Review & Plant Tours & Meetings IR 05000220/19860271986-12-30030 December 1986 Insp Repts 50-220/86-27 & 50-410/86-66 on 861201-05.No Violations Noted.Majors Areas inspected:organization,self- Indentification/Correction of Deficiencies,Plant Water Chemistry Sys & Sampling/Measurements IR 05000410/19860641986-12-12012 December 1986 Insp Rept 50-410/86-64 on 861117-21.No Violations Noted. Major Areas Inspected:Power Ascension Test Results Evaluation,Power Ascension Test Witnessing,Surveillance Procedure Review & Qa/Qc Interfaces IR 05000410/19860531986-12-11011 December 1986 Insp Rept 50-410/86-53 on 860922-26.No Violations Noted. Major Areas Inspected:Util Activities Re MSIV Reported Problems & Background History,Including Procurement of New ball-type MSIVs IR 05000220/19860241986-12-0505 December 1986 Insp Rept 50-220/86-24 on 861103-07.No Violations Noted. Major Areas Inspected:Maint Program & Associated Maint Activities IR 05000220/19860221986-12-0404 December 1986 Insp Repts 50-220/86-22 & 50-410/86-58 on 861027-29.No Violations Noted.Major Areas Inspected:Emergency Preparedness & 861029 Emergency Preparedness Exercise ML20214U9041986-12-0202 December 1986 Insp Repts 50-220/86-22 & 50-410/86-54 on 860929-1002.No Violations Noted.One Unresolved Item Identified Re off-hours Dose Assessment Capabilities.Major Areas Inspected: Operational Status of Emergency Preparedness Program IR 05000410/19860601986-11-26026 November 1986 Insp Rept 50-410/86-60 on 861031-1105.No Violations Noted. Major Areas Inspected:Initial Fuel Load Activities,Qa/Qc Interfaces,Independent Verifications & Calculations & Plant Tours & Meetings IR 05000410/19860621986-11-12012 November 1986 Initial OL Review Rept 50-410/86-62.Facility Constructed Per CPPR-112,FSAR & NRC Regulations & Util Ready to Safely Operate Facility IR 05000220/19860131986-10-21021 October 1986 Insp Rept 50-220/86-13 on 860910-19.Violations Identified: Failure to Control Measuring & Test Equipment,Failure to Control safety-related Maint Activities & Failure to Implement Surveillance Procedures IR 05000410/19860441986-09-0202 September 1986 Emergency Preparedness Implementation Appraisal Rept 50-410/86-44 on 860804-06.No Violations Noted.Major Areas Inspected:Open Items from Insp Rept 50-410/86-23 IR 05000220/19860151986-08-19019 August 1986 Insp Rept 50-220/86-15 on 860728-0801.Violation Noted: Failure to Identify Radionuclide Fe-55 & Activity,Quantity & Total Activity on Radwaste Shipping Manifests IR 05000410/19860471986-08-19019 August 1986 Insp Rept 50-410/86-47 on 860804-08.No Violation or Deviation Noted.Major Areas Inspected:Tech Spec Surveillance Testing & Calibr Program,Calibr of safety-related Instruments & Measuring & Testing Equipment Control Program IR 05000410/19860381986-08-0707 August 1986 Insp Rept 50-410/86-38 on 860714-24.No Violation Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings, Preoperational Test Results Evaluation Review & Power Ascension Test Program ML20205A4241986-08-0404 August 1986 Insp Rept 50-410/86-33 on 860630-0711.Deviation Noted: Failure to Review Results of Preliminary Test MD.0100.A03, Standby Diesel Generator Reliability Test IR 05000410/19860231986-07-10010 July 1986 Emergency Preparedness Implementation Appraisal 50-410/86-23 on 860519-22.No Violations Noted.Major Areas Inspected: Emergency Preparedness Program,Including Organization, Administration & Procedures IR 05000410/19860051986-04-0202 April 1986 Insp Rept 50-410/86-05 on 860303-07.No Violations Noted. Major Areas Inspected:Preoperational & Interim Surveillance & Preliminary Test Procedure Review & Qa/Qc Interface W/ Preoperational Test Program IR 05000410/19860071986-03-26026 March 1986 Insp Rept 50-410/86-07 on 860103 & 07 at S&W in Cherry Hill, Nj.Major Areas Inspected:Audit Results & Unresolved Corrective Action Items from Insp Rept 50-410/85-28 for Util Suppl to Engineering Assurance Audit 50 IR 05000220/19850131986-02-11011 February 1986 Enforcement Conference Rept 50-220/85-13 on 860205.Major Areas Discussed:Findings Identified in Insp Rept 50-220/85-13 Re Program of Qualification of Electrical Equipment Per 10CFR50.49 IR 05000410/19850481986-01-24024 January 1986 Preoperational Security Program Insp Rept 50-410/85-48 on 851216-19.No Violation Noted.Major Areas Inspected:Review of Implementing Procedures for Receipt of Snm.Info Partially Withheld (Ref 10CFR2.790) IR 05000410/19850311985-12-31031 December 1985 Errata to Insp Rept 50-410/85-31,consisting of Flow Chart for Large Bore as-built Piping Review,Inadvertently Omitted from Section 3 of 851112 Transmittal 1999-09-14
[Table view] Category:UTILITY
MONTHYEARIR 05000220/19880301988-11-16016 November 1988 Insp Repts 50-220/88-30 & 50-410/88-29 on 880926-30.No Violations Noted.Major Areas Inspected:Security Plan & Procedures,Mgt Organization,Audits,Records & Repts,Testing & Maint,Barriers,Security Power Supply & Assessment Aids IR 05000220/19880091988-05-19019 May 1988 Insp Repts 50-220/88-09 & 50-410/88-09 on 880307-11 & 0404- 08.Violations Noted.Major Areas Inspected:Inservice Insp Program Re First 10-yr Insp Interval & Augmented Exams Conducted by Licensee,Including Procedures IR 05000220/19870221987-12-0909 December 1987 Insp Rept 50-220/87-22 on 871019-23.No Violations Noted. Major Areas Inspected:Design Change/Mods,Maint & Previously Identified Items IR 05000220/19870151987-09-14014 September 1987 Insp Repts 50-220/87-15 & 50-410/87-24 on 870803-07.No Violations Noted.Major Areas Inspected:Radiochemical Measurements Program,Including Actions on Previous Insp Findings,Chemistry Mgt & Lab QC & Audits IR 05000410/19870051987-03-23023 March 1987 Insp Rept 50-410/87-05 on 870202-05.No Violations Noted. Major Areas Inspected:Msiv Control & Electrical Power Supplies IR 05000410/19870071987-03-10010 March 1987 Insp Rept 50-410/87-07 on 870209-13.No Violations or Deviations Noted.Major Areas Inspected:Electrical/Mechanical Testing,Pms & Repairs During Performance of Surveillance & Maint Activities IR 05000410/19870061987-03-10010 March 1987 Insp Rept 50-410/87-06 on 870210-13.No Violations Noted. Major Areas Inspected:Preoperational Test Results Review, Overall Power Ascension Test Program,Qa/Qc Interfaces, Independent Verifications & Facility Tours IR 05000410/19870031987-03-0606 March 1987 Insp Rept 50-410/87-03 on 870112-28.No Violations Noted. Major Areas Inspected:Licensee Activities Re MSIV Problems IR 05000220/19870021987-02-17017 February 1987 Safety Insp Repts 50-220/87-02 & 50-410/87-04 on 870112-16. No Violations or Deviations Noted.Major Areas Inspected: Radiation Protection Program & Previously Identified Items. Weaknesses in ALARA Area Re Goal Setting & Mgt Noted ML20211A4671987-02-0606 February 1987 Insp Repts 50-220/86-26 & 50-410/86-65 on 861117-870104. Violations Noted:Ineffective Corrective Action for Scram Discharge Vol High Level Trip & Momentary Breach of Reactor Bldg Integrity While in Power Operating Mode ML20212L0421987-01-22022 January 1987 Insp Repts 50-220/86-17 & 50-410/86-61 on 860825-29.No Violations Noted.Major Areas Inspected:Allegations Re Technical Issues.Apparent & Proposed Violations Identified & Will Be Discussed at Enforcement Conference IR 05000410/19860671987-01-0909 January 1987 Insp Rept 50-410/86-67 on 861201-05.No Violations Noted. Major Areas Inspected:Followup of MSIV Problems.Problem Re Seat Spool Packing Identified.No Judgement Could Be Made Re Actions Taken to Correct Ball Scoring Problem IR 05000410/19860681987-01-0606 January 1987 Insp Rept 50-410/86-68 on 861208-12.No Violations Noted. Major Areas Inspected:Preoperational Test Results Review, Overall Power Ascension Test Program,Power Ascension Test Procedure Review & Plant Tours & Meetings IR 05000220/19860271986-12-30030 December 1986 Insp Repts 50-220/86-27 & 50-410/86-66 on 861201-05.No Violations Noted.Majors Areas inspected:organization,self- Indentification/Correction of Deficiencies,Plant Water Chemistry Sys & Sampling/Measurements IR 05000410/19860641986-12-12012 December 1986 Insp Rept 50-410/86-64 on 861117-21.No Violations Noted. Major Areas Inspected:Power Ascension Test Results Evaluation,Power Ascension Test Witnessing,Surveillance Procedure Review & Qa/Qc Interfaces IR 05000410/19860531986-12-11011 December 1986 Insp Rept 50-410/86-53 on 860922-26.No Violations Noted. Major Areas Inspected:Util Activities Re MSIV Reported Problems & Background History,Including Procurement of New ball-type MSIVs IR 05000220/19860241986-12-0505 December 1986 Insp Rept 50-220/86-24 on 861103-07.No Violations Noted. Major Areas Inspected:Maint Program & Associated Maint Activities IR 05000220/19860221986-12-0404 December 1986 Insp Repts 50-220/86-22 & 50-410/86-58 on 861027-29.No Violations Noted.Major Areas Inspected:Emergency Preparedness & 861029 Emergency Preparedness Exercise ML20214U9041986-12-0202 December 1986 Insp Repts 50-220/86-22 & 50-410/86-54 on 860929-1002.No Violations Noted.One Unresolved Item Identified Re off-hours Dose Assessment Capabilities.Major Areas Inspected: Operational Status of Emergency Preparedness Program IR 05000410/19860601986-11-26026 November 1986 Insp Rept 50-410/86-60 on 861031-1105.No Violations Noted. Major Areas Inspected:Initial Fuel Load Activities,Qa/Qc Interfaces,Independent Verifications & Calculations & Plant Tours & Meetings IR 05000410/19860621986-11-12012 November 1986 Initial OL Review Rept 50-410/86-62.Facility Constructed Per CPPR-112,FSAR & NRC Regulations & Util Ready to Safely Operate Facility IR 05000220/19860131986-10-21021 October 1986 Insp Rept 50-220/86-13 on 860910-19.Violations Identified: Failure to Control Measuring & Test Equipment,Failure to Control safety-related Maint Activities & Failure to Implement Surveillance Procedures IR 05000410/19860441986-09-0202 September 1986 Emergency Preparedness Implementation Appraisal Rept 50-410/86-44 on 860804-06.No Violations Noted.Major Areas Inspected:Open Items from Insp Rept 50-410/86-23 IR 05000220/19860151986-08-19019 August 1986 Insp Rept 50-220/86-15 on 860728-0801.Violation Noted: Failure to Identify Radionuclide Fe-55 & Activity,Quantity & Total Activity on Radwaste Shipping Manifests IR 05000410/19860471986-08-19019 August 1986 Insp Rept 50-410/86-47 on 860804-08.No Violation or Deviation Noted.Major Areas Inspected:Tech Spec Surveillance Testing & Calibr Program,Calibr of safety-related Instruments & Measuring & Testing Equipment Control Program IR 05000410/19860381986-08-0707 August 1986 Insp Rept 50-410/86-38 on 860714-24.No Violation Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings, Preoperational Test Results Evaluation Review & Power Ascension Test Program ML20205A4241986-08-0404 August 1986 Insp Rept 50-410/86-33 on 860630-0711.Deviation Noted: Failure to Review Results of Preliminary Test MD.0100.A03, Standby Diesel Generator Reliability Test IR 05000410/19860231986-07-10010 July 1986 Emergency Preparedness Implementation Appraisal 50-410/86-23 on 860519-22.No Violations Noted.Major Areas Inspected: Emergency Preparedness Program,Including Organization, Administration & Procedures IR 05000410/19860051986-04-0202 April 1986 Insp Rept 50-410/86-05 on 860303-07.No Violations Noted. Major Areas Inspected:Preoperational & Interim Surveillance & Preliminary Test Procedure Review & Qa/Qc Interface W/ Preoperational Test Program IR 05000410/19860071986-03-26026 March 1986 Insp Rept 50-410/86-07 on 860103 & 07 at S&W in Cherry Hill, Nj.Major Areas Inspected:Audit Results & Unresolved Corrective Action Items from Insp Rept 50-410/85-28 for Util Suppl to Engineering Assurance Audit 50 IR 05000220/19850131986-02-11011 February 1986 Enforcement Conference Rept 50-220/85-13 on 860205.Major Areas Discussed:Findings Identified in Insp Rept 50-220/85-13 Re Program of Qualification of Electrical Equipment Per 10CFR50.49 IR 05000410/19850481986-01-24024 January 1986 Preoperational Security Program Insp Rept 50-410/85-48 on 851216-19.No Violation Noted.Major Areas Inspected:Review of Implementing Procedures for Receipt of Snm.Info Partially Withheld (Ref 10CFR2.790) IR 05000410/19850311985-12-31031 December 1985 Errata to Insp Rept 50-410/85-31,consisting of Flow Chart for Large Bore as-built Piping Review,Inadvertently Omitted from Section 3 of 851112 Transmittal IR 05000220/19850191985-12-0505 December 1985 Insp Rept 50-220/85-19 on 851112-14.No Violation Noted.Major Areas Inspected:Annual Emergency Exercise Performed on 851113 IR 05000410/20060181985-07-0909 July 1985 Insp Rept 50-461/85-20 on 850410-0618.No Violations or Deviations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Preoperational Test Procedure Review, Preoperational Test Witnessing & Program Implementation IR 05000410/19850061985-05-0707 May 1985 Insp Rept 50-410/85-06 on 850304-08.No Violation Noted.Major Areas Inspected:Turnover Portion of QA Program for Preoperational Testing,Including Qa/Qc Overview & Interface Activities IR 05000410/19850081985-05-0303 May 1985 Insp Rept 50-410/85-08 on 850318-22.No Violation Noted.Major Areas Inspected:Activities Re Installation of Electrical & Instrumentation safety-related Equipment & Status of Previous Insp Findings IR 05000220/20030201985-04-0909 April 1985 Insp Rept 50-334/85-06 on 850220-0320.No Violations Noted. Major Areas Inspected:Util Actions on Previous Insp Findings,Plant Operations,Housekeeping,Fire Protection, Physical Security & LERs IR 05000220/19820091982-07-23023 July 1982 IE Insp Rept 50-220/82-09 on 820615-18.Noncompliance Noted: Failure to Follow Procedure Re Fire Watch in Screen & Pump House Where Welding Was Being Conducted IR 05000410/19820061982-06-15015 June 1982 IE Mgt Meeting Rept 50-410/82-06 on 820601.No Noncompliance Noted.Major Areas Discussed:Recent Insp Finding Re Incorrect Welding Procedures Authorized for Use on Class I Piping Joints & Concerns Re Mgt Control of Itt Grinnell by S&W IR 05000410/19820051982-06-11011 June 1982 IE Insp Rept 50-410/82-05 on 820510-0603.No Noncompliance Noted.Major Areas Inspected:Pipe Cold Bending,Hvac Ductwork, welding-piping,heat treating-piping,fuel Storage Pool & Structural Steel Welding IR 05000220/19820071982-06-11011 June 1982 IE Insp Rept 50-220/82-07 on 820503-31.No Noncompliance Noted.Major Areas Inspected:Operational Safety Verification, Physical Security,Surveillance Testing,Plant Maint & Licensee Action on IE Bulletins & Circulars IR 05000410/19820041982-05-25025 May 1982 IE Insp Rept 50-410/82-04 on 820511-13.No Noncompliance Noted.Major Areas Inspected:Electrical Components Installed, Implementation of QA Plans & Instructions Associated W/Equipment Storage 1988-05-19
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARPNO-I-99-046, on 991008,NMP,Unit 1 Declared Unusual Event,Due to Carbon Dioxide Discharge in Records Storage Room of Administration Bldg,Which Was Migrating Beyond Confines of Storage Room.Nrc Resident Inspector Staff Responded1999-10-0808 October 1999 PNO-I-99-046:on 991008,NMP,Unit 1 Declared Unusual Event,Due to Carbon Dioxide Discharge in Records Storage Room of Administration Bldg,Which Was Migrating Beyond Confines of Storage Room.Nrc Resident Inspector Staff Responded IR 05000220/19990061999-09-14014 September 1999 Insp Repts 50-220/99-06 & 50-410/99-06 on 990620-0731.NCVs Noted.Major Areas Inspected:Licensee Operations,Engineering, Maint & Plant Support ML20196K6531999-06-29029 June 1999 Notice of Violation from NRC OI Investigation Conducted on 980701-1211.Violation Noted:For Approx Four Hours on 980616, with NMP1 at Full Power,Sro Assumed Assistant Shift Supervisor Position,Contrary to TS Requirements IR 05000220/19990041999-06-21021 June 1999 Insp Repts 50-220/99-04 & 50-410/99-04 on 990328-0508.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support PNO-I-99-023, on 990411,NMP Performed Insps That Identified Indications of Crack Growth Around Portion of One of Vertical Welds.Repair Mod for Shroud Vertical Welds Is Expected to Take Approx Five Days to Complete1999-05-12012 May 1999 PNO-I-99-023:on 990411,NMP Performed Insps That Identified Indications of Crack Growth Around Portion of One of Vertical Welds.Repair Mod for Shroud Vertical Welds Is Expected to Take Approx Five Days to Complete IR 05000220/19980151998-12-23023 December 1998 Insp Repts 50-220/98-15 & 50-410/98-15 on 980927-1121.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20196E5351998-11-19019 November 1998 Notice of Violation from Investigation on 980303-0930. Violation Noted:On 971224,individual Left Controls at NMP-2 Unattended for Six Minutes to Go Into Shift Supervisor Ofc, Area Not at Controls as Noted in NMPC UFSAR Figure 13.5-1 IR 05000220/19980141998-10-26026 October 1998 Insp Repts 50-220/98-14 & 50-410/98-14 on 980816-0926.No Violations Noted.Major Areas Inspected:Reviews of Licensee Activities in Functional Areas of Operations,Engineering, Maint & Plant Support ML20248A8001998-05-20020 May 1998 Notice of Violation from Insp on 980406-0409.Violation Noted:During Insp,Inspectors Determined That Licensee Failed to Properly Store,Control & Classify Safeguards Info ML20217L9251998-04-28028 April 1998 Insp Repts 50-220/98-08 & 50-410/98-08 on 980406-21. Violations Noted.Major Areas Inspected:Licensee Security Force Capability to Protect Facility Against Radiological Sabotage & Compliance W/Safeguards Program Commitments ML20199B8601998-01-22022 January 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:On 970925,package Containing Metal Samples Removed from Unit 1 Emergency Cooling Tube Sheet Was Sent to Listed Company,Not on List ML20198R4391997-11-0505 November 1997 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000.Violations Noted:Listed non-safety Related SSCs Were Not Included in 10CFR50.65 Monitoring Program ML20137U8501997-04-10010 April 1997 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $200,000.Violation Noted:As of 961105,measures Were Not Established to Assure Condition Adverse to Quality Are Promptly Identified & Corrected IR 05000220/19940011994-01-24024 January 1994 Insp Repts 50-220/94-01 & 50-410/94-01 on 940103-07.No Violations Noted.Major Areas Inspected:Mgt Support, Protected Area Barriers,Detection Aids & Assessment Aids, & Protected Area & Isolation Zone Lighting IR 05000220/19930221993-12-22022 December 1993 Insp Repts 50-220/93-22 & 50-410/93-22 on 931004-20.No Violations Noted.Major Areas Inspected:Mov Program Commitments & Enhancments Identified During Team Inspection in June 1992 Were Reviewed for Progress IR 05000220/19930011993-11-12012 November 1993 Insp Repts 50-220/93-01 & 50-410/93-01 on 930919-1030. Violations Noted.Major Areas Inspected:Major Components & Sys for Leakage,Alignment,Lubrication,Cooling Water Supply IR 05000220/19930231993-11-0505 November 1993 Insp Repts 50-220/93-23 & 50-410/93-22 on 931012-14.No Violations Noted.Major Areas Inspected:Mgt Support,Program Plans & Audits,Protected & Vital Area Physical Barriers, Detection & Assessment Aids PNO-I-93-058, on 931027,licensee Discovered Two Broken 100 Milliliter Vials of Yellow Powder (Believed to Be Yellowcake) at Corporate Ofc in Syracuse,Ny.No Personnel Contaminated.State of Ny Notified1993-10-28028 October 1993 PNO-I-93-058:on 931027,licensee Discovered Two Broken 100 Milliliter Vials of Yellow Powder (Believed to Be Yellowcake) at Corporate Ofc in Syracuse,Ny.No Personnel Contaminated.State of Ny Notified IR 05000220/19930241993-10-27027 October 1993 Insp Repts 50-220/93-24 & 50-410/93-23 on 931018-22.No Violations Noted.Major Areas Inspected:Exams of Procedures, Representative Records,Interviews W/Personnel & Observations by Inspectors IR 05000220/19930191993-10-18018 October 1993 Insp Rept 50-220/93-19 on 930823-27.No Violations Noted. Major Areas Inspected:Electrical Distribution Sys ML20057G3271993-10-12012 October 1993 Notice of Violation from Insp on 930808-0918.Violation Noted:On 930803,inspector Discovered Individual That Required Escort in Protected Area W/O Escort for Approx 25 Minutes IR 05000220/19930121993-10-0606 October 1993 Insp Repts 50-220/93-12 & 50-410/93-12 on 930615-18 & 0712-14.No Violations Noted.Major Areas inspected:930615-18 Emergency Preparedness Program & 930713 annual,full- Participation Emergency Preparedness Exercise IR 05000220/19930181993-10-0101 October 1993 Insp Repts 50-220/93-18 & 50-410/93-18 on 930808-0918. Violation Noted.Major Areas Inspected:Plant Operations, Maint & Surveillance Activities,Engineering & Plant Support, W/Regard to Radiological & Chemistry Controls & Security IR 05000220/19930131993-09-21021 September 1993 Insp Repts 50-220/93-13 & 50-410/93-13 on 930802-06.No Violations Noted.Major Areas Inspected:Design Changes & Mods,Installation & Testing of Mods,Interface/Communication, QA & Technical Support,Wrs & LERs IR 05000220/19930151993-09-16016 September 1993 Insp Repts 50-220/93-15 & 50-410/93-15 on 930719-23.No Violations or Deviations Noted.Major Areas Inspected:Offsite Power Supply Sources for Plant & to Review Licensees Corrective Action on Previously Identified Insp Findings IR 05000220/19930161993-08-0404 August 1993 Insp Repts 50-220/93-16 & 50-410/93-16 on 930426-30.No Violations Noted.Major Areas Inspected:Mgt Controls,Audits, Calibration of Effluent & Process Radiation Monitoring Sys, Air Cleaning Sys & Implementation of Previous Programs ML20056C1641993-03-23023 March 1993 Notice of Violation from Insp on 930124-0227.Violation Noted:I&C Technicians Performing N1-ISP-032-004 Failed to Correctly Perform Procedural Steps 7.2.1-7.2.5 Resulting in Automatic Reactor Scram Due to False High Neutron Flux ML20056C1661993-03-12012 March 1993 Insp Repts 50-220/93-01 & 50-410/93-01 on 930124-0227. Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls,Maintenance,Surveillance,Security & Safety Assessment/Quality Verification Activities PNO-I-90-092, on 901010,condensate Spill Occurred in Bldg. Caused by Malfunctioning Valve in Lineup for Transfer of New Resin from Mixing Tank to Condensate Demineralizer Bed. Excess Water Pumped Out sub-basement1990-10-11011 October 1990 PNO-I-90-092:on 901010,condensate Spill Occurred in Bldg. Caused by Malfunctioning Valve in Lineup for Transfer of New Resin from Mixing Tank to Condensate Demineralizer Bed. Excess Water Pumped Out sub-basement PNO-I-90-061, on 900806,plant Operators Manually Scrammed Reactor Due to High Vibration on Main Turbine Bearing.Caused by Blank Flange Left in Oil Supply Line to Bearing.Resident Inspectors Following Licensee Actions1990-08-0707 August 1990 PNO-I-90-061:on 900806,plant Operators Manually Scrammed Reactor Due to High Vibration on Main Turbine Bearing.Caused by Blank Flange Left in Oil Supply Line to Bearing.Resident Inspectors Following Licensee Actions IR 05000220/19890991990-08-0101 August 1990 Final SALP Repts 50-220/89-99 & 50-410/89-99 for Mar 1989 - Feb 1990 PNO-I-90-059, on 900730,plant Shut Down Due to Excessive RCS Leakage.Util Will Repair Plant Electromatic Relief Valves Found to Be Leaking During Startup.State of Ny Has Been Informed1990-07-30030 July 1990 PNO-I-90-059:on 900730,plant Shut Down Due to Excessive RCS Leakage.Util Will Repair Plant Electromatic Relief Valves Found to Be Leaking During Startup.State of Ny Has Been Informed PNO-I-90-057, on 900727,restart Authorized for Facility. Util Agreed to Perform Self Assessments of Performance & Inform NRC Restart Assessment Panel of Self Assessment Results1990-07-27027 July 1990 PNO-I-90-057:on 900727,restart Authorized for Facility. Util Agreed to Perform Self Assessments of Performance & Inform NRC Restart Assessment Panel of Self Assessment Results PNO-I-89-072A, on 890828,augmented Insp Team Exit Meeting Subsequent Press Conference Held at Plant Re Licensee Use of sub-basement for Storage of Solid & Liquid Radwaste.Two Violations Noted1989-08-29029 August 1989 PNO-I-89-072A:on 890828,augmented Insp Team Exit Meeting Subsequent Press Conference Held at Plant Re Licensee Use of sub-basement for Storage of Solid & Liquid Radwaste.Two Violations Noted ML20247D5991989-05-0202 May 1989 Investigation Rept 89-02 Re Misconduct of Ofc of Investigations Deputy Director,Ra Fortuna.Finding of No Misconduct or Dereliction of Duty Recommended IR 05000220/19880301988-11-16016 November 1988 Insp Repts 50-220/88-30 & 50-410/88-29 on 880926-30.No Violations Noted.Major Areas Inspected:Security Plan & Procedures,Mgt Organization,Audits,Records & Repts,Testing & Maint,Barriers,Security Power Supply & Assessment Aids IR 05000220/19860991988-07-0101 July 1988 Amended SALP Repts 50-220/86-99 & 50-410/87-99 for Nov 1986 - Feb 1988 & Feb 1987 - Feb 1988,respectively. Licensee Has Shown Limited Success W/Initiatives to Improve Previously Identified Weaknesses ML20155F4171988-06-10010 June 1988 Notice of Violation from Insp on 880404-08.Violation Noted: Site Procedures CBI-SC 1,Rev 0 & NES-8042433,Rev 3 Did Not Establish Adequate Controls Over Nondestructive Testing Process for Making Precision Thickness Measurements IR 05000220/19880091988-05-19019 May 1988 Insp Repts 50-220/88-09 & 50-410/88-09 on 880307-11 & 0404- 08.Violations Noted.Major Areas Inspected:Inservice Insp Program Re First 10-yr Insp Interval & Augmented Exams Conducted by Licensee,Including Procedures PNO-I-88-010, on 880120,reactor Scrammed from 42% Power Based on Low Reactor Vessel Water Level.Caused by Equipment Operator Error.Nrc Dispatched Augmented Insp Team to Site to Review Generic Safety Implications of Event1988-01-21021 January 1988 PNO-I-88-010:on 880120,reactor Scrammed from 42% Power Based on Low Reactor Vessel Water Level.Caused by Equipment Operator Error.Nrc Dispatched Augmented Insp Team to Site to Review Generic Safety Implications of Event PNO-I-88-009, on 880120,unusual Event Declared as Result of Worker Injured After Stepping Through Hole in Grating Between Reactor Vessel Flange & Refueling Cavity Floor.No Contamination Involved1988-01-21021 January 1988 PNO-I-88-009:on 880120,unusual Event Declared as Result of Worker Injured After Stepping Through Hole in Grating Between Reactor Vessel Flange & Refueling Cavity Floor.No Contamination Involved PNO-I-88-007, on 880115,present Unplanned Outage to Inspect & Repair Feedwater Sys Components & Supports Extended for Approx 3 Wks to Perform Insp of Bushings in Reactor Vessel Flange Which Hold 6-inch Diameter Reactor Vessel Head Studs1988-01-19019 January 1988 PNO-I-88-007:on 880115,present Unplanned Outage to Inspect & Repair Feedwater Sys Components & Supports Extended for Approx 3 Wks to Perform Insp of Bushings in Reactor Vessel Flange Which Hold 6-inch Diameter Reactor Vessel Head Studs PNO-I-87-120, on 871226,reactor Scram Occurred from Approx 25% Power Due to Turbine Trip on Low Condenser Vacuum Caused by Crack in Condenser Pipe Penetration.Pentration Seal Weld Repaired1987-12-29029 December 1987 PNO-I-87-120:on 871226,reactor Scram Occurred from Approx 25% Power Due to Turbine Trip on Low Condenser Vacuum Caused by Crack in Condenser Pipe Penetration.Pentration Seal Weld Repaired PNO-I-87-117, on 871219,reactor Manually Scrammed After Mechanical Vibrations from Turbine Bldg Felt in Control Room.Caused by Feedwater Control Valve Stem Separation from Disc.Outage Dependent on Availability of Repair Parts1987-12-21021 December 1987 PNO-I-87-117:on 871219,reactor Manually Scrammed After Mechanical Vibrations from Turbine Bldg Felt in Control Room.Caused by Feedwater Control Valve Stem Separation from Disc.Outage Dependent on Availability of Repair Parts PNO-I-87-114, on 871207,reactor Scrammed from Approx 96% Power Due to Low Reactor Vessel Water Level.Caused by Malfunction of Feedwater Control Valves 13A & 13B.Preventive & Corrective Maint Underway1987-12-10010 December 1987 PNO-I-87-114:on 871207,reactor Scrammed from Approx 96% Power Due to Low Reactor Vessel Water Level.Caused by Malfunction of Feedwater Control Valves 13A & 13B.Preventive & Corrective Maint Underway IR 05000220/19870221987-12-0909 December 1987 Insp Rept 50-220/87-22 on 871019-23.No Violations Noted. Major Areas Inspected:Design Change/Mods,Maint & Previously Identified Items PNO-I-87-113, on 871128,condensate Storage Tank Ruptured Spilling Over 260,000 Gallons Nonradioactive Demineralized Water.Caused by Break in Seam Between Tank Sidewall & Floor. Vendor Onsite Inspecting Cause.Plant in Cold Shutdown1987-12-0202 December 1987 PNO-I-87-113:on 871128,condensate Storage Tank Ruptured Spilling Over 260,000 Gallons Nonradioactive Demineralized Water.Caused by Break in Seam Between Tank Sidewall & Floor. Vendor Onsite Inspecting Cause.Plant in Cold Shutdown PNO-I-87-096, on 871016,plant Scrammed on High Neutron Flux from 89% Power During Testing Causing Main Steam Pressure Oscillations Triggering APRM High Flux Scram.Crd Stub Tube Leakage Identified.Hydrostatic Tests Performed1987-10-19019 October 1987 PNO-I-87-096:on 871016,plant Scrammed on High Neutron Flux from 89% Power During Testing Causing Main Steam Pressure Oscillations Triggering APRM High Flux Scram.Crd Stub Tube Leakage Identified.Hydrostatic Tests Performed IR 05000220/19870161987-10-15015 October 1987 Exam Rept 50-220/87-16OL on 870804-06.Exam Results:All Three Senior Reactor Operator Candidates Passed Written & Operating Exams.Exam Key Encl IR 05000410/19870181987-10-0101 October 1987 Requalification & Replacement Exam Rept 50-410/87-18OL on 870707-07.Exam Results:Two of Four Senior Reactor Operator Candidates & Three of Four Reactor Operator Candidates Passed Exam.Exams Encl 1999-09-14
[Table view] |
Text
-
.
e
%
)
Report 50-410/86-62
.
INITIAL OPERATING LICENSE
, REVIEW REPORT FOR
_
'
NINE MILE POINT UNIT 2 DOCKET NUMBER 50-4I0 PREPARED BY UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION I
.
8611170395 861112 PDR ADOCK 05000410 G PDR
,
..
SUMMARY SALP N FUNCTIONAL AREA SF CONT PIP COMP SYS ELEC INST ENG QA LIC 1 2 2 2 2 2 2 2 -
2 -
2 1 1 2 2 2 2 N -
3 2 3 1 2 3 2 -
2 2 -
3 2 4 -
2 2 1 1 3 2 3 2 2 OP RAD SUR POT FP SEC CONST QA LIC 5 2 2' 3 2 1 1 2 2 2 SF = Soils and foundations CONT = Containment and other safety related structure PIP = Piping and supports COMP = Safety related components SYS = Support systems ELEC = Electrical power systems INST = Instrumentation and control ENG = Engineering QA = Quality Assurance LIC = Licensing OP = Readiness for Operations RAD = Radiological controls SUR = Surveillance POT = Preoperational testing FP = Fire protection SEC = Security CONST = Construction N = No basis for rating
- = Not assessed
- - - .-. - - . . .
..
.. 25 l
5.2 First SALP (February 1,1980 to January 31, 1981)
Inspection activity had covered the containment structure, reactor pres-sure vessel installation, reactor pressure vessel internals, biological shield wall, and quality assrance. Only one notice of violation had been issued during the period for inadequate incorporation of design changes into the associated engineering drawings. NMPC had reported four 10 CFR 50.55(e) report .3 Second SALP (October 1, 1981 to September 30, 1982)
Two enforcement conferences (50-410/82-06 and 82-08) had been held to dis-cuss a violation involving ASME Class 1 weld procedures that had not been properly qualified for impact testing. The following root causes were identified: inexperience of the piping contractor (ITT) personnel, inef-fective Stone and Webster control of the piping contractor, and inadequate NMPC attention to subcontractor activities. NMPC committed to strengthen ITT engineering and QA staffs, to increase SWEC audits of ITT programs, and to reorganize the NMPC corporate offices to create two new positions of Vice President-QA and Senior Vice President Nuclear to serve as respon-sible NMPC management for all project matter There were several concerns in the Electrical Power Supply area including failure to specify design separation criteria in the installation specifi-cation, cable trays did not conform to procurement specifications, incor-rect design of cable tray weldments, and inadequate weld deposit on cable tray cross brace There were significant weaknesses within NMPC and contractor QA programs including: inexperienced personnel on the QA staffs, failure of QA to identify programmatic weaknesses, NMPC overdependence upon SWEC QA to as-sure plant quality, inability of NMPC to resolve audit findings, lack of licensee control of SWEC activities, and inadequate NMPC management in-volvement in the projec NMPC corrective actions to the QA shortcomings included: increased the site QA staff, created position of Vice President-QA, increased NMPC QA surveillances, increased SWEC surveillance of contractor activities, and increased overall NMPC management control of SWEC activitie .4 Third SALP (October 1, 1982 to September 30, 1983)
Region I identified two violations regarding the QC acceptance of noncon-forming concrete expansion anchor bolts and the inadequate QC inspection of structural steel bolted connections. The NMPC performed extensive re-inspections to assure the adequacy of other hardware.
.
During the period, major deficiencies were identified by NMPC in the ITT I
radiography program. Several instances of film enhancement were discov-ered by NMPC. The questionable welds were radiographed again and found acceptable. NMPC project management and oversight of ITT were weak as indicated by inadequate QA review of weld planner packages, inadequate
- ._. _- _ __, _ __ _______ _
- _ . _ . . , - - . . - _ , _ - . . _ - - _ _ - -
..
.. 26 control of the NDE process, and ITT QA management's prohibition of person-nel expressing quality concerns to the NR An Enforcement Conference (82-13) was held on October 20, 1982 to discuss the inproper use of QC trainees and the falsification of QC inspection records. Region I stated that greater NMPC overview was required of pro-ject QA activitie On May 23, 1983, a Management Meeting (83-09) was held to discuss the ne-cessity for increased NMPC control over ITT. Another Enforcement Confer-ence (83-14) was convened on August 30, 1983 to discuss the prohibition of personnel from bringing safety concerns to the NRC. Steps were instituted to increase the ITT QA staffing and to increase the level of NMPC surveil-lance of ITT activitie .5 Fourth SALP (October 1, 1983 to January 31, 1985)
There were further problems with the application of the AISC acceptance criteria for high strength bolting. NMPC reinspected and reworked the associated structural steel connection Vendor Procurement Quality Assurance (PQA) activities had not been effec-tively implemented. Nonconforming hardware had not been detected by PQA as evidenced by: undersized shop welds, inadequate mechanical component bolt thread engagement, and electrical equipment vendor wiring deficiencie The NMPC Quality Performance Management Program identified improved QC acceptance rates for piping and pipe support installation The SWEC small bore piping hardware was of high qualit The control of Preventive Maintenance (PM) activities required greater levels of management attention to assure that plant equipment was properly maintained during the construction phas Electrical wiring deficiencies were identified throughout the PGCC panel The entire PGCC was reinspected by GE and SWEC personnel to identify all locations of electrical separation problems. Additional concerns regard-ing the PGCC wiring terminations, harness supports, and as-built verifica-tion were identifie Extensive project management and quality assurance personnel changes re-sulted in improved NMPC control of site activities. The Quality Perfor-mance Management Program served as a management trending tool to identify those areas on which to focus management attention. Numerous program enhancements were instituted to upgrade site nondestructive examination effort The rate of design change remained high. Examples were detected in which the design change documents were inaccurate and not completely reviewe Several components were identified which engineering had not designed to
..
,. 27 appropriate seismic standards. Some instances were found where the design drawings had erroneously identified components as nonsafety-relate An enforcement conference and several management meetings were held to discuss the CAT inspection findings and the implemented site corrective action .6 Fifth SALP (February 1,1985 to January 31, 1986)
This assessment concentrated mainly on readiness for operations and con-struction transitio It found NMPC's performance satisfactory. Improved craft attitudes regarding the necessity to build quality into the plant were apparent, while management maintained oversight of construction quality through a site trending effort that tracked key parameters. In addition, the acceptability of previously installed components was assured through reinspection efforts. Notwithstanding, poor housekeeping condi-tions, the occasional lapses in the implementation of complete corrective actions, and control of Final Safety Analysis Report commitments were areau where improvement was noted as being neede The preoperational test activities have been executed by generally knowl-
-
edgeable personnel, and the field testing was well controlled. Close mon-itoring of preoperational test activities was maintained by Quality Assurance personnel. Also, permanent plant staff were actively involved in the system turnover and preoperctional testing process to gain system familiarization and to exercise plant operating procedures. Increased management attention was warranted in performing more timely reviews of preoperational test results to assure that satisfactory test completion was achieve For the transition from the construction phase, NMPC conducted a self evaluation to assure that all necessary preparations were performed to support plant operations. The permanent plant staff positions were filled with technically competent personnel. Due to a high Reactor Operator failure rate on the initial licensed operator examinations, increased man-agement attention was given to the operator training program to ensure that a sufficient number of licensed operators were available to support fuel load. As a result, significant improvement in candidate performance was noted on the second set of examinations. Some recurring program and individual shortcomings were noted on the thrid set of examinations for
- ,enior operator .
.
. 28
.
6.0 ALLEGATIONS AND INVESTIGATIONS 6.1 Overview Allegations received by NRC Region I addressed both safety related and nonsafety-related area Each allegation was reviewed by a board that included regional management, and appropriate followup was determined based on the potential safety significance of the allegation. Several of these allegations were investigated by members of the NRC Office of Investigation .2 Unit 2 Allegations Region I records indicate that 37 Nine Mile Point Unit 2 allega*'ons have been received to date. Of those allegations which were substantiated, 5 resulted in enforcement action as discussed below:
-
An allegation was received in September 1982 that uncertified quality control personnel.were performing inspections. Subsequent Region I investigation verified that inspections of safety-related electrical equipment had been performed solely by uncertified trainees. The
-
associated inspection records were falsified, as qualified Level II inspectors had signed the documents, which signified the inspections were performed by certified personnel. The deficient inspections and the falsified inspection records demonstrated the need for NMPC to increase its management involvement with contractor activities to assure proper implementation of site QA/0C programs. A level III violation and civil penalty were assessed. NMPC reinspected the work performed by the trainees and did not identify any substantive deficiencie An allegation was received in February 1983 that ITT welders were not provided weld procedures for ASME piping installation. The concern was substantiated through interviews with craft supervision and weld rod room attendants, and a Level IV violation was issued. NMPC con-ducted extensive training programs to ensure that craft personnel were aware that weld procedures are maintained for reference at all ITT weld rod issue stations. NMPC verified that the weld procedures were indexed at the field station An allegation was received in April 1983 that inconsistent diesel generator loading sequences were assumed by General Electric and Stone and Webster Engineering Corporation. The FSAR load sequencing was found to be inaccurate, and a Level V violation was issued for inadequate design review. NMPC amended the FSAR to portray the cor-rect load sequencing and instituted measures to enhance the review of
<
FSAR submittal . ._. _ _ _ _ _ _. . _ -
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_
.
. .
.
.
- 29 l
"This Section Intentionally Blank"
.
_
.
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . _ _ . _ _ . . . _ _
._ - -
.
. 30 l
I i
l l
l
"This Section Intentionally Blank" 6.4 Quality First Program In 1983 NMPC established an allegation clearinghouse program identified as the Quality First Program (Q1P). The Q1P program includes exit inter-views, a toll-free telephone line to receive concerns, and feedback to the concerned employee after the investigation is complete The adequacy of Q1P has been closely reviewed by Region I due to allega-tions that concerns were not properly handled when reported to the Q1P office. A Region I team inspection of the Q1P was performed on January 27, 1986. The inspection scope included a review of identified concerns, interviews of Q1P personnel, review of concern resolutions, examination of related site procedures and hardware, and interviews of site personnel not affiliated with the Quality First Program. The resolution of safety re-lated concerns was found satisfactory. Some program weaknesses were iden-tified in the area of handling of wrongdoing issues and the level of the
.
. -. . _ - .
-. --
=
..
.. 31 Quality First documentation to substantiate concern closure. A subsequent followup inspection conducted in June 1986 indicated improvements in these weak area .5 Allegation and Investigation Summary and Conclusions The most significant allegations at Nine Mile Point Unit 2 have involved quality concerns and harassment of those raising such concerns. In an attempt to identify and deal with these issues NMPC developed their Q1P program in late 1983. While this program appears to be working adequately based in Region I reviews, its integrity has been questioned several times by allegers. However, most of these concerns seem to be more indicative of poor employee relations and co;amunications rather than poor quality hardwar .
<
l
l l
_ _ _ _ . _ - _ _ _ _ - . _ _ . . _ _
_____ __ _-_. _ _- - . - - . - -
..
. . 32 7.0 FUTURE REGION I ACTIONS Three resident inspectors are currently assigned to the Nine Mile Point sit Region I resident and specialist inspections will continue through-
! out the startup test progran. Results evaluation will be closely monitore A Readiness Assessment Team inspection is currently planned during the low power portion of the power ascension test progra A team inspection of the Post Accident Sampling System and related TMI Task Action Plan post-accident monitoring issues is planned during low power testin A plan is being developed to closely monitor the progress of the NMPC cor-rective action program resulting from recent reviews of the Unit 1 I&C technician's allegations and the QA program concerns brought to Q1 ,
a i
,.7 .-y -- - . , .,-... , .m. ._ - n---._, - - - - - - -- , -, , ,
..
.o 33
,
8.0 SUMMARY AND CONCLUSIONS Region I has expended over 12,000 inspection hours at the Nine Mile Point Unit 2 facility and has determined that the project has been adequately managed while under close NRC scrutiny. Early in the project few problems were identified. Beginning in 1981 and continuing through the CAT inspec-tion in late 1983, significant weaknesses were identified in control over contractors and quality assurance, which resulted in both hardware and management deficiencies. As a result, two civil penalties and an order were issued. Consequently, experienced project construction and quality
.
assurance management were brought in to correct deficiencies and complete i
construction. Under continued close Region I scrutiny in the form of an Augmented Inspection Program, which continued to identify and ensure cor-rection of deficiencies, the new management organization was verified as able to complete the construction of the facility with acceptable qualit Although it developed and progressed very slowly, and early procedure re-views sometimes indicated an inadequate incorporation of licensing crite-ria, the preoperational, test program was ultimately well executed and results indicated few test exceptions. In addition, surveillance test procedures have been completed after system turnover and prior to declar-
-
ing systems operational in most cases.
'
At this time the remaining open issue that would prevent reactor opera-tion at Nine Mile Point Unit 2 is the resolution of problems with the Main Steam Isolation Valves. Prior to initial criticality the deficien-cies associated with the MSIVs must be resolved, and the valves must be satisfactorily tested. On the basis that the license meets such a condi-tion, we believe it is acceptable to issue the low power operating license at this time.
t We therefore conclude that Nine Mile Point Unit 2 has been constructed substantially in accordance with Construction Permit CPPR-112, the FSAR, and NRC requirements. We further conclude that NMPC has taken all neces-sary actions to permit initial license issuance subject to conditions of the license.
. _ _ _ _ _ _ _ _ _ _ _ _ . . . _ _ _ _ _ . _ . . . . . . _ . _ __-
.- _ _ _ _ . . .. . .. _ _
!
..
I
, ..
I 6,
ENCLOSURE 1
) NINE MILE POINT UNIT 2 INSPECTION SUMMARY
,
I INSPECTION NUMBER AREAS INSPECTED FINDINGS VIOLATIONS INSPECTION DATE NO. OF INSPECTORS j 72-01 Initial management meeting None None 4/10/72
- 72-02 QA Program 3 UNR None 7/28-8/24/72
73-01 QA Program None None 6/14/73
-
. 73-02 QA Program None None i
7/19-10/9/73 i 1
- 74-01 QA Program 6 UNR None
'
9/26-9/27/74
- 75-01 QA Program None None
4/16-4/17/75
,
'
. 75-02 Excavation progress, engi- 2 UNR None 7/9-7/10/75 neering review / approval
- 1 program, review of construc-I tion procedures
75-03 Environmental protection None None 7/29-8/1/75 program
i
- . , - - - . - . . . . - - . . . - . - - . - - - - . . - - - - _ . . - - . . . . . . - , - . - - - . - .
..
.a 2 Enclosure 1 INSPECTION NUMBER AREAS INSPECTED FINDINGS VIOLATIONS INSPECTION DATE NO. OF INSPECTORS 75-04 Site preparation activities 2 UNR None 10/21-10/22/75 and procedure review
76-01 Specification review, review 2 UNR Infraction:
2/24-2/26/75 of audits, material storage, Requisite QA 2 corrective action controls, requirements review of project manual not in spect-ficatio Infraction:
Specification review not performed in accordance with proce-dure Deficiency:
-
Audit findings not properly
,
documente Blasting records, QA proce- 4 UNR None 4/12-4/14/76 dures for concrete and foun-2 dations, site preparation, groundwater control 76-03 Site preparation excavation 3 UNR None 5/25-5/27/76 mapping, design review 2 meetings, porous concrete foundation drainage system, batch plant qualification, concrete mixes l
'
76-04 Concrete activities, batch None Infraction:
7/19-7/21/76 plant operation Inadequate 1 cadweld in-spections
>
76-05 Environmental protection 1 UNR None
- 8/16-8/20/76 activities
! 1
1 i
' .
..
.- 3 Enclosure 1 INSPECTION NUMBER AREAS INSPECTED FINDINGS VIOLATIONS INSPECTION DATE NO. OF INSPECTORS 76-06 Foundation backfill opera- 3 UNR Infraction:
9/28-9/30/76 tions, site preparation Concrete curing 1 inspections not performed 76-07 Site preparation and founda- 1 UNR Infraction:
11/16-11/18/76 tion records, QC personnel 1 qualification, batch plant operation 77-01 .
Containment base mat concrete, None None >
3/22-3/24/77 geologic investigation on 1 rock stress 77-02 Containment reinforcing steel 2 UNR None 4/5-4/7/77 cadwelding, QA Manual review 2 for containment liner contractor 77-03 Containment steel liner in- None None 4/14/77 stallation, geologic investi-1 gation review 77-04 Containment structural steel, 2 UNR None 5/2-5/5/77 containment concrete proce-2 dures, containment base mat concrete activities, noncon-formance program review 77-05 Containment base mat concrete, 1 IFI None 5/17-5/19/77 containment liner welding
77-06 Containment base mat concrete, 3 UNR None 6/8-6/10/77 containment structural steel I welding, component storage, reinforcing steel erection 77-07 Containment base mat concrete None None 6/15/77
77-08 Primary containment steel None None 7/18-7/20/77 liner welding, control of weld 1 material, weld inspection I
..
l
.. 4 Enclosure 1
.,
INSPECTION NUMBER AREAS INSPECTED FINDINGS VIOLATIONS INSPECTION DATE NO. OF INSPECTORS 77-09 Environmental protection None Infraction:
8/3-8/5/77 program Settling pond 1 operation procedures not followe Component storage and main- 1 UNR Deficiency:
8/23-8/25/77 tenance, containment basemat Failure to 2 concrete records perform proper preventive maintenance on recirculation pump motor QA record review for concrete 1 IFI Infraction:
10/11-10/13/77 basemat concrete Failure to 3 follow procedures for batch plan uniformity test Infraction:
Failure to document and report corrective actions to management relative to I&E Bulletins &
Circular Installation and welding of 1 UNR None 11/15-11/17/77 containment liner
78-01 Measuring and test equip- None None 1/31-2/2/78 ment nondestructive weld
-
I examination 78-02 Reinforcing bar installa- None None 3/28-3/31/78 tion, I&E Bulletins and 1 Circulars
____
i
.b l
Enclosure 1
'
.- 5
..
INSPECTION NUMBER AREAS INSPECTED FINDINGS VIOLATIONS INSPECTION DATE NO. OF INSPECTORS i
78-03 Piping and supports in- None None j 4/24-4/26/78 sta11ation, penetrations, 3 geotechnical review 78-04 Equipment storage, sur- None None 5/15-5/18/78 veillances, concrete activities
78-05 Cable tray support records None None 6/14/78
78-06 Mechanical equipment in- 1 UNR None 7/25-7/27/78 sta11ation, equipment main-1 tenance, I&E Bulletins and Circulars 78-07 Risk release program equip- 1 UNR None 9/26-9/28/70 ment installation documentation
78-08 Management controls 2 UNR None 9/25-9/29/78
78-09 Concrete activities, equip- 1 UNR None 10/30-11/2/78 ment installation
- 79-01 Structural steel erection, 2 UNR None
- 1/8-1/11/79 cadweld operations
i
'
79-02 Containment liner welding, None Infraction:
3/20-3/23/79 structural steel erection, Required
'
2 stud welding, equipment storage radio-graphy exami-
! nation not j performed.
- 79-03 Reinforcing bar, concrete 1 UNR None
4/24-4/26/79 activities, backfill operation
- 1
i l
i
- - . . . , . . _ _ . _ . _ . , , , _ , _ . _ _ _ ___ _ . _ _ . _ , . _ , _ . . , . . . _ , . _ . . . _ _ . . _ _ _ , - _ _ _ _ _ _ _ _ _ . _ _ _ _ . _ _ _ . _ _ _ _ _ _ _ _
_ _ _ . . . _ __ _
_ . - _ . _ .. _ . . _ - _ _ .
,
, .-
!
I
.- 6 Enclosure 1
-
..
INSPECTION NUMBER AREAS INSPECTED FINDINGS VIOLATIONS INSPECTION DATE NO. OF INSPECTORS
'
4 79-04 Containment liner installation, None None 7/10-7/12/79 piping, structural steel erection
l 79-05 Structural steel erection, None Infraction: No 5/14-5/17/79 containment liner installa- procedure for 1 tion ultrasonic examinatio Concrete activities, rein- 1 UNR None 8/27-8/31/79 forcing bar storage, elec- 1 IFI 1 trical installation i 79-07 Suppression pool downcomers, 4 UNR None 10/9-10/12/79 electrical activities 1 IFI
79-08 Reactor pressure vessel None None 11/6-11/8/79 transport / rigging / lifting
, 1 79-09 Containment liner welding, 1 UNR None 11/28-11/30/79 equipment rigging, valve
.. 2 installation 80-01 Equipment maintenance and 1 UNR Infraction:
1/9-11/11/80 storage Invalid j 1 preventive
maintenance record >
80-02 Reactor pressure vessel None None 3/19-3/21/80 storage, biological shield i & 4/10-4/11/80 wall installation
80-03 Plant tours None None
4/24/80
4 80-04 Repair of biological shield 2 UNR None
- 5/12-5/15/80 wall welds
,
4
}
l l
!
,
t
!
- . . . - - - - . . - . - - _ . . - - _ . - - . _ , . - .
._
-. .. _ . - - . - . ._- ..
..
.- 7 Enclosure 1
..
INSPECTION NUMBER AREAS INSPECTED FINDINGS VIOLATIONS INSPECTION DATE NO. OF INSPECTORS 80-05 Containment reinforcing bar 2 UNR None
. 6/17-6/19/80 cadweld operations l 1 80-06 Reactor pressure vessel None None
'
7/14-7/18/80 storage'and placement 1 ,
'
80-07 QA procedure review, review 1 UNR None 7/15-7/18/80 of engineering design changes,
2 nonconformance report disposition, trend analysis, audit program 80-08 Reactor pressure vessel placement None None 8/4-8/8/80
80-09 QC record review, reactor 1 UNR None 9/9-9/11/80 pressure vessel storage,
,
1 CRD hydraulic control unit storage i 80-10 QA program review None None 9/23-9/26/80
80-11 Concrete record documenta- None Infraction:
j 10/21-10/23/80 tion review Inadequate
& 11/4-11/6/80 document i i control of
- engineering
{ changes, i
j 81-01 Concrete placement, rein- 1 UNR None i 1/20-1/23/81 forcing bar cadwelds, engi-
I neering change document review i
81-02 Environmental protection None None
- 2/18-2/25/81 program
.,
81-03 Plant tour, cadweld None None 4/21-4/23/81 operations
J
>
'
..,.. , ..-_-- ..- _. - - ~.,__ - - - - - - _.- - --. -,---,-._ ,. - ,____-_- .-._.-. - -
I
..
..
8 Enclosure 1 l l
INSPECTION NUMBER AREAS INSPECTED FINDINGS VIOLATIONS INSPECTION DATE !
NO. OF INSPECTORS 81-04 SALP management meeting None None 4/22/81
81-05 Primary containment liner, 3 UNR None 6/23-6/25/81 equipment storage, house-I keeping 81-06 I&E Bulletin and Circular None None 7/14-7/16/81 review
81-07 Electrical procedure review, 1 UNR Violation:
7/27-7/31/81 installed raceway, geologic Pump motor 2 fault study review, primary electrical containment concrete test data not submitted
-
to engineer-in QA program personnel None None 8/4-8/6/81 certifications, licensee 1 audits 81-09 Primary containment record 1 UNR None 8/18-8/21/81 review, biological shield 3 wall welding, weld filler metal control, pipe welding 81-10 Plant tour, concrete aggre- 1 UNR None l 9/1-9/3/81 gates, corrective action ,
2 programs '
81-11 Plant tour, review of QA None None 9/29-9/30/81 organization
>
81-12 Containment penetrations,
'
'
1 UNR Violation:
10/13-11/13/81 piping and structural steel 1 IFI Incorrect
, 1 erection date sheet.
!
'
Violation:
Inadequate
- corrective
,
actions.
i-i l
!
l
. _ . - _ . _ - _ . _ _ . . . _ _ _ _ _ - . _ . _ . _ _ _ . . _ _ _ _ . _ _ _ _ _ . . . _ - - _ _
.. _ . . _ _ . ._ ~_ - . .___
,
l
.-
l
.- 9 Enclosure 1
! INSPECTION NUMBER AREAS INSPECTED FINDINGS VIOLATIONS
,
INSPECTION DATE NO. OF INSPECTORS j 81-13 Region I CAT inspection, 1 UNR Violation:
11/30-12/18/81 welding, nondestructive Ineffective QA 5 examination, electrical, progra : structural, procurement Violation:
l Lack of design
'
contro Violation:
Inadequate
, equipment qualifica-tio Structural steel erection, 1 UNR Violation:
12/21/81-1/15/82 piping activities, welder 1 IFI failure to qualification implement
- checklists.
) '
82-01 Pipe whip restraints, 3 UNR Violation:
1/18-2/26/82 structural steel, welder Inadequate QC 1 qualification, nondestruc- personnel tive examination, piping, training, procurement Violation:
Failure to follow l instruc-tions.
' "
82-02 Pipe supports, RPV nozzle 3 UNR Violation:
3/1-3/26/82 modifications, structural failure to 1 steel, receipt inspection, record data
- nondestructive examinations, properly.
,.
piping 82-03 Structural steel, cadwelding, 4 UNR Violation:
'l 3/29-4/30/82 expansion anchors, piping, 4 IFI Failure to 1 equipment, design control correctly translate design informa-
] tio Violation:
Failure to impose QA
'
requirement on purchase ,
>
orders.
!
!
l i
l
- - _- _ - - - - . - - - . - . _ - . _ - -.
. , _ . .- -- . - - - . . - - .- _ - . - - . - . - - - - _ _ - . .. . . , _ . ..
.. 10 Enclosure 1 6 -
INSPECTION NUMBER AREAS INSPECTED FINDINGS VIOLATIONS j INSPECTION DATE
', NO. OF INSPECTORS i 82-04 Electrical components 3 UNR None 5/11-5/13/82 '
- 82-05 Piping, HVAC installation, 1 IFI None 5/10-6/3/82 structural steel
-
,
82-06 Enforcement conference on None None
'
6/1/82 ITT Class I weld procedure
i
'
82-07 Piping, rigging, mechanical 1 UNR Violation:
- 6/21-7/23/82 equipment storage, structural 4 IFI Inadequate I
'
steel control of j rigging
- operation l Violation
l Failure to 1 identify a
!
nonconforming
- condition
l 82-08 Meeting on ITT welding None Violation:
7/16/82 procedures Failure to
-
5 control weld-ing processe Management controls 1 UNR None l 7/13-7/16/82 &
- 7/20/82 ;
j 2
~
82-10 Concrete testing, concrete 2 UNR Violation:
7/26-8/27/82 expansion anchors, piping, Underlength i 1 reactor head cavity, pit, welds on
! review of engineering design cable tray changes braces.
i Violation:
j Aggregate i
material not
! properly tested.
.: ,
!
i
$
_ . _ _ _ . , . - , _ . . . . . _ _ . _ _
. _ _ _ _ _ _ _ _ - . _ . _ _ . _ . _ . . . _ _ . . _ _ _ _ _ .
__ . _ _ __ .- __ __ _ -- .. _ _ . _ _ _ _ __
.-
_
1
,. 11 Enclosure 1
.
..
!
INSPECTION NUMBER AREAS INSPECTED FINDINGS VIOLATIONS INSPECTION DATE
'
NO. OF INSPECTORS l l
'
82-10(Cont) Violation:
Inadeqate inspection
,
of concrete expansion j anchor j 82-11 Mechanical equipment erection, 4 UNR Violation:
8/30-9/30/82 piping diesel generator build- 2 IFI work per-
2 ing, weld rod control, welder formed with-
'
qualification, pipe supports, out planner raceway packag Violation:
Weld filler material
!
'
not properly store i 82-12 Small bore piping, instrumen- 2 UNR Violation:
j 10/12-11/12/82 tation, structural steel, re- 2 IFI ASME piping
'
I circulation pipe welds, non- planner conformance reports package not properly j reviewe !
- 82-13 Enforcement conference re- None None i 10/20/82 garding use of trainees to j 1 conduct inspection
!
'
82-14 High strength bolting, elec- 1 UNR Violation:
1 11/15-12/22/82 trical support welds, struc- 2 IFI high
! 1 tural steel welding qualift- strength j cations, measuring and test bolts not
equipment inspected
. per AISC.
l Violation:
l Weld
!
material requisition
!
improperly i filled ou Violation:
Improper concrete i anchor bolt i
installa-tions.
i l
i
- - - - . _ . . - - -_ - -.- .-- --,-_---_- -,,.
.-
.. 12 Enclosure 1 INSPECTION NUMBER AREAS INSPECTED FINDINGS VIOLATIONS INSPECTION DATE NO. OF INSPECTORS 82-15 Bioshield wall fill material None None 12/13-12/17/82 placement, reactor building I concrete activities 82-16 Equipment storage, raceway 2 UNR None 12/14-12/16/82 installation
83-01 Instrumentation, pipe whip 4 UNR Violation:
1/3-2/4/83 restraints, engineering 7 IFI procedures 2 change documents, pipe not available supports, piping, cables to welder Safety related equipment, 3 UNR Violation:
2/7-3/11/83 concrete installation, cables, 2 IFI Planner 1 structural welding, piping package
' adhered to
-
for pipe installation activitie Electrical equipment storage 5 UNR None 3/1-3/3/83 raceway installation
83-04 Piping, licensee surveillances 2 UNR None 3/14-4/15/83 and audits, instrumentation 1 IFI 1 supports, structural steel, HVAC duct 83-05 Recirculation piping, con- 1 UNR Violation:
4/25-5/27/83 tainment liner, procurement, 4 IFI Inadequate 2 corrective action, instru- trend mentation supports, piping analysis, and pipe supports Violation:
Underlength fillet weld OA record review, design veri- 2 UNR Violation:
5/16-6/1/83 fication procedures, as- Inconsistent 1 built plant verification FSAR diesel generator load sequen-cin ..
.. 13 Enclosure 1
.
INSPECTION NUMBER AREAS INSPECTED FINDINGS VIOLATIONS INSPECTION DATE NO. OF INSPECTORS 83-07 Pipe supports, piping, struc- 3 UNR None 6/13-6/17/83 & tural steel, weld filler 3 IFI 7/13-8/5/83 material control, cable and I equipment installation 83-08 Switchgear installation and 3 UNR Violation:
6/7-6/9/83 instrumentation Deficient I vendor wiring on electrical equipmen Management meeting regarding None None 5/23/83 licensee overview of contrac-1 tor performance 83-10 Corrective action programs, 2 UNR None 7/25-7/29/83 piping and plant housekeeping 1 IFI
83-11 Cables, raceway, motor con- 1 UNR None 8/2-8/4/83 trol centers, electrical QA 1 IFI 1 records 83-12 Preventive maintenance, pipe 5 UNR Violation:
8/8-9/21/83 supports, cables, concrete 5 IFI Installed 2 placement, recirculation cable not piping nozzle modification properly inspecte Deviation:
Inspection holdpoints not specified in QC inspec-tion plan Environmental protection None None 9/14/83 program
83-14 Enforcement conference on None None 8/30/83 licensee overview and 1 investigations of the piping contractor
. _ - - . ._ _ _ _ _ - . _ __ ._ . ___ _ ._ _ . _ _ _
.
.
.-
i
.. 14 Enclosure 1
,
INSPECTION NUMBER AREAS INSPECTED FINDINGS VIOLATIONS
l INSPECTION DATE NO. OF INSPECTORS l 83-15 Electrical cables, motor 1 UNR None
- 10/18-10/20/83 control centers and QA 1 records 83-16 Equipment turnover, piping, 6 UNR Violation:
10/1-12/2/83/84 pipe supports, reactor build- 2 IFI Nonconforming 2 ing enclosure, CRD piping, welds accepted fire protection, instrumenta- by quality tion QA program contro RPV storage, hydraulic con- 4 UNR None 12/5/83-1/20/84 trol unit installation, 5 IFI 2 piping, pipe supports, welder qualification, HVAC systems l 83-18 I&E CAT Inspection 91 IFI Violation:
11/7-11/19/83 - Inadequate
& 11/28-12/9/83 review of 7 design change documents, inadequate review of radiography
,
film, defic-l ient inspection l procedures, I nonconforming i pipe supports, electrical separation violations, inadequate inspection documentation, inadequate weld filler metal control, Deficient NDE weld ' surface exams, non-conforming conditions not identified on NCR ,_.. - - - .-- . . _ - . - - , . . - - - . . . . _ - . . . _ _ , - - - - . - . _ , - - _ - - _ - , - _ - ,
. - - _ =_ -_ ,. - - -_
- ..
..- 6 15 Enclosure 1
.
INSPECTION NUMBER AREAS INSPECTED FINDINGS VIOLATIONS I
INSPECTION DATE NO. OF INSPECTORS i
84-01 Pipe supports, diesel gen- 4 UNR Violation:
i 1/23-3/2/84 erator cranes, reactor 1 IFI Nonconforming 2 vessel internals, QA program pipe support Violation:
Failure
.i to follow '
procedure for handling of significant deficienc Cables, switchgear and QA 5 UNR Violation:
2/7-2/9/84 records Wrong non-
- I conformance form in us Management meeting on None None 2/22/84 licensee corrective actions I for CAT findings 84-04 Concrete anchor bolts and None None 3/12-3/16/84 and structural steel 1 welding l
84-05 Electrical terminations, 3 UNR Violation:
3/5-4/7/84 piping, pipe supports, QA 1 IFI Inadequate i 1 surveillances, contractor design control j audits, design control for Seismic
- II/I items.
,
84-06 Structural steel, weld 2 UNR Violation:
l 4/9-5/11/84 material control, pipe 2 IFI Weld filler i 2 supports, housekeeping, not control-post inspection rework led.
-
control Violation:
Rework to
- structural
- beams not
- controlle Violation
i Inadequate l inspection
, of bolting and pipe
'
- support .
l
,
t
,
! --,_-[.._____ . . _ _ . . . . , . _ _ . . . . _ . _ _ , . _ _ . _ _ _ _ . _ . . _ . _ . . ~ _ _ _ _ _ _ . _ _ . . _ . _ . _ . , - . . . . . _ ,
..
l l
.. 16 Enclosure 1 INSPECTION NUMBER AREAS INSPECTED FINDINGS VIOLATIONS INSPECTION DATE NO. OF INSPECTORS 84-06 (Cont.) Violation:
Lack of inspection status for structural stee '
Violation:
Inadequate plant house-keepin Large and Small bore pipe None None 5/14-5/18/84 supports
84-08 NDE van inspection of ASME 3 UNR Violation:
4/30-5/25/83 and structural weldments by film indica-3 independent examination tion evaluated /
documente Violation: ,
Inadequate review of t RT fil Violation:
Minimum wall violatio ,
84-09 Corrective action programs, 1 UNR Violation:
5/14-6/15/84 electrical penetrations, pipe 4 IFI trends not 2 whip restraints, component detected by ,
supports analysi Violation:
Penetration NDE not per-forme i 84-10 Pre-operational security 25 IFI None 5/21-5/24/84 inspection
,
F-m - ~s - rs w w w wg m -e-m-w e ,-www-wn-,------wwo-,--ws-o n--w-~---*
. . - _ . - .-- =. . - . - .
'
..
.- 17 Enclosure 1 i
.
INSPECTION NUMBER AREAS INSPECTED FINDINGS VIOLATIONS
!
INSPECTION DATE NO. OF INSPECTORS 84-11 Document control, contain- 5 UNR Violation:
6/18-7/27/74 ment supports, design change 2 IFI Hold points 3 control, plant stack, battery violated i instsllation, equipment pre- during pipe ;
ventive maintenance whip restraint installatio <
Violation:
q Inadequate review of design change document I 84-12 Cancelled
.
'
84-13 Design change control, re- 4 UNR Violation:
7/30-9/6/84 vetment ditch, pre-op per- Inadequate
1 sonnel qualifications, hydro- thread
, tests, preventive maintenance, engagement
- standy liquid control system, of strainer weld filler metal control top bolt Violation:
Field issued weld filler
- metal not
,
controlle Welder qualifications, weld- 4 UNR None 8/20-8/24/84 ing, welding records
1 l
'
84-15 Electrical cable separation, 6 UNR None 9/10-11/2/84 containment penetrations, 3 IFI 3 diesel generator modifica-tion:
! 84-16 Radiological control None None 10/29-11/2/84 staffing ;
i'
84-17 Safety related equipment in- 1 UNR None l 10/29-11/2/84 stallation, inspection of 1 1 equipment, preventive j maintenance
8 i
s
.- - , - _ _ . . _ _ _ - - - _ _ . __ _ -- _ _. - _ . . . . . - . - _ _ - _ _ _ - _ _ - _ - - - _ . - -.-
__ _ - _ _ _ . _ _ _ _ - _ _ _ _ _ . . _ _ _ _ _ . - . _ _ _ _ _ _ _ _ . - _ - _ - _ _ . _ .
.-
.. 18 Enclosure 1
<
..
!
l i
INSPECTION NUMBER AREAS INSPECTED FINDINGS VIOLATIONS
! INSPECTION DATE
! NO. OF INSPECTORS f
! 84-18 Region I CTI, QA, project 2 UNR Violation:
1 12/3-12/14/84 mar..gement, mechanical, elec- 5 IFI Failure to
! 9 trical, instrumentation, execute
,
design control & welding adequate PM
. progra Violation:
Undersized weldments on instrument support stand.
,
'
84-19 MSIV cladding, instrument 2 IFI Violation: ,
11/5-12/21/84 tubing, small bore supports, to perform '
i 2 concrete expansion anchors adequate QC inspections on support Violation:
Lack of l effective 7 corrective action j implementa-
!
tion.
!
84-20 Management meeting to None None
'
11/14/84 discuss CAT corrective j actions
a 84-21 Concrete expansion anchors, 3 UNR Violation:
1 12/24/84-1/1/85 design control, HVAC supports 3 IFI Inadequate
! PSI, QA corrective action HVAC support l systems inspection.
j Violation:
} Failure j
a to translate FSAR QA commitments
- to site design docu-
- ments, i
.
!
!
i
!
'
I
i
- .. .- - - - - ,. . . - - - . - _ - - - - - , _ . - , - - - - , - , - _ - - - . - - . - _ .
_ _._ _ _ . . _ _ _ _ _ _ . . _ _ . . - _ _ - - _ . ___ _ .-__ -_
J t .*
.. 19 Enclosure 1 l
1 INSPECTION NUMBER AREAS INSPECTED FINDINGS VIOLATIONS ,
INSPECTION DATE
'
NO. OF INSPECTORS ,
.
j 85-01 Preoperational test program None None
- 1/15-1/18/85 and procedure review
85-02 Review of Johnson Controls None None 1/28-2/1/85 and Reactor Controls welder 1 qualification and welding operations.
i 85-03 Instrumentation, electrical, 2 UNR Violation: ,
2/11-2/15/85 HVAC, and preventive main- Inadequate 1 3 tenance HVAC baseplate installation.
Violation:
.
Inadequate
] PM for
inplant elec-
.
trical item FSAR verification, electrical None None
, 2/4-3/18/85 equipment wiring, ACRS
'
2 hearing participation
- 85-05 Management meeting to None None 2/6/85 discuss CAT enforcement
- corrective actions, i
- 85-06 QA/QC for system turnover 4 UNR None i 3/4-3/8/85 control, pipe supports, CR0
! 3 piping
!
j 85-07 Cancelled I 85-08 Electrical equipment install- None None i
3/18-3/22/85 ation, electrical QC records, j 3 instrumentation components i
i 85-09 Management meeting to discuss None None
- 2/27 & 3/16/85 conduct of Engineering Assur-
!
ance audit and as-built veri-fication of RCIC system
,
! l i
i l
i a
- - -. _ _ _ _ . _ . . - . - . - . -- -. . . . - - - - _ _ . - . - . . _ - - - ... -- - .
\
'
.-
.
j 20 Enclosure 1
.
'
INSPECTION NUMBER AREAS INSPECTED FINDINGS VIOLATIONS
- INSPECTION DATE NO. OF INSPECTORS
,
85-10 Reactor coolant system hydro 2 UNR Violation:
3/19-4/26/85 test, spent fuel racks, nitro- Improper 5 gen inerting system, allega- concrete l tions, QPMP expansion bolt instal-lation, i 85-11 Reactor coolant system hydro 1 UNR None
- 4/2-4/4/85 & test 4/9-4/12/85
1 85-12 Cable pull tension calcula- None None
] 5/6-5/10/85 tions and open items t
! I
'
85-13 EA audit, QPMP, diesel ex- 4 UNR None >
) 4/29-6/7/85 haust system, CR0 hydrotest, 2 IFI ,
1 3 instrument tubing and supports, '
i MSIV testing, pipe supports,
, allegations, SU-QA records,
- battery preoperational test s l procedure, CRD installation 85-14 Review of EA audit plan numerous None 4/22-4/23/85 comments
85-15 Operator licensing exams None None 6/11-6/19/85 ,
2 l
- '
t
'
85-16 Preservice inspection None None 5/28-5/31/85 activities
85-17 Open Items review None None i 6/10-6/14/85 j 1 i
! 85-18 Review of EA program plan 28 None j 5/21-5/24/85 implementation items
! 6
\
j 85-19 RPV internals, flood control 2 UNR None j 1 6/10-7/19/85 berm, QA activities, 3 IFI !
2 QPMP, preliminary testing I
- !
'
!
,.,-~--.n__nn-n- . - - .
.-
.. 21 Enclosure 1 INSPECTION NUMBER AREAS INSPECTED FINDINGS VIOLATIONS INSPECTION DATE NO. OF INSPECTORS
'
85-20 Preoperational radiological 1 UNR None 6/24-6/28/85 controls, preop testing rad- 8 IFI 3 waste systems, HVAC material control 85-21 Management meeting to discuss None None 6/17/85 licensee reinspection of 3 large bore pipe supports 85-22 Cancelled 85-23 Preservice inspection program 1 IFI None 7/16-7/19/85 and examination data
85-24 HVAC duct supports and open None None 7/22-7/26/85 item review 1 -
85-25 Piping and supports, hydro- 2 UNR None 7/22-8/30/85 static testing, diesel gen- 2 IFI 2 erator testing, RPV internals QPMP 85-26 Management meeting to discuss None None 7/23/85 licensee hardware verifica-tion, FSAR verification, and electrical separation 85-27 QPMP, local leak rate testing 1 UNR None 9/9-10/18/85 ing, pipe welds, HPCS walk-down, 2 IFI 5 PM program, preoperational procedures, QA Audit Review of EA audit results 23 OI's None 8/12-8/16/85 and corrective actions 85-29 ASME C1.1 weld impact test 1 UNR None 9/30-10/4/85 data, bioshield wall weld-1 ments, pre- and postweld heat treatment, welder quali-fication, QC records
.-
.
- 22 Enclosure 1 INSPECTION NUMBER AREAS INSPECTED FINDINGS VIOLATIONS INSPECTION DATE NO. OF INSPECTORS 85-30 Preoperational test program 1 UNR None 9/9-9/13/85 implementation, QA/QC inter-1 face with test program 85-31 Review of licensee large 1 UNR None 10/7-10/11/85 bore pipe support verification, 2 as-built pipe stress reconciliation program 85-32 Rad Controls program, fuel 9 IFI None 10/14-10/18/85 receipt planning, preopera-1 tional testing of radwaste systems, HVAC, shield survey program
! 85-33 Review of RPV hydrotest None None 10/21-10/25/85 results and open item review 1 -
85-34 Fire protection review, safe 7 UNR None 10/21-10/25/85 shutdown capability, emergency
,
lighting system
- 85-35 Electrical equipment install- None None 10/28-11/1/85 ation
85-36 Allegation, QPMP, preopera- None Violation:
10/21-11/26/85 tional testing, preliminary Undersized 3 testing, electrical equipment, bolting walkdown hardware in
- preoperational preparedness, i RCIC mote shutdown panel 85-37 Training program review for 1 IFI None 10/28-11/1/85 licensed operators and tech-5 nical training for mechanics, electricians, and I&C technicians.
l
- - - - - . . . - - - - , _ - . _ . . . .__. , , , . - . , _ _ . . , . - _ _ _ _ _ _ - . . _ - - - - . _ _ _ - , - - _ _ - _ _ - - -
._ _ _ -.
.-
,, 23 Enclosure 1
..
INSPECTION NUMBER AREAS INSPECTED FINDINGS VIOLATIONS INSPECTION DATE NO. OF INSPECTORS 85-38 Security plan implementation None None 10/28-11/1/85 for fuel receipt, preopera-1 tional security program 85-39 Cancelled 85-40 Nuclear material control None None
11/25-11/27/85 and accounting, shipping i 1 receiving, materials control
'
system 85-42 Neutron monitoring system 1 UNR Violation:
11/12-11/15/85 installation Coaxial cable 1 installed w/o procedur Violation:
Minimum cable bend radius
,
violated.
,
85-43 NDE van inspection of ASME None None 12/9-12/19/85 piping weldments
l 85-44 Allegation followup, fuel 1 IFI None 12/2/85-1/10/86 receipt, preoperational 4 testing, information notice Fire protection program 1 UNR None 12/9-12/10/85 for fuel receipt
85-46 Preservice inspection 1 UNR None 12/9-12/12/85 activities
85-47 Radiological controls 3 IFI None 12/16-12/20/85 program, fuel receipt, pre-1 operational testing 86-01 IEB's, allegations, refuel- 2 UNR Violation:
1/13-2/21/86 ing floor contamination, pre- Inadequate 5 operational testing, pre- preopera-operational service inspection tional test i CRD removal rework control, procedure acceptance criteri . - - - - . - , , . _ , - . - . . _ - - - _ . . - - _ _ _ . - - . _ , - . - - _ , - . - , . .
e=
j, 24 Enclosure 1 INSPECTION NUMBER AREAS INSPECTED FINDINGS VIOLATIONS IASPECTION DATE N0. OF INSPECTORS 86-02 Tech Spec review 4 IFI None 1/6-1/17/86
86-03 Preop test procedures & 1 UNR None 1/21-1/24/86 test conduct
86-04 Impl= mentation of Q1P None None 1 1/27-1/31/86
86-05 Preop test, interim surveillance None None 3/3-3/7/86 preliminary test procedure review
86-06 Management meeting: None None 1/22/86 Construction completion, preoperational test status '
and operational readines Inspection of Engineering None None 1/3 and 1/7/86 Assurance audit results and corrective actions 86-08 Instrumentation components 1 UNR Violation:
3/3-3/7/86 and cables Unaccept-able Cable separatio Violation:
Use of uncontrolled drawin Violation:
Damage to instrument tubin Violation:
EQ cable connector integrity lackin .
. _ - _ _
e=
25 Enclosure 1
..
INSPECTION NUMBER AREAS INSPECTED FINDINGS VIOLATIONS INSPECTION DATE NO. OF INSPECTORS 86-09 Structural integrity test, 45 IFI Violation:
2/22-4/18/86 raceway installation, pre- 1 UNR Improper 4 operational test procedure, design preoperational test witness control for and TMI action plan item class IE cable routin Readiness implementation of 2 UNR None 3/31-4/4/86 operational QA program, 3 Audits, QA/QC surveillances, M&TE, nonlicensed training, safety review committe Radiological controls, 1 IFI None 3/24-3/28/86 training, exposure control, 2 ALARA, control of contaminated material.
l l 86-14 Preoperational test program None None 3/31-4/4/86 procedure review and test I witnessin Preoperational testing, None None 4/7-4/11 and operational readiness, 4/21-4/25/86 administrative procedures, 3 operations procedures, design changes, and modification Integrated Leak Rate Test 1 UNR None 4/7-4/15/86 (ILRT) and Structural 1 Integrity Test (SIT).
86-17 Radiochemistry, liquid and 3 IFI None 4/28-5/1/86 gaseous radwaste, effluent 2 radiation monitors, procedures, training and qualificatio TMI action plan items, 4 IFI None i 4/19-5/31/86 generic letters, preopera-8 tional test procedures, pre-operational test witness, and preoperational test result .
__ _ _ _ _ . _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ . _ -
.
+
,. 26 Enclosure 1
..
INSPECTION NUMBER AREAS INSPECTED FINDINGS VIOLATIONS INSPECTION DATE
.
NO. OF INSPECTORS a
86-19 Radiological controls inspec- None None 5/19-23/86 tion covering the Preop Test 2 program and licensee action on previous finding Preoperational test proce- 1 UNR None 5/5-5/9/86 dures, test witnessing, test 2 results review, power ascension test program and QA/
QC interface Fire protection / prevention None None 5/12-5/15/86 program readiness, admini-2 strative controls, training, QA audit Procurement, receipt, storage 1 UNR None 4/30-5/9/86 & handling document, records 2 management programs, and
, licensee actions on previous inspection finding Emergency preparedness 13 IFI None 5/19-22/86 implementation appraisal, 5 including organization, admini-
' stration procedures, training, facilities, and equipmen t'
86-24 a Status of security program None None 5/12-16/86w testing and maintenance, 2 physical barriers, security system power supply, lighting,
'
licensee action on NRC in circulars, bulletins and inspection follow-up TMI action plan items, main- None None 5/20-23/86 tenance organization, main-2 tenance staffing, proper QA/
QC interfaces, and emergency operating procedure '
-
.
2
> 86-27 Preoperational test program, 1 UNR None 3 >
5/19-5/23/86 test witnessing, test I results evaluation.
,
y- - - e, - - - , , - . _ _
-.
-r
!
27 Enclosure 1 INSPECTION NUMBER AREAS INSPECTED FINDINGS VIOLATIONS INSPECTION DATE NO. OF INSPECTORS 86-28 Inspection of licensee None None 5/27-6/13/86 action or construction 2 deficiencies, IE Bulletins and Outstanding Items
'
86-29 TMI action plan items, IE 5 IFI None 6/1-7/6/86 Bulletins u irculars, NRR 5 open items, QIP follow-up, preop test procedure review, test witnessing, and test result revie Preop testing None None 6/2-6/6/86
86-31 Preop test program, preli None None 6/16-6/27/86 test witnessing,-test review, 2 QA/QC interface with preop test progra Preservice inspection None None 6/23-25/86 program, review of 1 installation procedure,
, and QC inspection of l bolted piping joints 86-33 Preop testing None None 6/30-7/11/86
,
'
86-34 Operator licensing None None 7/21-9/21/86 l 4 l
, 86-35 Radiochemistry, liquid 1 IFI None 7/7-11/86 radwaste, and gaseous
! radwaste l 86-36 Operational readiness of 1 UNR None 7/7-11/86 of instrumentation and I control maintenance program 86-37 Previous findings, instru- None None 7/14-8/15/86 mentation, electrical, 4 equipment qualification I
!
l
_ _ _ _ .
r Enclosure 1
.,
INSPECTION NUMBER AREAS INSPECTED FINDINGS VIOLATIONS INSPECTION DATE NO. OF INSPECTORS 86-38 Preop testing results & 2 IFI None 7/14-24/86 startup program
86-39 Resident Inspector None None 7/7-8/31/86
86-40 Physical security & None None 7/28-8/2/86 safeguards
86-41 Startup program; surveillance None None 7/29-8/1/86 testing, ILRT
l 86-42 Resident Inspector None None t 9/1-9/30/86
86-43 IE Bulletins & previous None None 7/28-8/1/86 findings
86-44 EP appraisal followup None None 8/4-6/86
86-45 Environmental monitoring None None 7/21-25/86 program
86-47 Tech. Spec. surveillance 8/4-8/8/86 program
i i
I
,
. ._- -- .
-
o'
..
ENCLOSURE 2 QUALITY ASSURANCE /0UALITY CONTROL SUMMARY Much of the information presented within this enclosure was compiled by the applicant's Quality Assurance (QA) organization. The data were extracted from NMPC QA report " Quality of Construction Report" dated March 10, 198 The information has not been verified for accuracy by Region A multi-tier quality program has been implemented during the construction phase at Nine Mile Unit 2. First line Quality Control (QC) inspection responsibilities have been performed by Stone and Webster Engineering Corporation (SWEC), ITT-Grinnell Inc. (ITT), Johnson Controls, Inc. (JCI)
and Reactor Controls, Inc. (RCI). Each of those contractors also had an affiliated QA organization that performed audit, surveillance, and other QA functions. SWEC site QA has performed surveillance of the sub-contractor effort SWEC QA audits have been performed by the Boston QA Auditing Department. The applicant has maintained a site QA organization that has performed both surveillances and audits of all contractor NMPC Audits and Surveillances NMPC has conducted over 180 audits and 8,800 surveillances of SWEC, GE, and the other site sub-contractors. A summary of the NMPC audits and surveillances is shown in the following tabulation:
AUDITS TOTAL YEAR OFF-SITE ON-SITE SURVEILLANCES FINDINGS 1972 1 0 0 20 1973 4 0 0 39 1974 10 0 0 20 1975 10 1 74 25 1976 6 3 302 58 1977 9 4 800 73 1978 7 4 673 65 1979 5 2 569 34 1980 9 5 359 40 1981 7 4 742 30 1982 7 9 822 54 1983 10 4 1959 94 1984 7 9 1570 263 1985 9 37 981 124 Totals 101 82 8851 939 As a result of the findings identified during the conduct of audits and surveillances, NMPC QA has exercised the authority to issue Stop Work Orders on nine occasions to cease work activities to prevent degradation of the conduct of safety-related activitie __ .
. _ _ _ _ .
.e
- 2 Enclosure 2
'
SWEC Audits l l
SWEC has conducted audits of component suppliers, engineering activities, )
QA programs, construction activities and subcontractor activitie SWEC Quality Assurance Auditing Division (QAAD) has performed site, subcontractor, ASME and supplemental audits as summarized by the following:
No. of Audits Total Year Program Site Contractor ASME Supplement Findings
1975 1 1 53 1976 1 4 112 1977 1 4 3 112 1978 1 4 2 1 111 1979 1 4 4 1 120 1980 1 4 3 49 1981 1 4 2 66 1982 1 4 9 112 1983 1 4 10 4 77 1984 1 4 11 6 94 1985 1 4 9 -
4 77 Totals 11 41 53 6 10 983 Ten Stop Work Orders have been issued as a result of the deficiencies identified by the QAAD audit SWEC Procurement Quality Assurance Division (PQAD) has performed supplier audits as summarized below:
SUPPLIER TOTAL YEAR AUDITS FINDINGS 1974 1 3 1975 0 0 1976 3 19 1977 12 106 1978 48 289 1979 40 241 ,
1980 28 195 g 1981 31 229 ,
g 1982 66 392 -
,
1983 44 280 1984 36 190 1985 28 101 Total 337 2045 -
_ _ _ _ _ _ _ - _ - _ _ _ - - - _ _ _
- - - ..
s f 3 Enclosure 2 SWEC Engineering Assurance (EA) has performed audits and surveillances to ensure
!
that the design control process has been adequately implemented. The EA activities are summarized below:
NUMBER NUMBER
, YEAR OF AUDITS OF SURVEILLANCES 1972 3 1973 10 1974 8
! 1975 8 1976 8 1977 8 1978 10 1979 10 1980 3 1981 1 2 1982 8 1 1983 8 11 1984 7 19 1985 6 8 Total 98 41 ITT Audits ITT was the major piping subcontractor responsible for fabrication and installation of large bore and small bore piping and supports. ITT performed audits of site and vendor activities as summarized:
SITE VENDOR AUDIT YEAR AUDITS AUDITS FINDINGS 1977 1 0 1978 1 2 1979 4 18 1980 2 0 1981 2 1 1982 4 2 11 1983 4 2 13 1984 4 2 29
'
1985 4 4 8 Total 26 10 82
_----_ _ _ __ _ -. . - _ _ . _ - , _ _ _ _ _ _ _ - , _ -
i
,p 4 Enclosure 2
.
ITT issued eight Stop Work Orders as a result of deficiencies identified regarding the piping activitie JCI Audits JCI was the subcontractor responsible for the installation of instrument tubing, supports and instruments. JCI performed the following audits:
SITE COR AUDIT YEAR AUDITS AUDITS FINDINGS 1983 1 2 36 1984 1 6 46 1985 1 3 14 TOTAL 3 11 96 JCI issued six Stop Work Orders to halt specific activities until necessary corrective actions were implemente RCI Audits RCI was the subcontractor responsible for the design and installation of the CRD system and installation of reactor internals and recirculating water system piping. RCI performed the following audits:
SITE ENG AUDIT YEAR AUDITS AUDITS FINDINGS 1981 0 1 2 1982 2 1 12 1983 3 1 3 1984 4 1 9 1985 2 1 6 TOTAL 11 5 32 Seven Stop Work Orders have been issued by RC QC Inspections QC inspections have been performed by SWEC, ITT, JCI and RC The inspections were performed to inspection plans or checklists to verify conformance of hardware or acceptability of software. The SWEC inspections are summarized below:
-- __
_- _ _- - __ -_ . _ _ .
se 3 Enclosure 2 RACEWAY ASME PROCUREMENT YEAR STRUCT REC ELEC MECH PGCC HANGERS S/B INSTR QA 1975 321 0 0 0 1976 3391 912 87 120 151 1977 2937 2739 860 862 754 1978 5728 2535 985 1191 1379 1979 8213 2770 1840 -1618 1589 1980 2500 1052 194 786 965 1981 6188 1864 2324 903 1102 1982 11041 2801 5984 1471 1691 1983 10581 4067 3883 2602 2635 7584 180 2000 1984 5694 4462 7123 4495 3792 9904 3038 1906 1985 3293 4017 14577 3636 4180 8760 5097 315 1005 TOTAL 59887 27219 37857 17684 10607 26248 8315 315 12542 Total Procurement QA Inspection Reports thru 1985 = 12,542 Total Field QC Inspection Reports thru 1985 = 188,167 The subcontractor QC organizations have generated the following Inspection Reports (irs) through 1985: -
ITT - 74,106 irs JCI - 17,938 irs RCI -
2,985 irs NONDESTRUCTIVE EXAMINATIONS (NDE)
Nondestructive examinations have been performed to verify through surface and volumetric examination that components and welds are in compliance with design requirements. SWEC has generated the following NDE reports:
RADIO- ULTRA- MAG LIQUID BUBBLE WELDER YEAR GRAPHY SONIC PARTICLE PENETRANT TEST QUAL , 1981 x 161 72
! 1982 2925 317 52 231 1983 15 39 1137 860 22 734
1984 44 1161 3698 126 1529 1985 132 72 1372 4876 196 524 TOTAL 344 289 6756 9823 396 3309
- 6301 inches x 1676 inches
_ _ . __ _ __
_ . _ _ .. _
F o
c> 6 Enclosure 2 Initial Acceptance Rate, Volumetric Examination 83%
Initial Acceptance Rate, Surface Examination 97.5%
ITT has generated the following inspection reports:
YEAR LIQUID PENETRANT / MAG. PARTICLE RADIOGRAPHY 1982 1729(1) 774 1983 2867 633 1984 7590 1163 1985 11819 1832 TOTAL 24005 4402 Initial Acceptance Rate, Volumetric Examination 72%
Initial Acceptance Rate, Surface Examination 95%
NOTE 1: LP/MT exam totals for 1982 for first nine months onl NOTE 2: SWEC QA/NDT, Boston conducted a complete review of 4,189 ITT Grinnell radiograph packages prior to 11/25/84. A total of 775 weld radiograph packages required some form of corrective action, which has been accomplishe ,